Loading...
HomeMy WebLinkAboutRFP - 8068 ENHANCED TRAVEL CORRIDOR MASTER PLAN FOR WEST ELIZABETHAddendum 1 – 8068 Enhanced Travel Corridor Master Plan for West Elizabeth Page 1 of 2 ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of BID 8068: Enhanced Travel Corridor Master Plan for West Elizabeth OPENING DATE: 3:00 PM (Our Clock) March 2, 2015 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit 1 – Questions & Answers Please contact John Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Addendum 1 – 8068 Enhanced Travel Corridor Master Plan for West Elizabeth Page 2 of 2 EXHIBIT 1 – QUESTIONS & ANSWERS 1. The RFP specifies that no costs should be provided. Does the City have a consultant budget specified for the project so we can make sure that our proposed approach and hours will align with the project’s budget? This project was funded through the 2015-2016 City of Fort Collins Budget which is available online at: fcgov.com/budget. This consultant selection will be based only on performance and not costs. 2. The City will develop a Public Engagement Plan with help from the consultant. To what extent does the City desire consultant assistance in implementing the Public Engagement Plan? The consultant is expected to assist with the public outreach process by providing presentation materials (graphics, illustrations, handouts, presentation boards, etc.), and attending/helping to facilitate public meetings. 3. Is the consultant expected to attend/facilitate all TAC and CAC meetings? The consultant is expected to have a representative attend and occasionally help facilitate TAC and CAC meetings. 4. No minimum UDBE requirement is identified in the RFP. However, Page 12 shows a weighting factor for UDBE participation. Will the UDBE participation weighting factor apply if there is no minimum UDBE requirement? Although there is no minimum requirement identified in the RFP, UDBE participation will be looked upon favorably in the evaluation process.