Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 7291 GEOTECHNICAL TESTING SERVICES (20)915 6 :1_I WORK ORDER PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND CTL Thompson Incorporated DATED: April 28, 2015 Work Order Number: CTL-01-400901920-15 Purchase Order Number: Project Title: Remington Greenway Original Bid/RFP Project Number & Name: 7291 On -Call Geotechnical Testing Services Commencement Date: May 1, 2015 Completion Date: September 30, 2015 Maximum Fee: (time and reimbursable direct costs): Not to Exceed $9,000.00 Project Description: Earthwork, Asphalt and Concrete Testing for the Remington Greenway project. The "Work' will be completed through the 7291 On -Call Contract. Scope of Services: See Attached Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of Two (2) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professional By:C Date: - Z� City of Fort Collins Prdjgc1 Manager Date: By: Gerry Paul Director of Purchasing and Risk Management (over $60,000.00) date: I H C O! P O■ A T 1 0 April 22, 2015 City of Fort Collins Engineering Department 281 N. College Avenue P.O. Box 580 Fort Collins, Colorado 80522-0580 Attention: Mr. Caleb Feaver Subject: Fee Estimate for Construction Observation and Materials Testing Services Remington Greenway Fort Collins, Colorado Fee Estimate No. FC 15-0129 At your request, CTLIThompson, Inc. is pleased to provide this fee estimate for Construction Observation and Materials Testing services for the Remington Greenway project located in Fort Collins, Colorado. We understand that the city will use our estimate for the basis of establishing a budget for the project and to issue a purchase order for our services. Our estimated scope of services and associated fees were prepared according to the terms and conditions of our professional services agreement with the City of Fort Collins and are presented below. Earthwork: Compaction testing will be required for curb subgrade, pavement subgrade, sidewalk subgrade, and bus pad subgrade. We estimate a total of 18 site visits will be necessary for testing and 1 additional site visit may be required to pick up a proctor sample. Engineering Technician 19 days x 2 hrs/day x $60/hr $2,280.00 Proctor 3 tests x $80/ea $240.00 Atterberg Limits 3 tests x $60/ea $180.00 Gradation 3 tests x $70/ea $210.00 Subtotal: $2,910.00 Concrete Testing: Concrete testing will be required for the curb, sidewalk, round -about, and bus pad. We estimate 21 concrete tests consisting of 4 cylinders each will be necessary. Concrete Cylinders 21 tests x $160/test $3,360.00 Subtotal: $3,360.00 400 North Link Lane I Fort Collins, Colorado 80524 Telephone:970-206-9455 Fax:970-206-9441 Asphalt Testing: Compaction testing may be required during asphalt patching. We estimate the project will require 4 days of asphalt compaction testing and 4 laboratory samples. Engineering Technician 4 days x 4 hrs/day x $60/hr $960.00 Lab Density (Rice) 4 tests x $80/ea $320.00 AC Content/Gradation 4 tests x $150/ea $600.00 Subtotal: $1,880.00 TOTAL ESTIMATED FEE: $8,150.00 It should be emphasized that this estimate is based upon assumptions of actual quantities and contractor's schedule. The fee will be charged only for the actual hours and unit rates presented for tests and observations requested by the owner, contractor or subcontractors who schedule the services. If we can be of further assistance, please contact us at your convenience. Very truly yours, CTL I THOMPSON, INC. Heather Grubb Field Department Manager CITY OF FORT COLLINS REMINGTON GREENWAY CTL I T FEE ESTIMATE NO. FC-15-0129