HomeMy WebLinkAbout109445 CONNELL RESOURCES INC - CONTRACT - AGREEMENT MISC - POUDRE RIVER TRAIL EXTENSION AT RIGDEN POND AND ARCONTRACT DOCUMENTS FOR Poudre River Trail Extension at Rigden Pond and Arapaho Bend Natural Area MISCELLANEOUS CONSTRUCTION ACTIVITIES WORK ORDER CR-RWSR-2015-3– 2015 May 2015 Poudre River Trail Extension AGREEMENT FORMS at Rigden Pond & Arapaho Bend Natural Area 00500-1 May 2015 SECTION 00500 AGREEMENT FORMS 00525 - Work Order, Notice of Award, and Bid Schedule 00525-1 - 00525-3 00530 - Notice to Proceed 00530-1 SECTION 00600 BONDS AND CERTIFICATES 00610 - Performance Bond 00610-1 - 00610-2 00615 - Payment Bond 00615-1 - 00615-2 00630 - Certificate of Insurance 00630-1 00635 – Certificate of Substantial Completion 00635-1 00640 - Certificate of Final Acceptance 00640-1 00650 - Lien Waiver Release (CONTRACTOR) 00650-1 - 00650-2 00651 - Lien Waiver Release (SUBCONTRACTOR) 00651-1 - 00651-2 00660 - Consent of Surety 00660-1 00670 - Application for Exemption Certificate 00670-1 - 00670-2 CONDITIONS OF THE CONTRACT 00800 - Supplementary Conditions 00800-1 - 00800-7 00900 - Addenda, Modifications and Payment 00900-1 00950 - Work Order Change Order 00950-1 00960 - Application for Payment 00960-1 - 00960-4 DRAWINGS SPECIFICATIONS SOILS REPORT Poudre River Trail Extension Notice to Proceed at Rigden Pond & Arapaho Bend Natural Area 00530-1 SECTION 00530 WORK ORDER NOTICE TO PROCEED Description of Work: Poudre River Trail Extension at Rigden Pond & Arapaho Bend Natural Area To: Connell Resources, Inc. 7785 Highland Meadows Parkway, #100 Fort Collins, CO 80528 This notice is to advise you: That the contract covering the above described Work has been fully executed by the CONTRACTOR and the OWNER. That the required CONTRACTOR's Performance Bond and Payment Bond have been received by the OWNER. That the OWNER has approved the said Contract Documents. Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and directed to proceed within fifteen (15) calendar days from receipt of this notice as required by the Agreement. Dated this . The dates for Substantial Completion and Final Acceptance shall be August 1, 2015 and August 14, 2015, respectively. City of Fort Collins OWNER By: Jason Stutzman, PE Title Special Projects Manager ACKNOWLEDGMENT OF NOTICE Receipt of the above Notice to Proceed is hereby acknowledged this day of , 2015. CONTRACTOR By: Title: Poudre River Trail Extension Certificate of Insurance at Rigden Pond & Arapaho Bend Natural Area MAY 2015 00630-1 SECTION 00630 CERTIFICATE OF INSURANCE CONTRACTOR shall insert his own standard form for Certificate of Insurance. Poudre River Trail Extension Certificate of Substantial Completion at Rigden Pond & Arapaho Bend Natural Area May 2015 00635-1 SECTION 00635 CERTIFICATE OF SUBSTANTIAL COMPLETION TO: City of Fort Collins (OWNER) PROJECT TITLE: Poudre River Trail Extension at Rigden Pond & Arapaho Bend Natural Area Date of Substantial Completion: LOCATION: Fort Collins, Colorado Project or Specified Part Shall Include: OWNER: City of Fort Collins CONTRACTOR: CONNELL RESOURCES CONTRACT DATE: Work performed under this contract has been inspected by authorized representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project (or specified part of the project, as indicated above) is hereby declared to be substantially completed on the above date. A tentative list of items to be completed or corrected is appended hereto. This list may not be exhaustive, and the failure to include an item on it does not alter the responsibility of the CONTRACTOR to complete all the Work in accordance with the Contract Documents. By: ENGINEER Authorized Representative Date The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to complete and correct the items on the tentative list within the time indicated. By: CONTRACTOR Authorized Representative Date The OWNER accepts the project or specified area of the project as substantially complete and will assume full possession of the project or specified area of the project at 12:01 a.m., on . The responsibility for heat, utilities, security, and insurance under the Contract Documents shall be as set forth under "Remarks" below. CITY OF FORT COLLINS, COLORADO By: Authorized Representative Date REMARKS: Your project name here Certificate of Final Acceptance XXXX 2012 00640-1 SECTION 00640 CERTIFICATE OF FINAL ACCEPTANCE , 2015 TO: Gentlemen: You are hereby notified that on the day of , 2015, the City of Fort Collins, Colorado, has accepted the Work completed by CONNELL RESOURCES for the City of Fort Collins project, Poudre River Trail Extension at Rigden Pond & Arapaho Bend Natural Area. A check is attached hereto in the amount of $ as Final Payment for all Work done, subject to the terms of the Contract Documents which are dated May 19, 2015 . In conformance with the Contract Documents for this project, your obligations and guarantees will continue for the specified time from the following date: . Sincerely, OWNER: City of Fort Collins By: Title: ATTEST: By: Title: Poudre River Trail Extension Lien Waiver Release (Contractor) at Rigden Pond & Arapaho Bend Natural Area 00650-1 MAY 2015 SECTION 00650 LIEN WAIVER RELEASE (Contractor) TO: City of Fort Collins, Colorado (OWNER) FROM: (CONTRACTOR) PROJECT: Poudre River Trail Extension at Rigden Pond and Arapaho Bend Natural Area. 1. The CONTRACTOR acknowledges having received payment, except retainage from the OWNER for all work, labor, skill and material furnished, delivered and performed by the CONTRACTOR for the OWNER or for anyone in the construction, design, improvement, alteration, addition or repair of the above described project. 2. In consideration of such payment and other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the CONTRACTOR voluntarily waives all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights which the CONTRACTOR may now or may afterward have, claim or assert for all and any work, labor, skill or materials furnished, delivered or performed for the construction, design, improvement, alteration, addition or repair of the above described project, against the OWNER or its officers, agents, employees or assigns, against any fund of or in the possession or control of the OWNER, against the project or against all land and the buildings on and appurtenances to the land improved by the project. 