HomeMy WebLinkAboutBID - 7665 TRANSFORT WHEEL LOADER ACCESSORIES (4)BID 7665 Transfort Wheel Loader Accessories Page 1 of 17
INVITATION TO BID
7665 TRANSFORT WHEEL LOADER ACCESSORIES
BID OPENING: 3:00 P.M. (our clock), JULY 18, 204
The City of Fort Collins is requesting bids from firms to furnish several different types of
accessories as specified for Wheel Loaders.
Sealed bids will be received and publicly opened at the office of the Director of
Purchasing and Risk Management, PO Box 580, 215 North Mason St., 2nd floor, Fort
Collins, Colorado 80522, at the time and date noted on the bid proposal and/or contract
documents. If delivered, they are to be sent to 215 North Mason Street, 2nd Floor, Fort
Collins, Colorado 80524. If mailed, the address is P.O. Box 580, Fort Collins, 80522-
0580.
Bids must be received at the Purchasing Office prior to 3:00 p.m. (our clock), July
18, 2014.
The City encourages all disadvantaged business enterprises to submit bid in response
to all invitations and will not be discriminated against on the grounds of race, color,
national origin.
Questions concerning the scope of the bid or submittal/ process should be directed to
Doug Clapp, Senior Buyer at (970) 221-6776 or dclapp@fcgov.com.
Any questions must be submitted via email to the Buyer by the end of the
business day on July 8th, 2014.
A copy of the Bid may be obtained as follows:
1. Download the Bid from the Purchasing Webpage, Current Bids page, at:
http://fcgov.com/eprocurement
Special Instructions
All bids must be properly signed by an authorized representative of the company with
the legal capacity to bind the company to the agreement. Bids may be withdrawn up to
the date and hour set for closing. Once bids have been accepted by the City and
closing has occurred, failure to enter into contract or honor the purchase order will be
cause for removal of supplier's name from the City of Fort Collins' bidders list for a
period of twelve months from the date of the opening. The City may also pursue any
remedies available at law or in equity. Bid prices must be held firm for a period of forty-
five (45) days after bid openings.
Submission of a bid is deemed as acceptance of all terms, conditions and specifications
contained in the City's specifications initially provided to the bidder. Any proposed
Financial Services
Purchasing Division
215 N. Mason St. 2nd Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov.com/purchasing
BID 7665 Transfort Wheel Loader Accessories Page 2 of 17
modification must be accepted in writing by the City prior to award of the bid.
Only bids properly received by the Purchasing Office will be accepted. All bids should
be clearly identified by the bid number and bid name contained in the bid proposal.
No proposal will be accepted from, or any purchase order awarded, to any person, firm
or corporation in default on any obligation to the City.
Bids must be furnished exclusive of any federal excise tax, wherever applicable.
Bidders must be properly licensed and secure necessary permits wherever applicable.
Bidders not responding to this bid will be removed from our automated vendor listing for
the subject commodities.
The City may elect where applicable, to award bids on an individual item/group basis or
on a total bid basis, whichever is most beneficial to the City. The City reserves the right
to accept or reject any and all bids, and to waive any irregularities or informalities.
Sales prohibited/conflict of interest: no officer, employee, or member of City Council,
shall have a financial interest in the sale to the City of any real or personal property,
equipment, material, supplies or services where such officer or employee exercises
directly or indirectly any decision-making authority concerning such sale or any
supervisory authority over the services to be rendered. This rule also applies to
subcontracts with the City. Soliciting or accepting any gift, gratuity, favor,
entertainment, kickback or any items of monetary value from any person who has or is
seeking to do business with the City of Fort Collins is prohibited.
Freight terms: unless otherwise noted, all freight is F.O.B. Destination, Freight Prepaid.
All freight charges must be included in prices submitted on proposal.
Discounts: any discounts allowed for prompt payment, etc., must be reflected in bid
figures and not entered as separate pricing on the proposal form.
Purchasing restrictions: your authorized signature of this bid assures your firm's
compliance with the City's purchasing restrictions. A copy of the resolutions is available
for review in the Purchasing Office or the City Clerk's Office. Request Resolution 91-
121 for cement restrictions.
Collusive or sham bids: any bid deemed to be collusive or a sham bid will be rejected
and reported to authorities as such. Your authorized signature of this bid assures that
such bid is genuine and is not a collusive or sham bid.
Bid results: for information regarding results for individual bids send a self-addressed,
self-stamped envelope and a bid tally will be mailed to you. Bid results will be posted in
our office 7 days after the bid opening.
Gerry S. Paul
Director of Purchasing and Risk Management
BID 7665 Transfort Wheel Loader Accessories Page 3 of 17
CITY OF FORT COLLINS
BID PROPOSAL
Transfort Wheel Loader Accessories
The City of Fort Collins is requesting bids to furnish several different types of accessories
as specified for Wheel Loaders. Vendors responding to this bid must comply with the federal
terms and conditions attached hereto. All bids shall be F.O.B. Transfort Bus Facilities, 6570
Portner Road, Fort Collins, CO 80525.
For questions, please contact:
• Doug Clapp, Senior Buyer at 970-221- 6776 or dclapp@fcgov.com.
Instructions for bid submittal:
Bids must include the following:
1. Complete Specifications for products to be furnished.
2. Completed Bid proposal pricing sheet.
3. Time frame to provide accessories.
Specifications – for attachments to a 3.5 cubic yard wheel loader w/ ACS coupling (Pro
Series 2000 size 30)
1. Multi-Directional Folding V Plow
a. Length – 12ft x 48”h Blade
b. 3” center hinge pin
2. Snowblower attachment
a. Option 1 – cutting width = 84”
b. Option 2 – cutting width = 96”
3. Angle Broom
a. 10ft wide
b. 36” diameter brush
Delivery
Delivery shall be made to the City’s Street Facility at 625 Ninth Street, Ft. Collins, CO 80524.
Contact Ian or Eric at 970-221-6613 to coordinate and schedule delivery.
BID 7665 Transfort Wheel Loader Accessories Page 4 of 17
BID PROPOSAL
PRICING -
Item Product qty $ / each Sub-total
1. Multi-Directional Folding V-Plow 1
Freight
Total cost $
Item Product qty $ / each Sub-total
2. Snowblower - option 1 1
or Snowblower – option 2 1
Freight
Total cost $
Item Product qty $ / each Sub-total
3. Angle Broom – 10ft x 36” 1
Freight
Total cost $
At the option of the City, additional purchases may be made from this bid for up to five years
following the initial award to include accessories for up to an additional 3 units.
BID AWARD
Bids will be awarded based on total cost on each item. Items may be awarded to a single
vendor or to multiple vendors depending on ability to supply the requested accessories. Please
include any applicable discounts for freight in the event the City awards multiple accessory
items to one vendor.
DELIVERY
Leadtime to provide attachment(s) Item 1: _____________________
Item 2: _____________________
Item 3: _____________________
BID 7665 Transfort Wheel Loader Accessories Page 5 of 17
VENDOR'S STATEMENT
I have read and fully understand all the conditions, specifications, and special instructions
herein set forth above. I hereby agree to comply with all said conditions, special instructions,
and specifications as stated or implied.
Signature:
Printed:
Title:
Company:
Address:
City, State, Zip:
Phone:
Email:
BID 7665 Transfort Wheel Loader Accessories Page 6 of 17
PLEASE NOTE: This is a federally funded project. All bidders must comply with the
following FTA terms and conditions.
FEDERAL TRANSIT ADMINISTRATION
TABLE OF CONTENTS
Federally Required and Other Model Contract Clauses
1. NO GOVERNMENT OBLIGATION TO THIRD PARTIES .................................................... 7
2. PROGRAM FRAUD AND FALSE OR FRAUDULENT STATEMENTS AND RELATED
ACTS ..................................................................................................................................... 7
3. ACCESS TO RECORDS AND REPORTS ............................................................................ 7
4. FEDERAL CHANGES ........................................................................................................... 9
5. TERMINATION ...................................................................................................................... 9
6. CIVIL RIGHTS REQUIREMENTS ....................................................................................... 12
7. DISADVANTAGED BUSINESS ENTERPRISE (DBE) ....................................................... 13
8. INCORPORATION OF FEDERAL TRANSIT ADMINISTRATION (FTA) TERMS ............. 14
9. GOVERNMENT-WIDE DEBARMENT AND SUSPENSION (NONPROCUREMENT) ....... 14
10. BUY AMERICA ................................................................................................................... 15
11. CARGO PREFERENCE REQUIREMENTS ........................................................................ 16
12. ENERGY CONSERVATION REQUIREMENTS .................................................................. 17
13. RECYCLED PRODUCTS .................................................................................................... 17
14. CITY OF FORT COLLINS BID PROTEST PROCEDURES ............................................... 17
BID 7665 Transfort Wheel Loader Accessories Page 7 of 17
1. NO GOVERNMENT OBLIGATION TO THIRD PARTIES
No Obligation by the Federal Government.
(1) The Purchaser and Contractor acknowledge and agree that, notwithstanding any
concurrence by the Federal Government in or approval of the solicitation or award of
the underlying contract, absent the express written consent by the Federal
Government, the Federal Government is not a party to this contract and shall not be
subject to any obligations or liabilities to the Purchaser, Contractor, or any other party
(whether or not a party to that contract) pertaining to any matter resulting from the
underlying contract.
(2) The Contractor agrees to include the above clause in each subcontract financed in
whole or in part with Federal assistance provided by FTA. It is further agreed that the
clause shall not be modified, except to identify the subcontractor who will be subject to
its provisions.
