HomeMy WebLinkAbout109445 CONNELL RESOURCES INC - CONTRACT - AGREEMENT MISC - POUDRE RIVER TRAIL EXTENSION AT RIGDEN POND AND ARCONTRACT DOCUMENTS FOR
Poudre River Trail Extension at Rigden Pond
and Arapaho Bend Natural Area
MISCELLANEOUS
CONSTRUCTION ACTIVITIES
WORK ORDER CR-RWSR-2015-3– 2015
May 2015
Poudre River Trail Extension AGREEMENT FORMS
at Rigden Pond & Arapaho Bend Natural Area 00500-1 May 2015
SECTION 00500
AGREEMENT FORMS
00525 - Work Order, Notice of Award, and Bid Schedule 00525-1 - 00525-3
00530 - Notice to Proceed 00530-1
SECTION 00600
BONDS AND CERTIFICATES
00610 - Performance Bond 00610-1 - 00610-2
00615 - Payment Bond 00615-1 - 00615-2
00630 - Certificate of Insurance 00630-1
00635 – Certificate of Substantial Completion 00635-1
00640 - Certificate of Final Acceptance 00640-1
00650 - Lien Waiver Release (CONTRACTOR) 00650-1 - 00650-2
00651 - Lien Waiver Release (SUBCONTRACTOR) 00651-1 - 00651-2
00660 - Consent of Surety 00660-1
00670 - Application for Exemption Certificate 00670-1 - 00670-2
CONDITIONS OF THE CONTRACT
00800 - Supplementary Conditions 00800-1 - 00800-7
00900 - Addenda, Modifications and Payment 00900-1
00950 - Work Order Change Order 00950-1
00960 - Application for Payment 00960-1 - 00960-4
DRAWINGS
SPECIFICATIONS
SOILS REPORT
Poudre River Trail Extension Notice to Proceed
at Rigden Pond & Arapaho Bend Natural Area 00530-1
SECTION 00530
WORK ORDER NOTICE TO PROCEED
Description of Work: Poudre River Trail Extension at Rigden Pond & Arapaho Bend Natural Area
To: Connell Resources, Inc.
7785 Highland Meadows Parkway, #100
Fort Collins, CO 80528
This notice is to advise you:
That the contract covering the above described Work has been fully executed by the
CONTRACTOR and the OWNER.
That the required CONTRACTOR's Performance Bond and Payment Bond have been received by
the OWNER.
That the OWNER has approved the said Contract Documents.
Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and
directed to proceed within fifteen (15) calendar days from receipt of this notice as required by the
Agreement.
Dated this .
The dates for Substantial Completion and Final Acceptance shall be August 1, 2015 and August
14, 2015, respectively.
City of Fort Collins
OWNER
By:
Jason Stutzman, PE
Title Special Projects Manager
ACKNOWLEDGMENT OF NOTICE
Receipt of the above Notice to Proceed is hereby acknowledged this day of
,
2015.
CONTRACTOR
By:
Title:
Poudre River Trail Extension Certificate of Insurance
at Rigden Pond & Arapaho Bend Natural Area MAY 2015
00630-1
SECTION 00630
CERTIFICATE OF INSURANCE
CONTRACTOR shall insert his own standard form for Certificate of Insurance.
Poudre River Trail Extension Certificate of Substantial Completion
at Rigden Pond & Arapaho Bend Natural Area May 2015
00635-1
SECTION 00635
CERTIFICATE OF SUBSTANTIAL COMPLETION
TO: City of Fort Collins (OWNER) PROJECT TITLE: Poudre River Trail Extension at
Rigden Pond & Arapaho Bend Natural Area
Date of Substantial Completion:
LOCATION: Fort Collins, Colorado
Project or Specified Part Shall Include: OWNER: City of Fort Collins
CONTRACTOR: CONNELL RESOURCES
CONTRACT DATE:
Work performed under this contract has been inspected by authorized representatives of the
OWNER, CONTRACTOR, and the ENGINEER and the project (or specified part of the project,
as indicated above) is hereby declared to be substantially completed on the above date.
A tentative list of items to be completed or corrected is appended hereto. This list may not be
exhaustive, and the failure to include an item on it does not alter the responsibility of the
CONTRACTOR to complete all the Work in accordance with the Contract Documents.
By:
ENGINEER Authorized Representative Date
The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to
complete and correct the items on the tentative list within the time indicated.
By:
CONTRACTOR Authorized Representative Date
The OWNER accepts the project or specified area of the project as substantially complete and
will assume full possession of the project or specified area of the project at 12:01 a.m., on
. The responsibility for heat, utilities, security, and insurance
under the Contract Documents shall be as set forth under "Remarks" below.
CITY OF FORT COLLINS, COLORADO By:
Authorized Representative Date
REMARKS:
Your project name here Certificate of Final Acceptance
XXXX 2012 00640-1
SECTION 00640
CERTIFICATE OF FINAL ACCEPTANCE
, 2015
TO:
Gentlemen:
You are hereby notified that on the day of , 2015, the City of
Fort Collins, Colorado, has accepted the Work completed by CONNELL RESOURCES for the
City of Fort Collins project, Poudre River Trail Extension at Rigden Pond & Arapaho Bend Natural
Area.
A check is attached hereto in the amount of $ as Final Payment for all
Work done, subject to the terms of the Contract Documents which are dated May 19, 2015
.
In conformance with the Contract Documents for this project, your obligations and guarantees
will continue for the specified time from the following date: .
Sincerely,
OWNER: City of Fort Collins
By:
Title:
ATTEST:
By:
Title:
Poudre River Trail Extension Lien Waiver Release (Contractor)
at Rigden Pond & Arapaho Bend Natural Area 00650-1 MAY 2015
SECTION 00650
LIEN WAIVER RELEASE
(Contractor)
TO: City of Fort Collins, Colorado
(OWNER)
FROM:
(CONTRACTOR)
PROJECT: Poudre River Trail Extension at Rigden Pond and Arapaho Bend Natural Area.
1. The CONTRACTOR acknowledges having received payment, except retainage from the
OWNER for all work, labor, skill and material furnished, delivered and performed by the
CONTRACTOR for the OWNER or for anyone in the construction, design, improvement,
alteration, addition or repair of the above described project.
2. In consideration of such payment and other good and valuable consideration, the receipt
and adequacy of which are hereby acknowledged, the CONTRACTOR voluntarily
waives all rights, claims and liens, including but not limited to, mechanic's liens, Miller
Act claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and
material bond rights which the CONTRACTOR may now or may afterward have, claim or
assert for all and any work, labor, skill or materials furnished, delivered or performed for
the construction, design, improvement, alteration, addition or repair of the above
described project, against the OWNER or its officers, agents, employees or assigns,
against any fund of or in the possession or control of the OWNER, against the project or
against all land and the buildings on and appurtenances to the land improved by the
project.
3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or
performed to or for the construction, design, improvement, alteration, addition or repair
of the project were furnished, delivered or performed by the CONTRACTOR or its
agents, employees, and servants, or by and through the CONTRACTOR by various
Subcontractors or materialmen or their agents, employees and servants and further
affirms the same have been paid in full and have released in full any and all existing or
possible future mechanic's liens or rights or claims against the project or any funds in the
OWNER'S possession or control concerning the project or against the OWNER or its
officers, agents, employees or assigns arising out of the project.
