Loading...
HomeMy WebLinkAboutRFP - 9234 CONTRACTOR SERVICES FOR 27IN POUDRE CANYON RAW WATERLINE PROJECT9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 1 of 133 REQUEST FOR PROPOSAL 9234 CONTRACTOR SERVICES FOR 27” POUDRE CANYON RAW WATERLINE PROJECT RFP DUE: 3:00 PM MT (OUR CLOCK), JANUARY 12, 2021 The City of Fort Collins is soliciting proposals from qualified Contractors to provide services related to design/preconstruction support and construction for the 27” Poudre Canyon Raw Waterline Project. As part of the City’s commitment to Sustainable Purchasing, proposals should be submitted online through the Rocky Mountain E-Purchasing System (RMEPS) at http://www.bidnetdirect.com/colorado/city-of-fort-collins. Note: please ensure adequate time to submit proposals through RMEPS. Proposals not submitted by the designated Due Date and Time will not be accepted by the system. Proposals must be received before 3:00 p.m. (our clock) on January 12, 2021 and referenced as Proposal No. 9234. A pre-proposal meeting will be held at 2:00 PM MT on December 8, 2020. The pre- proposal meeting will be hosted online via Zoom. Select or copy/paste the below link into your browser for access to the meeting. Please be prepared to announce your name and mute your microphone. The meeting information is as follows: https://us02web.zoom.us/j/81195478677?pwd=UW5lYWkyV1VMZWtxQjdKalVhaEdMdz09 Dial by your location +1 253 215 8782 US (Tacoma) +1 346 248 7799 US (Houston) +1 669 900 9128 US (San Jose) +1 301 715 8592 US (Washington D.C) +1 312 626 6799 US (Chicago) +1 646 558 8656 US (New York) Meeting ID: 811 9547 8677 Passcode: 986837 Find your local number: https://us02web.zoom.us/u/kjBAnEVp9 All questions should be submitted, in writing via email, to Marisa Donegon, Buyer at mdonegon@fcgov.com no later than 5:00 p.m. MT (our clock) on December 14, 2020. Please format your email to include: RFP 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project in the subject line. Questions received after this deadline may not be answered. Responses to all questions submitted before the deadline will be addressed in an addendum and posted on the Rocky Mountain E-Purchasing System webpage. Respondent communication regarding the proposal with other City personnel is prohibited and may be grounds for disqualification. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 2 of 133 Rocky Mountain E-Purchasing System hosted by Bidnet A copy of the RFP may be obtained at http://www.bidnetdirect.com/colorado/city-of-fort-collins. This RFP has been posted utilizing the following Commodity Code(s): 91223 Construction, General 91340 Construction, Pipeline 91356 Construction, Utility/Underground Projects 91360 Construction, Water System/Plants, Main and Service Line Prohibition of Unlawful Discrimination: The City of Fort Collins, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to 2000d- 4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The City strictly prohibits unlawful discrimination based on an individual’s gender (regardless of gender identity or gender expression), race, color, religion, creed, national origin, ancestry, age 40 years or older, marital status, disability, sexual orientation, genetic information, or other characteristics protected by law. For the purpose of this policy “sexual orientation” means a person’s actual or perceived orientation toward heterosexuality, homosexuality, and bisexuality. The City also strictly prohibits unlawful harassment in the workplace, including sexual harassment. Further, the City strictly prohibits unlawful retaliation against a person who engages in protected activity. Protected activity includes an employee complaining that he or she has been discriminated against in violation of the above policy or participating in an employment discrimination proceeding. The City requires its vendors to comply with the City’s policy for equal employment opportunity and to prohibit unlawful discrimination, harassment and retaliation. This requirement applies to all third-party vendors and their subcontractors at every tier. Public Viewing Copy: The City is a governmental entity subject to the Colorado Open Records Act, C.R.S. §§ 24-72-200.1 et seq. (“CORA”). Any proposals submitted hereunder are subject to public disclosure by the City pursuant to CORA and City ordinances. Vendors may submit one (1) additional complete proposal clearly marked “FOR PUBLIC VIEWING.” In this version of the proposal, the Vendor may redact text and/or data that it deems confidential or proprietary pursuant to CORA. Such statement does not necessarily exempt such documentation from public disclosure if required by CORA, by order of a court of appropriate jurisdiction, or other applicable law. Generally, under CORA trade secrets, confidential commercial and financial data information is not required to be disclosed by the City. Proposals may not be marked “Confidential” or ‘Proprietary’ in their entirety. All provisions of any contract resulting from this request for proposal will be public information. New Vendors: The City requires new Vendors receiving awards from the City to fill out and submit an IRS form W-9 and to register for Direct Deposit (Electronic) payment. If needed, the W-9 form and the Vendor Direct Deposit Authorization Form can be found on the City’s Purchasing website at www.fcgov.com/purchasing under Vendor Reference Documents. Please do not submit with your proposal. 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 3 of 133 Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision-making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited. Collusive or Sham Proposals: Any proposal deemed to be collusive or a sham proposal will be rejected and reported to authorities as such. Your authorized signature of this proposal assures that such proposal is genuine and is not a collusive or sham proposal. The City of Fort Collins reserves the right to reject any and all proposals and to waive any irregularities or informalities. Utilization of Award by Other Agencies: The City of Fort Collins reserves the right to allow other state and local governmental agencies, political subdivisions, and/or school districts to utilize the resulting award under all terms and conditions specified and upon agreement by all parties. Usage by any other entity shall not have a negative impact on the City of Fort Collins in the current term or in any future terms. The selected Vendor shall be expected to sign the City’s standard Agreement prior to commencing Services (see sample attached to this Proposal). Sincerely, Gerry Paul Purchasing Director 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 4 of 133 I. BACKGROUND & OBJECTIVE / OVERVIEW A. Purpose The purpose of this Request for Proposal (RFP) is to receive proposals from qualified firms (Contractor and Contractor/Subcontractor Teams) to provide General Contractor services for the City of Fort Collins (City) and its Engineering Consultant on the design and construction phases of the 27” Poudre Canyon Raw Waterline Project. B. Location The project site is located near Gateway Natural Area in the Cache la Poudre River Canyon (Poudre Canyon), approximately 5 miles west of the intersection of Colorado State Highway 287 and Colorado State Highway 14 (Ted’s Place), northwest of Fort Collins, CO. C. Objective The City owns and operates two raw water transmission pipelines in the Poudre Canyon. One of the pipelines is a 27-inch steel raw water pipeline. A section of this steel pipeline is exposed in the Cache la Poudre River (Poudre River) at one of its crossings near Gateway Natural Area and is at high risk for failure. The goal of this project is to ensure the structural integrity and operational longevity of the City’s raw water pipelines in the Poudre Canyon. The project will either replace or relocate portions of the raw water pipeline at the exposed Poudre River crossing. The design will consider the existing geomorphology of the river to develop a long-term solution which may require pipe alignment modifications, deeper burial depths of the pipeline, and/or localized river channel stabilization. Improvements to the 27” Poudre Canyon Raw Waterline will replace aging infrastructure (installed in the 1950s) and eliminate the risk of failure which ensures the continued delivery and reliability of raw water from the Poudre River to the Fort Collins Water Treatment Facility. Mitigating the existing situation provides an opportunity to modify the pipe alignment to provide increased integrity to the system. The City is currently evaluating two possible solutions: 1) Lower Access Road Alternative: Install approximately 1,900-feet of new 27- inch waterline in the unpaved lower access road to Gateway Natural Area (adjacent to the Poudre River). OR 2) Re-alignment River Crossing Alternative: Replace and lower approximately 470-feet of new 27-inch waterline along both channel banks and across the Poudre River channel. The project is planned to begin construction in the Fall of 2022 and will be completed during the river low flow season (October – March). 