3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or performed to or for the construction, design, improvement, alteration, addition or repair of the project were furnished, delivered or performed by the CONTRACTOR or its agents, employees, and servants, or by and through the CONTRACTOR by various Subcontractors or materialmen or their agents, employees and servants and further affirms the same have been paid in full and have released in full any and all existing or possible future mechanic's liens or rights or claims against the project or any funds in the OWNER'S possession or control concerning the project or against the OWNER or its officers, agents, employees or assigns arising out of the project. 4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if any, and the Surety on the project against and from any claim hereinafter made by the CONTRACTOR'S Subcontractors, materialmen, employees, servants, agents or assigns against the project or against the OWNER or its officers, employees, agents or assigns arising out of the project for all loss, damage and costs, including reasonable attorneys fees, incurred as a result of such claims. 5. The parties acknowledge that the description of the project set forth above constitutes and adequate description of the property and improvements to which this Lien Waiver Release pertains. It is further acknowledged that this Lien Waiver Release is for the Poudre River Trail Extension Lien Waiver Release (Contractor) at Rigden Pond & Arapaho Bend Natural Area 00650-2 MAY 2015 benefit of and may be relied upon by the OWNER, the lender, if any, and Surety on any labor and material bonds for the project. Signed this day of , 2015 CONTRACTOR By: Title: ATTEST: Secretary STATE OF COLORADO ) )ss. COUNTY OF LARIMER ) Subscribed and sworn to before me this day of , 2015, By Witness my hand and official seal. My Commission Expires: Notary Public Poudre River Trail Extension Lien Waiver Release (Subcontractor) at Rigden Pond & Arapaho Bend Natural Area 00651-1 MAY 2015 SECTION 00651 LIEN WAIVER RELEASE (Subcontractor) TO: (CONTRACTOR) FROM: (Subcontractor) PROJECT: Poudre River Trail Extension at Rigden Pond and Arapaho Bend Natural Area 1. The Subcontractor acknowledges having received payment, except retainage, from the CONTRACTOR for all work, labor, skill and material furnished, delivered and performed by the Subcontractor for the CONTRACTOR or for anyone in the construction, design, improvement, alteration, addition or repair of the above described project. 2. In consideration of such payment and other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the Subcontractor voluntarily waives all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights which the Subcontractor may now or may afterward have, claim or assert for all and any work, labor, skill or materials furnished, delivered or performed for the construction, design, improvement, alteration, addition or repair of the above described project, against the CONTRACTOR or its officers, agents, employees or assigns, against the project or against all land and the buildings on and appurtenances to the land improved by the project. 3. The Subcontractor affirms that all work, labor and materials, furnished, delivered or performed to or for the construction, design, improvement, alteration, addition or repair of the project were furnished, delivered or performed by the Subcontractor or its' agents, employees, and servants, or by and through the Subcontractor by various sub- subcontractors or materialmen or their agents, employees and servants and further affirms the same have been paid in full and have released in full any and all existing or possible future mechanic's liens or rights or claims against the project or against the CONTRACTOR or its officers, agents, employees or assigns arising out of the project. 4. The Subcontractor agrees to defend and hold harmless the CONTRACTOR, the lender, if any, and the Surety on the project against and from any claim hereinafter made by the Subcontractor's sub-subcontractors, materialmen, employees, servants agents or assigns against the project or against the CONTRACTOR or OWNER, lender or Surety or their officers, employees, agents or assigns arising out of the project for all loss, damage and costs, including reasonable attorneys fees, incurred as a result of such claims. 5. The parties acknowledge that the description of the project set forth above constitutes and adequate description of the property and improvements to which this Lien Waiver Release pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and may be relied upon by the CONTRACTOR, OWNER, the lender, if any, and Surety on any labor and material bonds for the project. Poudre River Trail Extension Lien Waiver Release (Subcontractor) at Rigden Pond & Arapaho Bend Natural Area 00651-2 MAY 2015 Signed this day of , 2015 SUBCONTRACTOR: By: Title: ATTEST: Secretary STATE OF COLORADO ) )ss. COUNTY OF LARIMER ) Subscribed and sworn to before me this day of , 2015, By Witness my hand and official seal. My Commission Expires: Notary Public Poudre River Trail Extension Consent of Surety at Rigden Pond & Arapaho Bend Natural Area 00660-1 MAY 2015 SECTION 00660 CONSENT OF SURETY TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER") CONTRACTOR: PROJECT: Poudre River Trail Extension at Rigden Pond and Arapaho Bend Natural Area CONTRACT DATE: In accordance with the provisions of the Contract between the OWNER and the CONTRACTOR as indicated above, for bond of (Surety) hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final Payment to the CONTRACTOR shall not relieve the Surety Company of any of its obligations to the OWNER, as set forth in the said Surety Company's Bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this day of , 2015. (Surety Company) By: ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-Fact. Poudre River Trail Extension Contractor Application for Tax Exemption Certificate at Rigden Pond & Arapaho Bend Natural Area 00670 - 1 MAY 2015 DR 0172 (12/98) COLORADO DEPARTMENT OF REVENUE DENVER CO 80261 (303) 232-2416 DO NOT WRITE IN THIS SPACE The exemption certificate for which you are applying must be used only for the purpose of purchasing construction and building materials for the exempt project described below. This exemption does not include or apply to the purchase or rental of equipment, supplies, and materials which are