HomeMy WebLinkAboutCHANGE ORDER - BID - 7673 NORTH COLLEGE IMPROVEMENTS PROJECT - CONIFER TO WILLOX (2)of
/'F6ryt Collins
�— Encgine�edng�
PROJECT NUMBER:
CONTRACTOR:
CHANGE ORDER NL
400903950 ( Bid #7673)
Zak Dirt (PO 49145479)
_R: 3
A)e
Planning, Development & Transportation
Englnoering
281 Nodh college Avenue
P.O. Box 500
Fort Collins, CO 80522.0580
970.221.6605
970.221.B378 - fax
Change Order Form
In preparing change orders show In order as separate numbered paragraphs the following:
1. Reason for change. 2. Description of change.
3. Change In contract cost. 4. Change In contract time.
iA2. See attached Invoice for details
3. The contract cost will not change. $0.00
(Change In Force Account)
4. There will be no change in contract time.
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDERS
TOTAL PENDING CHANGE ORDERS
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O. % ORIGINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
ACCEPTED BY:
REVIEWED BY: _ ' ' ' -
SUBMITTED BY:
$6,879,077.69
$0,00
$0.00
$0.00
0.00
0.00
$6,870,077.69
DATE: q ,2! 1 J
_DATE:
DATE:
APPROVED BY: f4 /R
DATE:
(Project �M,, anaager- Water Utilities)
APPROVED BY: QKLA--A '" DATE:
(Department Head)
APPROVED BY: GATE:
(Purchasing Agent over $60,000)
a: contractor
Purdustng
NoInt Fie
Englneedng
Water UM03
4-Zt-ts
;,4P11, CHANGE ORDER 3 • NVs N.
North College Conifer to Willox
SUMMARY OF. WORK
Item # Item Quantity Unit S / Unit Total
1
Temporary Concrete Pavement
50.00
SY
$ 81.00
$ 4,050.00
206
Structure Backfill (Flow -fill)
1600.00
CY
$ 105.00
$ 168,050.00
304
Aggregate Base Course (Class 6)
15405.00
TON
$ 19.00
$ (292,695.00)
304
Aggregate Base Course (Class 6)
8405.00
TON
$ 19.00
$ 159,695.00
210-1
Modify Inlet Type C
1.00
LS
$ 1,090.00
$ 1,090.00
210-2
Modify Inlet Type R L5
1.00
LS
$ 2,935.00
$ 2,936.00
623
Switch 1" Condui to 2" conduit for irrigation
1.00
LA
S 3.753.On
S, 3 753 nn
TOTAL $
0.00
REASON FOR CHANGE
1
Install Temp. Concrete Pavement at Hickory Street, Hibdon Court, and Bristlecone Drive as part of the storm sewer installation. Removal of temp concrete pavement is
included in the cost of the line item.
206
Add Strucutre Backfill for pipe and utility backfills as defined in the addendum to the contract.
304
Remove ABC that was overestimated based on an incorrect roadway cross section. Quantity zero'd and job estimated quantity added back to the contract
210-1. 210-2
Two precast inlets had to be modified due to design elevation errors on the plans. The inlets were prefabircated based on approved shop drawings to plan dimensions
and the plan dimensions were wrong. This price is for field modifications to the installed inlets. The prices are in agreement with CDOT's cost data pricing. See
attached.
623
Cost to switch 1' specifed conduits to 2" conduits. The 1 inch conduit is not adequately sized for the amount of wire designated to go in the conduit.
700
Use Minor Contract Revision to balance the additional driveway temp paving and flowfill quantity.
Posted to Pay App #5
Ak
1%-VzAK
February 26, 2015
ATTN: Mark Laken
City of Fort Collins
Project: North College Ave. Improvements —Conifer to Willox
RE: Modify Inlet Change Order
Mark,
Please find below the cost to Modify Inlet Type C W38 and also Modify Inlet Ty R L5 (5
foot) W22. These modifications are due to them being designed incorrectly.
