HomeMy WebLinkAboutWORK ORDER - RFP - 7421 CITY ARCHITECTURAL & ENGINEERING WORK ORDER CONTRACT (3)EXHIBIT ''All WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND RB+B Architects, Inc. DATED: August 24, 2007 Work Order Number: A1-03-2015 TMA Wo #: OP-465303 Purchase order Number: Project Title Downtown Restrooms Commencement Date: May 26, 2015 Completion Date: December 31, 2015 Maximum Fee (time and reimbursable direct costs) : $42,000.00 Project Description: To design a modem restroom facility to replace the existing restroom facility downtown. Scope of Services: Provide all necessary design services for the new downtown restroom per the attached RB+B Architects proposal dated 5/12/15. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms) the Services Agreement shall control. SERVICE PROVIDER ;J4-1 c'- By: I Date: ACCEPTANCE Ethan Cozzens USER The attached forms consisting of two (1) pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given - CITY OF FORT COLLINS By: Date: CC: Purchasing Director of Purchasing and Risk Management over $60,000. FACILITIES REQUISITION FORM VENDOR RB+B Architects DATE 6/1/15 REQ BY: Ethan Cozzens CHARGE# 400500108.521120 Work Order # OP-465303 Billable? Y/N Yes. TOTAL COST: $42,000.00 - BUYER: John Stephen OTY DESCRIPTION COST Provide all necessary design services for the new downtown restroom per the attached RB+B Architects work agreement dated 5/26/15. $42,000.00 ADDITIONAL INFO COMPUTER INPUT INFORMATION: VENDOR# REQUISITION # DATE ENTERED: R8s8 Architects, Inc. - 315 `cant ! trumlaih A,enue- Site : tt - Fn I C-c' .,s CQ F 0524-Z913 48441117 Flanrd-i3 (Meier 0 " r, M= May 12, 2015 Ethan Cozzens Project Manager Operation Services City of Fort Collins Ethan, Thank you for the opportunity to present a proposal for Site Planning, Civil and Landscape design, Architectural and Engineering services for the new downtown restroom building for the City of Fort Collins at the Oak Street Parking area. The building will be a modern restroom facility to replace the existing restroom facility to be demolished. This proposal includes, Civil Engineering, Site design, Limited site lighting, and Landscape Design. The scope of this proposal also includes Planning Department submittals, DDA submittals, Art in public places coordination, meetings and possible Minor Amendment to existing approved land use resulting from proposed use. Scope of Services: Site Schematic Design: RB+B and its consultants will meet with the COFC Planning Department to determine what process will be necessary for approval of the proposed land use. Then, utilizing existing base drawings, field notes and meeting minutes, we will research and present up to 2 design options for the building. Once approved by the Owner, the site design and coordinated building design drawings will provide the basis for submittal documents to the City Planning Department for approval. This phase will also include preliminary opinion of probable construction cost for site improvements. RB+B and its consultants will also meet with the Downtown Development Authority and Art in Public Places organization to determine what scope will be necessary for submittals and subsequent approval. Hourly Not To Exceed Total $12,000.00 Construction Documents/Planning Department Submittal: Provide a set of drawings for final planning department approval, competitive bid, permit and construction. After approval of the Schematic Design concept, RB+B will utilized the established drawings from the Schematic Design Phase. Project Specifications will be provided within the drawing package. A separate project manual is not included in this proposal. This package will include completed Civil, Landscape and other drawings as necessary for City Planning approval and construction of the project site. Hourly Not To Exceed Total $30,000.00 Items Not Included in this Proposal The following items are not included in this proposal: 1. Project Manual. This project will have specifications included on drawings. 2. Traffic Impact Study. 3. Erosion Control Report. 4. Hazardous waste removal, reports or Investigations. 5. Detailed cost estimating. An opinion of probable construction cost will be included in the initial design phase. 5. Design of water retention areas. It is assumed that the existing stormwater retention for the site is adequate for the project to tie into. 7. Planning or building department fees. 8. Alterations to existing streets or sidewalks, fencing or landscape or any new site access. 9. Site signage design. 10. Environmental Phase I or II site assessment reports or submittals. If you have any questions, please feel free to contact me. Sincerely, 1444---- Ken Field AIA Principal, RB+B Architects, Inc