Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 8098 TIMBERLINE & HORSETOOTH INTERSECTION IMPROVEMENTSCity Of Fort Collins Engineering Planning, Development & Transportation Engineering 281 Korth College Avenue P.O. Box 680 Fort Collins. CO 60522.0580 970.221.6605 970,221.6378 - fax Change Order Form PROJECT TITLE: Horsetoolh &Timberline Turn Lane Improvements PROJECT NUMBER: 400901812 (Bid #8098) CONTRACTOR: Naranjo Civil Contractors (PO #9152887) CHANGE ORDER NUMBER: 2 n prepanng change orders show in order as separate numbered paragrapns the tonomng: 1. Reason for change. 2, Description of change. 3. Change In contract cost. 4. Change In contract lime, 1.&2. See attached Invoice for details 3. The contract cost wlil increase by $110,943.40 4. There will be no change in contract time. ORIGINAL CONTRACT COST $3,304,501.62 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $10.943.40 TOTAL % OF THIS CHANGE ORDER 0.33% TOTAL C.O. % OF ORIGINAL CONTRACT 0.33% ADJUSTED CONTRACT COST $3,316,445.02 ACCEPTED BY: REVIEWED BY: SUBMITTED BY: rE: L 11 '1 // 5 TE: 'E: �r7 /57 APPROVED BY: DATE: (Department Head) APPROVED BY: DATE: (Purchasing Agent over $60,000) cc: Contractor Purehastng Project FYe CiY",5f ..Fort Collins Contract Modification CMO#002 281 North College Avenue PO Box 580 Fort Collins, CO 80522-0580 Project Name: Horsetooth and Timberline Operational Improvement Project Project Number: AQC M455-010 (19307) Date: June 17, 2015 Proposed Contract Modification No.: CMO#002 Project Manager: Dan Woodward Contractor: Naranjo Civil Constructors, Inc. John Leone, Project Manager A. Description of Modification This modification will change the top lift of asphalt to a mix with a modified binder (PG 64- 28). This is required to meet current City of Fort Collins standards for arterial roadways. The contract currently calls for a non -modified binder, this was a plan error. This modification will delete the following bid item: 403-03 Hot Mix Asphalt (Grading SX) (100) (PG 64-22) TON 1794 This modification will add the following bid item: 403-03 Hot Mix Asphalt (Grading S) (75) (PG 64-28) TON 1794 There will be no change in contract time due to this modification. All work will be performed according to the contract specifications. This work is within the original scope of the project. B. Changes to Specifications Make the following changes to the contract specifications: Fort Collins 281 North College Avenue PO Box 580 Fort Collins, CO 80522-0580 Replace Table 403-1 with the table below: Table 403-1 Test Value For Grading Property Method S (75) Air Voids, percent at: CPL 5115 N (design) 3.5 — 4.5 Lab Compaction (Revolutions): CPL 5115 N (design) 75 Stability, minimum CPL 5106 28 Minimum % of the aggregate retained on the 4.75 mm (No. 4) CP 45 60 sieve having at least 2 mechanically induced fractured faces Accelerated Moisture Susceptibility CPL 5109 Tensile Strength Ratio (Lottman), Method B 80 minimum Minimum Dry Split Tensile CPL 5109 205 (30) Strength, kPa (psi) Method B Grade of Asphalt Cement, Top PG 64-28 er Layer Grade of Asphalt Cement, Layers PG 64-22 below To Voids in the Mineral Aggregate CP 48 See Table (VMA) % minimum 403-2 Voids Filled with Asphalt (VFA), % Al MS-2 65-80 Dust to Asphalt Ratio Fine Gradation CP 50 0.6 - 1.2 Coarse Gradation 0.8 - 1.6 Note: Al MS-2 = Asphalt Institute Manual Series 2 Note. The current version of CPL 5115 is available from the Region Materials Engineer. Note: Mixes with gradations having less than 40% passing the 4.75 mrn (No. 4) sieve shall be approached with caution because of constructability problems. Note: Gradations for mixes with a nominal maximum aggregate size of one -inch or larger are considered a coarse gradation if they pass below the maximum density line at the #4 screen. Gradations for mixes with a nominal maximum aggregate size of/4 inch or smaller are considered a coarse gradation if they pass below the maximum density line at the 48 screen. .-Flirt-Collins Delete the following from Subsection 403.05: Pay Item Hot Mix Asphalt (Grading SX) (100) (PG 64-22) Add the following to Subsection 403.05: Pay Item Hot Mix Asphalt (Grading S) (75) (PG 64-28) C. Summary of Final Pricing 281 North College Avenue PO Box S80 Fort Collins, CO 80522-OS80 Pay Unit Ton Pay Unit Iwo rfEM QUANTrrY PRICE VALUE Item Number Item Description Unit (a) Original Estinated Quantity (b) Estimated Change in Quantity (c) New Estimated Quantity (a+b) (d) Bid I Price (e) Change In Price (f) New Price (d+e) (9) "Value of Modification 403-03 Hot MixAsphalt (Grading S) (75) (PG64-28) IPSM - 1,7941 1,794 S0.00 $112,10 $11110 S201,107.40 403.03 Hot Nlr\Asphall(GradingSX) (100)(PG UI-?2) LNI;T 1,794 1 (1,794) - S10600 -S10600 5000 -S190,16400 Net Value of Modification S10,943 40 . For all changes (g) = [(c) x(I)] - [(a) x(d)] Hot Mix Asphalt (Grading SX) (100) (PG64-22) was for the top lift of asphalt pavement and bid at $106.00 per ton. The increase in cost due to the material switch to Hot Mix Asphalt (Grading S) (75) (64-28) was $6.10 per ton, resulting in a final cost of $112.10 per ton for the top lift of asphalt.