Product
Code: Description:
Cost Cost
$23,896.00
$24,075.00
$3,662.00
Subtotal B: 51633
Cost Cost
Subtotal C: 0
0%
D. Total Cost before any other applicable Charges, Trade-Ins, Allowances, Discounts, Etc. (A+B+C)
1 51633 = Subtotal D: 51633
Cost Cost
($8,106.60)
-4683
Subtotal E: -12789.6
38843.4
Subtotal From Additional Sheet(s):
Description Description
Subtotal From Additional Sheet(s):
Quantity Ordered:
Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit For this transaction the percentage is:
Price plus Published Options (A+B).
X Subtotal of A + B + C:
E. Trade-Ins / Special Discounts / Other Allowances / Freight / Installation / Miscellaneous Charges
Description
Delivery Date: 15-30 days F. Total Purchase Price (D+E):
Less return customer discount
Description
Less 8"/10" wheels for CPR/SPR
CONTRACT PRICING WORKSHEET
For Standard Equipment Purchases
Accessories
A. Product Item Base Unit Price Per Contractor's H-GAC Contract:
This Worksheet is prepared by Contractor and given to End User. If a PO is issued, both documents
MUST be faxed to H-GAC @ 713-993-4548. Therefore please type or print legibly.
Robin Guthrie
800-327-7791 ext 224
City of Fort Collins, CO
Dave Kines
Elxsi dba CUES
B. Published Options - Itemize below - Attach additional sheet if necessary - Include Option Code in description if applicable
(Note: Published Options are options which were submitted and priced in Contractor's bid.)
WM312 Pnuematic tires/WM906 steel wheels
Description Description
MZ300 OZ III camera LED
WM350 Compact Steerable Pipe Ranger
C. Unpublished Options - Itemize below - Attach additional sheet if necessary
(Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)