purchased, rented, or consumed by the contractor and which do not become part of the structure, highway, road, street, or other public works owned and used by the exempt organization. Any unauthorized use of the exemption certificate will result in revocation of your exemption certificate and other penalties provided by law. A separate certificate is required for each contract. Subcontractors will not be issued Certificates of Exemption by the Department of Revenue. It is the responsibility of the prime contractor to issue certificates to each of the subcontractors. (See reverse side). FAILURE TO ACCURATELY COMPLETE ALL BOXES WILL CAUSE THE APPLICATION TO BE DENIED. Registration/Account No. (to be assigned by DOR) 89 - Period 0170-750 (999) $0.00 CONTRACTOR INFORMATION Trade name/DBA: Owner, partner, or corporate name: Mailing address (City, State, Zip): Contact Person E-Mail address: Federal Employer’s Identification Number: Bid amount for your contract: $ Fax Number: ( ) Business telephone number: ( ) Colorado withholding tax account number: EXEMPTION INFORMATION Copies of contract or agreement pages (1) identifying the contracting parties and (2) containing signatures of contracting parties must be attached. Name of exempt organization (as shown on contract): Exempt organization’s number: 98 - Address of exempt organization (City, State, Zip): Principal contact at exempt organization: Principal contact’s telephone number: Physical location of project site (give actual address when applicable and Cities and/or County (ies) where project is located) Scheduled construction start date: Month Day Year Estimated completion date: Month Day Year I declare under penalty of perjury in the second degree that the statements made in this application are true and complete to the best of my knowledge. Signature of owner, partner or corporate officer: Title of corporate officer: Date: DO NOT WRITE BELOW THIS LINE CONTRACTOR APPLICATION FOR EXEMPTION CERTIFICATE Pursuant to Statute Section 39-26.114(1)(a)(XIX) 6 Poudre River Trail Extension Contractor Application for Tax Exemption Certificate at Rigden Pond & Arapaho Bend Natural Area 00670 - 2 MAY 2015 Special Notice Contractors who have completed this application in the past, please note the following changes in procedure: The Department will no longer issue individual Certificates of exemption to subcontractors. Only prime contrac- tors will receive a Contractor’s Exemption Certificate on exempt projects. Upon receipt of the Certificate, the prime contractor should make a copy for each subcontractor involved in the project and complete it by filling in the subcontractor’s name and address and signing it. The original Certificate should always be retained by the prime contractor. Copies of all Certificates that the prime contractor issued to subcontractors should be kept at the prime contractor’s place of business for a minimum of three years and be available for inspection in the event of an audit. Once an 89# has been assigned to you, please use the next five numbers following it for any applications submitted for future projects. This should be your permanent number. For instance, if you were assigned 89- 12345-0001, every application submitted thereafter should contain 89-12345 on the application. The succeed- ing numbers will be issued by the Department of Revenue. DO NOT enter what you believe to be the next in sequence as this may delay processing of your application. Poudre River Trail Extension Supplementary Conditions at Rigden Pond & Arapaho Bend Natural Area 00800-1 SECTION 00800 SUPPLEMENTARY CONDITIONS Conditions of the Contract These Supplementary Conditions amend or supplement the General Conditions of the Construction Contract (EJCDC General Conditions 1910-8, 1990 edition with City of Fort Collins modifications (rev. 9/99)) and other provisions of the Contract Documents executed under the P951 Water, Wastewater, and Stormwater Utility Infrastructure Improvements Master Contract dated February 16, 2010. (Unless included in this work order,) All work performed under this work order shall be conducted in accordance with the technical specifications, of Work Order No. CR-RWSR-2015-3 SC-1 DEFINITIONS SC-1.38. Add the following language to the conclusion of paragraph 1.38 of the General Conditions: 1.38. Substantial Completion – Substantial Completion is further defined as that degree of completion of the operating facilities or systems of the Project defined in the Work Order sufficient to provide the OWNER the full time, uninterrupted, continuous, beneficial operation of the modifications, and all inspections required have been completed and identified deficiencies corrected. SC-1.43.A Add the following new paragraph immediately after paragraph 1.43 of the General Conditions: 1.43.A. Work Order – A written document executed by OWNER and CONTRACTOR that provides for the construction of a portion of the Work, pursuant to the Agreement and all as required by the Contract Documents, and that becomes a Contract Document when executed. SC-2 PRELIMINARY MATTERS SC-2.8. Delete paragraph 2.8 of the General Conditions entirely and replace it with the following paragraph: 2.8 Preconstruction Conference. Within ten days after the Contract Times for a Work Order start to run, but before any Work at the site is started, a conference attended by CONTRACTOR, ENGINEER and others as appropriate will be held to establish a working relationship among the parties as to the Work and to discuss the schedules referred to in paragraph 2.6, procedures for handling Shop Drawing and other submittals, processing Applications for Payment, and maintaining required records. SC-2.10, Add the following new paragraph immediately after paragraph 2.9 of the General Conditions: 2.10 Work Order Required for All Work. References to the Agreement in this Article 2 and in the General and Supplementary Conditions and Contract Documents notwithstanding, no Work shall be initiated or performed until CONTRACTOR has received Poudre River Trail Extension Supplementary Conditions at Rigden Pond & Arapaho Bend Natural Area 00800-2 a signed and executed Work Order, incorporating the Notice to Proceed, from OWNER; and no provision of the Article 2 or of the General and Supplementary Conditions and Contract Documents shall permit or require any action of CONTRACTOR in the absence of a signed and executed