Loading...
HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9153736�l 5-3_7 3A WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND BANNER CONCRETE, LLC. DATED: 4/6/2015 Work Order Number: 07-BAN-400903700-15 Purchase Order Number: Project Title: Cherrv/Mason — Sidewalk Repairs Original Bid/RFP Project Number & Name: 7658 (Annual Concrete Maintenance Contract) Commencement Date: 4/6/2015 Completion Date: 4/1012015 Maximum Fee: (time and reimbursable direct costs): $6,500.00 Project Description: Excavate and install approximately 450 SQ FT of NW corner accessible ramp, curb and gutter, Scope of Services: Conduct onsite meetings as necessary, perform general excavation, removal of improvements construction of new sidewalk and ramps and fulfill material testing requirements as necessary. Upon project completion to be reviewed by contractor and City engineering staff. The scope of services does not include authorization to deviate from the approved location without approval from engineering project manager. Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of one (j) page are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professional By: Date: 4/6/2015 City of Fort Collins s� By: Robert Mosbey /�'✓ ®�� Project Manager Date: 4/6/2015 By: Gerry Paul Director of Purchasing and Risk Management (over $60,000.00) Date: