Loading...
HomeMy WebLinkAboutRFP - 8053 PHOTOVOLTAIC SOLAR AT NIX FARM (2)ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of 8053 PHOTO VOLTAIC SOLAR AT NIX FARM BID OPENING: 3:00 P.M. (our clock), FEBRUARY 4, 2015 To all prospective bidders under the specifications and contract documents described above, the following changes/additions are hereby made and detailed in the following sections of this addendum: Exhibit A - Questions and Answers Exhibit B – Roof Drawings Please contact John Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Exhibit A Addendum #1 – 8053 Photo Voltaic Solar at Nix Farm 1. Would you have as-built drawings that detail the location of solatubes and roof vents available to share? A. Please reference attached drawing. 2. How many Abound Panels does Nix Farm have available? What type and condition are they in? A. Approximately 130 usable panels. 3. Regarding the Abound system, is the contractor responsible for the performance of the system if the Abound panels do not perform per their specifications? A. If the performance issue is a result of poor installation, than the expectation is that the contractor must fix the system. If the result is due to the panels themselves, than this is the responsibility of the City. 4. If there are performance issues with the Abound panels, what responsibility will the contractor have to correct those issues? A. Please reference question #3. Exhibit B