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 5 of 133 D. Background Studies and investigations have been conducted to identify the concerns and mitigation alternatives for the 27” steel raw waterline exposed in the Poudre River at the second river crossing below Gateway Natural Area. Primarily due to man-made alterations in the channel and floods in recent years, excessive erosion on the northeast bank of the river has left approximately 75-ft of the waterline exposed and at high risk of failure. Conceptual designs for four alternatives were developed in 2020 by the City’s Engineering Consultant (HDR) and included plan view drawings and Class 4 cost estimates. A multi-criteria decision analysis (MCDA) was used to rank each alternative based on project specific criteria, categorized by Triple Bottom Line factors (Environmental, Social, and Economic). The results of the MCDA process indicated that Alternative 4: Lower Access Road Alternative was the preferred solution and would require installation of approximately 1,900-feet of new 27-inch waterline in the unpaved lower access road to Gateway Natural Area (adjacent to the Poudre River). However, Alternative 3: Re-alignment River Crossing Alternative, was found to be the next best viable solution. Several design elements and constraints were further investigated as part of a preliminary design effort which included utility locates, survey, digging geotechnical test pits in the lower access road, pipeline plan and profile preliminary design, and updated cost estimates. As the preliminary work continues, and with the assistance of the selected Contractor during design phase, the Project Team will determine the best solution to carry forward to final design and construction. E. Preliminary Design Document Contractors interested in responding to this RFP should request the Preliminary Design Document. This document should be referenced for concept only. This material is provided for basic information regarding the existing site conditions, preliminary design layout for the two alternatives being considered, and preliminary plan and profile for the Re-Alignment River Crossing Alternative. The Re-Alignment River Crossing Alternative should be the focus of the proposal approach and only a portion of the Re-Alignment River Crossing Alternative will be used in the Sample Cost Estimate/Schedule section. The Preliminary Design Document (HDR, November 2020) consists of: • Preliminary Alternatives Overview Site Plan (1 sheet) • Preliminary Re-Alignment River Crossing Plan and Profile (1 sheet) To request the Preliminary Design Document, please email Marisa Donegon, Buyer, at mdonegon@fcgov.com. Prior to receiving the document, Contractors will be expected to sign the Mutual Non-Disclosure Agreement as outlined in Exhibit A, without exceptions. Note that the Preliminary Design Document will not be distributed after the question deadline on December 14, 2020. F. Permitting Permitting activities are expected to affect the project design and construction decisions and schedule. Depending on the final alternative selected, the following permits are anticipated: 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 6 of 133 • United States Army Corps of Engineers (USACE) 404/401 Permit for work within the banks of the Poudre River (likely covered by Nationwide Permits rather than an Individual Permit). o Water Quality Certification from the State for any Section 404 permit obtained • Larimer County Floodplain Permitting • Larimer County Planning: Location and Extent Permitting • CDOT Right-of-Way Work Permit • Additional construction permits are anticipated, such as the State’s Construction Dewatering permit G. Estimated Cost As part of the preliminary design efforts, Opinion of Probable Construction Costs were completed for both alternatives being considered. The Re-alignment River Crossing Alternative project cost estimate range is $2.2 M to $2.5 M and represents the total project cost, including final design, construction, permitting, mitigation, real estate acquisition, public outreach, contingency, and project management. H. Engineering Consultant Team The City intends to work with the Engineering Consultant and the awarded Contractor throughout the project beginning March 2021. Site investigation, environmental surveys, cultural resources surveys, etc. will be conducted, as needed, by firms under the supervision of the Engineering Consultant. II. GENERAL SCOPE OF SERVICES FOR DESIGN & CONSTRUCTION OF 27” POUDRE CANYON RAW WATERLINE PROJECT A. Scope of Services In general, the Contractor will be responsible for early contractor engagement to influence the selection of the final Alternative and the final design for more efficient construction. Because the Contractor is being selected for both the preconstruction and construction phases of service and due to the opportunity for the Contractor’s team to provide input to the design, it is expected that significant unforeseen changes, delays and risks will be avoided and that best value will be realized. The Contractor’s effort will consist of two phases. 1. Phase 1 - Design / Preconstruction. a. Anticipated timeframe: Spring 2021 – Fall 2022 b. Role: The Contractor and members of the Contractor’s team will be actively engaged members of the project through all design milestones where an innovative approach to solving difficult construction problems is essential. The Contractor’s input will help the team determine which Alternative is selected for the final design and construction. The Contractor will be expected to attend design meetings (virtual and/or in-person) as needed during all phases of the project. The awarded Contractor is expected to bring construction expertise to the team and actively provide constructability review and construction planning including but not limited to 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 7 of 133 scheduling, materials and subcontractor selection, design alternative assessment and selection, contract requirements, and detailed cost estimating and pricing to include competitive quoting at various design milestones. c. Cost: Pricing of the project along with a third-party independent cost estimate (ICE), will be completed at various design milestones as determined by the City with input from the project team. The third-party ICE firm will be solicited for and contracted separately by the City. During the preconstruction phase, information provided by the Contractor will be reviewed and discussed, and consensus will be reached by the project team for the execution, schedule, and cost for each major decision. At various design milestones, the Contractor team, Engineering Consultant team and third-party ICE Consultant will discuss and reconcile cost estimates. Material and subcontractor pricing will be determined by a competitive quote process at certain project milestones determined by the team. d. Contract: This phase of work will be based on hourly billing rates for assistance with design. 2. Phase 2 – Construction. a. Anticipated timeframe: Fall 2022 – Spring 2023 b. Role: The selected Contractor will serve as the General Contractor for construction of the 27” Poudre Canyon Raw Waterline Project and function as part of the Project Team during construction. The Contractor’s team is expected to bring experience and expertise in conveyance pipe installation, work and water control in a flowing river, excavation and pipe construction in highly variable subsurface conditions, blasting techniques, temporary structure stabilization techniques, and have a history of delivering projects using early contractor involvement methods. Constructability methods, sequencing, scheduling, and pre-construction pricing and estimates will also be a focused role of the Contractor team. In addition, the Contractor’s team may be requested to inform decisions on or perform some or all of the following services for the 27” Poudre Canyon Raw Waterline Project: • Safety and security • Site access, staging, layout and development • Excavation in constrained corridor • Water and sediment management during construction • Field and laboratory testing to support construction quality monitoring • Earthwork and paving • Interaction with involved agencies / key stakeholders • Environmental/ecological restoration and/or mitigation • Additional services, as needed c. Contract: Between the 90% and 100% design phase, a construction Work Order will be negotiated and executed. The Work Order value will be based on an agreed upon 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 8 of 133 target price for the construction project with actual costs paid on a cost-plus fixed percent markup. Material and subcontractor pricing will be determined by a competitive quote process (for those subcontractors not already identified in this proposal). B. Delivery Approach The 27” Poudre Canyon Raw Waterline Project will be managed using Fort Collins Utilities’ Alternative Product Delivery System (APDS). APDS, an alternative project delivery method, is commonly utilized for utility infrastructure projects at the City. This delivery method engages the Owner (City), Consultant team and Contractor team at an early stage of a project and the team works together in a collaborative environment from design through completion of construction. Participation by all team members throughout the lifetime of a project allows for innovation, strategic alignment within the team, and enhances project quality and value. This team approach assists in ensuring that projects are delivered in a timely, safe and efficient manner. Principles of alternative delivery include: 1) teamwork within the design and construction teams, 2) shared set of project goals amongst the project team, and 3) identification and mitigation of project risks. Multiple design and construction components, including but not limited to material selection and alignment, require the Contractor’s invaluable input to contribute to the success of the project. Each team member will have significant involvement in the development and execution of design and construction concepts which are utilized for the successful completion of the project. Participation by all team members throughout the project is expected and encouraged to allow innovation and enhance project quality and value. Strategic partnering sessions for the project team will likely be conducted during the course of the project. Partnering sessions will help to promote the APDS key concepts through team development, team identification of common goals for the project, team communications, and team identification and approach to risk. Partnering sessions are intended to result in mutual trust amongst the team members, commitment to shared goals, open communication and establishes strong working relationships within the team. Experience with the APDS or a similar alternative delivery method of design and construction (CM/GC, CMAR etc.) is critical for the Contractor firm. The Contractor team will be part of a collaborative project team consisting of the City’s Project Manager(s), other City staff and the Engineering Consultant team. The Engineering Consultant team was previously selected through a similar competitive selection process. This team will work together from the preliminary design through completion of construction. Each team member will have significant involvement in the design and construction concepts that are utilized. 