HomeMy WebLinkAboutCHANGE ORDER - RFP - 8031 CM GC SERVICES FOR OLD TOWN SQUARE RENOVATIONS (2)CHANGE ORDER NO. 02
PROJECT TITLE: DDA - Old Town Square Renovation
CONTRACTOR: Mortenson Construction, Inc.
PROJECT NUMBER: 8031
PURCHASE ORDER NO.: 9151772
DESCRIPTION: Concrete Paving at the Walnut Street - Linden Street Intersection
1. Reason for change:
deteriorated, cracked and failing. The work was previously planned by the City of Fort Collins Streets
This change order adds concrete paving replacement in the Walnut Intersection as it was severly
Department and is being funded through their pavement replacement budget. {
i
i
2. Description of Change:
This change order includes replacement of approximately 1,000 SF of +8" concrete pavement, dowels, joint
sealing, finishing, placement, complete in place.
3. Change in Contract Cost: $ 14,510.00
4. Change in Contract Time: 0 calendar days for substantial completion
0 calendar days for final completion
ORIGINAL CONTRACT COST $2,868,187.00
TOTAL APPROVED CHANGE ORDERS $ 43,709.00
TOTAL PENDING CHANGE ORDERS $0.00
TOTAL THIS CHANGE ORDER $ 14,510.00
TOTAL % OF ORIGINAL CONTRACT, THIS C.O. 0.51%
TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S 2.03%
ADJUSTED CONTRACT COST $2,926,406.00
(Assuming all change orders approved)
ACCEPTED BY: F — — — L— DATE:
Contractor's Representative _
REVIEWED BY: ,jr'nw DATE: t�7-�9- /S
Construction Manager /
APPROVED BY: DATE:
DDA Project Manager -4tw
APPROVED BY: DATE: (0 A
DDA Executive Director
APPROVED BY: DATE:
Purchasing Agent over $60,000
cc: City Clerk Architect
Contractor Engineer
Project File Purchasing
MORTENSON CONSTRUCTION
6560 NORTHFIELD BLVD, #1920 �'�
DENVER,CO80238 Mortenson
PHONE: 303.503.4767 comm��cxbn
CONCRETE PAVING IN WALNUT PCO #03
May 5, 2015
Item Code
Description
OTY
UnitLabor
Unit Cost
Material Sub
Equip
Labor
Total Cost
Material
Sub
EQUIP
Total Co
OLD TOWN SQUARE RENOVATION
1
CONCRETE DEMO
1.00
REMOVE CONCRETE PAVING 8" IN WALNUT
622
SF
$ 2.26
$0.60
$ 1.02
$1,403
$0
$373
$633
$2,409
2.00
REMOVE CONCRETE PAVING IN LINDEN
450
SF
$ 2.34
$0.60
$ 0.94
$1,052
$0
$270
$422
$1,744
3.00
REMOVE CONCRETE V-PAN
23
LF
$ 3.81
$0.75
$ 4.80
$88
$0
$17
$110
$215
4.00
REMOVE RADIUS CURB
13
LF
$ 6.74
$0.75
$ 8.50
$88
$0
$10
$110
$208
5.00
REMOVE 6" CURB W 36" PAN (8" PAVING)
180
SF
$ 2.44
(
i
$0.60
$ 0.61
$438
1
$0 j
$108
$110
$657
CONCRETE PLACEMENT
1.00
INSTALL CONCRETE PAVING 8" IN WALNUT W/DOWEL BARS
622
SF
$ 2.77
$ 2.85
$1,725
$1,774
$0
I $0
$3.500
2.00
REMOVE CONCRETE PAVING IN LINDEN
450
SF
$ 3.04
$ 2.85
$1,370
$1,283
$0
$0
$2,653
3.00
INSTALL CONCRETE V-PAN
23
LF
$ 7.62
$ 10.35
$175
$238
$0
$0
$413
4.00
INSTALL RADIUS CURB
13
LF
$ 6.74
$ 5.63
$88
$73
$0
$0
I
$161
5.00
INSTALL 6" CURB W/36" PAN
180
SF
$ 3.04
$ 4.28
$547
$770
$0
$0
$1.317
I
SUBTOTAL
$13,277
PAYMENT & PERFORMANCE BOND
0.57%
%
$76
LIABILITY & BUILDERS RISK INS.
0.62%
%
$82
FEE
8%
%
$1.075
TOTAL CONCRETE PAVING IN WALNUT PCO #03
$14,510
LABOR RATE (COMMON, DEMO)
1.00
HR
$ 21.92
LABOR RATE SKILLED (CARPENTER, INSTALLER)
1.00
HR
$ 34.22
OPERATOR
1.00
HR
$ 45.44
EQUIPMENT ONLY (SKID)
1.00
HR
$ 65.00
GALLEGOS CONCRETE RECYCLING ($250I20 TONS)
i
517/2015 11:10 AM Page 1 of 1