Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 7658 MISCELLANEOUS CONCRETE ANNUAL (22)WORK ORDERI PURSUANT TO AN AGREEMiNT BETWEEN THE CITY OF FORT dOLLINS AND 1 BANNER CONCRETE, LLC. DATED: 219/2015 Work Order Number. 01-BAN-2S4903400-15 Purchase Order Number: Project Title: ChenylMasan -Sidewalk Repairs, �1� '�-C/ 3 Originai Bid/RFP Project Number & Name: 7658 (Annual Concrete Maintenance Contract) Commencement Date: 21-1012015 Completion Date: 4/24/2015 Maximum Fee: (time and reimbursable direct costs): $40,600,00 Project Description: Excavate and install approxirmteiy 380 LF of sidewalk and remove and replace 4 accessible ramps. Scope of Services: Conduct onsite meetings as necessary, perform general excavation, removal of ion to be does not deviate from the approved location without approval from engineering ttroiect manager. Professional agrees to perform the services City of Fora Collins identified above and on the attached forms in accordance with the terms and conditions By: Robert Mosbey t-44 contained herein and in the Professional Services Project Manager Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Date: 21912015 Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of one (U page are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professional Date: 2/9/2015 By: Gerry Paul Director of Purchasing and Risk Management (over $60,000.00) Date: