Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7175 BRIDGE INSPECTION MAINTENANCE REPAIR AND REPLACEMENT PROGRAM (18)q �5-3'733 WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND MICHAEL BAKER INTERNATIONAL DATED: June 17, 2015 Work Order Number: &k €' %- D'5 --- -?-5'+ q v2 D) 1 Purchase Order Number: Project Title: Arthur Ditch Wood St Headwall Modification Original Bid/RFP Project Number & Name: Commencement Date: 6/17/2015 Completion Date: 11/30/2015 Maximum Fee: (time and reimbursable direct costs): Not to exceed $25,298.35 Project Description: Arthur Ditch Wood St Headwall Modification Scope of Services: See attached. Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of six (6) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professional By: _ Date: �l City of Fort Collins By. Project Manager: JjwVVang Date: 6 By: Gerry Paul Director of Purchasing and Risk Management (over $60,000.00) Date: Exhibit "A" PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND MICHAEL BAKER INTERNATIONAL. DATED: June 01, 2015 Work Order No. 23 Purchase Order No. Project title: Design Services for Arthur Ditch Headwall Modification Commencement Date: June 01, 2015 Completion Date: November 30, 2015 Maximum Fee: $25,298.35 PROJECT DESCRIPTION The purpose of this project is to provide final design services, including plans, for the modification of the headwall and trash grate for Arthur Ditch at the intersection of Wood Street and Sycamore Street in Fort Collins, Colorado. The newly constructed box culvert is approximately 170'-5" long and has a custom trash grate and headwall at the inlet. It was recently discovered that the maintenance equipment used to maintain the trash grate is not compatible with the headwall in its current state. As a result, the CITY plans to modify the headwall to be more compatible with the maintenance equipment. This scope of work defines the effort required to provide bid documents for the replacement of the expansion joints. SCOPE OF SERVICES: The scope of services for this project is to perform design services and prepare construction plans for the modification of the headwall and trash grate for Arthur Ditch at the intersection of Wood Street and Sycamore Street. BAKER will provide design services including: project management and structural design. All work will be based upon information determined from the original construction plans for the culvert. Services not included in this scope of work include, but are not limited to: roadway, traffic phasing, cost estimating, utility coordination, topographical survey, environmental coordination and permitting, right-of-way services, bidding assistance and post design services. Design criteria, standard details, and specifications shall first follow CDOT guidelines and secondly follow CITY guidelines. Final construction documents shall be consistent with CDOT requirements. The design process will only include one review by the CITY. The final product for this scope is a set of modification plans for the headwall and trash grate for Arthur Ditch at the intersection of Wood Street and Sycamore Street. The CITY will coordinate all contracting and logistical elements directly with the Contractor. Construction documents will be prepared in accordance with this contracting method. Exhibit A - Work Order Form Design Services for Arthur Ditch Headwall Modification I. PROJECT ADMINISTRATION Upon notice to proceed, BAKER will perform project administration duties throughout the length of the contract. A. Invoices will be provided to the CITY on a monthly basis and will include a billing summary and a progress report for work performed during the billing period. B. All documents will receive a quality assurance and quality control (QA/QC) review prior to submittal. C. The following meetings are anticipated: • One Pre -Design Meeting (Fort Collins) • One Design Review Meeting (Fort Collins) D. BAKER will prepare documentation of meetings and telephone conversations and provide them to the CITY for review and recording keeping. II. FINAL DESIGN The final design phase includes preparation construction document preparation for the project. Work elements include: A. Surveying / Survey Mapping — None B. Utilities —None C. Geotechnical Investigation — None D. Easements / Right of Way — None E. Environmental Documentation — None F. Final Roadway —None G. Structural Design — BAKER shall prepare engineering design calculations as necessary. Design calculations shall be submitted to the CITY upon request. A construction field package will not be included in this scope. H. Construction Plans —BAKER shall prepare construction plans for the full scope of the project. The plans shall be QC reviewed prior to submittal to the CITY. Construction plans shall be prepared in the Microstation format. June15,2015 INTKNNATIONAL "� `�'.- �, u n. .�. �'�S�f°.-mn�'k""".. ,�,:N,n.,� ,.k's�,*.""+«.;,^;r'S ,;�tid".':4�F"i'�s.