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 9 of 133 III. SCHEDULE A. Anticipated Schedule The following represents the City’s target schedule for the RFP. The City reserves the right to amend the target schedule at any time. • RFP Issuance: December 2, 2020 • Pre-Proposal Meeting: 2:00 PM MT on December 8, 2020 • Question Deadline: 5:00 PM MT on December 14, 2020 • Final Addendum Issued: December 17, 2020 • Proposal Due Date: 3:00 PM MT (our clock) on January 12, 2021 • Short List Determined: January 26, 2021 • Interviews (tentative): Week of February 1 - 12, 2021 • Award of Contract: February 15, 2021 • Project Start Date: March 2021 B. Pre-Proposal Meeting Contractor teams are strongly encouraged to attend a pre-proposal meeting scheduled at 2:00 PM on December 8, 2020. The pre-proposal meeting will be hosted online via Zoom. Select or copy/paste the below link into your browser for access to the meeting. Please be prepared to announce your name and mute your microphone. The meeting information is as follows: https://us02web.zoom.us/j/81195478677?pwd=UW5lYWkyV1VMZWtxQjdKalVhaEdMdz 09 Dial by your location +1 253 215 8782 US (Tacoma) +1 346 248 7799 US (Houston) +1 669 900 9128 US (San Jose) +1 301 715 8592 US (Washington D.C) +1 312 626 6799 US (Chicago) +1 646 558 8656 US (New York) Meeting ID: 811 9547 8677 Passcode: 986837 Find your local number: https://us02web.zoom.us/u/kjBAnEVp9 C. Project Schedule The schedule for construction of the 27” Poudre Canyon Raw Waterline is primarily dictated by the alternative selected for final design and construction and the associated permitting requirements and time frames. To expedite transition from permitting to construction, design is anticipated to be conducted in parallel with permitting as much as possible with various permitting processes starting at key design milestones. Design will be conducted in phases, as agreed upon by the project team. An anticipated, preliminary 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 10 of 133 project schedule is provided below. IV. ADDITIONAL INSTRUCTIONS FOR CONTRACTORS A. Site Walk/Interviews In addition to submitting a written proposal, the top-rated Contractors may be invited to an interview at the site where they will be asked to detail the Contractor’s overall approach, Early Contractor Involvement (ECI) experience, project challenges, approach to project risk elements, and cost factors during a walking site visit with the City’s evaluation team and Engineering Consultant (who will not be part of the evaluation team). The evaluation criteria for the site walk/interview will be the same as for the written evaluations included in Section VI. If needed, the City may conduct additional interviews with the top-rated Contractors to discuss any final clarifications or questions. Because of recent events involving COVID-19, the City may use non-traditional methods for the interview phase of the assessment process. Instead of traditional in-person interviews for the interview session, the City may opt to use alternate methods including, but not limited to remote interviews through a platform such as Microsoft Teams or Zoom. B. Travel & Expenses Contractors are to provide a list of fees for reimbursable expenses. Subject to the terms of the applicable Work Order, reasonable expenses may be reimbursable per the current rates found at www.gsa.gov. C. Contractors/Subcontractors Contractors will be responsible for identifying any subcontractors in their proposal. Contractor must identify the firm(s) responsible for these facets of the project: 1) Excavation of oversized materials, including controlled blasting of larger boulders and/or use of expansive grouts and rock hammers Please note that the City will contract solely with the awarded Contractor and third-party Independent Cost Estimator (ICE); therefore, subcontractors will be the responsibility of the Contractor. MILESTONE Q1 ‘21 Q2 ‘21 Q3 ‘21 Q4 ‘21 Q1 ‘22 Q2 ‘22 Q3 ‘22 Q4 ‘22 Q1 ‘23 Q2 ‘23 Preliminary Design Final Design Permitting & Jurisdictional Approvals Pre-Construction Activities Construction Project Close-Out 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 11 of 133 D. Current Standards All work and/or materials must meet current standards in force by recognized technical and professional societies, trade and materials supply associations, institutes and organizations, bureaus and testing laboratories, and national, federal, state, county, and local laws, codes and ordinances. E. Insurance & Bonding 1. Insurance The Contractor will provide, from insurance companies acceptable to the City, the insurance coverage designated hereinafter and pay all costs. Before commencing work under this RFP, the Contractor shall furnish the City with certificates of insurance showing the type, amount, class of operations covered, effective dates and date of expiration of policies, and containing substantially the following statement: “The insurance evidenced by this Certificate will not reduce coverage or limits and will not be cancelled, except after thirty (30) days written notice has been received by the City of Fort Collins.” In case of the breach of any provision of the Insurance Requirements, the City, at its option, may take out and maintain, at the expense of the Contractor, such insurance as the City may deem proper and may deduct the cost of such insurance from any monies which may be due or become due the Contractor under this Agreement. Insurance coverages shall be as follows: A. Workers' Compensation & Employer's Liability. i. Workers' Compensation insurance with statutory limits as required by Colorado law. ii. Employer's Liability insurance with limits of $100,000 per accident, $500,000 disease aggregate, and $100,000 disease each employee. B. Commercial General & Vehicle Liability: Commercial general liability and automobile liability insurance for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of the work. Coverage for property damage shall be on a "broad form" basis. The amount of insurance for each coverage, Commercial General and Vehicle, shall not be less than $1,000,000 combined single limits for bodily injury and property damage. In the event any work is performed by a subcontractor, the Service Provider shall be responsible for any liability directly or indirectly arising out of the work performed under this Agreement by a subcontractor, which liability is not covered by the subcontractor's insurance. 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 12 of 133 C. The City, its officers, agents and employees shall be named as additional insureds on the Contractor's general liability and automobile liability insurance policies for any claims arising out of work performed under the Agreement. D. Primary Coverage. For any claims related to the Agreement, Contractor’s insurance shall be primary coverage, and any insurance or self-insurance maintained by the City, its officers, agents and employees shall be in excess of the Contractor’s insurance and shall not contribute with it. E. Waiver of Subrogation. Contractor will grant to the City a waiver of any right of subrogation which any insurer of Contractor may acquire against the City by virtue of any payment of any loss. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer. In the event any work is performed by a subcontractor, the Contractor shall be responsible for any liability directly or indirectly arising out of the work performed by a subcontractor, which liability is not covered by the subcontractor's insurance. Provide a sample insurance certificate outlining coverage and policy limits or a letter from the firm’s insurance agency stating limits in these categories. Provide the name, address and phone number of the firm’s insurance agent(s). 2. Bonding The City will require one hundred percent (100%) Payment and Performance Bonds upon execution of the applicable Construction Work Order(s). F. Fees & Licenses The successful Contractor shall be responsible for obtaining any necessary licenses, fees or permits without additional expense to the City. All equipment shall be properly licensed and insured, carry the appropriate permits and be placarded as required by law. G. Independent Cost Estimate The independent cost estimating process will be used for the 27” Poudre Canyon Raw Waterline Project. An Independent Cost Estimate (ICE) is a tool utilized to assist in determining the reasonableness of the Contractor’s proposed project construction cost. The ICE is performed by a third-party ICE Consultant at critical milestones during the project. The City’s Project Manager will initiate the ICE with input from the Contractor by providing the ICE Consultant all pertinent information required to accurately estimate the project. This information may include, but is not limited to, the following: contract drawings, quantities, quotes, bids, equipment and material specifications, quality requirements, geotechnical reports, construction start date, and special conditions. 