Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8631 GENERAL ENVIRONMENTAL SERVICES (5)Vendor: Today's Date: November 20, 2020 Address: Requisition No.: End Date: Date Entered: Vendor #: (Promised Delivery) Date Approved: Date Denied: Item # Quantity Unit Description Total Charge Number 1 1 $2,000.00 420270.521210 $0.00 $0.00 $0.00 $2,000.00 Requested By: Authorized By: Authorized By: S:\Purchasing\FORMS\Blank Requisition.xls UTILITIES REQUISITION FORM FOR ACCOUNTS PAYABLE USE ONLY Name, title typed here under the line Matt Zoccali, Envionmental Regulatory Affairs Manager AECOM 1601 Prospect Parkway Fort Collins, CO 80525 Comments: $2,000.00 Unit Price Total: Task 100 Project Management for Monitoring Well Abandonment Page 1    aecom.com 1/3 Via Email Only Mr. Matt Zocalli Fort Collins Utilities Environmental Regulatory Affairs 700 Wood Street Fort Collins, CO 80521 AECOM 1601 Prospect Parkway Fort Collins, CO 80525 aecom.com November 12, 2020 Subject: Poudre River Removal Action – Monitoring Well Abandonment Dear Mr. Zocalli: AECOM Technical Services, Inc. (AECOM) is pleased to provide for your approval the following scope of work and cost estimate for the Poudre River Removal Action (PRRA) project for well abandonment of City owned wells for City of Fort Collins (City). As requested, this work order addresses efforts associated with final closure of the PRRA site in Fort Collins and includes the abandonment of City-owned monitoring wells at the site. Scope of Work Task 100 Project Management The project management task includes project coordination and communication with City of Fort Collins and AECOM project teams; project planning and scope development; project financial reviews; and project quality assurance/quality control. The total estimated budget for Task 100 is summarized in Table 1. Task 200 Monitoring Well Abandonment This task includes health and safety tasks, well abandonment, and reporting associated with monitoring well abandonment at the PRRA site. x Health and Safety will include creating a Health and Safety Plan (HASP) to cover this scope of work at the PRRA site. Task Hazard Analyses (THA) associated with specific tasks that occur at the individual sites are included in the (HASP). x Field oversight includes support for monitoring well abandonment at the site. Up to ten (10) monitoring wells at the site will be abandoned in accordance with State of Colorado regulations. The monitoring wells listed on Table 2 will be abandoned. All ten (10) wells will be abandoned if all can be located prior to the start of work. AECOM’s selected subcontractor, Remington Technologies, LLC, will implement the work and AECOM will provide observation of the abandonment activities. AECOM will also coordinate a One Call utility locate for the abandonment work and communicate the schedule. x Based on discussions with the City of Fort Collins, an asbestos spotter is not required during these activities, however the City will provide an 0.5-hour asbestos awareness training to the field    aecom.com 2/3 crew as part of the daily tailgate the first day of activities. Any potential asbestos containing material findings during abandonment will result in a stop work for that location and the City will be immediately notified. Costs associated with an asbestos spotter are not included in this scope of work. The total estimated budget for Task 200 is summarized in Table 1. Task 300 Reporting The reporting task will include filling out and submitting well abandonment forms required by the State of Colorado for permitted wells and providing a brief summary memo of field activities to the City of Fort Collins. The memo will summarize activities, provide a table of abandoned wells, provide a figure of abandoned well locations, and provide well abandonment forms. The total estimated budget for Task 300 is summarized in Table 1. Budget Summary and Schedule AECOM proposes to undertake the proposed scope of work on a Time and Materials basis with a not-to-exceed cost of $12,857.25 as illustrated in Table 1 below. Work will be billed on a time and materials basis and performed in accordance with the existing Master Service Agreement between City of Fort Collins and AECOM Technical Services, Inc. (8631 General Environmental Services) fully executed on March 29, 2018 and subsequent renewal, and in accordance with the attached 2020 rates for the site. If additional work is required, it will be discussed in advance with City of Fort Collins representatives and addressed under an add-on budget request. The proposed schedule of performance for the above described scope begins on November 23, 2020 and continues through February 27, 2021. AECOM is prepared to begin work immediately, pending driller availability, upon acceptance of this proposal and receipt of a signed work order. We anticipate field work for Task 200 to take three (3) working days. As you are aware, the world is experiencing a pandemic as it relates to the coronavirus COVID-19 (“Coronavirus”). This health emergency has the potential of impacting multiple facets of the project including, without