`-''•fie-;:.. '^4�;as,'. �•-c'';.' Exhibit A - Work Order Form Design Services for Arthur Ditch Headwall Modification Traffic Control Plan — None J. Project Specifications — The CITY will complete all specifications including project special provisions, any boiler plate specifications and the General Conditions. Specifications shall follow CITY specifications where applicable, and CDOT 2011 specifications otherwise. K. Construction Cost Estimate — None III. ADVERTISEMENT The advertisement design phase includes revisions to the final design and construction documents in response to comments provided by the CITY from the design review. Work elements include: A. Final Design — BAKER shall revise the engineering design according to comments from the CITY. All documents signed and sealed. B. Contract Documents — BAKER shall revise construction plans according to comments from the CITY. C. Utility Coordination & Design — None D. Construction Cost Estimate — None E. Assistance with Project Bidding - None F. Preparation of revised "For Construction" Plan Set — Prepare a final plan set and contract document package that incorporates any revisions required during the pre -construction meeting. Plans shall be marked "FOR CONSTRUCTION, (DATE)". All documents signed and sealed. IV. POST — DESIGN SERVICES A. Construction Administration Assistance — Post -Design services are excluded from this scope of work. If requested, BAKER can provide construction administration and design support services under a separate contract. Construction administration effort includes: RFI responses, shop drawing review, and assistance in the field. June 15,2015 #MTINNAT10MAL Exhibit A - work Order Form Design Services for Arthur Ditch Headwall Modification V. REFERENCES AND DESIGN CRITERIA The following references and design criteria shall be used throughout all phases of the project: A. All structural design shall follow the load and resistance factor design (LRFD) methodology. Design shall be in accordance with the AASHTO LRFD Bridge Design Specifications, 6th Edition. In addition, the design shall follow all CDOT technical documents, including: Bridge Design Manual, Bridge Detailing Manual, Load Rating Manual, and Technical Memorandums. B. Construction specifications will be in accordance with the Colorado Department of Transportation 2011 Standard Specifications for Road and Bridge Construction and related special provisions as developed by the CITY. VI. DELIVERABLES The following is an estimate of the deliverables required for this project. Refer to the detailed discussions above for further detail. All copies shall be submitted in hard copy and .pdf format; plans are 1 lx17, all others 8%z xl 1, except as noted otherwise. Project Administration: (Ongoing) - Monthly progress reports with monthly invoices - Meeting and telephone conversation documentation - Quality Control review of all project deliverables prior to their submittal Final Design - Final design plans Advertisement - Completed design plans VII. SCHEDULE Construction documents will be completed and submitted to the CITY as soon as possible, but no later than November 30, 2015 unless directed otherwise by the CITY. June15,2015 INTINNATIONAI Exhibit "B" Task Order 23 Fee Summary for Michael Baker Jr., Inc. City of Fort Collins Bridge Inspection, Maintenance, Repair and Replacement Program Description: Arthur Ditch at Wood Street and Sycamore Street Headwall Modification PRIMARYDESIGN TASK ELEMENTS TOTALHOURS LABOR Project Management & Meetings 40 $5,206.20 Final Design 113 45 $13,566.08 $6,276.57 Preparation for Project Advertisement Subtotal 198 $25,048.85 REIMBURSABLE EXPENSES: (Approximate) Copies & Plotting (B&W) (500 x $0.05) -- $25.00 $75.00 Copies & Plotting (Color) (150 x $0.50) _ Mileage ($0.575/mi) (2 trips @ 130 mi/trip) 2 $149.50 Su btota I 249.50 WORK ORDER TOTAL 611712015 1 of 1 Arthur Ditch at Wood Street and Sycamore Street Headwall Modification -- Hours Fee Estimate -- Michael Baker International 6/17/2015 ESTIMATED PROJECT HOURS & FEE QA/QC (Stapleton) Structural Manager (Nomovitz) Project Manager (Johnson) Structural Engineer (Zulegar) Structural Cadd (Mayhew) Civil Lead (StMllah) Roadway Designer (Wray) Roadway Cadd (Vaughn) Admin. Assistant (Robbins) Subtotal RolelPersonnel -. Work Element Description Rate-» $194.54 $147.97 $122.52 $78.97 $129.00 $135.00 $96.00 1 $87.11 $92.02 PROJECT ADMINISTRATION & MEETINGS Project Setup and Initiation 8 8 Pro ect Billinq and Progress Reports 8 t8 Pre -Design Meeting 4 4 1 1 8 esi n Revew Mee n HOURS SUBTOTAL 0 12 28 1 0 0 0 0 0 0 40 FEE SUBTOTAL ,$0.00 $1,775.64 $3,430.56 $0.00 $0.00 $0.00 $0.00 $0,00 $0.00 $5,206.20 FINAL DESIGN (FOR) Structural Design 0 Design Make 8 8 Design Check 8 8 Plan Details 4 8 12 40 64 Prepare Final Design Construction Plans 0 Prepare Plan Package 1 2 2 1 4 9 Prepare Construction Cost Estimate 1 0 PS&E QA1QC 4 4 2 1 10 Submittal to City 1 1 4 6 Quantities 4 4 8 HOURS SUBTOTAL 41 10 25 26 1 48 1 0 0 0 0 113 FEE SUBTOTAL $778.16 $1,479.70 $3,063,00 $2,053.22 $5,19200 $0.00 $0.00 $0.00 $0.00 $13,566.08 PREPARATION FOR PROJECT ADVERTISEMENT Incorporate Design Review Comments 2 4 6 Revisions to Construction Documents 8 8 PS&E QA1QC Review 4 4 2 4 14 Bid Package Submittal Preparation 1 1 2 4 Revisions to Construction Bid Plans 2 4 6 Pre are Si n & Seal, and Submit "For Construction" Sets ro act oseout 1 1 1 1 4 3 HOURS SUBTOTAL FEE SUBTOTAL 5 $972.70 11 $1,627.67 10 $1,225.20 0 $0.00 19 $2,451.00 0 1 $0.00 0 $0.00 0 $0.00 0 $0.00 45 7276.57 BAKER TOTAL HOURS BY STAFF 9 33 63 26 67 0 0 0 0 198 BAKER TOTAL FEE BY STAFF $1,750.86 $4,883.01 $7,718.76 $2,053,22 $8,643.00 $0.00 $0.00 $0.00 $0.00 $25,048.85 TOTAL PROJECT HOURS & FEE $25,048.85 1