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 13 of 133 The Contractor will be required to provide competitive quotes for all subcontract work and materials (except for subcontractors included as part of the Contractor team in this RFP where markups, labor rates, and equipment rates have been provided), when the total project spend with any one subcontractor or supplier will exceed sixty-thousand dollars ($60,000). Also, at least two quotes are required when the Construction Contractor proposes using self-supplied materials. The competitive selection process will be conducted by the Contractor with input from the project team. The City’s Project Manager will complete a comprehensive review of cost estimates from both the Contractor and ICE Consultant. A reconciliation meeting with the Project Manager, Contractor, and ICE Consultant will be conducted to review, in an ‘open book’ manner, the cost estimates prepared by the Contractor and the ICE Consultant. Any single line item discrepancies exceeding 5% shall be evaluated and reconciled. The level of due diligence should be commensurate with the materiality of the variance. Comparison of the cost estimates will be continued until all items are understood and agreed upon by the Project Manager, Consultants, and Construction Contractor. If the City and Construction Contractor cannot reach agreement of the contract price through the ICE process, the City reserves the right to terminate the contract. In this case, the Contractor will not be able to propose or bid on the project in the future. The individual, staff member, or ICE Consultant performing the ICE will be required to submit a detailed final report of the cost estimate, reconciliation process, and outcome. The report will be maintained in the project file kept by the City’s Project Manager. H. Laws and Regulations The Contractor agrees to comply fully with all applicable local, State of Colorado and Federal laws and regulations and municipal ordinances. The Contractor further agrees to comply fully with the Occupational Safety and Health Act, all regulations issued there under and all state laws and regulations enacted and adopted pursuant thereto. I. Agreement & Term The intent of the City of Fort Collins is to award a contract to a qualified Contractor team for the services outlined in this RFP. The Contractor and the City will enter into a Work Order Type Construction Agreement known as the “Master Agreement”. This Master Agreement will cover the design, pre-construction, and construction phases of work and it is anticipated that this work will be conducted in phases, with Work Orders negotiated and issued for each phase of work as the project progresses. The Master Agreement contains the terms and conditions, a general scope of work, hourly rates, insurance, etc. Included with this RFP is a sample Master Agreement (Section VIII) that the City intends to use for obtaining the services of the Contractor. The Contractor is required to review the Master Agreement and indicate any objections to the terms of the contracts. If revisions to the contractual terms are requested, provide suggested revisions as part of the proposal. J. Work Order Procedure Work will be conducted in phases under the Master Agreement and authorized by individual Work Orders (a sample is included in the attached Master Agreement) as the 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 14 of 133 project progresses. The Contractor shall provide all personnel, materials, equipment and supplies necessary to complete the services set forth in the applicable Work Orders. Each Work Order form must include a schedule showing the start and completion dates, total cost and a general summary of work. Subsequent supporting documentation pages may include the Contractor’s quote which includes a detailed scope of work, project schedule, deliverables, number of hours, cost detail supporting total cost including hourly rates, personnel details, materials, subcontractors, fee schedules and expenses. Cost factors outlined in the Work Order will be based on the budgetary cost factors submitted in the RFP response and subsequently negotiated and incorporated in the contract. Preconstruction hourly rates, construction labor and equipment rates will be firm for the first year of the Master Agreement and updated annually in subsequent years based on fair market indices. It is possible that the City will choose not to incorporate one or more portions of the general scope of services described in this RFP into any contract(s) executed pursuant to this RFP. Similarly, additional similar services may be added to the Master Agreement if required. No work order over $5,000 will be considered valid until signed, at a minimum, by the Contractor, Project Manager, and Purchasing Department representative and a purchase order is issued. Depending on the cost and nature of the work, additional signature authorization may be required. Any changes to the dates, cost, or scope of any Work Order must be agreed upon in writing utilizing the City’s Change Order (included in the agreement) and will not be considered valid until signed, at a minimum, by the Contractor, Project Manager, and Purchasing Department representative. K. Invoicing and Payment Invoices should be emailed monthly to invoices@fcgov.com with a copy to the Project Manager. The cost of the work completed shall be paid to the Contractor each month following the submittal of a correct invoice by the Contractor indicating the project name, Purchase Order number, task description, hours worked, personnel/work type category, hourly rate for each employee/work type category, date of the work performed specific to the task, percentage of that work that has been completed by task, 3rd party supporting documentation (including subcontractor and material invoices) with the same detail and a brief progress report. The City pays invoices on Net 30 terms. Payments will be made using the prices listed on the agreed-to Price Schedule from the Master Agreement. In the event a service is requested which is not listed on the Price Schedule, the Contractor and the City will negotiate an appropriate unit price for the service prior to the Contractor initiating such work. L. Proposal Acknowledgment A proposal acknowledgment form is attached as Section VII. Complete the attached form indicating the Contractor hereby acknowledges receipt of the City of Fort Collins Utilities’ Request for Proposal and acknowledges that the Contractor has read and agrees to be fully bound by all of the terms, conditions and other provisions set forth in the RFP. 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 15 of 133 M. COVID-19 Compliance. The Contractor and its subcontractors shall comply with all state, county, and local laws, ordinances, and public health orders established to reduce the spread of COVID-19, as applicable. The Contractor shall ensure employees and subcontractors with COVID-19 symptoms do not report to the job site. Contractor must organize work to ensure individuals minimize contact and maximize social distancing. Individuals should wear a mask or cloth face covering consistent with local public health recommendations. V. PROPOSAL SUBMITTAL Respondents shall submit a proposal tailored specifically to work related to the 27” Poudre Canyon Raw Waterline Project. Proposals shall be limited to a total length of thirty (30) single sided 8 ½ x 11” pages (excluding cover pages, table of contents, resumes, dividers, cost backup information, Preferred Qualifications and Experience Form, Safety Form, and Acknowledgement Form). Font shall be a minimum of 10 Arial and margins are limited to no less than 0.5” for sides and top/bottom. Extended page sizes, such as 11” x 17”, count as a single page, are limited to ten (10) total, and should be used only for graphics, diagrams, spreadsheets, or drawings not easily presented on 8 ½ x 11” pages. Please, no embedded documents. Proposals that do not conform to these requirements may be rejected. The proposal shall follow the format presented below. For this section, Contractors are required to provide detailed written responses to the following items in the order outlined below. The responses shall be considered technical offers of what Contractors propose to provide and shall be incorporated in the contract award as deemed appropriate by the City. A proposal that does not include all the information required may be deemed non-responsive and subject to rejection. Responses must include all the items in the order listed below. It is suggested that the Contractor include each of the City’s questions with their response immediately following the question. The City of Fort Collins shall not reimburse any firm for costs incurred in the preparation and presentation of their proposal. A. Cover Letter Provide a cover letter that describes any unique aspects or qualifications provided by your firm and how your firm can provide the best value to the City. B. Contractor Information Provide an outline describing the Contractor’s firm, including: 1. Describe the Contractor’s business and background 2. Number of years in the business 3. Details about ownership 4. An overview of services offered and qualifications 5. Size of the firm 6. Location(s) of offices. If multiple, identify which will be the primary for this project. 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 16 of 133 7. Primary contact information for the company including contact name(s) and title(s), mailing address(s), phone number(s), and email address(s). 8. Have you, or your firm, ever defaulted on a contract? If yes, provide details of when, where, and why. 9. Are you, or your firm, debarred by any government agency? If yes, provide agency names and locations. 10. Are there any pending lawsuits against your firm at this time? If yes, provide a summary of the matter and current status of the lawsuit. 11. If the respondent is a Joint Venture, the lead firm for the venture shall be clearly identified and expected participation percentages stated along with any previous history of working together over the past 15 years. C. Contractor Experience and Project Personnel 1. Preferred Qualifications & Experience Contractor shall complete the following checklist (Y/N), attached as Exhibit B. Examples and references will be requested in the proposal. A single project may be used to meet more than one of the described qualifications. In all instances, experience and projects completed must be within the past 10 years. Qualification Details Response (Y/N) 1 Experience installing water conveyance pipelines and infrastructure Contractor has completed at least two projects (including design and construction phase services) which included 24-inch (or larger) diameter pipe, greater than 500 LF in length. 2 Experience working in a flowing river Contractor has completed at least two projects in a flowing river which included water control, dewatering, and sediment management activities. 3 Experience working in tight, constrained corridors such as narrow alleys or roads Contractor has completed at least two infrastructure water, wastewater, or stormwater projects in constrained corridors. 