Change Order Form
PROJECT TITLE: Arthur Ditch @ Wood Street, Bridge Replacement
PROJECT NUMBER: 254902109 (Bid #8038)
CONTRACTOR: Lobos Structures (PO #9147660)
CHANGE ORDER NUMBER: 7
n preparing change orders show in order as separate numbered paragraphs the tollowing
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time.
1 &2. See attached sheet for detail.
3. The contract cost will increase by $ 41,541.95
4. There will be no change in contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY:
L
REVIEWED BYE
APPROVED BY:
APPROVED BY:
APPROVED BY:
(Engineer - Bridge)
(Engineer -
(Project Manager -
5.90%
5.90%
$704,330.63
$0.00
$0.00
$41,541.95
$745,872.58
DATE: / (— CJ 0/ -r
DATE: 4 13 60ts
DATE:
DATE:
DATE: I I � ^ l S
APPROVED BY: �i�� DATE:
J (Department Head)
APPROVED BY: ( DATE:
cc: Contractor
Purchasing
Project File
(Purchasing Agent over $60,000)
Engineering $57,948.55
Utilities ($16,406.60)
C:Fsstructures
oborm
8084 Sherman St. Denver, CO 802211 Phone: 303.669-3811 1 Fax: 303428-5314
Email: lobosslructures@gmaii.com
CHANGE ORDER L D
April 1, 2016
Submitted to: City of Fort Collins
Proiect: Arthur Ditch Wood Street Bridge Replacement No. 8038
WATERLINE CHANGE ORDER
Description
Unit
CQTY
Unit Price
Cost
Labor
HOURS
289.50
$59.45
$17,210,77
Overtime Labor for Waterline Work
HOURS
201.00
$29.73
$5,975.73
E �Cj,
Equipment (breakdown below)
CAT 325C
HOURS
109.00
$195.00
$21,255.00
CAT 325C Fuel Cost
LS
1.00
$645.00
$645.00
Gradall XL 3300
HOURS
109.00
$185.00
$20,165.00
Gradall XL 3300 Fuel Cost
LS
1.00
$645.00
$645.00
Bobcat S300
HOURS
72.38
$49.00
$3,546.62
Bobcat S300 Fuel Cost
LS
1.00
$420.00
$420.00
Concrete Saw
LF
290.00
$4.75
$1,377.50
2007 GMC
DAY
11.00
$28.00
$308.00
2007 Dodge Ram
DAY
1.00
$95.00
$95.00
2008 Dodge Ram
DAY
11.00
$95.00
$1,045.00
2001 Kenworth T800 (3 loads of asphalt)
HOURS
6.00
$95.00
$570.00
2001 Kenworth T800 (Hauling excess dirt)
HOURS
10.00
$95.00
$950.00
2001 Kenworth T800 (Concrete Removal)
HOURS
5.00
$95.00
$475.00
Squeege
TONS
55.00
$12.02
$661.10
Waterline Material
LS
1.00
$7,524.78
$7,524.78
Potholing
HOURS
6.00
$225.00
$1,350.00
ABC Class 5 (Place only, removal & prep for asphalt
patch pending)
TONS
27.35
$13.92
$380.71
Hydrant Water Meter
LS
1.00
$158.24
$158.24
Removal ol MucKy Sul! (due to city do, npi, ig wate,
PROPOSAL TOTAL ,
Change Order
Project: Arthur Ditch Wood Street Bridge Replacement
City Bid No.: 8038
Contractor: Lobos Structures
CO #
Discri tion
Reason for Change
I Unit
Quantit Unit Cost $
ltem Cost $
11
Reconcile CO
Reconcile CO for Final Pay Application
Orginal Contract Value
704,330.63
New Reconcile Contract Value
745,872.58
C011 Tot4
41,541.95
City of
F6rt Collins
�7-_,,.,/lllllllEngineering
Planning, Development & Transportation
Engineering
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80522.0580
970,221.6605
970.221,6378 - fax
Change Order Form
PROJECT TITLE: Arthur Ditch @ Wood Street, Bridge Replacement
PROJECT NUMBER: 254902109 (Bid #8038)
CONTRACTOR: Lobos Structures (PO #9147660)
CHANGE ORDER NUMBER: 6
n preparing change orders show in order as separate numbered paragrapns the meowing
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time.
1 &2. See attached sheet for detail.
3. The contract will not change.
(Change in Force Account)
4. There will be no change in contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % OF ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY:
REVIEWED BY:
APPROVED BY:
(Engineer - Bridge)
& IAA
0.00 %
0.00 %
$704,330.63
$0.00
$0.00
$0.00
$704,330.63
DATE:"-
TE: �?� i2 ai
DATE:
(Engineer - Pedestrain Sidewalk)
APPROVED BY: DATE: �� 13 !S
(Project Manager - gineering)
APPROVED BY: DATE: S l - t
(Project Manager tilities)
APPROVED BY: DATE:
(Department Head)
APPROVED BY: DATE:
(Purchasing Agent over $60,000)
cc: Contractor
Purchasing
Project File
Change Order (Out of Force Account)