4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if
any, and the Surety on the project against and from any claim hereinafter made by the
CONTRACTOR'S Subcontractors, materialmen, employees, servants, agents or assigns
against the project or against the OWNER or its officers, employees, agents or assigns
arising out of the project for all loss, damage and costs, including reasonable attorneys
fees, incurred as a result of such claims.
5. The parties acknowledge that the description of the project set forth above constitutes
and adequate description of the property and improvements to which this Lien Waiver
Release pertains. It is further acknowledged that this Lien Waiver Release is for the
Poudre River Trail Extension Lien Waiver Release (Contractor)
at Rigden Pond & Arapaho Bend Natural Area 00650-2 MAY 2015
benefit of and may be relied upon by the OWNER, the lender, if any, and Surety on any
labor and material bonds for the project.
Signed this day of , 2015
CONTRACTOR
By:
Title:
ATTEST:
Secretary
STATE OF COLORADO )
)ss.
COUNTY OF LARIMER )
Subscribed and sworn to before me this day of , 2015,
By
Witness my hand and official seal.
My Commission Expires:
Notary Public
Poudre River Trail Extension Lien Waiver Release (Subcontractor)
at Rigden Pond & Arapaho Bend Natural Area 00651-1 MAY 2015
SECTION 00651
LIEN WAIVER RELEASE
(Subcontractor)
TO: (CONTRACTOR)
FROM: (Subcontractor)
PROJECT: Poudre River Trail Extension at Rigden Pond and Arapaho Bend Natural Area
1. The Subcontractor acknowledges having received payment, except retainage, from the
CONTRACTOR for all work, labor, skill and material furnished, delivered and performed by
the Subcontractor for the CONTRACTOR or for anyone in the construction, design,
improvement, alteration, addition or repair of the above described project.
2. In consideration of such payment and other good and valuable consideration, the receipt
and adequacy of which are hereby acknowledged, the Subcontractor voluntarily waives all
rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40
U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights
which the Subcontractor may now or may afterward have, claim or assert for all and any
work, labor, skill or materials furnished, delivered or performed for the construction, design,
improvement, alteration, addition or repair of the above described project, against the
CONTRACTOR or its officers, agents, employees or assigns, against the project or against
all land and the buildings on and appurtenances to the land improved by the project.
3. The Subcontractor affirms that all work, labor and materials, furnished, delivered or
performed to or for the construction, design, improvement, alteration, addition or repair of
the project were furnished, delivered or performed by the Subcontractor or its' agents,
employees, and servants, or by and through the Subcontractor by various sub-
subcontractors or materialmen or their agents, employees and servants and further affirms
the same have been paid in full and have released in full any and all existing or possible
future mechanic's liens or rights or claims against the project or against the CONTRACTOR
or its officers, agents, employees or assigns arising out of the project.
4. The Subcontractor agrees to defend and hold harmless the CONTRACTOR, the lender, if
any, and the Surety on the project against and from any claim hereinafter made by the
Subcontractor's sub-subcontractors, materialmen, employees, servants agents or assigns
against the project or against the CONTRACTOR or OWNER, lender or Surety or their
officers, employees, agents or assigns arising out of the project for all loss, damage and
costs, including reasonable attorneys fees, incurred as a result of such claims.
5. The parties acknowledge that the description of the project set forth above constitutes and
adequate description of the property and improvements to which this Lien Waiver Release
pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and
may be relied upon by the CONTRACTOR, OWNER, the lender, if any, and Surety on any
labor and material bonds for the project.
Poudre River Trail Extension Lien Waiver Release (Subcontractor)
at Rigden Pond & Arapaho Bend Natural Area 00651-2 MAY 2015
Signed this day of , 2015
SUBCONTRACTOR:
By:
Title:
ATTEST:
Secretary
STATE OF COLORADO )
)ss.
COUNTY OF LARIMER )
Subscribed and sworn to before me this day of , 2015,
By
Witness my hand and official seal.
My Commission Expires:
Notary Public
Poudre River Trail Extension Consent of Surety
at Rigden Pond & Arapaho Bend Natural Area 00660-1 MAY 2015
SECTION 00660
CONSENT OF SURETY
TO: City of Fort Collins, Colorado
(hereinafter referred to as the "OWNER")
CONTRACTOR:
PROJECT: Poudre River Trail Extension at Rigden Pond and Arapaho Bend Natural Area
CONTRACT DATE:
In accordance with the provisions of the Contract between the OWNER and the CONTRACTOR
as indicated above, for
bond of (Surety)
hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final Payment to
the CONTRACTOR shall not relieve the Surety Company of any of its obligations to the
OWNER, as set forth in the said Surety Company's Bond.
IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this
day of , 2015.
(Surety Company)
By:
ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-Fact.
Poudre River Trail Extension Contractor Application for Tax Exemption Certificate
at Rigden Pond & Arapaho Bend Natural Area 00670 - 1 MAY 2015
DR 0172 (12/98)
COLORADO DEPARTMENT OF REVENUE
DENVER CO 80261
(303) 232-2416
DO NOT WRITE IN THIS SPACE
The exemption certificate for which you are applying must be used only for the purpose of purchasing construction and building
materials for the exempt project described below. This exemption does not include or apply to the purchase or rental of equipment,
supplies, and materials which are purchased, rented, or consumed by the contractor and which do not become part of the structure,
highway, road, street, or other public works owned and used by the exempt organization.
Any unauthorized use of the exemption certificate will result in revocation of your exemption certificate and other penalties provided by
law.
A separate certificate is required for each contract.
Subcontractors will not be issued Certificates of Exemption by the Department of Revenue. It is the responsibility of the prime
contractor to issue certificates to each of the subcontractors. (See reverse side).
FAILURE TO ACCURATELY COMPLETE ALL BOXES WILL CAUSE THE APPLICATION TO BE DENIED.
Registration/Account No. (to be assigned by DOR)
89 -
Period 0170-750 (999) $0.00
CONTRACTOR INFORMATION
Trade name/DBA: Owner, partner, or corporate name:
Mailing address (City, State, Zip): Contact Person
E-Mail address: Federal Employer’s Identification Number: Bid amount for your contract:
$
Fax Number:
( )
Business telephone number:
( )
Colorado withholding tax account number:
EXEMPTION INFORMATION Copies of contract or agreement pages (1) identifying the contracting parties
and (2) containing signatures of contracting parties must be attached.
Name of exempt organization (as shown on contract):
Exempt organization’s number:
98 -
Address of exempt organization (City, State, Zip):
Principal contact at exempt organization: Principal contact’s telephone number:
Physical location of project site (give actual address when applicable and Cities and/or County (ies) where project is located)
Scheduled
construction start date:
Month Day Year Estimated
completion date:
Month Day Year
I declare under penalty of perjury in the second degree that the statements made in this application are true and
complete to the best of my knowledge.