4 Experience with excavation and pipe construction in highly variable subsurface conditions and oversized materials. Contractor or subcontractor on proposed Team has completed at least two infrastructure projects that required work in highly variable subsurface conditions including cobbles, large boulders, and oversized materials that required use of expansive grout, rock hammers, and blasting work to excavate oversized subsurface materials. 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 17 of 133 field verifications and documentation to support compliance. 6 Experience with Alternative Project Delivery Systems Contractor Team has been part of at least two projects that utilized an Alternative Project Delivery System, CM/GC method, or other similar project delivery method that incorporated collaborate project teams and partnering with Owners, Engineers, and Contractors during both the design and construction phases. 2. Summary of Project Experience / References Provide project descriptions of work performed and references for at least four (4) relevant, similar, construction projects where your firm has served as the prime contractor. The projects shall have been completed in the last 10 years. For each, describe the firm’s roles and responsibilities, and identify the roles and responsibilities of proposed team members on the past projects. Indicate which of the Preferred Qualifications & Experience listed above the project example meets. All Preferred Qualifications & Experience the Contractor has should be supported within the submitted project descriptions. Additional elements of the work may include o temporary structure stabilization techniques: use of underpinning with micropiles and tieback anchors to temporarily stabilize structures o river / stream restoration techniques such as channel regrading, grade control structures, boulder vanes, wood toe and soil lifts, habitat features, revegetation, and erosion control. Please describe any similar experience you have with temporary structure stabilization and/or stream restoration also. Project narratives shall include: 1. Description of the project, including project name and location, and its similarity to the 27” Poudre Canyon Raw Waterline Project, including details of work completed 2. Owner’s name and address, contact person and their telephone number and email address 3. Engineering consulting firm on the project 4. Contractor’s team members and roles. Identify key subcontractors on these projects that are also proposed as part of your team for this project. 5. Project delivery method used 6. Key project challenges and successes 7. Risks involved and methods of avoidance or mitigation 8. Original contract value and final contract amount 9. Responsibility of the firm and percent of contract self-performed 10. Change order history and amounts – categorized as owner directed or other 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 18 of 133 11. Disputes, claims and litigation summary, if applicable. 12. Liquidated damages applied, if applicable. Identify the top three references the Contractor suggests the City contact. If Contractor has worked for the City of Fort Collins, provide two references beyond the City reference. The Contractor authorizes the City to verify any and all information contained in the Contractor’s submittal from references contained herein and hereby releases all those concerned providing information as a reference from any liability in connection with any information they give. Provide any information that distinguishes Contractor from its competition and any additional information applicable to this RFP that might be valuable in assessing the Contractor’s proposal. 3. Project Personnel/Availability 1. Provide an organization chart for this project, identifying the team’s structure and titles. The chart should include all resources (including subcontractors) anticipated for the project and their specific roles and responsibilities. Identify what portion of work, if any, may be performed by subcontractors. Contractor must identify the firm(s) responsible for the excavation of oversized materials, including expansive grout, rock hammers, and blasting. 2. Describe how the project would be managed and who would have primary responsibility for its timely and professional completion. 3. Submit detailed resumes of individuals (including subcontractors) proposed to fill key positions. Please limit resumes to one (1) page. Resumes should highlight or demonstrate the following: a. Experience and capabilities in constructing water conveyance pipelines and infrastructure with similar features to the 27” Poudre Canyon Raw Waterline project. Provide specific project examples demonstrating this experience. b. Role and responsibility on related projects. c. Experience in a significant role on projects using alternative delivery methods with early construction contractor involvement during the design. Provide specific project examples and delivery method. d. Experience in partnering, both formal and informal. e. Provide two (2) owner references (including name, title, address, email address, and phone number). 4. Describe the team’s commitment to the 27” Poudre Canyon Raw Waterline Project and the availability of key members. The commitment of key personnel is critical to the City of Fort Collins and the success of this project. It is the City’s expectation that key members assigned to the project will remain throughout the project and act as the City’s primary resources. Any replacement for key individuals must be approved in advance and agreed to in writing by the City Project Manager. Describe how the proposed team intends to stay engaged throughout the project when it is likely there is potential for a pause between design and construction. 5. Provide information regarding your firm’s suggestion for determining the level of 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 19 of 133 effort proposed during the design phase. Who is responsible for determining the level of effort by your team? 6. Indicate your availability to participate in the interviews on the proposed dates as stated in the Schedule section. D. Project Approach For purposes of this section, assume that the design phase will focus on both alternatives. Although a decision has not been made at this time, and the Contractor’s input is desired to help make the final decision, with respect to the value of the Contractor’s time in preparing this proposal – please focus solely on the Re-alignment River Crossing Alternative for the remainder of the proposal sections. 1. Describe how the Contractor will help evaluate the two alternatives for this project with the Project Team to determine the selected approach. Describe your means and methods for engaging with the Project Team. 2. Provide a narrative identifying the Contractor’s approach to project risk, impacts, and schedule. 3. Identify key risks, opportunities, and challenges of the Project for both the pre- construction and construction phases of work. 4. Identify the major impacts and potential mitigation measures or unique solutions that could be implemented to reduce risk or capitalize on opportunities. 5. Describe how the team will drive the construction schedule, while managing critical paths, sequencing milestones, and mitigating risk. 6. Describe the value and innovation the team proposes to influence the delivery and execution of the work. 7. Describe and estimate the percentage of work to be performed by the Contractor compared to work performed by subcontractors. E. Cost Factors 1. Phase I - Design/Pre-construction Cost Factors Provide a detailed rate structure for services provided during the pre-construction phase of the project. The rate structure should include: a. A fee schedule of hourly billing rates for key project staff including their job title. b. A fee schedule for subcontractors by category and job title, if used, with mark-up if applicable. c. A list of direct costs and reimbursable expenses (e.g., travel, printing, postage, etc.). 2. Phase II - Construction Cost factors (Re-alignment River Crossing Alternative only) Establish in detail the factors which will be used in determining the final prices of work on a cost-plus markup basis. These factors shall be comprehensive in 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 20 of 133 establishing all costs to be applied to direct project labor, materials, subcontractors, and equipment in determining the construction cost. Commitments shall include: a. Markup for materials, equipment, and labor. b. Markup on subcontractor work under the direction of the General Contractor. c. Labor and material rates for all Subcontractor firms identified as part of the Contractor Team and included in this proposal. d. The costs of providing bonds and insurance for the project. e. An overall list of your 2021 labor and equipment rates for a project of similar scope as the 27” Poudre Canyon Raw Waterline Project. f. Current General Conditions costs during construction, covering items such as jobsite office, storage and tool trailers, dumpsters, and/or personnel vehicles, Please note, General Conditions costs will be paid on a cost-plus markup basis at the time of construction or as otherwise mutually agreed upon. g. Provide recommendations regarding an annual escalation percentage, based on relevant or regional indices, to use as justification for future increases during the construction phase. Contractor’s and key subcontractor firms are expected and required to have a completely open book policy on all pricing of work throughout the duration of the project. Reasonable labor rates and equipment costs may be negotiated and updated on an annual basis. F. Sample Cost Estimate/Schedule Development The sample Cost Estimate/Schedule Development requirement is meant to demonstrate the Contractor’s process and approach to building a cost estimate, applying cost factors, and developing a corresponding schedule. The City understands this effort is preliminary in nature and this portion of the proposal is not intended to seek bids for the project, but rather to allow Contractors to show their pricing and scheduling process for a portion of the overall project. Contract prices will be negotiated later with the firm that is awarded the project. For purposes of this section, the sample Cost Estimate and Schedule is to be based on the Re-alignment River Crossing Alternative and specifically limited to just the portion of the excavation, installation, concrete encasement, and backfill of the pipeline across the Poudre River from STA 22+83.96 to STA 23+76.72 (as shown on Sheet 2 of the Preliminary Plans for the Re-alignment River Crossing Alternative) and the water and sediment control required to complete the work. Even though the Preliminary Plans include both alternatives and additional detail beyond these Station Locations, the sample Cost Estimate and Schedule is limited to the portion described in the above paragraph. Additional Cost Estimates/Schedule Development are not required nor desired. Provide the following: 1. Provide a narrative of the work and include assumptions used to build the estimate and schedule, potential construction issues/risks, sequences, means/methods, pipe materials, equipment used, etc. 2. Use the cost factors developed in the previous section to develop a detailed cost 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 21 of 133 estimate showing how cost factors are applied to labor rates, materials, equipment, subcontractors, markup, etc. Assume this estimate will need to be presented in an open book manner at an interview. 