Work Order. All provisions of this Article 2 and of the General and Supplementary Conditions and Contract Documents referencing the Agreement or other parts of the Contract Documents, or permitting or requiring any action of CONTRACTOR, shall be read as referencing and, as appropriate, requiring a signed and executed Work Order. SC-4 AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE POINTS SC-4.2.1.2. Add the following new paragraph immediately following paragraph 4.2.1.2 of the General Conditions: 4.2.1.2.1 No drawing of physical conditions in or relating to existing surface or subsurface structures (except Underground Facilities referred to in Paragraph 4.3) which are at or contiguous to the site have been utilized by the Engineer in preparation of the Contract Documents, except the following: 1. none Contractor may rely upon the accuracy of the technical data contained in the documents, but not upon non-technical data, interpretations or opinions contained therein or upon the completeness of any information in the report. SC-5 BONDS AND INSURANCE SC-5.4.7. Include the following parties or entities as additional Insureds, as provided in paragraph 5.4.7 of the General Conditions: 5.4.7.1.The City of Fort Collins, Colorado, 4316 LaPorte Avenue, Fort Collins, Colorado 80522 5.4.7.2. Interwest Consulting Group, 1218 West Ash, Suite C, Windsor, CO 80550 SC-5.4.8.1. Add the following new paragraph immediately following paragraph 5.4.8 of the General Conditions: 5.4.8.1.1. Limits of Liability. The limits of liability for the insurance required by the paragraph numbers of the General Conditions listed below are as follows: 5.4.1 and 5.4.2 Coverage A - Statutory Limits Coverage B - $100,000 / $100,000 / $500,000. 5.4.3 and 5.4.5 Commercial General Liability policy will have limits of $1,000,000 combined single limits (CSL). This policy will include coverage for Explosion, Collapse, and Underground coverage unless waived by the OWNER. 5.4.6: The Comprehensive Automobile Liability Insurance policy will have limits of $1,000,000 combined single limits (CSL). Poudre River Trail Extension Supplementary Conditions at Rigden Pond & Arapaho Bend Natural Area 00800-3 5.4.9. This policy will include completed operations coverage / product liability coverage with limits of $1,000,000 combined single limits (CSL). This policy shall also include an Umbrella Excess Liability as follows: General liability and automobile liability insurance in an amount not less than $1,000,000 per occurrence in excess of the above stated primary limits. SC-6 CONTRACTOR’S RESPONSIBILITIES SC-6.14.3. Add the following new paragraph immediately following paragraph 6.14.2 of the General Conditions: 6.14.3.1. The following Laws or Regulations are included in the Contract Documents as mandated by statute or for the convenience of the CONTRACTOR. Other Laws and Regulations apply which are not included herein, and are within the CONTRACTOR’S duty and responsibility for compliance thereto: 6.14.3.2. Notice to owners of Underground Facilities is required prior to excavations in the vicinity of such facilities. 6.14.3.2. Unless otherwise decided by reason of the amount of the Contract Price involved, or other good reason, before or at the time that the contract is awarded to a corporation outside the State of Colorado, such corporation must carry out the proper procedure to become authorized to do business in the State of Colorado, designate a place of business therein, and appoint an agent for service of process. Such corporation must furnish the OWNER with a certificate from the Secretary of State of Colorado, has been issued by its office and there shall also be procured from the Colorado Secretary of State a photostatic or certified copy of the designated place of business and appointment of agent for service of process, or a letter from the Colorado Secretary of State that such designation of place of business and agent for service of process have been made. 6.14.3.3 The CONTRACTOR must conform to the rules and regulations of the Industrial Commission of Colorado. Particular reference is made to rules and regulations governing excavation Work adopted by the Industrial Commission of Colorado. SC-6.35. Add the following new paragraphs immediately following paragraph 6.34 of the General Conditions: 6.35 Federal Requirements. As applicable, and as may be required for any Work Order, CONTRACTOR agrees to the following additional requirements. 6.35.1. CONTRACTOR agrees that he is subject to the provisions of the Williams-Steiger Occupational Safety and Health Act of 1970 and related program requirements, as included in Appendix A of the Supplementary Conditions. 6.35.2. CONTRACTOR agrees to utilize the rural Area business Development Plan, as included in Appendix B of the Supplementary Conditions. 6.35.3. CONTRACTOR agrees to the Prohibition Against Listed Violated Facilities, as included in Appendix C of the Supplementary Conditions. Poudre River Trail Extension Supplementary Conditions at Rigden Pond & Arapaho Bend Natural Area 00800-4 6.35.4. CONTRACTOR agrees to the provisions of the Notice of Requirement for Affirmative Action to ensure equal employment opportunity and related attached documents, as included in Appendix D of the Supplementary Conditions SC-11 CHANGE OF CONTRACT PRICE SC-11.6.2.7. Add the following new paragraph to paragraph 11.6.2 of the General Conditions. 11.6.2.7. Cost of the Work. Allowances for profit, overhead and mark-up prescribed by Article 4 of the Agreement shall be used in lieu of any CONTRACTOR’S fee, overhead, profit or mark-up allowances as prescribed in paragraphs 11.6.2.1, 11.6.2.2 and 11.6.2.3. SC-12 CHANGE OF CONTRACT TIMES SC-12.3. Add the following language to the end of paragraph 12.3 of the General Conditions. 12.3 … Lost days due to abnormal weather conditions will be allocated as required. SC-14 PAYMENTS TO CONTRACTOR AND COMPLETION SC- 14.1. Add the following language to the end of paragraph 14.1 of the General Conditions. 