Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9201787 (2)Contract No.: SCO1-18 Date Prepared: 11/18/2020 Buying Agency: Contractor: Contact Person: Prepared By: Phone: Phone: Fax: Fax: Email: Email: Product Code: Description: Cost Cost $23,896.00 $24,075.00 $3,662.00 Subtotal B: 51633 Cost Cost Subtotal C: 0 0% D. Total Cost before any other applicable Charges, Trade-Ins, Allowances, Discounts, Etc. (A+B+C) 1 51633 = Subtotal D: 51633 Cost Cost ($8,106.60) -4683 Subtotal E: -12789.6 38843.4 Subtotal From Additional Sheet(s): Description Description Subtotal From Additional Sheet(s): Quantity Ordered: Check: Total cost of Unpublished Options (C) cannot exceed 25% of the total of the Base Unit For this transaction the percentage is: Price plus Published Options (A+B). X Subtotal of A + B + C: E. Trade-Ins / Special Discounts / Other Allowances / Freight / Installation / Miscellaneous Charges Description Delivery Date: 15-30 days F. Total Purchase Price (D+E): Less return customer discount Description Less 8"/10" wheels for CPR/SPR CONTRACT PRICING WORKSHEET For Standard Equipment Purchases Accessories A. Product Item Base Unit Price Per Contractor's H-GAC Contract: This Worksheet is prepared by Contractor and given to End User. If a PO is issued, both documents MUST be faxed to H-GAC @ 713-993-4548. Therefore please type or print legibly. Robin Guthrie 800-327-7791 ext 224 City of Fort Collins, CO Dave Kines Elxsi dba CUES B. Published Options - Itemize below - Attach additional sheet if necessary - Include Option Code in description if applicable (Note: Published Options are options which were submitted and priced in Contractor's bid.) WM312 Pnuematic tires/WM906 steel wheels Description Description MZ300 OZ III camera LED WM350 Compact Steerable Pipe Ranger C. Unpublished Options - Itemize below - Attach additional sheet if necessary (Note: Unpublished options are items which were not submitted and priced in Contractor's bid.)