limitation, labor, personnel, manufacturing, equipment, materials, transportation and related supply chains, and tasks such as the well and vault abandon, which have the potential to adversely impact the critical path of the project schedule. These potential, unusual, and unavoidable delays are outside of the control of AECOM and cannot be anticipated or determined in advance. AECOM will exercise reasonable care to mitigate the potential impact of the Coronavirus to the extent within AECOM’s reasonable control. AECOM will notify you in the event AECOM becomes aware of any potential impact to the work caused by the Coronavirus. Table 1: Cost Summary Task Labor Hours Labor Costs Subcontractor Costs ODC Costs Total Costs 100 – Project Management 8 $897.75 $0 $0 $897.75 200 – Monitoring Well Abandonment 42 $4,389.00 $6,300.00 $73.50 $10,762.50 300 - Reporting 8 $1,197.00 $0 $0 $1,197.00 Totals 58 $6,483.75 $6,300.00 $73.50 $12,857.25    aecom.com 3/3 AECOM appreciates the opportunity to propose continuing environmental services to the City of Fort Collins. Please do not hesitate to call Jeremy Hurshman at (970) 530-3418 if you have any questions regarding this proposed scope of work. Yours sincerely, AECOM Jeremy Hurshman Margaret Zebley, P.E. Project Manager Associate Vice President Attachments: Table 2: City of Fort Collins Wells to be Abandoned AECOM Commercial Terms – Rates Offered to City of Fort Collins    Table 2: City of Fort Collins Wells to be Abandoned Poudre River Removal Action Site Well Name Status PZ-10 Permitted with City of Fort Collins PZ-11 Permitted with City of Fort Collins PRBB-11 Permitted with City of Fort Collins BTH-09 Permitted with City of Fort Collins BTH-10 Permitted with City of Fort Collins BTH-11 Permitted with City of Fort Collins BTH-13 Permitted with City of Fort Collins, unable to locate FC-MW-01 Permitted with City of Fort Collins, unable to locate FC-MW-05 Permitted with City of Fort Collins, unable to locate FC-MW-06 Permitted with City of Fort Collins, unable to locate    AECOM Fee Schedule Category/Item Unit Rate Labor Project Director III, Project Director IV hour $190.00 Project Director II, Principal Engineer/Scientist hour $166.25 Project Director I, Project Manager II, Construction Mgmt IV hour $147.25 Scientist V, Engineer IV hour $128.25 Project Manager I, Scientist IV, Engineer III, Constr. Mgmt III hour $114.00 Project Controls II, Scientist III, Engineer II, Technician IV, Data Administrator III, Project Administrator III hour $104.50 Scientist II, Engineer I, Data Administrator II, Construction Mgmt II, Technician III hour $90.25 Project Controls I, Scientist I, Project Administrator II, Construction Mgmt I hour $76.00 Data Administrator I, Technician II hour $66.50 Technician I, Project Administrator I hour $52.25 Meeting (Assuming Project Manager + 1 Task Lead for 2 hours) per meeting $484.50 Reimbursables Unit Rate Dual Interface Probe Day $29.25 Groundwater level indicator Day $16.25 Photoionization Detector / FID or similar Day $48.75 Automated Samplers, Monitors, and Data Loggers Day $22.75 PID / FID / multi gas meter (or similar) Day $32.50 Groundwater sampling kit Day $150.00 Soil Sampling kit Day $19.50 Mileage $/mile $0.54 Litigation Support Pass Through Rate – Subcontractor Costs and Management All Subcontracted Services % mark-up per job 5% Field Sampling and Investigation Supplies and Materials % mark-up per job 5% Other Supplies and Materials % mark-up per job 5% Prevailing wage hourly rate + fringe (if applicable) % mark-up per job 5% Phase I Environmental Site Assessment Title Rate Hours Cost Notes Scientist I $76.00 4 $304 GIS (Draft Figures) Scientist II $90.25 22 $1,986 Phase I Specialist Scientist V $128.25 4 $513 Technical review Project Manager II $147.25 4 $589 PM/Sr. Review Project Administrator I $52.25 4 $209 Word Processing EDR Report $345 - $362 EDR Report (5% mark- up) $3,963 In the event that AECOM’s employees are requested by the City of Fort Collins or compelled by subpoena or otherwise by any party to give expert or witness testimony or otherwise participate in a judicial or administrative proceeding involving the City of Fort Collins at any time, the City of Fort Collins shall compensate AECOM at 150% of the Billing Rate, including preparation time, and shall reimburse AECOM for all out-of-pocket costs as provided herein. AECOM Pricing for Phase I Environmental Site Assessments: AECOM costs associated with the implementation of Phase I Environmental Site Assessments (ESAs) are highly dependent on property size and use. AECOM staff used for Phase I ESA are also based on the complexity of the project, and therefore, the overall Phase I costs will vary depending on the property being assessed. AECOM is able to perform Phase I ESAs on a Time and Materials (T&M) or fixed price basis. Under a T&M contract, AECOM would only bill the City of Fort Collins for hours spent and ODCs incurred on the project. If multiple sites are being assessed at one time, cost savings could be realized based on increased efficiency and volume of work. Example Pricing for a standard Phase I ESA per ASTM E-1527-13: This example cost estimate assumes a property less than 5 acres in size with one basic building (i.e., non- industrial) in a mixed use area, historical information and regulatory database report provided by Environmental Data Resources (EDR), and that the City of Fort Collins will provide the title search for prior property owners. AECOM will provide pricing for Phase I ESAs on a project-by-project basis as opposed to a ‘one size fits all’ approach. The estimated cost provided below could be lower or higher based upon the complexity of the project. If additional labor hours are needed, AECOM will include those additional labor hours in its proposal at the scoping phase of the project. In addition, the cost of the EDR report could increase for larger scale projects which would also be provided to the City of Fort Collins in our proposal. TOTAL Utilities Work Order Form Official Purchasing Form Last updated 10/2017 WORK ORDER PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND AECOM TECHNICAL SERVICES INC. WORK ORDER NUMBER: 2020-011 PROJECT TITLE: Poudre River Removal Action- Monitoring Well Abandonment ORIGINAL BID/RFP NUMBER & NAME: 8631 General Environmental Services MASTER AGREEMENT EFFECTIVE DATE: 2/28/2018 ARCHITECT/ENGINEER: Margaret Zebley OWNER’S REPRESENTATIVE: Matt Zoccali WORK ORDER COMMENCEMENT DATE: 11/23/2020 WORK ORDER COMPLETION DATE: 12/31/2020 MAXIMUM FEE: (time and reimbursable direct costs): $12,857.25 PROJECT DESCRIPTION/SCOPE OF SERVICES: Task 100 Project Management x The project management task includes project coordination and communication with City of Fort Collins and AECOM project teams; project planning and scope development; project financial reviews; and project quality assurance/quality control. Task 200 Monitoring Well Abandonment x This task includes health and safety tasks, well abandonment, and reporting associated with monitoring well abandonment at the Poudre River Removal Action (PRRA) site. x Health and Safety will include creating a Health and Safety Plan (HASP) to cover this scope of work at the PRRA site. ā Task Hazard Analyses (THA) associated with specific tasks that occur at the individual sites are included in the (HASP). x Field oversight includes support for monitoring well abandonment at the site. Up to ten (10) monitoring wells at the site will be abandoned in accordance with State of Colorado regulations. x All ten (10) wells will be abandoned if all can be located prior to the start of work. AECOM’s selected subcontractor, Remington Technologies, LLC, will implement the work and AECOM will provide observation of the abandonment activities. AECOM will also coordinate a One Call utility locate for the abandonment work and communicate the schedule. x Based on discussions with the City of Fort Collins, an asbestos spotter is not required during these activities, however the City will provide an 0.5-hour asbestos awareness      Utilities Work Order Form Official Purchasing Form Last updated 10/2017 training to the field as part of the daily tailgate the first day of activities. Any potential asbestos containing material findings during abandonment will result in a stop work for that location and the City will be immediately notified. Task 300 Reporting x The reporting task will include filling out and submitting well abandonment forms required by the State of Colorado for permitted wells and providing a brief summary memo of field activities to the City of Fort Collins. x The memo will summarize activities, provide a table of abandoned wells, provide a figure of abandoned well locations, and provide well abandonment forms. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of Certificate of Liabilities (2) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: AECOM By: Date: Name: 0DUJDUHW=HEOH\3( Title: $VVRFLDWH9LFH3UHVLGHQW       Utilities Work Order Form Official Purchasing Form Last updated 10/2017 OWNER’S ACCEPTANCE & EXECUTION: This Work Order and the attached Contract Documents are hereby accepted and incorporated herein by this reference. ACCEPTANCE: Date: Matt Zoccali, Project Manager REVIEWED: Date: Pat Johnson, Senior Buyer APPROVED AS TO FORM: Date: Name,City Attorney's Title (if greater than $1,000,000) ACCEPTANCE: Date: Name, Title ACCEPTANCE: Date: Name, Title ACCEPTANCE: Date: Name, Utilities Executive Director (if greater than $1,000,000) ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) ACCEPTANCE: Date: Darin Atteberry, City Manager (if greater than $1,000,000) ATTEST: Date: City Clerk (if greater than $1,000,000)       Utilities Work Order Form Official Purchasing Form Last updated 10/2017 ATTACHMENT A WORK ORDER SCOPE OF SERVICES       Utilities Work Order Form Official Purchasing Form Last updated 10/2017 ATTACHMENT B WORK ORDER COST DETAIL       Utilities Work Order Form Official Purchasing Form Last updated 10/2017 ATTACHMENT C CERTIFICATE OF INSURANCE CONTRACTOR shall submit Certificate of Insurance in compliance with the Contract Documents.                           1 of 9                                             PZ