14.1. Schedule of values … Progress payments on the negotiated not-to-exceed fee shall be based on a time and materials basis END OF SECTION Poudre River Trail Extension Supplementary Conditions at Rigden Pond & Arapaho Bend Natural Area 00800-5 APPENDIX A WILLIAMS-STEIGER OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970 A. AUTHORITY (1) The CONTRACTOR is subject to the provisions of the Williams-Steiger Occupational Safety and Health Act of 1970. (2) These construction documents and the joint and several phases of construction hereby contemplated are to be governed, at all times, by applicable provisions of the Federal law(s), including but not limited to the latest amendment of the following: a. Williams-Steiger Occupational Safety and Health Act of 1970, Public Law 94-596; b. Part 1910 - Occupational Safety and Health Standards, Chapter XVII of the Title 29, Code of the Federal Regulations. c. Part 1926 - Safety and Health Regulations for Construction, Chapter XVII of Title 29, Code of Federal Regulations. B. SAFTEY AND HEALTH PROGRAM REQUIREMENTS (1) This project, its prime contractor and its subcontractors, shall at all times be governed by Chapter XVII of Title 29, Code of Federal Regulations, Part 1926 - Safety and Health Regulations for Construction (29 CFR 22801), as amended to date. (2) To implement the program and to provide safe and healthful working conditions for all persons, general project safety meetings will be conducted at the site at least once each month during the course of the construction, by the construction superintendent or his/her designated safety officer. Notice of such meeting shall be issued not less than three (3) days prior, stating the exact time, location and agenda to be included. Attendance by the OWNER, architect, general foreman, shop steward(s) and trades, or their designated representatives, witnessed in writing as such, shall be mandatory. (3) To further implement the program, each trade shall conduct a short gang meeting, not less than once a week, to review project safety requirements mandatory for all persons during the coming week. The gang foremen shall report the agenda and specific items covered to the project superintendent, who shall incorporate these items in his/her daily log or report. (4) The prime contractor and all subcontractors shall immediately report all accidents, injuries or health hazards to the owner and architect or their designated representatives, in writing. This shall not obviate any mandatory reporting under the provisions of the Occupational Safety and Health Act of 1970. (5) This program shall become a part of the contract documents and the contract between the owner and prime contractor, prime contractor and all subcontractors, as though fully written therein. Poudre River Trail Extension Supplementary Conditions at Rigden Pond & Arapaho Bend Natural Area 00800-6 APPENDIX B RURAL AREA BUSINESS ENTERPRISE DEVELOPMENT PLAN The Contractor agrees and is required to utilize the following affirmative steps: A. Placing Small Businesses in Rural Areas (SBRA) on solicitation lists; B. Ensuring that SBRAs are solicited whenever they are potential sources; C. Dividing total requirements, when economically feasible, into small tasks or quantities to permit maximum participation by SBRAs; D. Establishing delivery schedules, where the requirements of work will permit, which would encourage participation by SBRAs; E. Requiring the contractors if it awards subcontracts, to take the affirmative steps in subparagraphs A. through E. of this condition. Poudre River Trail Extension Supplementary Conditions at Rigden Pond & Arapaho Bend Natural Area 00800-7 APPENDIX C PROHIBITION AGAINST LISTED VIOLATED FACILITIES A. REQUIREMENTS (1) To comply with all the requirements of section 114 of the Clean Air Act, as amended (42 U.S.C. 1857, et seq., as amended by Pub. L. 92-604) and section 308 of the Clean Water Act (33 U.S.C. 1251, as amended), respectively, which relate to inspection, monitoring, entry, reports and information, as well as other requirements specified in section 114 and section of the Air Act and the Water Act, respectively, and all regulations and guidelines issued thereunder before the award of this contract. (2) That no portion of the work required by this prime contract will be performed in a facility listed on the Environmental Protection Agency list of violating facilities on the date when this contract was awarded unless and until the EPA eliminates the name of such facility or facilities from the listing. (3) That the best efforts to comply with clean air and clean water standards at the facilities in which the contract is being performed. (4) To insert the substance of the provisions of this clause, including this paragraph (4), in any nonexempt subcontract. B. DEFINITIONS (1) Air Act means the Clean Air Act, as amended (42 U.S.C. 1857 et seq.). (2) Water Act means the Clean Water Act, as amended (33 U.S.C. 1251 et seq.). (3) Clean Air Standards means any enforceable rules, regulations, guidelines, standards, limitations, orders, controls, prohibitions or other requirements which are contained in, issued under or otherwise adopted under the Air Act or Executive Order 11738, an applicable implementation plan as described in section 110(d) of the Air Act (42 U.S.C. 1857c-5(d), an approved implementation procedure or plan -under section 111(c) or section 111(d), or an approved implementation procedure under section 112(d) of the Air Act (42 U.S.C. 1857c- 7(d). (4) Clean Water Standards means any enforceable limitation, control, condition, prohibition, standard or other requirement which is promulgated under the Water Act or contained in a permit issued to a discharger by the Environmental Protection Agency or by a State under an approved program, as authorized by section 402 of the Water Act (33 U.S.C. 1342), or by a local government to ensure compliance with pretreatment regulations as required by section 307 of Water Act (33 U.S.C. 1317). (5) Compliance means compliance with clean air or water standards. Compliance shall also mean compliance with a schedule or plan ordered or approved by a court of competent jurisdiction, the Environmental Protection Agency in accordance with the requirements of the Air Act or Water Act and regulations. (6) Facility means any building, plant, installation, structure, mine, vessel or other floating craft, location or site of operations, owned leased or supervised by a contractor or subcontractor, to be used in the performance of a contract or subcontract. Where a location or site of operations contains or includes more than one building plant, installation or structure, the entire location or site shall be deemed to be a facility except where the