TO CONTRACTOR: Mortenson Construction (Mortenson) WCD NO: 001
PROJECT: Old Town Square Renovation PROJECT NO: 9151772
OWNER: Fort Collins Downtown Development Authority
ARCHITECT: studiolNSITE
The following additions, deletions, or revisions to the Work have been ordered and authorized:
Description of Work:
(Title of WCD). Pa11eLiZe Pavers
This Work Change Directive (WCD) directs the Contractor to price, and if accepted, make the modifications as
described below. The DDA has coordinated with outside parties to provide pavers from the square in the
quantities listed below. The contractor shall provide individual pricing for each item listed below; these prices
will be utilized to invoice the appropriate party.
Mortenson costs are listed in
1. Parks Department red next to each line item.
a. City Park Nine Golf Course — 4000sf $1,480.00
b. Spring Canyon Park — 500sf $185.00 Total Cost: $2,701.00
2. Engineering Departmnet Total Time: 0 days
a. City ROW— 2 full pallets (approximately 250sf-300sf) $111.00
3. POTS
a. Parking Area — 900sf $33100
b. Private Party—1600sf $592.00
The work shall include supplying equipment, labor, and materials to perform the work according to the Old
Town Square Renovation plan documents, specifications, and approved submittals.
The DDA has a desire to recycle as much as possible from the square. The utilization of pavers by other parties
assists the DDA with this goal.
Attachments (List Supporting Documents):
It is understood that this rk Change Directive ay change the Contract Price and/or Time, and is evidence that the parties
expect a Change Order quest f approval t ubsequently follow this Work Change Directive.
Ordered By: 41- Z.3—
caner Date
Recommended By: April 1, 2015
Resident Engineer Date
Copy: Owner, Field File . SharePoint