HomeMy WebLinkAboutCHANGE ORDER - RFP - 8031 CM GC SERVICES FOR OLD TOWN SQUARE RENOVATIONS (2)CHANGE ORDER NO. 02 PROJECT TITLE: DDA - Old Town Square Renovation CONTRACTOR: Mortenson Construction, Inc. PROJECT NUMBER: 8031 PURCHASE ORDER NO.: 9151772 DESCRIPTION: Concrete Paving at the Walnut Street - Linden Street Intersection 1. Reason for change: deteriorated, cracked and failing. The work was previously planned by the City of Fort Collins Streets This change order adds concrete paving replacement in the Walnut Intersection as it was severly Department and is being funded through their pavement replacement budget. { i i 2. Description of Change: This change order includes replacement of approximately 1,000 SF of +8" concrete pavement, dowels, joint sealing, finishing, placement, complete in place. 3. Change in Contract Cost: $ 14,510.00 4. Change in Contract Time: 0 calendar days for substantial completion 0 calendar days for final completion ORIGINAL CONTRACT COST $2,868,187.00 TOTAL APPROVED CHANGE ORDERS $ 43,709.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $ 14,510.00 TOTAL % OF ORIGINAL CONTRACT, THIS C.O. 0.51% TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S 2.03% ADJUSTED CONTRACT COST $2,926,406.00 (Assuming all change orders approved) ACCEPTED BY: F — — — L— DATE: Contractor's Representative _ REVIEWED BY: ,jr'nw DATE: t�7-�9- /S Construction Manager / APPROVED BY: DATE: DDA Project Manager -4tw APPROVED BY: DATE: (0 A DDA Executive Director APPROVED BY: DATE: Purchasing Agent over $60,000 cc: City Clerk Architect Contractor Engineer Project File Purchasing MORTENSON CONSTRUCTION 6560 NORTHFIELD BLVD, #1920 �'� DENVER,CO80238 Mortenson PHONE: 303.503.4767 comm��cxbn CONCRETE PAVING IN WALNUT PCO #03 May 5, 2015 Item Code Description OTY UnitLabor Unit Cost Material Sub Equip Labor Total Cost Material Sub EQUIP Total Co OLD TOWN SQUARE RENOVATION 1 CONCRETE DEMO 1.00 REMOVE CONCRETE PAVING 8" IN WALNUT 622 SF $ 2.26 $0.60 $ 1.02 $1,403 $0 $373 $633 $2,409 2.00 REMOVE CONCRETE PAVING IN LINDEN 450 SF $ 2.34 $0.60 $ 0.94 $1,052 $0 $270 $422 $1,744 3.00 REMOVE CONCRETE V-PAN 23 LF $ 3.81 $0.75 $ 4.80 $88 $0 $17 $110 $215 4.00 REMOVE RADIUS CURB 13 LF $ 6.74 $0.75 $ 8.50 $88 $0 $10 $110 $208 5.00 REMOVE 6" CURB W 36" PAN (8" PAVING) 180 SF $ 2.44 ( i $0.60 $ 0.61 $438 1 $0 j $108 $110 $657 CONCRETE PLACEMENT 1.00 INSTALL CONCRETE PAVING 8" IN WALNUT W/DOWEL BARS 622 SF $ 2.77 $ 2.85 $1,725 $1,774 $0 I $0 $3.500 2.00 REMOVE CONCRETE PAVING IN LINDEN 450 SF $ 3.04 $ 2.85 $1,370 $1,283 $0 $0 $2,653 3.00 INSTALL CONCRETE V-PAN 23 LF $ 7.62 $ 10.35 $175 $238 $0 $0 $413 4.00 INSTALL RADIUS CURB 13 LF $ 6.74 $ 5.63 $88 $73 $0 $0 I $161 5.00 INSTALL 6" CURB W/36" PAN 180 SF $ 3.04 $ 4.28 $547 $770 $0 $0 $1.317 I SUBTOTAL $13,277 PAYMENT & PERFORMANCE BOND 0.57% % $76 LIABILITY & BUILDERS RISK INS. 0.62% % $82 FEE 8% % $1.075 TOTAL CONCRETE PAVING IN WALNUT PCO #03 $14,510 LABOR RATE (COMMON, DEMO) 1.00 HR $ 21.92 LABOR RATE SKILLED (CARPENTER, INSTALLER) 1.00 HR $ 34.22 OPERATOR 1.00 HR $ 45.44 EQUIPMENT ONLY (SKID) 1.00 HR $ 65.00 GALLEGOS CONCRETE RECYCLING ($250I20 TONS) i 517/2015 11:10 AM Page 1 of 1