Director, Office of Federal Activities, Environmental Protection Agency, determines that independent facilities are located in one geographical area. Poudre River Trail Extension Contract Change Order at Rigden Pond & Arapaho Bend Natural Area 00950-1 SECTION 00950 CHANGE ORDER NO. PROJECT TITLE: Poudre River Trail Extension at Rigden Pond and Arapaho Bend Natural Area CONTRACTOR: PROJECT NUMBER: DESCRIPTION: 1. Reason for change: 2. Description of Change: 3. Change in Contract Cost: 4. Change in Contract Time: ORIGINAL CONTRACT COST $ 0.00 TOTAL APPROVED CHANGE ORDERS 0.00 TOTAL PENDING CHANGE ORDERS 0.00 TOTAL THIS CHANGE ORDER 0.00 THIS C.O. % OF ORIGINAL CONTRACT 0.0% TOTAL C.O.’S % OF ORIGINAL CONTRACT 0.0% ADJUSTED CONTRACT COST $ 0.00 (Assuming all change orders approved) ACCEPTED BY: DATE: Contractor's Representative ACCEPTED BY: DATE: Project Manager REVIEWED BY: DATE: Title: APPROVED BY: DATE: Title: APPROVED BY: DATE: Purchasing Agent over $60,000 cc: Project File Contractor Purchasing PROJECT: OWNER: City of Fort Collins Park Planning & Development CONTRACTOR: APPLICATION NUMBER: APPLICATION DATE: PERIOD BEGINNING: PERIOD ENDING: ENGINEERS: PROJECT NUMBER: CHANGE ORDERS: PAY APPLICATION: NUMBER DATE AMOUNT Application is made for Payment as shown below in connection with the Contract. The present status of the account for this Contract is as follows. Original Contract Amount: Net Change by Change Order: $ - Revised Current Contract Amount: $0.00 Total Work Completed to Date: Total Change Order Work to Date: Total Stored to Date: Total Completed and Stored Materials to Date: $0.00 Less Previous Payments: Amount due this Pay Application (before retainage): $0.00 Less Retainage: $ - Net Change by Change Order: $ - AMOUNT DUE THIS APPLICATION: $0.00 Change Order %: 0.00% CERTIFICATION: The undersigned CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection with the WORK have been satisfied as required in paragraph 14.3 of the General Conditions of the Contract. The above Amount Due this Application is requested by the CONTRACTOR's Project Manager. Date: By: Payment of the above Amount Due This Application has been reviewed by the OWNER'S Project Manager. Date: By: Jason Stutzman, Special Projects Manager Payment of the above Amount Due This Application is approved by the OWNER. Date: By: Owen L. Randall, Chief Engineer 00960 - Application for Payment Pay Request Period Ending: Contract Summary Cost Percent Item # Description Quantity UOM Unit Price Total Quantity Total Quantity Total Quantity Total Remaining Complete 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 18a 19 20 21 22 23 24 25 25a 26 27 28 Combined: Total Contract Amount Total This Period $ - Previous Billings Total Completed to Date Balance Remaining $ - Percent Complete Crosscheck $ - $ - Contract Summary: Original Contract Amount Change Orders To Date (see attached) Adjusted Contract Amount Total Completed to Date Total Materials Remaining @ Site Total Change Order Work to Date (see attached) Value of Work in Place Percent Complete Including Stored Materials Less Retention @ 10% up to 50% complete, 5% beyond 50% of Adjusted Contract Total to Date Less Retention Less Previous Billings Total Due This Period Previous Total to Date Page 1 of 1 6/1/2015 Change Change Order Summary This Period Previous Total to Date Cost Percent Order # Description Quantity UOM Unit Price Total Amount Quantity Amount Quantity Amount Quantity Amount Remaining Complete 1 Total Amount of Change Orders $ - Total This Period $ - Previous Billings $ - Total Completed to Date $ - Balance Remaining $ - Percent Complete #DIV/0! Page 1 of 1 Poudre River Trail Extension DRAWINGS at Rigden Pond & Arapaho Bend Natural Area May 2015 DRAWINGS SITE HARMONY RD MARIAH LN ARAPAHO BEND NATURAL AREA BOX ELDER DITCH CACHE LA POUDRE RIVER I-25 STRAUSS CABIN RD HORSETOOTH RD I-25 CACHE LA POUDRE RIVER PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME 1096-012-54 ARAPAHO BEND NATURAL AREA TRAIL COVER SHEET 05/27/15 1"=1000' N/A SMB MPO C0 NATURAL AREAS 1745 Hoffman Mill Road Fort Collins, CO 80524 970-416-2815 Revisions No. Date Description By Revisions No. Date Description By FOR CONSTRUCTION vicinity map Scale: 1"=1000' ARAPAHO BEND NATURAL AREA TRAIL LOCATED IN THE NORTHWEST QUARTER OF SECTION 34, T-7-N, R-68-W CITY OF FORT COLLINS, LARIMER COUNTY, COLORADO MAY 2015 PROJECT DATUM: HORIZONTAL: STATE PLAN, VERTICAL: NAVD88 BENCHMARKS: BENCHMARK 1: CITY OF FORT COLLINS BM #3-01 SOUTHEAST CORNER OF A STEEL AND WOOD FOOT BRIDGE ABUTMENT AT THE ENTRANCE TO STRAUSS CABIN, NEAR THE INTERSECTION OF HORSETOOTH ROAD AND STRAUSS CABIN RD. ELEVATION=4860.19 (NAVD88) BENCHMARK 2: CITY OF FORT COLLINS BM #5-01 SOUTHEAST CORNER OF STRAUSS CABIN RD (CR-7) AND HARMONY RD IN A STREET LIGHT POLE BASE PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME 1096-012-54 ARAPAHO BEND NATURAL AREA TRAIL OVERALL TRAIL ALIGNMENT 05/27/15 1"=200' N/A SMB MPO C1 NATURAL AREAS 1745 Hoffman Mill Road Fort Collins, CO 80524 970-416-2815 Revisions No. Date Description By Revisions No. Date Description By 0 SCALE: 1" = 200' 200 100 200 400 CONTINUATION LINE STA:53+00 FOR CONSTRUCTION PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME 1096-012-54 ARAPAHO BEND NATURAL AREA TRAIL OVERALL TRAIL ALIGNMENT 05/27/15 1"=200' N/A SMB MPO C2 NATURAL AREAS 1745 Hoffman Mill Road Fort Collins, CO 80524 970-416-2815 Revisions No. Date Description By Revisions No. Date Description By CONTINUATION LINE STA:53+00 0 SCALE: 1" = 200' 200 100 200 400 FOR CONSTRUCTION PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME 1096-012-54 ARAPAHO BEND NATURAL AREA TRAIL TRAIL PLAN & PROFILE 05/27/15 1"=50' 1"=5' SMB MPO C3 NATURAL AREAS 1745 Hoffman Mill Road Fort Collins, CO 80524 970-416-2815 Revisions No. Date Description By Revisions No. Date Description By 0 SCALE: 1" = 50' 50 25 50 100 CONTINUATION LINE STA:11+50 MATCH LINE STA:11+50 FOR CONSTRUCTION PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME 1096-012-54 ARAPAHO BEND NATURAL AREA TRAIL TRAIL PLAN & PROFILE 05/27/15 1"=50' 1"=5' SMB MPO C4 NATURAL AREAS 1745 Hoffman Mill Road Fort Collins, CO 80524 970-416-2815 Revisions No. Date Description By Revisions No. Date Description By CONTINUATION LINE STA:25+00 CONTINUATION LINE STA:11+50 0 SCALE: 1" = 50' 50 25 50 100 MATCH LINE STA:11+50 MATCH LINE STA:25+00 FOR CONSTRUCTION PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME 1096-012-54 ARAPAHO BEND NATURAL AREA TRAIL TRAIL PLAN & PROFILE 05/27/15 1"=50' 1"=5' SMB MPO C5 NATURAL AREAS 1745 Hoffman Mill Road Fort Collins, CO 80524 970-416-2815 Revisions No. Date Description By Revisions No. Date Description By 0 SCALE: 1" = 50' 50 25 50 100 CONTINUATION LINE STA:39+00 CONTINUATION LINE STA:25+00 MATCH LINE STA:25+00 MATCH LINE STA:39+00 FOR CONSTRUCTION PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME 1096-012-54 ARAPAHO BEND NATURAL AREA TRAIL TRAIL PLAN & PROFILE 05/27/15 1"=50' 1"=5' SMB MPO C6 NATURAL AREAS 1745 Hoffman Mill Road Fort Collins, CO 80524 970-416-2815 Revisions No. Date Description By Revisions No. Date Description By 0 SCALE: 1" = 50' 50 25 50 100 CONTINUATION LINE STA:53+00 CONTINUATION LINE STA:39+00 MATCH LINE STA:39+00 MATCH LINE STA:53+00 FOR CONSTRUCTION PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME 1096-012-54 ARAPAHO BEND NATURAL AREA TRAIL TRAIL PLAN & PROFILE 05/27/15 1"=50' 1"=5' SMB MPO C7 NATURAL AREAS 1745 Hoffman Mill Road Fort Collins, CO 80524 970-416-2815 Revisions No. Date Description By Revisions No. Date Description By 0 SCALE: 1" = 50' 50 25 50 100 CONTINUATION LINE STA:66+50 CONTINUATION LINE STA:53+00 MATCH LINE STA:39+00 MATCH LINE STA:66+50 FOR CONSTRUCTION PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME 1096-012-54 ARAPAHO BEND NATURAL AREA TRAIL TRAIL PLAN & PROFILE 05/27/15 1"=50' 1"=5' SMB MPO C8 NATURAL AREAS 1745 Hoffman Mill Road Fort Collins, CO 80524 970-416-2815 Revisions No. Date Description By Revisions No. Date Description By 0 SCALE: 1" = 50' 50 25 50 100 CONTINUATION LINE STA:78+00 CONTINUATION LINE STA:66+50 MATCH LINE STA:66+50 MATCH LINE STA:78+00 FOR CONSTRUCTION PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME 1096-012-54 ARAPAHO BEND NATURAL AREA TRAIL TRAIL PLAN & PROFILE 05/27/15 1"=50' 1"=5' SMB MPO C9 NATURAL AREAS 1745 Hoffman Mill Road Fort Collins, CO 80524 970-416-2815 Revisions No. Date Description By Revisions No. Date Description By 0 SCALE: 1" = 50' 50 25 50 100 CONTINUATION LINE STA:78+00 MATCH LINE STA:78+00 MATCH LINE STA:91+00 CONTINUATION LINE STA:91+00 FOR CONSTRUCTION PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME 1096-012-54 ARAPAHO BEND NATURAL AREA TRAIL TRAIL PLAN & PROFILE 05/27/15 1"=50' 1"=5' SMB MPO C10 NATURAL AREAS 1745 Hoffman Mill Road Fort Collins, CO 80524 970-416-2815 Revisions No. Date Description By Revisions No. Date Description By 0 SCALE: 1" = 50' 50 25 50 100 CONTINUATION LINE STA:91+00 MATCH LINE STA:91+00 MATCH LINE STA:104+00 CONTINUATION LINE STA:104+00 FOR CONSTRUCTION PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME 1096-012-54 ARAPAHO BEND NATURAL AREA TRAIL TRAIL PLAN & PROFILE 05/27/15 1"=50' N/A SMB MPO C11 NATURAL AREAS 1745 Hoffman Mill Road Fort Collins, CO 80524 970-416-2815 Revisions No. Date Description By Revisions No. Date Description By CONTINUATION LINE STA:116+00 CONTINUATION LINE STA:104+00 0 SCALE: 1" = 50' 50 25 50 100 MATCH LINE STA:104+00 MATCH LINE STA:116+00 FOR CONSTRUCTION PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME 1096-012-54 ARAPAHO BEND NATURAL AREA TRAIL TRAIL PLAN & PROFILE 05/27/15 1"=50' N/A SMB MPO C12 NATURAL AREAS 1745 Hoffman Mill Road Fort Collins, CO 80524 970-416-2815 Revisions No. Date Description By Revisions No. Date Description By CONTINUATION LINE STA:116+00 0 SCALE: 1" = 50' 50 25 50 100 MATCH LINE STA:103+00 MATCH LINE STA:128+00 CONTINUATION LINE STA:128+00 FOR CONSTRUCTION PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME 1096-012-54 ARAPAHO BEND NATURAL AREA TRAIL TRAIL PLAN & PROFILE 05/27/15 1"=50' 1"=5' SMB MPO C13 NATURAL AREAS 1745 Hoffman Mill Road Fort Collins, CO 80524 970-416-2815 Revisions No. Date Description By Revisions No. Date Description By CONTINUATION LINE STA:128+00 0 SCALE: 1" = 50' 50 25 50 100 MATCH LINE STA:128+00 MATCH LINE STA:137+00 CONTINUATION LINE STA:137+00 FOR CONSTRUCTION PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME 1096-012-54 ARAPAHO BEND NATURAL AREA TRAIL TRAIL PLAN & PROFILE 05/27/15 1"=50' 1"=5' SMB MPO C14 NATURAL AREAS 1745 Hoffman Mill Road Fort Collins, CO 80524 970-416-2815 Revisions No. Date Description By Revisions No. Date Description By CONTINUATION LINE STA:137+00 CONTINUATION LINE STA:151+50 0 SCALE: 1" = 50' 50 25 50 100 MATCH LINE STA:137+00 MATCH LINE STA:150+50 FOR CONSTRUCTION PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME 1096-012-54 ARAPAHO BEND NATURAL AREA TRAIL TRAIL PLAN & PROFILE 05/27/15 1"=50' 1"=5' SMB MPO C15 NATURAL AREAS 1745 Hoffman Mill Road Fort Collins, CO 80524 970-416-2815 Revisions No. Date Description By Revisions No. Date Description By CONTINUATION LINE STA:151+50 0 SCALE: 1" = 50' 50 25 50 100 MATCH LINE STA:137+00 FOR CONSTRUCTION WINDROW DETAIL NTS PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME 1096-012-54 ARAPAHO BEND NATURAL AREA TRAIL CONSTRUCTION DETAILS 05/27/15 N/A N/A SMB MPO C16 NATURAL AREAS 1745 Hoffman Mill Road Fort Collins, CO 80524 970-416-2815 Revisions No. Date Description By Revisions No. Date Description By FOR CONSTRUCTION Poudre River Trail Extension SPECIFICATIONS at Rigden Pond & Arapaho Bend Natural Area May 2015 SPECIFICATIONS Poudre River Trail Extension 01110-1 SUMMARY OF WORK at Rigden Pond & Arapaho Bend Natural Area MAY 2015 SECTION 01110 SUMMARY OF WORK PART 1 GENERAL 1.01 SECTION INCLUDES The Work generally includes erosion control, excavation and grading, removal and relocation of an existing 90’ steel pedestrian bridge, installation of a new 110’ steel pedestrian bridge and abutments, ten feet wide colored concrete trail, 4 feet wide crusher fines path, 10 feet wide recycled asphalt roadbed, fence installation, seeding and restoration and surveying work. 1.02 WORK SEQUENCE A. The Work Sequence is to be submitted as part of the construction schedule required in Section 01320. Construction of the project shall begin within seven (7) calendar days of the date of Notice to Proceed. 1.03 UNDERGROUND UTILITIES A. It shall be the responsibility of the CONTRACTOR to verify the existence and location of all underground utilities along the route of the work and to coordinate the construction schedules with these utility owners. B. Known utilities and structures adjacent to or encountered in the work are shown on the drawings. The locations shown are taken from existing records and the best information available from existing utility plans and from field potholing, however, it is expected that there may be some discrepancies and omissions in the locations and quantities of utilities and structures shown. Those shown are for the convenience of the CONTRACTOR only, and no responsibility is assumed by either the OWNER or the ENGINEER for their accuracy or completeness. C. The CONTRACTOR shall field verify all utilities and coordinate construction with utility owners prior to starting construction. The CONTRACTOR shall be responsible for protecting utilities during construction and scheduling utility adjustments to eliminate conflict with progress of the work. D. The CONTRACTOR shall notify the ENGINEER immediately of any field condition not consistent with the contract documents. PART 2 PRODUCTS (Not Applicable) PART 3 EXECUTION (Not Applicable) END OF SECTION Poudre River Trail Extension at Rigden MEASUREMENT AND PAYMENT Pond & Arapaho Bend Natural Area 01270-1 MAY 2015 SECTION 01270 MEASUREMENT AND PAYMENT PART 1 GENERAL 1.01 SECTION INCLUDES A. The work performed under this Agreement shall be paid for on a Time and Materials basis. The quantities provided on the Bid Schedule are only estimates of the actual quantities of the work to be performed, and are only included for purposes of making the award and establishing a basis for estimating the probable cost of the Work. The actual amounts of work performed and materials furnished may differ from the estimated quantities. The basis of payment for work and materials bid as time and materials will be the actual amount of approved work done and materials furnished. The CONTRACTOR agrees that he will make no claim for damages, anticipated profits, or otherwise on account of any difference between the amounts of work actually performed and materials actually furnished and the estimated amount for bid items. Payment shall be made only for those items included in the Bid Schedule. All costs incurred shall comply with the provisions of these Specifications and shall be included in the price bid for the associated items in the Bid Schedule. Except as may be otherwise stipulated, the OWNER will furnish no material, labor or equipment. The quantity of work, which will be considered for payment, is the actual cost of the work plus CONTRACTOR’S markups in accordance with all relative Specifications and Agreements. END OF SECTION Poudre River Trail Extension SOILS REPORT at Rigden Pond & Arapaho Bend Natural Area May 2015 SOILS REPORT ELEVATION=4850.95 (NAVD88) NOTE: IF NGVD29 IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED= NAVD88 - 3.19' ENGINEER Interwest Consulting Group 1218 W. Ash, Suite C Windsor, Colorado 80550 PH. 970.460.1091 Contact: Skylar Brower SURVEYOR King Surveyors, INC. 650 East Garden Drive Windsor, Colorado 80550 PH. 970.686.5011 Contact: Larry Pepek CONTRACTOR Connell Resources 7785 Highland Meadows Pkwy #100 Fort Collins, Colorado 80528 PH: 970.223.3151 Contact: Todd Filkowski Owner City of Fort Collins Natural Areas 1745 Hoffman Mill Road Fort Collins, CO 80524 Ph. 970.416.2815 Contact: Karen Manci PROJECT MANAGER City of Fort Collins Park Planning & Development 215 N Mason St Fort Collins, Colorado 80522 PH: 970.221.6366 Contact: Jason Stutzman PROPOSED STREET LIGHT PROPOSED STORM SEWER MANHOLE EXISTING SANITARY SEWER MAIN PROPOSED TELEPHONE LINE EXISTING GAS EXISTING STORM SEWER EXISTING WATER MAIN EXISTING MANHOLE PROPOSED STORM INLET LEGEND PROPOSED CONCRETE PROPOSED MINOR CONTOUR PROPOSED SPOT ELEVATION EXISTING SPOT ELEVATION PROPOSED MAJOR CONTOUR EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING UTILITY POLE EXISTING GUY WIRE PROPOSED GAS EXISTING ELECTRIC LINE PROPOSED ELECTRIC LINE EXISTING TELEPHONE LINE PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT EXISTING WATER VALVE PROPOSED SANITARY SEWER MANHOLE PROPOSED WATER VALVE EXISTING CONCRETE EXISTING FLOWLINE, CURB & GUTTER PROPOSED FLOWLINE, CURB & GUTTER PROPOSED FENCE LIMITS OF DEVELOPMENT (LOD) EXISTING OVERHEAD UTILITY EXISTING STORM SEWER INLET PROPOSED UTILITY POLE EXISTING STREET LIGHT PROPOSED SWALE PROPOSED DIRECTION OF OVERLAND FLOW PROPOSED EMERGENCY OVERFLOW ROUTE EXISTING FIBER OPTIC LINE PROPOSED HANDICAP RAMP EXISTING OVERHEAD ELECTRIC LINE EXISTING OVERHEAD TELEPHONE LINE PROPOSED OVERHEAD ELECTRIC LINE PROPOSED FIBER OPTIC LINE PROPOSED OVERHEAD TELEPHONE LINE EXISTING FENCE PROPOSED WATER SERVICE W/ PROPOSED SANITARY SEWER SERVICE CURB STOP AND METER PIT W/ CLEANOUT AD ALGEBRAIC DIFFERENCE AE ACCESS EASEMENT ARV AIR RELEASE VALVE BOV BLOW OFF VALVE BW BOTTOM OF WALL CL CENTERLINE CMP CORRUGATED METAL PIPE CO CLEAN OUT DE DRAINAGE EASEMENT E ELECTRIC EAE EMERGENCY ACCESS EASEMENT EG EXISTING GROUND EL ELEVATION EOA EDGE OF ASPHALT EX EXISTING ESMT EASEMENT F FIRE LINE FES FLARED END SECTION FF FINISHED FLOOR FG FINISHED GRADE FH FIRE HYDRANT FL FLOWLINE FO FIBER OPTIC G GAS GB GRADE BREAK GD GROUND GV GATE VALVE HDPE HIGH DENSITY POLYETHYLENE HP HIGH POINT IE IRRIGATION EASEMENT INV INVERT IRR IRRIGATION LF LINEAR FEET LP LOW POINT LT LEFT MH MANHOLE OHE OVERHEAD ELECTRIC OHT OVERHEAD TELEPHONE OHU OVERHEAD UTILITY PE PEDESTRIAN EASEMENT PC POINT OF CURVATURE PCC POINT OF COMPOUND CURVATURE PCR POINT OF CURB RETURN PI POINT OF INTERSECTION PT POINT OF TANGENCY PVC POLYVINYL CHLORIDE RCP REINFORCED CONCRETE PIPE RD ROOF DRAIN ROW RIGHT-OF-WAY RT RIGHT S SANITARY SEWER STA STATION SD STORM DRAIN PIPE SDMH STORM DRAIN MANHOLE SMH SANITARY SEWER MANHOLE T TELEPHONE TB THRUST BLOCK TBC TOP BACK OF CURB TCE TEMPORARY CONSTRUCTION EASEMENT TOC TOP OF CONCRETE TF TOP OF FOUNDATION TW TOP OF WALL TYP TYPICAL UE UTILITY EASEMENT VB VALVE BOX VCP VITRIFIED CLAY PIPE VPC VERTICAL POINT OF CURVATURE VPI VERTICAL POINT OF INTERSECTION VPT VERTICAL POINT OF TANGENCY W WATERLINE ABBREVIATION LIST PROPOSED OVERHEAD UTILITY PROPOSED LIGHT POLES EXISTING CABLE TV PROPOSED CABLE TV EXISTING WOOD POST EXISTING METAL POST PHASE LINE COVER SHEET OVERALL TRAIL ALIGNMENT TRAIL PLAN & PROFILE CONSTRUCTION DETAILS BRIDGE ABUTMENT DETAILS C0 C1- C2 C3 - C15 C-16 S1 - S2 ........................................... ........................................... ........................................... ........................................... ........................................... Sheet No. Description of Sheets INDEX OF SHEETS