Project: Arthur Ditch Wood Street Bridge Replacement
City Bid No.: 8038
Contractor: Lobos Structures
CO # Discri tion Reason for Change
Change requested by Engineering
6 Flow Fill De artment due to depth of 16" pipe
Requested by Engineering Department to fix
7 1.5" Landscaping Rock landscaping of prop rty next to theproject..._
Requested by Engineering Department to fix
8 Topsoil landscaping of property next to the project.
9 Adjust Manholes & Valve Items was left out of bid schdules
Boxes
Engineering share of F/A work requested by
10 Water Line - Engineering Utilities Department
F/A work as requested by Utilities
10 Water Line -Utilities Department including Engineering shares
Bid Items work due to waterline work. See
10 Water Line -Utilities Pav APP for break down.
Unit
Quantity
Unit Cost $
Item Cost $
LS
1
1,279.91
(1,279.91)
LS
1
1,929.83
(1,929.83)
LS
1
1,516.23
(1,516.23)
LS
1
1,786.00
(1,786.00)
LS
1
11,706.84
(11,706.84)
Total C06 - CO10 (Eng)
(18,218.81)
LS
1
68,500.00
(68,500.00)
LS
1
5,093.40
(5,093.40)
Total C010 (Utilities)) (73,593.40)
CO # Discri Lion Reason for Change Unit Quantit Unit Cost ($)]Item Cost $
Adjustment to Force Account Minor Contract LS 1 70,000.00
F/A Minor Contract Revisions Revisions
CO2-3 (1,725.00)
C04-5 (35,838.80)
C06-10 (Eng) (18,218.81)
New adjusted FIA value 14,217.39
Change Order (Out of Force Account)
Project: Arthur Ditch Wood Street Bridge Replacement
City Bid No.: 8038
Contractor: Lobos Structures
CO # Discri tion Reason for Change Unit Quantit Unit Cost $ Item Cost $
Adjustment to Force Account Water Line LS 1 90,000.00
F/A Water Line Utilities (Utilities)
CO10 (Utilities) (73,593.40)
New adjusted FIA value 16,406.60
pu
ME
rucr
8084 Sherman St. Denver, CO 802211 Phone: 303-669-3811 j Fax: 303428-5314
Email: lobosstructures@gmaii.com
CHANGE ORDER 6
April 17, 2015
Submitted to: City of Fort Collins
Attn: Jin Wang
Proiect: Arthur Ditch Wood Street Bridge Replacement No. 8038
16" PLASTIC PIPE (SPECIAL) - FLOW FILL
Description Unit QTY Unit Price Cost
Material - Flowfill Cy7-- 10.5 $96.61 $1,014.41
Labor - Regular Time HOURS 3.0 $59.00 $177.00
Labor - Overtime HOURS 3.0 $29.50 $88.50
CHANGE ORDER TOTAL $1,279.91
This Change order is for Flowfill used for the 16" Plastic Pipe (Special) as requested by Jin Wang.
Thanks,
Luis Villalobos
p 0
Lobos
tw. S:)tructures)
8084 Sherman St. Denver, CO 802211 Phone: 303-669-3811 1 fax: 303-428.5314
Email: lobosstructures@gmail.com
Change Order 7 -1.5" Landscape Rock
May 11, 2015
Submitted to: City of Fort Collins
Attn: Jin Wang
Project: Arthur Ditch Wood Street Bridge Replacement
Description Unit QTY Unit Price Cost
1.5" Landscape Rock LS 1.0 $1,929.83 $1,929,83
Labor
Material
Equipment
CHANGE ORDER TOTAL $1,929.83
This Change Order is for 1.5" Landscape Rock as requested by Jin Wang.
Sincreley,
Luis Villalobos
r Ur..- t UIr L= S
8084 Sherman St. Denver, CO 802211 Phone: 303.669.3811 1 Fax: 303428-5314
Email: lobosstructures@gmail.com
Change Order 8 - Topsoil
May 11, 2015
Submitted to: City of Fort Collins
Attn: Jin Wang
Project: Arthur Ditch Wood Street Bridge Replacement
Description Unit QTY Unit Price Cost
Topsoil LS 1.0 $1,516.23 $1,516.23
Labor
Material
Equipment
CHANGE ORDER TOTAL $1,516.23
This Change Order is for Topsoil as requested by Jin Wang.
Sincerely,
Luis Villalobos
0 ��z;'
ructures
8084 Sherman St. Denver, Co 802211 Phone: 303-669-3811 1 Fax: 303-428-5314
Email: lobosstructures@gmaiI.com
Change Order 9 - Adjust Manholes & Valve Boxes
May 10, 2015
Submitted to: City of Fort Collins
Attn: Jin Wang
Project: Arthur Ditch Wood Street Bridge Replacement
Description Unit CITY Unit Price Cost
Adjust Manholes & Valve Boxes LS 1.0 $1,786.00 $1,786.00
Labor
Material
Equipment
CHANGE ORDER TOTAL $1,786.00
This Change Order is for the adjusting of manholes and valve boxes as requested by Jin Wang.
Sincerely ,
Luis Vilialobcs