3. Develop an overall schedule for the portion of work including milestones, critical paths, etc. G. Safety Provide an overview of the firm’s safety program and policies. Contractor shall complete the attached Contractor Safety Form, Exhibit C. H. Sustainability/TBL Methodology In concise terms (no more than two pages), please describe your organization’s commitment to sustainability and supporting values. 1. Address how your firm strives to incorporate all three aspects (social, environmental, and economic) of Triple Bottom Line (TBL) sustainable practices into the workplace. Provide examples along with any metrics used to measure success within your firm. 2. Also provide examples of how your firm has incorporated all three aspects of TBL sustainable practices in previous similar projects on which your firm has been the prime Contractor. Some examples are provided below: 1. Environmental – Experience delivering projects / programs focused on environmental health priorities in the areas of climate resiliency, water quality and watershed protection, regulatory performance, management systems, air quality, renewable energy, sustainable building and design, construction materials management, and solid waste reduction. 2. Economic – Experience working and delivering projects with an emphasis on strategic financial planning, job creation, business development, asset management, various project delivery methods, value engineering, regional partnerships, transparency, stakeholder engagement, strategic investments, aging infrastructure, repurposing of existing facilities, and competing financial priorities. 3. Social - Experience working and delivering projects, programs, and/or initiatives that support Equity, Diversity, and Inclusion throughout your firm’s workplace, including leadership, and supply chain. Examples of this may be demonstration of working within cultural and language gaps, development of diversity programs, diverse project teams, equitable opportunity vendor supply chain, and how your firm has applied an equity lens to processes such as recruitment, hiring, purchasing, career pathways, salaries, and staff engagement. Each element of the TBL sustainability criteria will receive equal consideration in determining the final Sustainability/TBL score. I. Sample Agreement Included with this RFP is a sample Master Agreement (Section VIII) that the City intends to use for obtaining the services of the Contractor. The Contractor is required to review this Master Agreement and indicate any objections to the terms of the contract. If revisions 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 22 of 133 to the contractual terms are requested, provide suggested revisions. J. Proposal Acknowledgment A Contractor Statement form is attached as Section VII. Complete the attached form indicating the Contractor hereby acknowledges receipt of the City of Fort Collins Utilities’ Request for Proposal and acknowledges that the Contractor has read and agrees to be fully bound by all of the terms, conditions and other provisions set forth in the RFP. VI. REVIEW AND ASSESSMENT CRITERIA A. Written Proposal and Interview Evaluation Criteria Contractors will be evaluated on the following criteria. These criteria will be the basis for review and assessment of the written proposals and interviews. At the discretion of the City, interviews of the top-rated Contractors may be conducted. The rating scale shall be from 1 to 5, with 1 being a poor rating, 3 being an average rating, and 5 being an outstanding rating. WEIGHTING FACTOR QUALIFICATION STANDARD 35% Firm Experience and Project Personnel • Does the firm have the resources, capacity and support capabilities required to successfully complete the project on-time and in-budget? • Has the Contractor completed Exhibit B and do they have the preferred qualifications? • Has the firm successfully completed previous projects of this type and scope? • Do the persons who will be working on the project have the necessary skills and qualifications? • Are enough people of the requisite skills and qualifications assigned to the project? • Are roles and responsibilities of the project team clearly identified? • Does the project team demonstrate experience with, or have a willingness to adapt to, an alternative delivery method that includes early construction contractor involvement? • Has the project team demonstrated their availability, willingness and long-term commitment to the project? • Are the appropriate number of subcontractors/expertise provided to execute the project? • Does the Contractor Team interact effectively with each other and with the Owner and Engineer (for interviews)? 20% Project Approach • Does the proposal show an understanding of the project objective, methodology to be used, and results that are desired from the project? 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 23 of 133 B. References Prior to award, the Project Manager may check references. Negative responses from references may impact the award determination. • Has the Contractor described their design and pre- construction involvement? • Has the project team clearly identified the project needs, risks, and challenges? 15% Cost Factors • Are the proposed design billing rates reasonable and competitive? • Do the proposed construction cost factors compare favorably with industry standards and other firms’ construction cost factors? 15% Sample Cost/Schedule Development • Does cost/schedule example clearly show how the cost factors are applied to the estimate? • Does the estimate align with the cost factors in Section IV F? • Is the schedule reasonable and does it demonstrate an understanding of milestones and critical paths? 10% Safety • Has the Contractor completed Exhibit C and have they demonstrated a commitment towards safety? • Has the Contractor provided information on how they ensure safety programs and policies are complied with, to include sub-contractors? 5% Sustainability/TBL Methodology • Does the firm demonstrate a commitment to sustainability, and have they provided examples of how they’ve incorporated all three aspects of the triple bottom line practices in their organization and on previous projects? • Has the Contractor suggested sustainability opportunities for this project? 8820 Directional Boring & Trenching RFP Page 24 of 133 VII. CONTRACTOR STATEMENT Contractor hereby acknowledges receipt of the City of Fort Collins Request for Proposal and acknowledges that it has read and agrees to be fully bound by all of the terms, conditions and other provisions set forth in the RFP. Additionally, Contractor hereby makes the following representations to City: a. All of the statements and representations made in this proposal are true to the best of the Contractor’s knowledge and belief. b. Contractor commits that it is able to meet the terms provided in this proposal. c. This proposal is a firm and binding offer, for a period of 90 days from the date hereof. d. Contractor further agrees that the method of award is acceptable. e. Contractor also agrees to complete the proposed Master Agreement with the City of Fort Collins within 30 days of notice of award. If contract is not completed and signed within 30 days, City reserves the right to cancel and award to the next highest rated firm. f. Contractor acknowledges there are no conflicts of interest for this project. g. Contractor acknowledge receipt of __ addenda. Legal Firm Name: Physical Address: Remit to Address: Phone: Name of Authorized Agent of Firm: Signature of Authorized Agent: Primary Contact for Project: Title: Email Address: Phone: Cell Phone: NOTE: CONTRACTOR STATEMENT IS TO BE SIGNED & RETURNED WITH YOUR PROPOSAL. 8820 Directional Boring & Trenching RFP Page 25 of 133 VIII. SAMPLE AGREEMENT (FOR REFERENCE ONLY – DO NOT SIGN ) SERVICES AGREEMENT WORK ORDER TYPE THIS AGREEMENT made and entered into the day and year set forth below, by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and hereinafter referred to as "Service Provider". WITNESSETH: In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows: 1. Services to be Performed. a. This Agreement shall constitute the basic agreement between the parties for boring & trenching services. The conditions set forth herein shall apply to all services performed by the Service Provider on behalf of the City and particularly described in Work Orders agreed upon in writing by the parties from time to time. Such Work Orders, samples of which are attached hereto as Exhibit A & B, consisting of two (2) and ( ) pages and incorporated herein by this reference, shall include a description of the services to be performed, the location and time for performance, the amount of payment, any materials to be supplied by the City and any other special circumstances relating to the performance of services. A general scope of services is attached hereto as Exhibit C, consisting of ( ) pages, and incorporated herein by this reference. The only services authorized under this Agreement are those which are performed after receipt of such Work Order, except in emergency circumstances where oral work requests may be issued. Oral requests for emergency actions will be confirmed by issuance of a written Work Order within two (2) working days. Irrespective of references in Exhibit A to certain named third parties, Service Provider shall be solely responsible for performance of all duties hereunder. b. The City may, at any time during the term of a particular Work Order and without invalidating such Work Order, make changes to the scope of the particular services. Such changes shall be agreed upon in writing by the parties by Change Order, a sample of which is attached hereto as Exhibit B, consisting of one (1) page and incorporated herein by this reference. 