Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8031 CM GC SERVICES FOR OLD TOWN SQUARE RENOVATIONS�WORK CHANGE DIRECTIVE 9DWttMAN 031LUPNMNT hk'THCtuTr rJ'!T tO:.lt:tS . CCH.rNtt.QA TO CONTRACTOR: Mortenson Construction (Mortenson) WCD NO: 001 PROJECT: Old Town Square Renovation PROJECT NO: 9151772 OWNER: Fort Collins Downtown Development Authority ARCHITECT: studiolNSITE The following additions, deletions, or revisions to the Work have been ordered and authorized: Description of Work: (Title of WCD). Pa11eLiZe Pavers This Work Change Directive (WCD) directs the Contractor to price, and if accepted, make the modifications as described below. The DDA has coordinated with outside parties to provide pavers from the square in the quantities listed below. The contractor shall provide individual pricing for each item listed below; these prices will be utilized to invoice the appropriate party. Mortenson costs are listed in 1. Parks Department red next to each line item. a. City Park Nine Golf Course — 4000sf $1,480.00 b. Spring Canyon Park — 500sf $185.00 Total Cost: $2,701.00 2. Engineering Departmnet Total Time: 0 days a. City ROW— 2 full pallets (approximately 250sf-300sf) $111.00 3. POTS a. Parking Area — 900sf $33100 b. Private Party—1600sf $592.00 The work shall include supplying equipment, labor, and materials to perform the work according to the Old Town Square Renovation plan documents, specifications, and approved submittals. The DDA has a desire to recycle as much as possible from the square. The utilization of pavers by other parties assists the DDA with this goal. Attachments (List Supporting Documents): It is understood that this rk Change Directive ay change the Contract Price and/or Time, and is evidence that the parties expect a Change Order quest f approval t ubsequently follow this Work Change Directive. Ordered By: 41- Z.3— caner Date Recommended By: April 1, 2015 Resident Engineer Date Copy: Owner, Field File . SharePoint OTS_WCD001-PALLETIZE_PAVERS_DRAFT FOR PRICING PAGE 1 OF 1