Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9153737City of �F� Collins Page 1 Customer: CITY OF FORT COLLINS FC BIKES 281 N COLLEGE AVENUE FORT COLLINS CO 80524 Invoice W j 3 7 3 % Invoice Number: 68631 Customer Number: 535504 Invoice Date: 6/17/2015 Invoice Due Date: 7/17/2015 Company Number: 00292 Remit To: CITY OF FORT COLLINS 117 NORTH MASON STREET P.O. BOX 580 FORT COLLINS, CO 80522-0580 Please Return the Enclosed Copy with your Payment Item Description Charges 001 Work Order 177590 24,734,11 Balance Due 24,734.11 TERMS AND CONDITIONS Payment is due within 30 days of the invoice date. If you have any questions, please contact saragon@fcgov.com or call 6103. Cit, of �&t Cohn Traffic Operations Itemized Invoice 177590 W. LAUREL BIKE PROJECT 2015 "Customer tdame`� - Cortt� ''hlame C�sstomr�r hiurrtber BIKES/MOVESFC - 0. Description: S&P PROJECT (WFO) Install Signs and Pavement markings per Plans Developed by FC Moves and Traffic Operations staff. ----------------------------------------------------------------------------------- ------------------------------------------ _------------------------------------ Total Reaular Overtime Extended Description Hours Hours Costs Hours Costs Cost CREW CHIEF 10.50 0.00 $0.00 10.50 $689.29 $689.29 STREET SIGN TECHNICIAN 16.25 5.00 $181.26 11.25 $487.28 $668.54 TRAFFIC ENGINEERING TECH II 12.00 2.00 $83.11 10.00 $493.44 $576.55 TRAFFIC EQUIPMENT OPERATOR 1 32.50 13.00 $406.04 19.50 $732.01 $1,138.06 TRAFFIC EQUIPMENT OPERATOR 11 15.00 5.00 $215.52 10.00 $511.14 $726.66 UTILITY WORKER- STRTS/TRAFFIC 69.75 30.00 $450.19 39.75 $875.48 $1,325.68 Total Labor $5,124.78 Description Quantity Cost Per Unit Extended Cost 2' WAIT HERE THERMO 1.00 $196.51 $196.51 24" GREEN BIKE LANE THERMO 195.00 $8.99 $1,752.66 24" WHITE LINE 150.00 $6.62 $993.60 24" X 30" SIGN BLANK (5 SQFT) 6.00 $13.32 $79.92 4" WHITE LINE 720.00 $1.10 $794.88 48" WHITE REFLECTIVE DELINEATOR POST 50.00 $126.60 $6,330.00 48"X84" LFT BIKE SYMBOL BOX PANEL 1.00 $180.85 $180.85 6" WHITE LINE 240.00 $1.66 $397.44 BIKE SYMBOL (THERMO) 6' 5.00 $98.44 $492.18 Band -It Set (Set of 1) 12.00 $7.34 $88.13 Begin Right Turn Lane Yield to Bikes HI 36X30 (7.5SQFT) 1.00 $44.74 $44.74 CITY POST BASE WRENCH 1.00 $14.40 $14.40 DP200 SERIES SPINNER ALUM CUP 50.00 $13.20 $660-00 EC Film "Acrylic" any size or color 38.00 $1.06 $40.13 FG 300 END CAP FOR ANCHOR 50.00 $5.40 $270.00 Hi Intensity Microprismatic, any color or size 32.00 $1.38 $44.16 LARGE SHARROW SYMBOL LFT 6'X15' 2.00 $1,015.92 $2,031.84 LFT ARROW STENCIL (THERMO) 8.00 $103.64 $829.15 No Parking Symbol Anytime (Arrow) HI 12"x18" (1.5 SOFT) 6.00 $13.10 $78.62 PART A EPDXY FOR DELINEATORS 2.00 $81.60 $163.20 Page 1 of 2 PART B EPDXY FOR DELINEATORS 2.00 $81.60 $163.20 PREMARK RXR KIT 90MIL 3.00 $284.09 W2.26 PREMARK SP SEALER KIT 5.00 $91.80 $459.00 RT ARROW STENCIL (THERMO) 2.00 $103.64 $207.29 Red Paint Low Voc 10.00 $15.53 $155.28 Reflective Beads 190.00 $0.46 $86.64 STRAIGHT ARROW STENCIL 6 FT (THERMO) 6.00 $42.11 $252.65 White Paint Latex 12.60 $10.79 $135.92 Yellow Paint Latex 6.20 $10.79 $66.89 asphalt core bit 1.00 $177.60 $177.60 water hose fore core bit 1.00 $12.37 $12.37 Total Materials $18,051.52 Description Hours Cost Per Hour Extended Cost F350 FLATBED STENCIL TRUCK 1.50 $18.00 $27.00 PLATFORM TRUCK 1999 I.H. 5.00 $30.25 $151.26 TRUCK 2002 CHEVY FLATBED 10.00 $21.60 $216.00 TRUCK 2004 Ford F-350 10.00 $21.60 $216.00 PICKUP TRUCK (RICH) 10.00 $14.40 $144.00 2012 ISUZU SIGN TRUCK 9.25 $34.20 $316.36 2012 STRIPER 3.00 $105.60 $316.80 TRAILER - TRAFFIC CONTROL 10.00 $6.00 $60.00 X-WALK CREW TRAILER 10.00 $9_$4 $98.40 5900 LINE LAZER/DRIVER (2011) 0.50 $24.00 $12.00 Total Equipment $1,557.82 Total - Work Order #177590 $24,734.11 Traffic Operations Use Only Date Paid Comments/Notes 20612 DC 24734:09 Page 2 of 2