Modify Inlet Type C
W38
$1,090.00
Modify Inlet Type R L5
W22
$2.936,00
Total Cost
$4,026.00
Average Cost per Each
$2,013.00
Zak would also like to request three calendar day time extension for the modifications
to inlets W38 and W22.
Please contact me with any questions.
Respectfully,)
5;ro my Weiss
Estimator
Zak Dirt, Inc.
(970)535-4657
14290 HBftop Road Longmont CO 80504 www zakdirtcM 877/ZAK-DIRT 970/535-1657 FAX 970/535-4561
GI
INIY
000P1b
mYN
�
JOfIN
1
OFI
YM
m
Gi
IIN
f-Mly
N Nlc
ANIM
^ M
N pO[I
I
1
1
C I
4 I
1
I
1
1
i
I 1
e
1
e
I
1
1
I
!• 1
1
t
1
Y
I 1
1
1
1
1
1
1
1 01
1 1
OI
Ylb�m
/
;
oI loam
1
010
N+;N
D I m�
4 1
irlm
[{ Ip
�+Frl^
nl 1N
i0
NIN/N
/
m10
w i Ui
N IN
N n1lc
:
I:
1
1
mOIN
M M
1
t„IN
1
1
1
1 1
1
1
I
•i
:OIm
P1P
i
oIOeO
i
O10
01r
O
1 WI
NIN
ac
Onol
ONIN�M
:
01�0
NOI
mim
I
ImYm
1
NIN
�N I!
y'
F 1 1
1
O t
i
y
aoI
0==aic
o{S
o
oioio
i
of
ee o
�1-i {H.i
IN<1
Pln
YNIn10
C
NI!
1
p
pFp
W N 1 1
I
�
I 1
iN
1 •
1
1
1
1
I�
NN
�N
FOI W!
YI K 1 F 1
�0.1 {1
N
m
NN
o000
0o
m
e
<0.01 I
i 1
N
IW+
3K ¢Y 1{G
6
FW
W W
C
h
o
C
pFp��
iC
q
f
F
4
a
N
UD�1,�" I 1
V w
K
•CO (J
T M1l
6
1QJ W
MS
M
S{ 4
K
Y C
5
ICON
� o
NyOm Ij
u
t
0
u
ry u
`si
u
3
u�
a
i i
=•
qw
� w
n � �
a
K'a
m :� 'c5
.n. umi n
0
o
c
o
0
0
F
f
s
i
3
Y
I'J
it
Iw
n
IN i
IF
Y
a
o
om
N
Nn
I CI
L.I1
:o
Ite
VNm3
I-m
1
i
o
HNO
I
Q
In
NOO(v�I
O
N
COLOEADO DEPARTMENT OF TfW3SPORTATIOH
09142 M rd.y, February
24, 2014 20O
IEEM OMIT COSTS BY PROJECTS --
2013 COST OATH
------- ----------------
----
------------
--- ----------
1TEM NUHBER/
----------------------- ---------------- ...
ITEM DE9CRIPTIOHI
------------------------------
OBIT/
PROJECT HV518ER
PROJECT LOCAITOR DATE LET
QUANTITY
SUM. EST.
AVERAGE BID
AWARDED BID
............... 403-00800
6 tq POCAola Rep
It, ......................................................
IM0253-222
1-25 MAINLINE : US36 TO 120TH 07/25/13
500.00
175.00
456.55
525.00
STA0704-230
- Steel Alt
I-70 FROM TOWSR ROAD TO COLFA 09/1510
300.00
250.00
326.32
415.00
STA0104-210
- Concrete Alt
I-70 FROM TOWER ROAD TO COLFA
PBROSSA-031
SR 00 ARAPABOS RD OVRR CHERRY 09/12/13
-----------
50.00
--------_.-----
325.01
316.44
------------------------------
470.00
n,,, Eo
AVERAGE FOR THE TRIRO QDARTEE
450.00
---
398.08
---- -----
422.45
--
511.50
------------
WEIGHTED AVENGE MR THE YEAR
115.00
202.17
417,R5
491.51
............... 403-02000
HM. (Spec)
San..........................�....._.........-........