2. PROGRAM FRAUD AND FALSE OR FRAUDULENT STATEMENTS AND RELATED
ACTS
Program Fraud and False or Fraudulent Statements or Related Acts.
(1) The Contractor acknowledges that the provisions of the Program Fraud Civil Remedies
Act of 1986, as amended, 31 U.S.C. § 3801 et seq. and U.S. DOT regulations,
"Program Fraud Civil Remedies," 49 C.F.R. Part 31, apply to its actions pertaining to
this Project. Upon execution of the underlying contract, the Contractor certifies or
affirms the truthfulness and accuracy of any statement it has made, it makes, it may
make, or causes to be made, pertaining to the underlying contract or the FTA assisted
project for which this contract work is being performed. In addition to other penalties
that may be applicable, the Contractor further acknowledges that if it makes, or causes
to be made, a false, fictitious, or fraudulent claim, statement, submission, or
certification, the Federal Government reserves the right to impose the penalties of the
Program Fraud Civil Remedies Act of 1986 on the Contractor to the extent the Federal
Government deems appropriate.
(2) The Contractor also acknowledges that if it makes, or causes to be made, a false,
fictitious, or fraudulent claim, statement, submission, or certification to the Federal
Government under a contract connected with a project that is financed in whole or in
part with Federal assistance originally awarded by FTA under the authority of 49
U.S.C. § 5307, the Government reserves the right to impose the penalties of 18 U.S.C.
§ 1001 and 49 U.S.C. § 5307(n)(1) on the Contractor, to the extent the Federal
Government deems appropriate.
(3) The Contractor agrees to include the above two clauses in each subcontract financed
in whole or in part with Federal assistance provided by FTA. It is further agreed that
the clauses shall not be modified, except to identify the subcontractor who will be
subject to the provisions.
3. ACCESS TO RECORDS AND REPORTS
Access to Records - The following access to records requirements apply to this Contract:
A. Where the Purchaser is not a State but a local government and is the FTA Recipient
or a subgrantee of the FTA Recipient in accordance with 49 C.F.R. 18.36(i), the
Contractor agrees to provide the Purchaser, the FTA Administrator, the Comptroller
BID 7665 Transfort Wheel Loader Accessories Page 8 of 17
General of the United States or any of their authorized representatives access to any
books, documents, papers and records of the Contractor which are directly pertinent
to this contract for the purposes of making audits, examinations, excerpts and
transcriptions. Contractor also agrees, pursuant to 49 C.F.R. 633.17 to provide the
FTA Administrator or his authorized representatives including any PMO Contractor
access to Contractor's records and construction sites pertaining to a major capital
project, defined at 49 U.S.C. 5302(a)1, which is receiving federal financial assistance
through the programs described at 49 U.S.C. 5307, 5309 or 5311.
B. The Contractor agrees to permit any of the foregoing parties to reproduce by any
means whatsoever or to copy excerpts and transcriptions as reasonably needed.
C. The Contractor agrees to maintain all books, records, accounts and reports required
under this contract for a period of not less than three years after the date of
termination or expiration of this contract, except in the event of litigation or settlement
of claims arising from the performance of this contract, in which case Contractor
agrees to maintain same until the Purchaser, the FTA Administrator, the Comptroller
General, or any of their duly authorized representatives, have disposed of all such
litigation, appeals, claims or exceptions related thereto. Reference 49 CFR
18.39(i)(11).
D. FTA does not require the inclusion of these requirements in subcontracts.
Requirements for Access to Records and Reports by Types of Contract
Contract
Characteristics
Operationa
l Service
Contract
Turnkey Constructio
n
Architectural
Engineering
Acquisitio
n of
Rolling
Stock
Professional
Services
I State Grantees
a. Contracts below
SAT ($100,000)
b. Contracts above
$100,000/Capital
Projects
None
None
unless1
non-
competitive
award
Those
imposed on
state pass
thru to
Contractor
None
Yes, if non-
competitive
award or if
funded thru2
5307/5309/5
311
BID 7665 Transfort Wheel Loader Accessories Page 9 of 17
4. FEDERAL CHANGES
Federal Changes - Contractor shall at all times comply with all applicable FTA
regulations, policies, procedures and directives, including without limitation those listed
directly or by reference in the Master Agreement between Purchaser and FTA, as they
may be amended or promulgated from time to time during the term of this contract.
Contractor's failure to so comply shall constitute a material breach of this contract.
5. TERMINATION
A. Termination for Convenience (General Provision) The (Recipient) may terminate
this contract, in whole or in part, at any time by written notice to the Contractor when it
is in the Government's best interest. The Contractor shall be paid its costs, including
contract close-out costs, and profit on work performed up to the time of termination.
The Contractor shall promptly submit its termination claim to (Recipient) to be paid the
Contractor. If the Contractor has any property in its possession belonging to the
(Recipient), the Contractor will account for the same, and dispose of it in the manner
the (Recipient) directs.
B. Termination for Default [Breach or Cause] (General Provision) If the Contractor
does not deliver supplies in accordance with the contract delivery schedule, or, if the
contract is for services, the Contractor fails to perform in the manner called for in the
contract, or if the Contractor fails to comply with any other provisions of the contract,
the (Recipient) may terminate this contract for default. Termination shall be effected
by serving a notice of termination on the contractor setting forth the manner in which
the Contractor is in default. The contractor will only be paid the contract price for
supplies delivered and accepted, or services performed in accordance with the manner
of performance set forth in the contract.
If it is later determined by the (Recipient) that the Contractor had an excusable reason
for not performing, such as a strike, fire, or flood, events which are not the fault of or
are beyond the control of the Contractor, the (Recipient), after setting up a new
delivery of performance schedule, may allow the Contractor to continue work, or treat
the termination as a termination for convenience.
C. Opportunity to Cure (General Provision) The (Recipient) in its sole discretion may,
in the case of a termination for breach or default, allow the Contractor [an appropriately
short period of time] in which to cure the defect. In such case, the notice of termination
will state the time period in which cure is permitted and other appropriate conditions
If Contractor fails to remedy to (Recipient)'s satisfaction the breach or default of any of
the terms, covenants, or conditions of this Contract within [ten (10) days] after receipt
by Contractor of written notice from (Recipient) setting forth the nature of said breach
or default, (Recipient) shall have the right to terminate the Contract without any further
obligation to Contractor. Any such termination for default shall not in any way operate
to preclude (Recipient) from also pursuing all available remedies against Contractor
and its sureties for said breach or default.
D. Waiver of Remedies for any Breach In the event that (Recipient) elects to waive its
remedies for any breach by Contractor of any covenant, term or condition of this
Contract, such waiver by (Recipient) shall not limit (Recipient)'s remedies for any
succeeding breach of that or of any other term, covenant, or condition of this Contract.
E. Termination for Convenience (Professional or Transit Service Contracts) The
(Recipient), by written notice, may terminate this contract, in whole or in part, when it is
BID 7665 Transfort Wheel Loader Accessories Page 10 of 17
in the Government's interest. If this contract is terminated, the Recipient shall be liable
only for payment under the payment provisions of this contract for services rendered
before the effective date of termination.
F. Termination for Default (Supplies and Service) If the Contractor fails to deliver
supplies or to perform the services within the time specified in this contract or any
extension or if the Contractor fails to comply with any other provisions of this contract,
the (Recipient) may terminate this contract for default. The (Recipient) shall terminate
by delivering to the Contractor a Notice of Termination specifying the nature of the
default. The Contractor will only be paid the contract price for supplies delivered and
accepted, or services performed in accordance with the manner or performance set
forth in this contract.
If, after termination for failure to fulfill contract obligations, it is determined that the
Contractor was not in default, the rights and obligations of the parties shall be the
same as if the termination had been issued for the convenience of the Recipient.
G. Termination for Default (Transportation Services) If the Contractor fails to pick up
the commodities or to perform the services, including delivery services, within the time
specified in this contract or any extension or if the Contractor fails to comply with any
other provisions of this contract, the (Recipient) may terminate this contract for default.
The (Recipient) shall terminate by delivering to the Contractor a Notice of Termination
specifying the nature of default. The Contractor will only be paid the contract price for
services performed in accordance with the manner of performance set forth in this
contract.
If this contract is terminated while the Contractor has possession of Recipient goods,
the Contractor shall, upon direction of the (Recipient), protect and preserve the goods
until surrendered to the Recipient or its agent. The Contractor and (Recipient) shall
agree on payment for the preservation and protection of goods. Failure to agree on an
amount will be resolved under the Dispute clause.
If, after termination for failure to fulfill contract obligations, it is determined that the
Contractor was not in default, the rights and obligations of the parties shall be the
same as if the termination had been issued for the convenience of the (Recipient).
H. Termination for Default (Construction) If the Contractor refuses or fails to prosecute
the work or any separable part, with the diligence that will insure its completion within
the time specified in this contract or any extension or fails to complete the work within
this time, or if the Contractor fails to comply with any other provisions of this contract,
the (Recipient) may terminate this contract for default. The (Recipient) shall terminate
by delivering to the Contractor a Notice of Termination specifying the nature of the
default. In this event, the Recipient may take over the work and compete it by contract
or otherwise, and may take possession of and use any materials, appliances, and
plant on the work site necessary for completing the work. The Contractor and its
sureties shall be liable for any damage to the Recipient resulting from the Contractor's
refusal or failure to complete the work within specified time, whether or not the
Contractor's right to proceed with the work is terminated. This liability includes any
increased costs incurred by the Recipient in completing the work.
The Contractor's right to proceed shall not be terminated nor the Contractor charged
with damages under this clause if-
1. the delay in completing the work arises from unforeseeable causes beyond the
control and without the fault or negligence of the Contractor. Examples of such
BID 7665 Transfort Wheel Loader Accessories Page 11 of 17
causes include: acts of God, acts of the Recipient, acts of another Contractor in the
performance of a contract with the Recipient, epidemics, quarantine restrictions,
strikes, freight embargoes; and
2. the contractor, within [10] days from the beginning of any delay, notifies the
(Recipient) in writing of the causes of delay. If in the judgment of the (Recipient),
the delay is excusable, the time for completing the work shall be extended. The
judgment of the (Recipient) shall be final and conclusive on the parties, but subject
to appeal under the Disputes clauses.
If, after termination of the Contractor's right to proceed, it is determined that the
Contractor was not in default, or that the delay was excusable, the rights and
obligations of the parties will be the same as if the termination had been issued for the
convenience of the Recipient.
I. Termination for Convenience or Default (Architect and Engineering) The
(Recipient) may terminate this contract in whole or in part, for the Recipient's
convenience or because of the failure of the Contractor to fulfill the contract
obligations. The (Recipient) shall terminate by delivering to the Contractor a Notice of
Termination specifying the nature, extent, and effective date of the termination. Upon
receipt of the notice, the Contractor shall (1) immediately discontinue all services
affected (unless the notice directs otherwise), and (2) deliver to the Contracting Officer
all data, drawings, specifications, reports, estimates, summaries, and other information
and materials accumulated in performing this contract, whether completed or in
process.
If the termination is for the convenience of the Recipient, the Contracting Officer shall
make an equitable adjustment in the contract price but shall allow no anticipated profit
on unperformed services.
If the termination is for failure of the Contractor to fulfill the contract obligations, the
Recipient may complete the work by contact or otherwise and the Contractor shall be
liable for any additional cost incurred by the Recipient.
If, after termination for failure to fulfill contract obligations, it is determined that the
Contractor was not in default, the rights and obligations of the parties shall be the
same as if the termination had been issued for the convenience of the Recipient.
J. Termination for Convenience of Default (Cost-Type Contracts) The (Recipient)
may terminate this contract, or any portion of it, by serving a notice or termination on
the Contractor. The notice shall state whether the termination is for convenience of the
(Recipient) or for the default of the Contractor. If the termination is for default, the
notice shall state the manner in which the contractor has failed to perform the
requirements of the contract. The Contractor shall account for any property in its
possession paid for from funds received from the (Recipient), or property supplied to
the Contractor by the (Recipient). If the termination is for default, the (Recipient) may
fix the fee, if the contract provides for a fee, to be paid the contractor in proportion to
the value, if any, of work performed up to the time of termination. The Contractor shall
promptly submit its termination claim to the (Recipient) and the parties shall negotiate
the termination settlement to be paid the Contractor.
If the termination is for the convenience of the (Recipient), the Contractor shall be paid
its contract close-out costs, and a fee, if the contract provided for payment of a fee, in
proportion to the work performed up to the time of termination.
BID 7665 Transfort Wheel Loader Accessories Page 12 of 17
If, after serving a notice of termination for default, the (Recipient) determines that the
Contractor has an excusable reason for not performing, such as strike, fire, flood,
events which are not the fault of and are beyond the control of the contractor, the
(Recipient), after setting up a new work schedule, may allow the Contractor to continue
work, or treat the termination as a termination for convenience.
6. CIVIL RIGHTS REQUIREMENTS
Civil Rights - The following requirements apply to the underlying contract:
(1) Nondiscrimination - In accordance with Title VI of the Civil Rights Act, as amended, 42
U.S.C. § 2000d, section 303 of the Age Discrimination Act of 1975, as amended, 42
U.S.C. § 6102, section 202 of the Americans with Disabilities Act of 1990, 42 U.S.C. §
12132, and Federal transit law at 49 U.S.C. § 5332, the Contractor agrees that it will
not discriminate against any employee or applicant for employment because of race,
color, creed, national origin, sex, age, or disability. In addition, the Contractor agrees
to comply with applicable Federal implementing regulations and other implementing
requirements FTA may issue.
(2) Equal Employment Opportunity - The following equal employment opportunity
requirements apply to the underlying contract:
(a) Race, Color, Creed, National Origin, Sex - In accordance with Title VII of the Civil
Rights Act, as amended, 42 U.S.C. § 2000e, and Federal transit laws at 49 U.S.C.