2. Changes in the Work. The City reserves the right to independently bid any services rather than issuing work to the Service Provider pursuant to this Agreement. Nothing within this Agreement shall obligate the City to have any particular service performed by the Service Provider. 8820 Directional Boring & Trenching RFP Page 26 of 133 3. Time of Commencement and Completion of Services. The services to be performed pursuant to this Agreement shall be initiated as specified by each written Work Order or oral emergency service request. Oral emergency service requests will be acted upon without waiting for a written Work Order. Time is of the essence. 4. Contract Period. This Agreement shall commence February 1, 2019 and shall continue in full force and effect until January 31, 2020, unless sooner terminated as herein provided. In addition, at the option of the City, the Agreement may be extended for additional one year periods not to exceed four (4) additional one year periods. Renewals and pricing changes shall be negotiated by and agreed to by both parties. Written notice of renewal shall be provided to the Service Provider and mailed no later than thirty (30) days prior to contract end. 5. Delay. If either party is prevented in whole or in part from performing its obligations by unforeseeable causes beyond its reasonable control and without is fault or negligence, then the party so prevented shall be excused from whatever performance is prevented by such cause. To the extent that the performance is actually prevented, the Service Provider must provide written notice to the City of such condition within fifteen (15) days from the onset of such condition. 6. Early Termination by City/Notices. Notwithstanding the time periods contained herein, the City may terminate this Agreement at any time without cause by providing written notice of termination to the Service Provider. Such notice shall be mailed at least fifteen (15) days prior to the termination date contained in said notice unless otherwise agreed in writing by the parties. All notices provided under this Agreement shall be effective when mailed, postage prepaid and sent to the following address: Service Provider: City: Copy to: Attn: City of Fort Collins Attn: PO Box 580 Fort Collins, CO 80522 City of Fort Collins Attn: Purchasing Dept. PO Box 580 Fort Collins, CO 80522 In the event of early termination by the City, the Service Provider shall be paid for services rendered to the termination date, subject only to the satisfactory performance of the Service Provider's obligations under this Agreement. Such payment shall be the Service Provider's sole right and remedy for such termination. 7. Contract Sum. This is an open-end indefinite quantity Agreement with no fixed price. The actual amount of work to be performed will be stated on the individual Work Orders. The City makes no guarantee as to the number of Work Orders that may be issued or the actual amount of services which will in fact be requested. 8. Payments. a. The City agrees to pay and the Service Provider agrees to accept as full payment for all work done and all materials furnished and for all costs and expenses incurred in 8820 Directional Boring & Trenching RFP Page 27 of 133 performance of the work the sums set forth for the hourly labor rate and material costs, with markups, stated within the Bid Schedule Proposal Form, attached hereto as Exhibit , consisting of ( ) pages, and incorporated herein by this reference. Payment shall be made by the City only upon acceptance of the work by the City and upon the Service Provider furnishing satisfactory evidence of payment of all wages, taxes, supplies and materials, and other costs incurred in connection with the performance of such work. 9. Liquidated Damages. OWNER and CONTRCTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in the Work Order, plus any extensions thereof allowed in accordance with Article 12 of the General conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as penalty) CONTRACTOR shall pay OWNER the amount set forth in each Work Order. 10. City Representative. The City's representative will be shown on the specific Work Order and shall make, within the scope of his or her authority, all necessary and proper decisions with reference to the work requested. All requests concerning this Agreement shall be directed to the City Representative. 11. Independent Contractor. It is agreed that in the performance of any services hereunder, the Service Provider is an independent contractor responsible to the City only as to the results to be obtained in the particular work assignment and to the extent that the work shall be done in accordance with the terms, plans and specifications furnished by the City. 12. Subcontractors. Service Provider may not subcontract any of the Work set forth in the Exhibit A, Statement of Work without the prior written consent of the city, which shall not be unreasonably withheld. If any of the Work is subcontracted hereunder (with the consent of the City), then the following provisions shall apply: (a) the subcontractor must be a reputable, qualified firm with an established record of successful performance in its respective trade performing identical or substantially similar work, (b) the subcontractor will be required to comply with all applicable terms of this Agreement, (c) the subcontract will not create any contractual relationship between any such subcontractor and the City, nor will it obligate the City to pay or see to the payment of any subcontractor, and (d) the work of the subcontractor will be subject to inspection by the City to the same extent as the work of the Service Provider. 13. Personal Services. It is understood that the City enters into the Agreement based on the special abilities of the Service Provider and that this Agreement shall be considered as an agreement for personal services. Accordingly, the Service Provider shall neither assign any responsibilities nor delegate any duties arising under the Agreement without the prior written consent of the city. 8820 Directional Boring & Trenching RFP Page 28 of 133 14. Acceptance Not Waiver. The City's approval or acceptance of, or payment for any of the services shall not be construed to operate as a waiver of any rights under the Agreement or of any cause of action arising out of the performance of this Agreement. 15. Warranty. a. Service Provider warrants that all work performed hereunder shall be performed with the highest degree of competence and care in accordance with accepted standards for work of a similar nature. b. Unless otherwise provided in the Agreement, all materials and equipment incorporated into any work shall be new and, where not specified, of the most suitable grade of their respective kinds for their intended use, and all workmanship shall be acceptable to City. c. Service Provider warrants all equipment, materials, labor and other work, provided under this Agreement, except City-furnished materials, equipment and labor, against defects and nonconformances in design, materials and workmanship/workwomanship for a period beginning with the start of the work and ending twenty-four (24) months from and after final acceptance under the Work Order, regardless whether the same were furnished or performed by Service Provider or by any of its subcontractors of any tier. Upon receipt of written notice from City of any such defect or nonconformances, the affected item or part thereof shall be redesigned, repaired or replaced by Service Provider in a manner and at a time acceptable to City. 16. Default. Each and every term and condition hereof shall be deemed to be a material element of this Agreement. In the event either party should fail or refuse to perform according to the terms of this Agreement, such party may be declared in default thereof. 17. Remedies. In the event a party has been declared in default, such defaulting party shall be allowed a period of ten (10) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to (a) terminate the Agreement and seek damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail himself of any other remedy at law or equity. If the non-defaulting party commences legal or equitable actions against the defaulting party, the defaulting party shall be liable to the non-defaulting party for the non-defaulting party's reasonable attorney fees and costs incurred because of the default. 18. Binding Effect. This writing, together with the exhibits hereto, constitutes the entire agreement between the parties and shall be binding upon said parties, their officers, employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representative, successors and assigns of said parties. 