Signature of owner, partner or corporate officer: Title of corporate officer: Date:
DO NOT WRITE BELOW THIS LINE
CONTRACTOR APPLICATION
FOR
EXEMPTION CERTIFICATE
Pursuant to Statute
Section 39-26.114(1)(a)(XIX)
6
Poudre River Trail Extension Contractor Application for Tax Exemption Certificate
at Rigden Pond & Arapaho Bend Natural Area 00670 - 2 MAY 2015
Special Notice
Contractors who have completed this application in the past, please note the following changes in procedure:
The Department will no longer issue individual Certificates of exemption to subcontractors. Only prime contrac-
tors will receive a Contractor’s Exemption Certificate on exempt projects.
Upon receipt of the Certificate, the prime contractor should make a copy for each subcontractor involved in the
project and complete it by filling in the subcontractor’s name and address and signing it.
The original Certificate should always be retained by the prime contractor. Copies of all Certificates that the
prime contractor issued to subcontractors should be kept at the prime contractor’s place of business for a
minimum of three years and be available for inspection in the event of an audit.
Once an 89# has been assigned to you, please use the next five numbers following it for any applications
submitted for future projects. This should be your permanent number. For instance, if you were assigned 89-
12345-0001, every application submitted thereafter should contain 89-12345 on the application. The succeed-
ing numbers will be issued by the Department of Revenue. DO NOT enter what you believe to be the next in
sequence as this may delay processing of your application.
Poudre River Trail Extension Supplementary Conditions
at Rigden Pond & Arapaho Bend Natural Area 00800-1
SECTION 00800
SUPPLEMENTARY CONDITIONS
Conditions of the Contract
These Supplementary Conditions amend or supplement the General Conditions of the Construction
Contract (EJCDC General Conditions 1910-8, 1990 edition with City of Fort Collins modifications
(rev. 9/99)) and other provisions of the Contract Documents executed under the P951 Water,
Wastewater, and Stormwater Utility Infrastructure Improvements Master Contract dated February
16, 2010.
(Unless included in this work order,) All work performed under this work order shall be conducted in
accordance with the technical specifications, of Work Order No. CR-RWSR-2015-3
SC-1 DEFINITIONS
SC-1.38. Add the following language to the conclusion of paragraph 1.38 of the General
Conditions:
1.38. Substantial Completion – Substantial Completion is further defined as that degree
of completion of the operating facilities or systems of the Project defined in the Work Order
sufficient to provide the OWNER the full time, uninterrupted, continuous, beneficial
operation of the modifications, and all inspections required have been completed and
identified deficiencies corrected.
SC-1.43.A Add the following new paragraph immediately after paragraph 1.43 of the General
Conditions:
1.43.A. Work Order – A written document executed by OWNER and CONTRACTOR that
provides for the construction of a portion of the Work, pursuant to the Agreement and all as
required by the Contract Documents, and that becomes a Contract Document when
executed.
SC-2 PRELIMINARY MATTERS
SC-2.8. Delete paragraph 2.8 of the General Conditions entirely and replace it with the following
paragraph:
2.8 Preconstruction Conference. Within ten days after the Contract Times for a Work
Order start to run, but before any Work at the site is started, a conference attended by
CONTRACTOR, ENGINEER and others as appropriate will be held to establish a working
relationship among the parties as to the Work and to discuss the schedules referred to in
paragraph 2.6, procedures for handling Shop Drawing and other submittals, processing
Applications for Payment, and maintaining required records.
SC-2.10, Add the following new paragraph immediately after paragraph 2.9 of the General
Conditions:
2.10 Work Order Required for All Work. References to the Agreement in this Article 2
and in the General and Supplementary Conditions and Contract Documents
notwithstanding, no Work shall be initiated or performed until CONTRACTOR has received
Poudre River Trail Extension Supplementary Conditions
at Rigden Pond & Arapaho Bend Natural Area 00800-2
a signed and executed Work Order, incorporating the Notice to Proceed, from OWNER; and
no provision of the Article 2 or of the General and Supplementary Conditions and Contract
Documents shall permit or require any action of CONTRACTOR in the absence of a signed
and executed Work Order. All provisions of this Article 2 and of the General and
Supplementary Conditions and Contract Documents referencing the Agreement or other
parts of the Contract Documents, or permitting or requiring any action of CONTRACTOR,
shall be read as referencing and, as appropriate, requiring a signed and executed Work
Order.
SC-4 AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS;
REFERENCE POINTS
SC-4.2.1.2. Add the following new paragraph immediately following paragraph 4.2.1.2 of the
General Conditions:
4.2.1.2.1 No drawing of physical conditions in or relating to existing surface or
subsurface structures (except Underground Facilities referred to in Paragraph 4.3) which
are at or contiguous to the site have been utilized by the Engineer in preparation of the
Contract Documents, except the following:
1. none
Contractor may rely upon the accuracy of the technical data contained in the documents,
but not upon non-technical data, interpretations or opinions contained therein or upon the
completeness of any information in the report.
SC-5 BONDS AND INSURANCE
SC-5.4.7. Include the following parties or entities as additional Insureds, as provided in
paragraph 5.4.7 of the General Conditions:
5.4.7.1.The City of Fort Collins, Colorado, 4316 LaPorte Avenue, Fort Collins, Colorado
80522
5.4.7.2. Interwest Consulting Group, 1218 West Ash, Suite C, Windsor, CO 80550
SC-5.4.8.1. Add the following new paragraph immediately following paragraph 5.4.8 of the
General Conditions:
5.4.8.1.1. Limits of Liability. The limits of liability for the insurance required by the paragraph
numbers of the General Conditions listed below are as follows:
5.4.1 and 5.4.2
Coverage A - Statutory Limits
Coverage B - $100,000 / $100,000 / $500,000.
5.4.3 and 5.4.5 Commercial General Liability policy will have limits of $1,000,000 combined
single limits (CSL). This policy will include coverage for Explosion, Collapse, and
Underground coverage unless waived by the OWNER.
5.4.6: The Comprehensive Automobile Liability Insurance policy will have limits of $1,000,000
combined single limits (CSL).
Poudre River Trail Extension Supplementary Conditions
at Rigden Pond & Arapaho Bend Natural Area 00800-3
5.4.9. This policy will include completed operations coverage / product liability coverage with
limits of $1,000,000 combined single limits (CSL). This policy shall also include an Umbrella
Excess Liability as follows: General liability and automobile liability insurance in an amount not
less than $1,000,000 per occurrence in excess of the above stated primary limits.
SC-6 CONTRACTOR’S RESPONSIBILITIES
SC-6.14.3. Add the following new paragraph immediately following paragraph 6.14.2 of the
General Conditions:
6.14.3.1. The following Laws or Regulations are included in the Contract Documents
as mandated by statute or for the convenience of the CONTRACTOR. Other Laws
and Regulations apply which are not included herein, and are within the
CONTRACTOR’S duty and responsibility for compliance thereto:
6.14.3.2. Notice to owners of Underground Facilities is required prior to excavations in
the vicinity of such facilities.
6.14.3.2. Unless otherwise decided by reason of the amount of the Contract Price
involved, or other good reason, before or at the time that the contract is awarded to
a corporation outside the State of Colorado, such corporation must carry out the
proper procedure to become authorized to do business in the State of Colorado,
designate a place of business therein, and appoint an agent for service of process.