§ 5332, the Contractor agrees to comply with all applicable equal employment
opportunity requirements of U.S. Department of Labor (U.S. DOL) regulations,
"Office of Federal Contract Compliance Programs, Equal Employment Opportunity,
Department of Labor," 41 C.F.R. Parts 60 et seq., (which implement Executive
Order No. 11246, "Equal Employment Opportunity," as amended by Executive
Order No. 11375, "Amending Executive Order 11246 Relating to Equal
Employment Opportunity," 42 U.S.C. § 2000e note), and with any applicable
Federal statutes, executive orders, regulations, and Federal policies that may in
the future affect construction activities undertaken in the course of the Project. The
Contractor agrees to take affirmative action to ensure that applicants are
employed, and that employees are treated during employment, without regard to
their race, color, creed, national origin, sex, or age. Such action shall include, but
not be limited to, the following: employment, upgrading, demotion or transfer,
recruitment or recruitment advertising, layoff or termination; rates of pay or other
forms of compensation; and selection for training, including apprenticeship. In
addition, the Contractor agrees to comply with any implementing requirements FTA
may issue.
(b) Age - In accordance with section 4 of the Age Discrimination in Employment Act of
1967, as amended, 29 U.S.C. § § 623 and Federal transit law at 49 U.S.C. § 5332,
the Contractor agrees to refrain from discrimination against present and
prospective employees for reason of age. In addition, the Contractor agrees to
comply with any implementing requirements FTA may issue.
(c) Disabilities - In accordance with section 102 of the Americans with Disabilities Act,
as amended, 42 U.S.C. § 12112, the Contractor agrees that it will comply with the
requirements of U.S. Equal Employment Opportunity Commission, "Regulations to
Implement the Equal Employment Provisions of the Americans with Disabilities
Act," 29 C.F.R. Part 1630, pertaining to employment of persons with disabilities. In
addition, the Contractor agrees to comply with any implementing requirements FTA
BID 7665 Transfort Wheel Loader Accessories Page 13 of 17
may issue.
(3) The Contractor also agrees to include these requirements in each subcontract financed
in whole or in part with Federal assistance provided by FTA, modified only if necessary
to identify the affected parties.
7. DISADVANTAGED BUSINESS ENTERPRISE (DBE)
a. This contract is subject to the requirements of Title 49, Code of Federal Regulations,
Part 26, Participation by Disadvantaged Business Enterprises in Department of
Transportation Financial Assistance Programs. The national goal for participation of
Disadvantaged Business Enterprises (DBE) is 10%. The agency’s overall goal for
DBE participation is __ %. A separate contract goal [of __ % DBE participation has]
[has not] been established for this procurement.
b. The contractor shall not discriminate on the basis of race, color, national origin, or sex
in the performance of this contract. The contractor shall carry out applicable
requirements of 49 CFR Part 26 in the award and administration of this DOT-assisted
contract. Failure by the contractor to carry out these requirements is a material breach
of this contract, which may result in the termination of this contract or such other
remedy as City of Fort Collins deems appropriate. Each subcontract the contractor
signs with a subcontractor must include the assurance in this paragraph (see 49 CFR
26.13(b)).
c. {If a separate contract goal has been established, use the following}
Bidders/offerors are required to document sufficient DBE participation to meet these
goals or, alternatively, document adequate good faith efforts to do so, as provided for
in 49 CFR 26.53. Award of this contract is conditioned on submission of the following
[concurrent with and accompanying sealed bid] [concurrent with and
accompanying an initial proposal] [prior to award]:
1. The names and addresses of DBE firms that will participate in this
contract;
2. A description of the work each DBE will perform;
3. The dollar amount of the participation of each DBE firm participating;
4. Written documentation of the bidder/offeror’s commitment to use a DBE
subcontractor whose participation it submits to meet the contract goal;
5. Written confirmation from the DBE that it is participating in the contract as
provided in the prime contractor’s commitment; and
6. If the contract goal is not met, evidence of good faith efforts to do so.
[Bidders][Offerors] must present the information required above [as a matter of
responsiveness] [with initial proposals] [prior to contract award] (see 49 CFR
26.53(3)).
{If no separate contract goal has been established, use the following} The
successful bidder/offeror will be required to report its DBE participation obtained
through race-neutral means throughout the period of performance.
d. The contractor is required to pay its subcontractors performing work related to this
contract for satisfactory performance of that work no later than 30 days after the
contractor’s receipt of payment for that work from the City of Fort Collins. In addition,
[the contractor may not hold retainage from its subcontractors.] [is required to
BID 7665 Transfort Wheel Loader Accessories Page 14 of 17
return any retainage payments to those subcontractors within 30 days after the
subcontractor's work related to this contract is satisfactorily completed.] [is
required to return any retainage payments to those subcontractors within 30
days after incremental acceptance of the subcontractor’s work by the City of
Fort Collins and contractor’s receipt of the partial retainage payment related to
the subcontractor’s work.]
e. The contractor must promptly notify City of Fort Collins whenever a DBE
subcontractor performing work related to this contract is terminated or fails to complete
its work, and must make good faith efforts to engage another DBE subcontractor to
perform at least the same amount of work. The contractor may not terminate any DBE
subcontractor and perform that work through its own forces or those of an affiliate
without prior written consent of City of Fort Collins.
