Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 8046 ARTHUR DITCH BRIDGE REPLACEMENT - OAK & WHITCOMB (2)CHANGE~ ORDER NO. 2 PROJECT TITLE: Arthur Ditch @ Oak & Whitcomb CONTRACTOR:. Connell Resources, Inc. (PO#9150574) PROJECT NUMBER: #254902106 (Bid #8046) DESCRIPTION: 1. Reason for change: Additional waterline work requested by Water Feld Operations (WFO) to Improve system reliability in the Intersection. 2. Description of Change: a. Addition of 8" waterline on east leg of Intersection b. Addition of valving to Improve system control c. Asphalt patching outside of original bid limits 3. Change in Contract Cost: $20,250.00 4. Change in Contract Time: N/A ORIGINAL CONTRACT COST $ 848,648.70 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $20,250.00 THIS C.O. % OF ORIGINAL CONTRACT 2.39% TOTAL C.O.'S % OF ORIGINAL CONTRACT 2.39% ADJUSTED CONTRACT COST $ 868,898.70 Assuming all change oorrd`er proved t ACCEPTED BY: DATE: Jr` tip Contra is Representative ACCEPTED BY DATE: ZoI S` P( t anager— rew Gingerich REVIEWED BY: } DATE: APPROVED BY: i ' 1 DATE: 5 -1 -IS APPROVED BY: DATE: Gerry S Paul, Director of Purchasing and Risk Management If over $60,000 cc: Project File Contractor Purchasing Arthur Ditch ® Oak & Whitcomb Contract Change Order Connell Resources, Inc. 7785 Highland Meadows Pkwy, #100 Fort Collins, CO 80528 Phone: (970) 223-3151 Fax: (970) 223-3191 Estimator: Roland Tremble CHANGE ORDER Date: 2/5/2015 QUOTATION Submitted To: City Of Fort Collins - Engineering Bid Me Arthurs Ditch Bridge Replacement - Oak & Whitcomb Intersection Address: 281 North College Avenue Bid Number. Fort Collins, 00 80522 Project Location: Oak And Whitcomb Contact: Project City, State: Fort Collins, CO Phone: 970-221-66227 Fax: 970-221-6378 Engineer/Architect: We offer for your consideration the following Change Order Quotation which, if accepted, shall constitute a modification to the contract between us. Item # Item Description Estimated Quantity Unit Unit Price Total Price Changes 8 Removal of Asphalt Mat (6"-9") 12 Remove 6" Waterline 36 Hot Mix Asphalt Patching(Grading S) (75) (PG 64-22) 50 8" PVC C900 DR 18 East Side Of Intersection Only 51 8"x6" Reducer 52 8" Gate Valve 55 8"x8" Tee W/ Thrust Block 59 6" Solid Sleeves For Cut In Valve West Of Hydrant Tee 60 4" Solid Sleeves 300 Stainless Steel Bolt Kits 4" 300 Stainless Steel Bolt Kits 6" 300 Stainless Steel Bolt Kits 8" Notes: " changes based on discussions with city of fort collins ACCEPTED: The above prices, specifications and conditions are satisfactory and hereby accepted. Sponsor: , Signature: Date of Acceptance: ew ,s 100.00 SY $10.00 $1,000.00 60.00 LF $25.00 $1,500.00 22.00 TON $247.00 $5,434.00 73.00 LF $106.00 $7,738.00 2.00 EACH $160.00 $320.00 1.00 EACH $1,300.00 $1,300.00 1.00 EACH $499.00 $499.00 1.00 EACH $935.00 $935.00 2.00 EACH $250.00 $500.00 2.00 EACH $20.00 $40.00 12.00 EACH $27.00 $324.00 22.00 EACH $30.00 $660.00 Total Price for above Changes Items: $20 250.00 Total Bid Price: $20,250.00 CONFIRMED: Connell Resources, Inc. Authorized Signature: Estimator: Roland Tremble 970-215-8897 rtremble@connellresources.com Arthurs Ditch Bridge Replacement - Oak & Whitcomb Intersection Page 1 of 1