Such corporation must furnish the OWNER with a certificate from the Secretary of
State of Colorado, has been issued by its office and there shall also be procured
from the Colorado Secretary of State a photostatic or certified copy of the
designated place of business and appointment of agent for service of process, or a
letter from the Colorado Secretary of State that such designation of place of
business and agent for service of process have been made.
6.14.3.3 The CONTRACTOR must conform to the rules and regulations of the
Industrial Commission of Colorado. Particular reference is made to rules and
regulations governing excavation Work adopted by the Industrial Commission of
Colorado.
SC-6.35. Add the following new paragraphs immediately following paragraph 6.34 of the
General Conditions:
6.35 Federal Requirements. As applicable, and as may be required for any Work Order,
CONTRACTOR agrees to the following additional requirements.
6.35.1. CONTRACTOR agrees that he is subject to the provisions of the Williams-Steiger
Occupational Safety and Health Act of 1970 and related program requirements, as
included in Appendix A of the Supplementary Conditions.
6.35.2. CONTRACTOR agrees to utilize the rural Area business Development Plan, as
included in Appendix B of the Supplementary Conditions.
6.35.3. CONTRACTOR agrees to the Prohibition Against Listed Violated Facilities, as
included in Appendix C of the Supplementary Conditions.
Poudre River Trail Extension Supplementary Conditions
at Rigden Pond & Arapaho Bend Natural Area 00800-4
6.35.4. CONTRACTOR agrees to the provisions of the Notice of Requirement for Affirmative
Action to ensure equal employment opportunity and related attached documents, as
included in Appendix D of the Supplementary Conditions
SC-11 CHANGE OF CONTRACT PRICE
SC-11.6.2.7. Add the following new paragraph to paragraph 11.6.2 of the General Conditions.
11.6.2.7. Cost of the Work. Allowances for profit, overhead and mark-up prescribed
by Article 4 of the Agreement shall be used in lieu of any CONTRACTOR’S fee,
overhead, profit or mark-up allowances as prescribed in paragraphs 11.6.2.1,
11.6.2.2 and 11.6.2.3.
SC-12 CHANGE OF CONTRACT TIMES
SC-12.3. Add the following language to the end of paragraph 12.3 of the General Conditions.
12.3 … Lost days due to abnormal weather conditions will be allocated as required.
SC-14 PAYMENTS TO CONTRACTOR AND COMPLETION
SC- 14.1. Add the following language to the end of paragraph 14.1 of the General Conditions.
14.1. Schedule of values … Progress payments on the negotiated not-to-exceed fee
shall be based on a time and materials basis
END OF SECTION
Poudre River Trail Extension Supplementary Conditions
at Rigden Pond & Arapaho Bend Natural Area 00800-5
APPENDIX A
WILLIAMS-STEIGER OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970
A. AUTHORITY
(1) The CONTRACTOR is subject to the provisions of the Williams-Steiger Occupational Safety
and Health Act of 1970.
(2) These construction documents and the joint and several phases of construction hereby
contemplated are to be governed, at all times, by applicable provisions of the Federal law(s),
including but not limited to the latest amendment of the following:
a. Williams-Steiger Occupational Safety and Health Act of 1970, Public Law 94-596;
b. Part 1910 - Occupational Safety and Health Standards, Chapter XVII of the Title 29,
Code of the Federal Regulations.
c. Part 1926 - Safety and Health Regulations for Construction, Chapter XVII of Title 29,
Code of Federal Regulations.
B. SAFTEY AND HEALTH PROGRAM REQUIREMENTS
(1) This project, its prime contractor and its subcontractors, shall at all times be governed by
Chapter XVII of Title 29, Code of Federal Regulations, Part 1926 - Safety and Health
Regulations for Construction (29 CFR 22801), as amended to date.
(2) To implement the program and to provide safe and healthful working conditions for all
persons, general project safety meetings will be conducted at the site at least once each
month during the course of the construction, by the construction superintendent or his/her
designated safety officer. Notice of such meeting shall be issued not less than three (3) days
prior, stating the exact time, location and agenda to be included. Attendance by the OWNER,
architect, general foreman, shop steward(s) and trades, or their designated representatives,
witnessed in writing as such, shall be mandatory.
(3) To further implement the program, each trade shall conduct a short gang meeting, not less
than once a week, to review project safety requirements mandatory for all persons during the
coming week. The gang foremen shall report the agenda and specific items covered to the
project superintendent, who shall incorporate these items in his/her daily log or report.
(4) The prime contractor and all subcontractors shall immediately report all accidents, injuries or
health hazards to the owner and architect or their designated representatives, in writing. This
shall not obviate any mandatory reporting under the provisions of the Occupational Safety
and Health Act of 1970.
(5) This program shall become a part of the contract documents and the contract between the
owner and prime contractor, prime contractor and all subcontractors, as though fully written
therein.
Poudre River Trail Extension Supplementary Conditions
at Rigden Pond & Arapaho Bend Natural Area 00800-6
APPENDIX B
RURAL AREA BUSINESS ENTERPRISE DEVELOPMENT PLAN
The Contractor agrees and is required to utilize the following affirmative steps:
A. Placing Small Businesses in Rural Areas (SBRA) on solicitation lists;
B. Ensuring that SBRAs are solicited whenever they are potential sources;
C. Dividing total requirements, when economically feasible, into small tasks or quantities to
permit maximum participation by SBRAs;
D. Establishing delivery schedules, where the requirements of work will permit, which would
encourage participation by SBRAs;
E. Requiring the contractors if it awards subcontracts, to take the affirmative steps in
subparagraphs A. through E. of this condition.
Poudre River Trail Extension Supplementary Conditions
at Rigden Pond & Arapaho Bend Natural Area 00800-7
APPENDIX C
PROHIBITION AGAINST LISTED VIOLATED FACILITIES
A. REQUIREMENTS
(1) To comply with all the requirements of section 114 of the Clean Air Act, as amended (42
U.S.C. 1857, et seq., as amended by Pub. L. 92-604) and section 308 of the Clean Water Act
(33 U.S.C. 1251, as amended), respectively, which relate to inspection, monitoring, entry,
reports and information, as well as other requirements specified in section 114 and section of
the Air Act and the Water Act, respectively, and all regulations and guidelines issued
thereunder before the award of this contract.
(2) That no portion of the work required by this prime contract will be performed in a facility listed
on the Environmental Protection Agency list of violating facilities on the date when this
contract was awarded unless and until the EPA eliminates the name of such facility or
facilities from the listing.
(3) That the best efforts to comply with clean air and clean water standards at the facilities in
which the contract is being performed.
(4) To insert the substance of the provisions of this clause, including this paragraph (4), in any
nonexempt subcontract.
B. DEFINITIONS
(1) Air Act means the Clean Air Act, as amended (42 U.S.C. 1857 et seq.).
(2) Water Act means the Clean Water Act, as amended (33 U.S.C. 1251 et seq.).
(3) Clean Air Standards means any enforceable rules, regulations, guidelines, standards,
limitations, orders, controls, prohibitions or other requirements which are contained in, issued
under or otherwise adopted under the Air Act or Executive Order 11738, an applicable
implementation plan as described in section 110(d) of the Air Act (42 U.S.C. 1857c-5(d), an
approved implementation procedure or plan -under section 111(c) or section 111(d), or an
approved implementation procedure under section 112(d) of the Air Act (42 U.S.C. 1857c-
7(d).