8. INCORPORATION OF FEDERAL TRANSIT ADMINISTRATION (FTA) TERMS
Incorporation of Federal Transit Administration (FTA) Terms - The preceding provisions
include, in part, certain Standard Terms and Conditions required by DOT, whether or not
expressly set forth in the preceding contract provisions. All contractual provisions required
by DOT, as set forth in FTA Circular 4220.1E, are hereby incorporated by reference.
Anything to the contrary herein notwithstanding, all FTA mandated terms shall be deemed
to control in the event of a conflict with other provisions contained in this Agreement. The
Contractor shall not perform any act, fail to perform any act, or refuse to comply with any
(name of grantee) requests which would cause (name of grantee) to be in violation of the
FTA terms and conditions.
9. GOVERNMENT-WIDE DEBARMENT AND SUSPENSION (NONPROCUREMENT)
Background and Applicability
In conjunction with the Office of Management and Budget and other affected Federal
agencies, DOT published an update to 49 CFR Part 29 on November 26, 2003. This
government-wide regulation implements Executive Order 12549, Debarment and
Suspension, Executive Order 12689, Debarment and Suspension, and 31
U.S.C. 6101 note (Section 2455, Public Law 103-355, 108 Stat. 3327).
The provisions of Part 29 apply to all grantee contracts and subcontracts at any level
expected to equal or exceed $25,000 as well as any contract or subcontract (at any level)
for Federally required auditing services. 49 CFR 29.220(b). This represents a change
from prior practice in that the dollar threshold for application of these rules has been
lowered from $100,000 to $25,000. These are contracts and subcontracts referred to in
the regulation as “covered transactions.”
Grantees, contractors, and subcontractors (at any level) that enter into covered
transactions are required to verify that the entity (as well as its principals and affiliates)
they propose to contract or subcontract with is not excluded or disqualified. They do this
by (a) Checking the Excluded Parties List System, (b) Collecting a certification
from that person, or (c) Adding a clause or condition to the contract or
subcontract. This represents a change from prior practice in that certification
is still acceptable but is no longer required. 49 CFR 29.300.
Grantees, contractors, and subcontractors who enter into covered transactions
also must require the entities they contract with to comply with 49 CFR 29,
subpart C and include this requirement in their own subsequent covered
BID 7665 Transfort Wheel Loader Accessories Page 15 of 17
transactions (i.e., the requirement flows down to subcontracts at all levels).
Clause Language
The following clause language is suggested, not mandatory. It incorporates the optional
method of verifying that contractors are not excluded or disqualified by certification.
Suspension and Debarment
This contract is a covered transaction for purposes of 49 CFR Part 29. As such,
the contractor is required to verify that none of the contractor, its principals, as
defined at 49 CFR 29.995, or affiliates, as defined at 49 CFR 29.905, are excluded
or disqualified as defined at 49 CFR 29.940 and 29.945.
The contractor is required to comply with 49 CFR 29, Subpart C and must include
the requirement to comply with 49 CFR 29, Subpart C in any lower tier covered
transaction it enters into.
By signing and submitting its bid or proposal, the bidder or proposer certifies as follows:
The certification in this clause is a material representation of fact relied upon by {insert
agency name}. If it is later determined that the bidder or proposer knowingly rendered an
erroneous certification, in addition to remedies available to {insert agency name}, the
Federal Government may pursue available remedies, including but not limited to
suspension and/or debarment. The bidder or proposer agrees to comply with the
requirements of 49 CFR 29, Subpart C while this offer is valid and throughout the period of
any contract that may arise from this offer. The bidder or proposer further agrees to
include a provision requiring such compliance in its lower tier covered transactions.
10. BUY AMERICA
The contractor agrees to comply with 49 U.S.C. 5323(j) and 49 C.F.R. Part 661, which
provide that Federal funds may not be obligated unless steel, iron, and manufactured
products used in FTA-funded projects are produced in the United States, unless a waiver
has been granted by FTA or the product is subject to a general waiver. General waivers
are listed in 49 C.F.R. 661.7, and include final assembly in the United States for 15
passenger vans and 15 passenger wagons produced by Chrysler Corporation, and
microcomputer equipment and software. Separate requirements for rolling stock are set
out at 49 U.S.C. 5323(j)(2)(C) and 49 C.F.R. 661.11. Rolling stock must be assembled in
the United States and have a 60 percent domestic content.
A bidder or offeror must submit to the FTA recipient the appropriate Buy America
certification (below) with all bids or offers on FTA-funded contracts, except those subject to
a general waiver. Bids or offers that are not accompanied by a completed Buy America
certification must be rejected as nonresponsive. This requirement does not apply to lower
tier subcontractors.
