Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 9200 ROOFING SERVICESWork Order Form Official Purchasing Form Last updated 10/2017 WORK ORDER FORM PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND AAA ROOFING AND CONSTRUCTION WORK ORDER NUMBER: PR-600414 PROJECT TITLE: Ball Field Re-roofing Project Rolland Moore Park, 2201 N. Shields St. ORIGINAL BID/RFP NUMBER & NAME: 9200 MASTER AGREEMENT EFFECTIVE DATE: 11/12/2020 WORK ORDER COMMENCEMENT DATE: 11/18/2020 WORK ORDER COMPLETION DATE: 12/24/2020 MAXIMUM FEE: (time and reimbursable direct costs): $37,667.00 PROJECT DESCRIPTION/SCOPE OF SERVICES: Provide Labor, materials and equipment to complete the re-roofing project for the ballfield concessions and the score keeper booth roofs as per the base bid proposal dated 10/19/20. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of One (1) page(s) are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. FINISHING TOUCH: Date: Joshua Morales, Owner ACCEPTANCE: Date: Brian Hergott, Project Manager APPROVED BY: Date: Ken Mannon – Director of Operations REVIEWED: Date: Jake Rector, Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) DocuSign Envelope ID: BE0E6255-985C-4D14-9C22-4E1B443B98BE 11/18/2020 11/18/2020 11/24/2020 11/24/2020 Roof Replacement Proposal Roland Moore Park roof We appreciate the opportunity to earn your business. Our company strives for quality workmanship, competitive pricing, and complete customer satisfaction. The terms of the following roofing contract are valid for 30 days after date of issuance. SCOPE OF WORK: • Remove roof down to deck and dispose of waste • Install 2 layers of 2.6 ISO insulation on concession roof only • Install ¼” Tapered ISO • Install ½” Dens Deck prime • Fully adhere 60mil TPO • Install new edge metal and roof accessories • Provide 20yr NDL • Clarifications: Wood blocking built up to account for Insulation • Tapered Can be reduced to 1/8” per ft to reduce need for high nailer. • Special coping to be made on concessions roof • Positive drainage needed for all city roofs Price: $37,667.00 Alternate dens deck only (awning) $32,872.00 Will need building department approval The above referenced job will be completed for $____________This price includes all material, labor, equipment, dump fees and Taxes to perform said job. Any additional work that is not stated in the contract will require a change order and an additional charge to the contract. This contract is between the owner(s) as described above and AAA Roofing & Construction, LLC. By signing below the Owner agrees to pay the amount quoted above for the work done as described in the Scope of Work per the payment terms described above and is authorizing commencement of work. Schedule of work determined by availability of materials, acts of god, weather, etc. Please call with any questions 970-744-1340 First Owner Signature First Owner Printed Name Date Joshua Morales 10/19/20 AAA Roofing & Construction DocuSign Envelope ID: BE0E6255-985C-4D14-9C22-4E1B443B98BE