(4) Clean Water Standards means any enforceable limitation, control, condition, prohibition,
standard or other requirement which is promulgated under the Water Act or contained in a
permit issued to a discharger by the Environmental Protection Agency or by a State under an
approved program, as authorized by section 402 of the Water Act (33 U.S.C. 1342), or by a
local government to ensure compliance with pretreatment regulations as required by section
307 of Water Act (33 U.S.C. 1317).
(5) Compliance means compliance with clean air or water standards. Compliance shall also
mean compliance with a schedule or plan ordered or approved by a court of competent
jurisdiction, the Environmental Protection Agency in accordance with the requirements of the
Air Act or Water Act and regulations.
(6) Facility means any building, plant, installation, structure, mine, vessel or other floating craft,
location or site of operations, owned leased or supervised by a contractor or subcontractor, to
be used in the performance of a contract or subcontract. Where a location or site of
operations contains or includes more than one building plant, installation or structure, the
entire location or site shall be deemed to be a facility except where the Director, Office of
Federal Activities, Environmental Protection Agency, determines that independent facilities
are located in one geographical area.
Poudre River Trail Extension Contract Change Order
at Rigden Pond & Arapaho Bend Natural Area 00950-1
SECTION 00950
CHANGE ORDER NO.
PROJECT TITLE: Poudre River Trail Extension at Rigden Pond and Arapaho Bend Natural
Area
CONTRACTOR:
PROJECT NUMBER:
DESCRIPTION:
1. Reason for change:
2. Description of Change:
3. Change in Contract Cost:
4. Change in Contract Time:
ORIGINAL CONTRACT COST $ 0.00
TOTAL APPROVED CHANGE ORDERS 0.00
TOTAL PENDING CHANGE ORDERS 0.00
TOTAL THIS CHANGE ORDER 0.00
THIS C.O. % OF ORIGINAL CONTRACT 0.0%
TOTAL C.O.’S % OF ORIGINAL CONTRACT 0.0%
ADJUSTED CONTRACT COST $ 0.00
(Assuming all change orders approved)
ACCEPTED BY: DATE:
Contractor's Representative
ACCEPTED BY: DATE:
Project Manager
REVIEWED BY: DATE:
Title:
APPROVED BY: DATE:
Title:
APPROVED BY: DATE:
Purchasing Agent over $60,000
cc: Project File
Contractor
Purchasing
PROJECT:
OWNER: City of Fort Collins Park Planning & Development CONTRACTOR: APPLICATION NUMBER:
APPLICATION DATE:
PERIOD BEGINNING:
PERIOD ENDING:
ENGINEERS:
PROJECT NUMBER:
CHANGE ORDERS: PAY APPLICATION:
NUMBER DATE AMOUNT Application is made for Payment as shown below in connection with the Contract.
The present status of the account for this Contract is as follows.
Original Contract Amount:
Net Change by Change Order: $ -
Revised Current Contract Amount: $0.00
Total Work Completed to Date:
Total Change Order Work to Date:
Total Stored to Date:
Total Completed and Stored Materials to Date: $0.00
Less Previous Payments:
Amount due this Pay Application (before retainage): $0.00
Less Retainage: $ -
Net Change by Change Order: $ - AMOUNT DUE THIS APPLICATION: $0.00
Change Order %: 0.00%
CERTIFICATION:
The undersigned CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection with
the WORK have been satisfied as required in paragraph 14.3 of the General Conditions of the Contract.
The above Amount Due this Application is requested by the CONTRACTOR's Project Manager.
Date: By:
Payment of the above Amount Due This Application has been reviewed by the OWNER'S Project Manager.
Date: By:
Jason Stutzman, Special Projects Manager
Payment of the above Amount Due This Application is approved by the OWNER.
Date: By:
Owen L. Randall, Chief Engineer
00960 - Application for Payment
Pay Request
Period Ending:
Contract Summary Cost Percent
Item # Description Quantity UOM Unit Price Total Quantity Total Quantity Total Quantity Total Remaining Complete
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
18a
19
20
21
22
23
24
25
25a
26
27
28
Combined:
Total Contract Amount
Total This Period $ -
Previous Billings
Total Completed to Date
Balance Remaining $ -
Percent Complete
Crosscheck $ - $ -
Contract Summary:
Original Contract Amount
Change Orders To Date (see attached)
Adjusted Contract Amount
Total Completed to Date
Total Materials Remaining @ Site
Total Change Order Work to Date (see attached)
Value of Work in Place
Percent Complete Including Stored Materials
Less Retention @ 10% up to 50% complete, 5% beyond 50% of Adjusted Contract
Total to Date Less Retention
Less Previous Billings
Total Due
This Period Previous Total to Date
Page 1 of 1
6/1/2015
Change Change Order Summary This Period Previous Total to Date Cost Percent
Order # Description Quantity UOM Unit Price Total Amount Quantity Amount Quantity Amount Quantity Amount Remaining Complete
1
Total Amount of Change Orders $ -
Total This Period $ -
Previous Billings $ -
Total Completed to Date $ -
Balance Remaining $ -
Percent Complete #DIV/0!
Page 1 of 1
Poudre River Trail Extension DRAWINGS
at Rigden Pond & Arapaho Bend Natural Area May 2015
DRAWINGS
SITE
HARMONY RD
MARIAH LN
ARAPAHO BEND
NATURAL AREA
BOX ELDER DITCH
CACHE LA
POUDRE RIVER
I-25
STRAUSS CABIN RD
HORSETOOTH RD
I-25
CACHE LA
POUDRE RIVER
PREPARED FOR
PROJ. NO.
DATE:
SCALE (H):
SCALE (V):
CHECKED BY:
DESIGNED BY:
PROJECT NAME
1096-012-54
ARAPAHO BEND NATURAL AREA TRAIL
COVER SHEET
05/27/15
1"=1000'
N/A
SMB
MPO
C0
NATURAL AREAS
1745 Hoffman Mill Road
Fort Collins, CO 80524
970-416-2815
Revisions
No. Date Description By
Revisions
No. Date Description By
FOR
CONSTRUCTION
vicinity map
Scale: 1"=1000'
ARAPAHO BEND NATURAL AREA TRAIL
LOCATED IN THE NORTHWEST QUARTER OF SECTION 34, T-7-N, R-68-W
CITY OF FORT COLLINS, LARIMER COUNTY, COLORADO
MAY 2015
PROJECT DATUM:
HORIZONTAL: STATE PLAN, VERTICAL: NAVD88
BENCHMARKS:
BENCHMARK 1:
CITY OF FORT COLLINS BM #3-01
SOUTHEAST CORNER OF A STEEL AND WOOD FOOT BRIDGE ABUTMENT
AT THE ENTRANCE TO STRAUSS CABIN, NEAR THE INTERSECTION OF
HORSETOOTH ROAD AND STRAUSS CABIN RD.