CC RGOC-420
CHATFIELD STATE PARR 02/21/13
110$6.00
---------- --------
65.OD
-----
71.42
--`---------- ---------------
75.03
HELGRTP,b
---
AVFAAGE FOR THE FIRST OUAATER
11056,00
65.00
71.42
75.03
H1104D2-085
U540 MP 156.4 MOODY PASS 05/09/13
$24.00
60.00
136,77
133.32
STA139A-031
S9139 MP 0 TO MP 15.5 TN MESA 05/23/13
-------------
1,238.00
---------------
100.00
46.01
-------------- ---------------
44.00
WEIGHTED
AVERAGE FOR THE SECOND QUARTER
11762.00
88.10
$6.70
70.71
...........................................................
WSZGHTEO AVERAGE FOR IH£ YEAR
21819.00
79.45
76.30
72.32
...............
403-59210
SW
Ten .....................................................
NH4701-122
C470: SANTA FE 10 NADSMJRTH 03114113
25,776,00
--------------
80.00
62.67
`-------
79.25
-------------
WEtCHTED
--------------
AVEMM FOR TEE FIRST QUARTER
25,776.00
80.00
82.67
19.25
IM0705-080
I-70 WEST OF FLAGLER 04/18/13
72,667.00
IOD.00
106.40
94.50
FOR0761-210
L-76 NEAR US85. PEORIA ST 05/23/13
650.00
---------------
100.00
112.86
--------------- ---------------
103.00
WEIGHTED
-------------
AVERAGE FOR THE SECOMO OVARIER
73,311.00
100.00
106.49
94.58
REIGHIED AVERAGE FOR THE YEAR
59,091.00
91
80 99.23
90.59
Ak
'%-VZAK
April 7, 2015
ATTN: Mark Laken
City of Fort Collins
Project: North College Ave. Improvements — Conifer to Willox
RE: Change order request for switching 1" pipe to 2" for irrigation
Mark,
Zak Dirt would like to request a change order for switching out the 1" irrigation sleeves
for 2" irrigation sleeves.
Total LF — 6,950
Back out 1" sleeve at $0.21 / LF — ($1,459.50)
Add back 2" sleeve at $0.75 / LF - $5,212.50
Total additional cost for the switch - $3,753
Please contact me with any questions.
Respectfully,
Angelo Mancina
Corporate Treasurer
Zak Dirt, Inc.
(970)535-4657
14290 Hilltop Road Longmont CO 80504 www,zakdirt.com 877/ZAK-DIRT 970/535-4657 FAX 970/535-4561
City of
of CoLLins
Engineering
Planning, Development & Transportation
Engineering
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80522.0580
970.221.6605
970,221.6378 - fax
Project Pay Estimate Form
PROJECT TITLE: N. College, Conifer to Willox Project (Phase III) ESTIMATE NUMBER: 5
PROJECT NUMBER: 400903950.6 (Bid #7673) PARTIAL: X
CONTRACTOR: Zak Dirt, Inc. (PO #9145479) FINAL:
ORIGINAL CONTRACTAMOUNT
APPROVED CHANGE ORDERS
ADJUSTED CONTRACT AMOUNT
$6, 879, 077.69
$0.00
$6, 879, 077.69
TOTAL WORK COMPLETED AND MATERIALS STORED TO DATE $2,102,021.12
RETAINAGE: 5% $105,101.06
TOTAL EARNED LESS RETAINAGE $1,996,920.06
LESS PREVIOUS PAYMENTS $1,721,259.83
CURRENT PAYMENT DUE $275,660.23
ACCEPTED BY:
DATE:
Contractor's Representative
REVIEWED BY:
DATE:
Project Engineer - Engineering
SUBMITTED BY:
DATE:
Project Manager - Engineering
APPROVED BY:
DATE:
Project Manager - Utilities
APPROVED BY:
DATE:
Department Head
cc. Contractor
OV# Batch#
$275,660.23 Engineering
Accounting
OV# Batch#
$0.00 Utilities
Project Files
PV# Batch#