Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 7675 SOUTH TRANSIT CENTER - BIKE SHELTER ADDITION (3)Tl C,��/ 7 �" Fort Collins Planning, Development & Transportation Engineering 281 North College Avenue P.O. Box 580 Fart Collins. CO 80522.0580 970.221.6605 970.2,21.6378 • tax kgov com/Ongineerrng CHANGE ORDER FORM PROJECT TITLE: MAX BRT Project PROJECT NUMBER: 400903220.563040.90 CONTRACTOR: Heath Construction (PON9145871) CHANGE ORDER NUMBER: 3 In preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 182. See attached for reason and description of change. 3. The contract cost will Increase by $632.00. 4. There is no change In contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER ADJUSTED CONTRACT COST all change orders ACCEPTED BY: DATE: $224,760.00 $1,835.36 $7,845.00 $632.00 $235,072.36 (Contractor's Representative) J SUBMITTED BY: _ 4�- DATE:'(2-�3 (Project Manager) APPROVED BY: DATE: (Director of Infrastructure Services) APPROVED BY: (Purchasing Agent) cc: City Clerk Contractor Purchasing Project File DATE: Heath Construction, LLC CHANGE ORDER REQUEST 141 Racquette Drive N0.00005 P.O. Drawer H Phone: 970-221-4195 Fort Collins, CO 80524 Fax: 970-221-4258 TITLE: COR # 06 Cabinet Lock Upgrade DATE: 05/28/2015 PROJECT: South Transit Center Bike Shelter Ad JOB: 14BO597 TO: Attn: Chad Mapp City of Fort Collins 300 LaPorte Ave Fort Collins, CO 80522 Phone: Fax: RE: To: CONTRACT NO: 1 From: Number: DESCRIPTION OF PROPOSAL Replace (2) MSI Tec Cabinet Key Systems per the City's 1T Department's Request. Item Description Stock## 00001 MSI Tech Cylinder 00002 Overhead & Profit Sub (540) 00003 Project Management 00004 Field Coordination 00005 Project Coordination 00006 Overhead & Profit Heath (150'.) 00007 Insurance (Iola) APPROVAL: By: Chad Mapp Date: Quantity Units 1.000 LS 1.000 LS 0.000 Hrs 2.000 Hrs 0.000 Hrs 1.000 LS 1.000 LS Unit Price Tax Rate Tax Amount Net Amount $371.40 0.Wa $0.00 $371.40 S18.57 0.Wo $0.00 $18.57 $65.17 0.00% S0.00 $0.00 $65.17 0.00% $0.00 $130.34 $44.93 0.00% $0.00 $0.00 S53.25 0.00?a S0.00 $53.25 $58.44 0.00% Unit Cost: Unit Tax: Unit Total: By: $0.00 $58.44 Dan Dit Date: /, l $632.00 $0.00 $632.00 Pn=, en t Kbi I ar t DATA SERVICESINC, DATA V VOICE CABLING - PHONE SYSTEMS PROPOSAL TO: HEATH CONSTRUCTION STREET: 141 RAQUETTE DRIVE CITY: FORT COLLINS,CO. 80524 1310 Webster Ave. Ft. Collins, Co.80524 Tel: 970-482-6064 Fax: 970-484-3252 CONTACT: JOEL HARDY PHONE: 970-221-4195 JOB NAME: STC SECURE BIKE STORAGE PROPOSAL M 1409004 ( MSI TEC Cabinet ) 05/28/15 PROVIDE MATERIALS AND LABOR TO INSTALL, TEST AND DOCUMENT A CERTIFIED CAT5E I CAT6 STRUCTURED CABLING SYSTEM PER DESCRIPTION LISTED BELOW: MSI CABINET KEY SYSTEM CHANGE PER CFC MIS REQUEST ON 5-20-15. HORIZONTAL CABLING AND WORK AREAS: *REPLACE (2) TWO MSI TEC CABINET KEY SYSTEMS GENERAL: *H&H TECHNICIANS ARE INDUSTRY AND MANUFACTURER CERTIFIED. *H&H DATA SERVICE'S RCDD AND A PROJECT MANAGER WILL OVERSEE THE INSTALLATION. *INSTALLATION WILL BE PER ANSI/EIA/TIA STANDARDS AND LOCAL CODES AND ORDINANCES. *INSTALLATION OF ALL WORK TO BE COMPLETED DURING STANDARD BUSINESS HOURS. *INCLUDES MANUFACTURER'S WARRANTY ON MATERIALS AND ONE-YEAR WARRANTY ON WORKMANSHIP. *EXCLUDES TAX. *EXCLUDES CONDUIT, J- BOXES IN WALLS AND ABOVE CEILINGS AND SLEEVES BETWEEN FLOORS AND THROUGH WALLS. CITY UN MFG PART# 2 EA MSI TEC SZ 2571.000 0 EA Proposal Accepted By: Printed Name: Date: LOCK CYLINDER INSERT DESCRIPTION H&H Data Contract policies. Proposal number shall be on all Job related documents, including emails. Purchase Orders must be received prior to material purchase and scheduling of project. 100% of materials will be Invoiced upon contract signing. Work Releases for service work must be received prior to scheduling. All service work requests require signature approval prior to scheduling. Note: Proposals are valid for 30 days. Payment Terms: NET30 There will be a 5% finance charge if payment is not received within NET 30 Freight Terms: PPDICHARGE EXTENSION $78.40 $0.00 MATERIAL $78.40 LABOR $293.00 TAX (0%) $0.00 TOTAL $371.40