ELEVATION=4860.19 (NAVD88)
BENCHMARK 2:
CITY OF FORT COLLINS BM #5-01
SOUTHEAST CORNER OF STRAUSS CABIN RD (CR-7) AND HARMONY RD IN
A STREET LIGHT POLE BASE
PREPARED FOR
PROJ. NO.
DATE:
SCALE (H):
SCALE (V):
CHECKED BY:
DESIGNED BY:
PROJECT NAME
1096-012-54
ARAPAHO BEND NATURAL AREA TRAIL
OVERALL TRAIL ALIGNMENT
05/27/15
1"=200'
N/A
SMB
MPO
C1
NATURAL AREAS
1745 Hoffman Mill Road
Fort Collins, CO 80524
970-416-2815
Revisions
No. Date Description By
Revisions
No. Date Description By
0
SCALE: 1" = 200'
200 100 200 400
CONTINUATION LINE
STA:53+00
FOR
CONSTRUCTION
PREPARED FOR
PROJ. NO.
DATE:
SCALE (H):
SCALE (V):
CHECKED BY:
DESIGNED BY:
PROJECT NAME
1096-012-54
ARAPAHO BEND NATURAL AREA TRAIL
OVERALL TRAIL ALIGNMENT
05/27/15
1"=200'
N/A
SMB
MPO
C2
NATURAL AREAS
1745 Hoffman Mill Road
Fort Collins, CO 80524
970-416-2815
Revisions
No. Date Description By
Revisions
No. Date Description By
CONTINUATION LINE
STA:53+00
0
SCALE: 1" = 200'
200 100 200 400
FOR
CONSTRUCTION
PREPARED FOR
PROJ. NO.
DATE:
SCALE (H):
SCALE (V):
CHECKED BY:
DESIGNED BY:
PROJECT NAME
1096-012-54
ARAPAHO BEND NATURAL AREA TRAIL
TRAIL PLAN & PROFILE
05/27/15
1"=50'
1"=5'
SMB
MPO
C3
NATURAL AREAS
1745 Hoffman Mill Road
Fort Collins, CO 80524
970-416-2815
Revisions
No. Date Description By
Revisions
No. Date Description By
0
SCALE: 1" = 50'
50 25 50 100
CONTINUATION LINE
STA:11+50
MATCH LINE STA:11+50
FOR
CONSTRUCTION
PREPARED FOR
PROJ. NO.
DATE:
SCALE (H):
SCALE (V):
CHECKED BY:
DESIGNED BY:
PROJECT NAME
1096-012-54
ARAPAHO BEND NATURAL AREA TRAIL
TRAIL PLAN & PROFILE
05/27/15
1"=50'
1"=5'
SMB
MPO
C4
NATURAL AREAS
1745 Hoffman Mill Road
Fort Collins, CO 80524
970-416-2815
Revisions
No. Date Description By
Revisions
No. Date Description By
CONTINUATION LINE
STA:25+00
CONTINUATION LINE
STA:11+50
0
SCALE: 1" = 50'
50 25 50 100
MATCH LINE STA:11+50
MATCH LINE STA:25+00
FOR
CONSTRUCTION
PREPARED FOR
PROJ. NO.
DATE:
SCALE (H):
SCALE (V):
CHECKED BY:
DESIGNED BY:
PROJECT NAME
1096-012-54
ARAPAHO BEND NATURAL AREA TRAIL
TRAIL PLAN & PROFILE
05/27/15
1"=50'
1"=5'
SMB
MPO
C5
NATURAL AREAS
1745 Hoffman Mill Road
Fort Collins, CO 80524
970-416-2815
Revisions
No. Date Description By
Revisions
No. Date Description By
0
SCALE: 1" = 50'
50 25 50 100
CONTINUATION LINE
STA:39+00
CONTINUATION LINE
STA:25+00
MATCH LINE STA:25+00
MATCH LINE STA:39+00
FOR
CONSTRUCTION
PREPARED FOR
PROJ. NO.
DATE:
SCALE (H):
SCALE (V):
CHECKED BY:
DESIGNED BY:
PROJECT NAME
1096-012-54
ARAPAHO BEND NATURAL AREA TRAIL
TRAIL PLAN & PROFILE
05/27/15
1"=50'
1"=5'
SMB
MPO
C6
NATURAL AREAS
1745 Hoffman Mill Road
Fort Collins, CO 80524
970-416-2815
Revisions
No. Date Description By
Revisions
No. Date Description By
0
SCALE: 1" = 50'
50 25 50 100
CONTINUATION LINE
STA:53+00
CONTINUATION LINE
STA:39+00
MATCH LINE STA:39+00
MATCH LINE STA:53+00
FOR
CONSTRUCTION
PREPARED FOR
PROJ. NO.
DATE:
SCALE (H):
SCALE (V):
CHECKED BY:
DESIGNED BY:
PROJECT NAME
1096-012-54
ARAPAHO BEND NATURAL AREA TRAIL
TRAIL PLAN & PROFILE
05/27/15
1"=50'
1"=5'
SMB
MPO
C7
NATURAL AREAS
1745 Hoffman Mill Road
Fort Collins, CO 80524
970-416-2815
Revisions
No. Date Description By
Revisions
No. Date Description By
0
SCALE: 1" = 50'
50 25 50 100
CONTINUATION LINE
STA:66+50
CONTINUATION LINE
STA:53+00
MATCH LINE STA:39+00
MATCH LINE STA:66+50
FOR
CONSTRUCTION
PREPARED FOR
PROJ. NO.
DATE:
SCALE (H):
SCALE (V):
CHECKED BY:
DESIGNED BY:
PROJECT NAME
1096-012-54
ARAPAHO BEND NATURAL AREA TRAIL
TRAIL PLAN & PROFILE
05/27/15
1"=50'
1"=5'
SMB
MPO
C8
NATURAL AREAS
1745 Hoffman Mill Road
Fort Collins, CO 80524
970-416-2815
Revisions
No. Date Description By
Revisions
No. Date Description By
0
SCALE: 1" = 50'
50 25 50 100
CONTINUATION LINE
STA:78+00
CONTINUATION LINE
STA:66+50
MATCH LINE STA:66+50
MATCH LINE STA:78+00
FOR
CONSTRUCTION
PREPARED FOR
PROJ. NO.
DATE:
SCALE (H):
SCALE (V):
CHECKED BY:
DESIGNED BY:
PROJECT NAME
1096-012-54
ARAPAHO BEND NATURAL AREA TRAIL
TRAIL PLAN & PROFILE
05/27/15
1"=50'
1"=5'
SMB
MPO
C9
NATURAL AREAS
1745 Hoffman Mill Road
Fort Collins, CO 80524
970-416-2815
Revisions
No. Date Description By
Revisions
No. Date Description By
0
SCALE: 1" = 50'
50 25 50 100
CONTINUATION LINE
STA:78+00
MATCH LINE STA:78+00
MATCH LINE STA:91+00
CONTINUATION LINE
STA:91+00
FOR
CONSTRUCTION
PREPARED FOR
PROJ. NO.
DATE:
SCALE (H):
SCALE (V):
CHECKED BY:
DESIGNED BY:
PROJECT NAME
1096-012-54
ARAPAHO BEND NATURAL AREA TRAIL
TRAIL PLAN & PROFILE
05/27/15
1"=50'
1"=5'
SMB
MPO
C10
NATURAL AREAS
1745 Hoffman Mill Road
Fort Collins, CO 80524
970-416-2815
Revisions
No. Date Description By
Revisions
No. Date Description By
0
SCALE: 1" = 50'
50 25 50 100
CONTINUATION LINE
STA:91+00
MATCH LINE STA:91+00
MATCH LINE STA:104+00 CONTINUATION LINE
STA:104+00
FOR
CONSTRUCTION
PREPARED FOR
PROJ. NO.
DATE:
SCALE (H):
SCALE (V):
CHECKED BY:
DESIGNED BY:
PROJECT NAME
1096-012-54
ARAPAHO BEND NATURAL AREA TRAIL
TRAIL PLAN & PROFILE
05/27/15
1"=50'
N/A
SMB
MPO
C11
NATURAL AREAS
1745 Hoffman Mill Road
Fort Collins, CO 80524
970-416-2815
Revisions
No. Date Description By
Revisions
No. Date Description By
CONTINUATION LINE
STA:116+00
CONTINUATION LINE
STA:104+00
0
SCALE: 1" = 50'
50 25 50 100
MATCH LINE STA:104+00
MATCH LINE STA:116+00
FOR
CONSTRUCTION
PREPARED FOR
PROJ. NO.
DATE:
SCALE (H):
SCALE (V):
CHECKED BY:
DESIGNED BY:
PROJECT NAME
1096-012-54
ARAPAHO BEND NATURAL AREA TRAIL
TRAIL PLAN & PROFILE
05/27/15
1"=50'
N/A
SMB
MPO
C12
NATURAL AREAS
1745 Hoffman Mill Road
Fort Collins, CO 80524
970-416-2815
Revisions
No. Date Description By
Revisions
No. Date Description By
CONTINUATION LINE
STA:116+00
0
SCALE: 1" = 50'
50 25 50 100
MATCH LINE STA:103+00
MATCH LINE STA:128+00
CONTINUATION LINE
STA:128+00
FOR
CONSTRUCTION
PREPARED FOR
PROJ. NO.
DATE:
SCALE (H):
SCALE (V):
CHECKED BY:
DESIGNED BY:
PROJECT NAME
1096-012-54
ARAPAHO BEND NATURAL AREA TRAIL
TRAIL PLAN & PROFILE
05/27/15
1"=50'
1"=5'
SMB
MPO
C13
NATURAL AREAS
1745 Hoffman Mill Road
Fort Collins, CO 80524
970-416-2815
Revisions
No. Date Description By
Revisions
No. Date Description By
CONTINUATION LINE
STA:128+00
0
SCALE: 1" = 50'
50 25 50 100
MATCH LINE STA:128+00
MATCH LINE STA:137+00
CONTINUATION LINE
STA:137+00
FOR
CONSTRUCTION
PREPARED FOR
PROJ. NO.
DATE:
SCALE (H):
SCALE (V):
CHECKED BY:
DESIGNED BY:
PROJECT NAME
1096-012-54
ARAPAHO BEND NATURAL AREA TRAIL
TRAIL PLAN & PROFILE
05/27/15
1"=50'
1"=5'
SMB
MPO
C14
NATURAL AREAS
1745 Hoffman Mill Road
Fort Collins, CO 80524
970-416-2815
Revisions
No. Date Description By
Revisions
No. Date Description By
CONTINUATION LINE
STA:137+00
CONTINUATION LINE
STA:151+50
0
SCALE: 1" = 50'
50 25 50 100
MATCH LINE STA:137+00
MATCH LINE STA:150+50
FOR
CONSTRUCTION
PREPARED FOR
PROJ. NO.
DATE:
SCALE (H):
SCALE (V):
CHECKED BY:
DESIGNED BY:
PROJECT NAME
1096-012-54
ARAPAHO BEND NATURAL AREA TRAIL
TRAIL PLAN & PROFILE
05/27/15
1"=50'
1"=5'
SMB
MPO
C15
NATURAL AREAS
1745 Hoffman Mill Road
Fort Collins, CO 80524
970-416-2815
Revisions
No. Date Description By
Revisions
No. Date Description By
CONTINUATION LINE
STA:151+50
0
SCALE: 1" = 50'
50 25 50 100
MATCH LINE STA:137+00
FOR
CONSTRUCTION
WINDROW DETAIL
NTS
PREPARED FOR
PROJ. NO.
DATE:
SCALE (H):
SCALE (V):
CHECKED BY:
DESIGNED BY:
PROJECT NAME
1096-012-54
ARAPAHO BEND NATURAL AREA TRAIL
CONSTRUCTION DETAILS
05/27/15
N/A
N/A
SMB
MPO
C16
NATURAL AREAS
1745 Hoffman Mill Road
Fort Collins, CO 80524
970-416-2815
Revisions
No. Date Description By
Revisions
No. Date Description By
FOR
CONSTRUCTION
Poudre River Trail Extension SPECIFICATIONS
at Rigden Pond & Arapaho Bend Natural Area May 2015
SPECIFICATIONS
Poudre River Trail Extension 01110-1 SUMMARY OF WORK
at Rigden Pond & Arapaho Bend Natural Area MAY 2015
SECTION 01110
SUMMARY OF WORK
PART 1 GENERAL
1.01 SECTION INCLUDES
The Work generally includes erosion control, excavation and grading, removal and
relocation of an existing 90’ steel pedestrian bridge, installation of a new 110’ steel
pedestrian bridge and abutments, ten feet wide colored concrete trail, 4 feet wide
crusher fines path, 10 feet wide recycled asphalt roadbed, fence installation, seeding
and restoration and surveying work.
1.02 WORK SEQUENCE
A. The Work Sequence is to be submitted as part of the construction schedule required
in Section 01320. Construction of the project shall begin within seven (7) calendar
days of the date of Notice to Proceed.
1.03 UNDERGROUND UTILITIES
A. It shall be the responsibility of the CONTRACTOR to verify the existence and
location of all underground utilities along the route of the work and to coordinate the
construction schedules with these utility owners.
B. Known utilities and structures adjacent to or encountered in the work are shown on
the drawings. The locations shown are taken from existing records and the best
information available from existing utility plans and from field potholing, however, it is
expected that there may be some discrepancies and omissions in the locations and
quantities of utilities and structures shown. Those shown are for the convenience of
the CONTRACTOR only, and no responsibility is assumed by either the OWNER or
the ENGINEER for their accuracy or completeness.
C. The CONTRACTOR shall field verify all utilities and coordinate construction with
utility owners prior to starting construction. The CONTRACTOR shall be responsible
for protecting utilities during construction and scheduling utility adjustments to
eliminate conflict with progress of the work.
D. The CONTRACTOR shall notify the ENGINEER immediately of any field condition
not consistent with the contract documents.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
END OF SECTION
Poudre River Trail Extension at Rigden MEASUREMENT AND PAYMENT
Pond & Arapaho Bend Natural Area 01270-1 MAY 2015
SECTION 01270
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.01 SECTION INCLUDES
A. The work performed under this Agreement shall be paid for on a Time and
Materials basis. The quantities provided on the Bid Schedule are only estimates
of the actual quantities of the work to be performed, and are only included for
purposes of making the award and establishing a basis for estimating the
probable cost of the Work. The actual amounts of work performed and materials
furnished may differ from the estimated quantities. The basis of payment for
work and materials bid as time and materials will be the actual amount of
approved work done and materials furnished. The CONTRACTOR agrees that
he will make no claim for damages, anticipated profits, or otherwise on account
of any difference between the amounts of work actually performed and materials
actually furnished and the estimated amount for bid items.