Certification requirement for procurement of steel, iron, or manufactured products
Certificate of Compliance with 49 U.S.C. 5323(j)(1)
The bidder or offeror hereby certifies that it will meet the requirements of 49 U.S.C.
5323(j)(1) and the applicable regulations in 49 C.F.R. Part 661.5.
Date ___________________________________________________________________
Signature ________________________________________________________________
Company Name __________________________________________________________
BID 7665 Transfort Wheel Loader Accessories Page 16 of 17
Title ___________________________________________________________________
Certificate of Non-Compliance with 49 U.S.C. 5323(j)(1)
The bidder or offeror hereby certifies that it cannot comply with the requirements of 49
U.S.C. 5323(j)(1) and 49 C.F.R. 661.5, but it may qualify for an exception pursuant to 49
U.S.C. 5323(j)(2)(A), 5323(j)(2)(B), or 5323(j)(2)(D), and 49 C.F.R. 661.7.
Date ___________________________________________________________________
Signature _______________________________________________________________
Company Name __________________________________________________________
Title ___________________________________________________________________
Certification requirement for procurement of buses, other rolling stock and
associated equipment
Certificate of Compliance with 49 U.S.C. 5323(j)(2)(C).
The bidder or offeror hereby certifies that it will comply with the requirements of 49 U.S.C.
5323(j)(2)(C) and the regulations at 49 C.F.R. Part 661.11.
Date ___________________________________________________________________
Signature _______________________________________________________________
Company Name __________________________________________________________
Title ___________________________________________________________________
Certificate of Non-Compliance with 49 U.S.C. 5323(j)(2)(C)
The bidder or offeror hereby certifies that it cannot comply with the requirements of 49
U.S.C. 5323(j)(2)(C) and 49 C.F.R. 661.11, but may qualify for an exception pursuant to
49 U.S.C. 5323(j)(2)(A), 5323(j)(2)(B), or 5323(j)(2)(D), and 49 CFR 661.7.
Date ___________________________________________________________________
Signature _______________________________________________________________
Company Name __________________________________________________________
Title ___________________________________________________________________
11. CARGO PREFERENCE REQUIREMENTS
Cargo Preference - Use of United States-Flag Vessels - The contractor agrees: a. to
use privately owned United States-Flag commercial vessels to ship at least 50 percent of
the gross tonnage (computed separately for dry bulk carriers, dry cargo liners, and
tankers) involved, whenever shipping any equipment, material, or commodities pursuant to
the underlying contract to the extent such vessels are available at fair and reasonable
rates for United States-Flag commercial vessels; b. to furnish within 20 working days
following the date of loading for shipments originating within the United States or within 30
working days following the date of leading for shipments originating outside the United
States, a legible copy of a rated, "on-board" commercial ocean bill-of -lading in English for
BID 7665 Transfort Wheel Loader Accessories Page 17 of 17
each shipment of cargo described in the preceding paragraph to the Division of National
Cargo, Office of Market Development, Maritime Administration, Washington, DC 20590
and to the FTA recipient (through the contractor in the case of a subcontractor's bill-of-
lading.) c. to include these requirements in all subcontracts issued pursuant to this
contract when the subcontract may involve the transport of equipment, material, or
commodities by ocean vessel.
12. ENERGY CONSERVATION REQUIREMENTS
Energy Conservation - The contractor agrees to comply with mandatory standards and
policies relating to energy efficiency which are contained in the state energy conservation
plan issued in compliance with the Energy Policy and Conservation Act.
13. RECYCLED PRODUCTS
Recovered Materials - The contractor agrees to comply with all the requirements of
Section 6002 of the Resource Conservation and Recovery Act (RCRA), as amended (42
U.S.C. 6962), including but not limited to the regulatory provisions of 40 CFR Part 247,
and Executive Order 12873, as they apply to the procurement of the items designated in
Subpart B of 40 CFR Part 247.
14. CITY OF FORT COLLINS BID PROTEST PROCEDURES
The City of Fort Collins has a protest procedure, covering any phase of solicitation or
award, including but not limited to specification or award. The protest procedures are
available from the Purchasing Department, City of Fort Collins, 215 N. Mason, Street, 2nd
Floor, P. O. Box 580, Fort Collins, CO. 80522. You may also request a copy of the
procedures by emailing: Purchasing@fcgov.com or calling 970-221-6775.
None
None unless
non-
competitive
award
None
None
unless
non-
competitiv
e award
None
None unless non-
competitive award
II Non State Grantees
a. Contracts below
SAT ($100,000)
b. Contracts above
$100,000/Capital
Projects
Yes3
Yes3
Those
imposed on
non-state
Grantee
pass thru to
Contractor
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Sources of Authority: 1 49 USC 5325 (a) 2 49 CFR 633.17 3 18 CFR 18.36 (i)