Payment shall be made only for those items included in the Bid Schedule. All
costs incurred shall comply with the provisions of these Specifications and shall
be included in the price bid for the associated items in the Bid Schedule. Except
as may be otherwise stipulated, the OWNER will furnish no material, labor or
equipment. The quantity of work, which will be considered for payment, is the
actual cost of the work plus CONTRACTOR’S markups in accordance with all
relative Specifications and Agreements.
END OF SECTION
Poudre River Trail Extension SOILS REPORT
at Rigden Pond & Arapaho Bend Natural Area May 2015
SOILS REPORT
ELEVATION=4850.95 (NAVD88)
NOTE: IF NGVD29 IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING
EQUATION SHOULD BE USED: NGVD29 UNADJUSTED= NAVD88 - 3.19'
ENGINEER
Interwest Consulting Group
1218 W. Ash, Suite C
Windsor, Colorado 80550
PH. 970.460.1091
Contact: Skylar Brower
SURVEYOR
King Surveyors, INC.
650 East Garden Drive
Windsor, Colorado 80550
PH. 970.686.5011
Contact: Larry Pepek
CONTRACTOR
Connell Resources
7785 Highland Meadows Pkwy #100
Fort Collins, Colorado 80528
PH: 970.223.3151
Contact: Todd Filkowski
Owner
City of Fort Collins
Natural Areas
1745 Hoffman Mill Road
Fort Collins, CO 80524
Ph. 970.416.2815
Contact: Karen Manci
PROJECT MANAGER
City of Fort Collins Park
Planning & Development
215 N Mason St
Fort Collins, Colorado 80522
PH: 970.221.6366
Contact: Jason Stutzman
PROPOSED STREET LIGHT
PROPOSED STORM SEWER MANHOLE
EXISTING SANITARY SEWER MAIN
PROPOSED TELEPHONE LINE
EXISTING GAS
EXISTING STORM SEWER
EXISTING WATER MAIN
EXISTING MANHOLE
PROPOSED STORM INLET
LEGEND
PROPOSED CONCRETE
PROPOSED MINOR CONTOUR
PROPOSED SPOT ELEVATION
EXISTING SPOT ELEVATION
PROPOSED MAJOR CONTOUR
EXISTING MINOR CONTOUR
EXISTING MAJOR CONTOUR
EXISTING UTILITY POLE
EXISTING GUY WIRE
PROPOSED GAS
EXISTING ELECTRIC LINE PROPOSED ELECTRIC LINE
EXISTING TELEPHONE LINE
PROPOSED FIRE HYDRANT
EXISTING FIRE HYDRANT
EXISTING WATER VALVE
PROPOSED SANITARY SEWER MANHOLE
PROPOSED WATER VALVE
EXISTING CONCRETE
EXISTING FLOWLINE, CURB & GUTTER
PROPOSED FLOWLINE, CURB & GUTTER
PROPOSED FENCE
LIMITS OF DEVELOPMENT (LOD)
EXISTING OVERHEAD UTILITY
EXISTING STORM SEWER INLET
PROPOSED UTILITY POLE
EXISTING STREET LIGHT
PROPOSED SWALE
PROPOSED DIRECTION OF OVERLAND FLOW
PROPOSED EMERGENCY OVERFLOW ROUTE
EXISTING FIBER OPTIC LINE
PROPOSED HANDICAP RAMP
EXISTING OVERHEAD ELECTRIC LINE
EXISTING OVERHEAD TELEPHONE LINE
PROPOSED OVERHEAD ELECTRIC LINE
PROPOSED FIBER OPTIC LINE
PROPOSED OVERHEAD TELEPHONE LINE
EXISTING FENCE
PROPOSED WATER SERVICE W/
PROPOSED SANITARY SEWER SERVICE
CURB STOP AND METER PIT
W/ CLEANOUT
AD ALGEBRAIC DIFFERENCE
AE ACCESS EASEMENT
ARV AIR RELEASE VALVE
BOV BLOW OFF VALVE
BW BOTTOM OF WALL
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CO CLEAN OUT
DE DRAINAGE EASEMENT
E ELECTRIC
EAE EMERGENCY ACCESS EASEMENT
EG EXISTING GROUND
EL ELEVATION
EOA EDGE OF ASPHALT
EX EXISTING
ESMT EASEMENT
F FIRE LINE
FES FLARED END SECTION
FF FINISHED FLOOR
FG FINISHED GRADE
FH FIRE HYDRANT
FL FLOWLINE
FO FIBER OPTIC
G GAS
GB GRADE BREAK
GD GROUND
GV GATE VALVE
HDPE HIGH DENSITY POLYETHYLENE
HP HIGH POINT
IE IRRIGATION EASEMENT
INV INVERT
IRR IRRIGATION
LF LINEAR FEET
LP LOW POINT
LT LEFT
MH MANHOLE
OHE OVERHEAD ELECTRIC
OHT OVERHEAD TELEPHONE
OHU OVERHEAD UTILITY
PE PEDESTRIAN EASEMENT
PC POINT OF CURVATURE
PCC POINT OF COMPOUND CURVATURE
PCR POINT OF CURB RETURN
PI POINT OF INTERSECTION
PT POINT OF TANGENCY
PVC POLYVINYL CHLORIDE
RCP REINFORCED CONCRETE PIPE
RD ROOF DRAIN
ROW RIGHT-OF-WAY
RT RIGHT
S SANITARY SEWER
STA STATION
SD STORM DRAIN PIPE
SDMH STORM DRAIN MANHOLE
SMH SANITARY SEWER MANHOLE
T TELEPHONE
TB THRUST BLOCK
TBC TOP BACK OF CURB
TCE TEMPORARY CONSTRUCTION EASEMENT
TOC TOP OF CONCRETE
TF TOP OF FOUNDATION
TW TOP OF WALL
TYP TYPICAL
UE UTILITY EASEMENT
VB VALVE BOX
VCP VITRIFIED CLAY PIPE
VPC VERTICAL POINT OF CURVATURE
VPI VERTICAL POINT OF INTERSECTION
VPT VERTICAL POINT OF TANGENCY
W WATERLINE
ABBREVIATION LIST
PROPOSED OVERHEAD UTILITY
PROPOSED LIGHT POLES
EXISTING CABLE TV PROPOSED CABLE TV
EXISTING WOOD POST
EXISTING METAL POST
PHASE LINE
COVER SHEET
OVERALL TRAIL ALIGNMENT
TRAIL PLAN & PROFILE
CONSTRUCTION DETAILS
BRIDGE ABUTMENT DETAILS
C0
C1- C2
C3 - C15
C-16
S1 - S2
...........................................
...........................................
...........................................
...........................................
...........................................
Sheet No. Description of Sheets
INDEX OF SHEETS