19. Indemnity/Insurance. a. The Service Provider agrees to indemnify and save harmless the City, its officers, agents and employees against and from any and all actions, suits, claims, demands or liability of any character whatsoever, brought or asserted for injuries to or death of any person 8820 Directional Boring & Trenching RFP Page 29 of 133 or persons, or damages to property arising out of, result from or occurring in connection with the performance of any service hereunder. b. The Service Provider shall take all necessary precautions in performing the work hereunder to prevent injury to persons and property. c. Without limiting any of the Service Provider's obligations hereunder, the Service Provider shall provide and maintain insurance coverage naming the City as an additional insured under this Agreement of the type and with the limits specified within Exhibit E, consisting of one (1) page, attached hereto and incorporated herein by this reference. The Service Provider before commencing services hereunder shall deliver to the City's Purchasing Director, P. O. Box 580, Fort Collins, Colorado 80522 one copy of a certificate evidencing the insurance coverage required from an insurance company acceptable to the city. 20. Entire Agreement. This Agreement, along with all Exhibits and other documents incorporated herein, shall constitute the entire Agreement of the parties. Covenants or representations not contained in this Agreement shall not be binding on the parties. 21. Law/Severability. This Agreement shall be governed in all respect by the laws of the State of Colorado. In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction such holding shall not invalidate or render unenforceable any other provision of this Agreement. 22. Prohibition Against Employing Illegal Aliens. Pursuant to Section 8-17.5-101, C.R.S., et. seq., Service Provider represents and agrees that: a. As of the date of this Agreement: 1. Service Provider does not knowingly employ or contract with an illegal alien who will perform work under this Agreement; and 2. Service Provider will participate in either the e-Verify program created in Public Law 208, 104th Congress, as amended, and expanded in Public Law 156, 108th Congress, as amended, administered by the United States Department of Homeland Security (the “e-Verify Program”) or the Department Program (the “Department Program”), an employment verification program established pursuant to Section 8- 17.5-102(5)(c) C.R.S. in order to confirm the employment eligibility of all newly hired employees to perform work under this Agreement. b. Service Provider shall not knowingly employ or contract with an illegal alien to perform work under this Agreement or knowingly enter into a contract with a subcontractor that knowingly employs or contracts with an illegal alien to perform work under this Agreement. c. Service Provider is prohibited from using the e-Verify Program or Department Program procedures to undertake pre-employment screening of job applicants while this Agreement is being performed. 8820 Directional Boring & Trenching RFP Page 30 of 133 d. If Service Provider obtains actual knowledge that a subcontractor performing work under this Agreement knowingly employs or contracts with an illegal alien, Service Provider shall: 1. Notify such subcontractor and the City within three days that Service Provider has actual knowledge that the subcontractor is employing or contracting with an illegal alien; and 2. Terminate the subcontract with the subcontractor if within three days of receiving the notice required pursuant to this section the subcontractor does not cease employing or contracting with the illegal alien; except that Service Provider shall not terminate the contract with the subcontractor if during such three days the subcontractor provides information to establish that the subcontractor has not knowingly employed or contracted with an illegal alien. e. Service Provider shall comply with any reasonable request by the Colorado Department of Labor and Employment (the “Department”) made in the course of an investigation that the Department undertakes or is undertaking pursuant to the authority established in Subsection 8-17.5-102 (5), C.R.S. f. If Service Provider violates any provision of this Agreement pertaining to the duties imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If this Agreement is so terminated, Service Provider shall be liable for actual and consequential damages to the City arising out of Service Provider’s violation of Subsection 8-17.5-102, C.R.S. g. The City will notify the Office of the Secretary of State if Service Provider violates this provision of this Agreement and the City terminates the Agreement for such breach. 23. Dust Control. The Service Provider shall abide by the City of Fort Collins “Dust Control and Prevention Manual,” which is available for public download at https://www.fcgov.com/airquality/pdf/dust-prevention-and-control-manual.pdf, and is incorporated herein by this reference. The City of Fort Collins has implemented this manual for all projects performed for the City of Fort Collins or located within the City of Fort Collins City limits. 24. Haul Routes. All trucks used for work contracted by the City utilizing asphalt from the asphalt plant located at 1800 North Taft Hill Road may only enter North Taft Hill Road from the North using CR 54 G and only exit the site on North Taft Hill Road to the North to CR 54G. 25. Special Provisions. Special provisions or conditions relating to the services to be performed pursuant to this Agreement are set forth in Exhibit - Confidentiality consisting of (1) page, Exhibit , Section 00700 General Conditions consisting of fifty-three (53) pages, and Section 800 Supplementary Conditions Exhibit , consisting of ( ) pages attached hereto and incorporated herein by this reference. 8820 Directional Boring & Trenching RFP Page 31 of 133 THE CITY OF FORT COLLINS, COLORADO By: Gerry Paul Purchasing Director DATE: ATTEST: APPROVED AS TO FORM: SERVICE PROVIDER'S NAME By: Printed: Title: CORPORATE PRESIDENT OR VICE PRESIDENT Date: 8820 Directional Boring & Trenching RFP Page 32 of 133 EXHIBIT A WORK ORDER FORM (Short form) PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND SERVICE PROVIDER'S NAME WORK ORDER NUMBER: PM's Tracking # PROJECT TITLE: ORIGINAL BID/RFP NUMBER & NAME: MASTER AGREEMENT EFFECTIVE DATE: Original Contract Date ARCHITECT/ENGINEER: If using a 3rd party architect/engineer or City PM/Engineer OWNER’S REPRESENTATIVE: City PM WORK ORDER COMMENCEMENT DATE: WORK ORDER COMPLETION DATE: MAXIMUM FEE: (time and reimbursable direct costs): PROJECT DESCRIPTION/SCOPE OF SERVICES: Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of ( ) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Service Provider's Name By: Date: Name: Title: 8820 Directional Boring & Trenching RFP Page 33 of 133 OWNER’S ACCEPTANCE & EXECUTION: This Work Order and the attached Contract Documents are hereby accepted and incorporated herein by this reference. ACCEPTANCE: Date: Name, Project Manager REVIEWED: Date: Name, Buyer or Senior Buyer APPROVED AS TO FORM: Date: Name,City Attorney's Title (if greater than $1,000,000) ACCEPTANCE: Date: Name, Title ACCEPTANCE: Date: Name, Title ACCEPTANCE: Date: Kevin Gertig, Utilities Executive Director (if greater than $1,000,000) ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) ACCEPTANCE: Date: Darin Atteberry, City Manager (if greater than $1,000,000) ATTEST: Date: City Clerk (if greater than $1,000,000) 8820 Directional Boring & Trenching RFP Page 34 of 133 EXHIBIT B WORK ORDER FORM (Construction over $100,000) FORT COLLINS UTILITIES CONSTRUCTION WORK ORDER PROJECT TITLE WORK ORDER NO. PM'S TRACKING # CONTRACTOR: Company Name 8820 Directional Boring & Trenching RFP Page 35 of 133 TABLE OF CONTENTS AGREEMENT FORMS 00525 Work Order, Notice of Award & Bid Schedule 00530 Work Order Notice to Proceed 00600 Bonds and Certificates 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONTRACTOR) 00651 Lien Waiver Release (SUBCONTRACTOR) 00660 Consent of Surety 00670 Application for Exemption Certificate 00800 Supplementary Conditions 00900 Addenda, Modifications and Payment 00950 Work Order Change Order Form 00960 Application for Payment ADDITIONAL DOCUMENTS Attachment A DRAWING INDEX 8820 Directional Boring & Trenching RFP Page 36 of 133 SECTION 00500 CONSTRUCTION WORK ORDER AGREEMENT FORMS 00525 Work Order, Notice of Award & Bid Schedule 00530 Work Order Notice to Proceed 8820 Directional Boring & Trenching RFP Page 37 of 133 SECTION 00525 WORK ORDER, NOTICE OF AWARD AND BID SCHEDULE TO: Company Name WORK ORDER NUMBER: PM's Tracking # PROJECT TITLE: ORIGINAL BID/RFP NUMBER & NAME: MASTER AGREEMENT EFFECTIVE DATE: Original Contract Date ARCHITECT/ENGINEER: If using a 3rd party architect/engineer or can be City PM/Engineer OWNER’S REPRESENTATIVE: City PM WORK ORDER COMMENCEMENT DATE: MAXIMUM FEE: (time and reimbursable direct costs): NOTICE OF AWARD DATE: Date of this Document OWNER: City of Fort Collins (hereinafter referred to as OWNER) 1. WORK. Pursuant to your MASTER AGREEMENT with OWNER dated Original Contract Date, and your Work Order Proposal dated Date of Quote, you have been awarded a Work Order for Project Title. PROJECT DESCRIPTION & SITE LOCATION: 2. CONTRACT PRICE, BONDS AND CERTIFICATES. The price of your Work Order is Written Dollar Amount ($Numerical Dollar Amount). Pursuant to the AGREEMENT and the Work Order Documents, Performance and Payment Bonds and insurance are required. 3. CONTRACT TIMES. Pursuant to the MASTER AGREEMENT and the Work Order Documents, the date for Substantial Completion of this Work Order is Date, and after Substantial Completion, the date for Final Completion is Date. 4. LIQUIDATED DAMAGES. OWNER and CONTRACTOR recognize that time is of the essence of this Work Order and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as penalty) CONTACTOR shall pay OWNER the amounts set forth hereafter. 1) Substantial Completion: Written Dollar Amount ($Numerical Dollar Amount) for each calendar day or fraction thereof after Date until the work is Substantially Complete. 8820 Directional Boring & Trenching RFP Page 38 of 133 2) Final Acceptance: After Substantial Completion, Written Dollar Amount ($Numerical Dollar Amount) for each calendar day or fraction thereof after XX number of calendar days until the Work is ready for Final Payment and Acceptance. 5. PAYMENT PROCEDURES. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by OWNER. PROGRESS PAYMENTS. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's Application for Payment, once each month during construction as provided below. All progress payments will be on the basis of the progress of the Work measured by the schedule of values established in paragraph 2.6 of the General Conditions and in the case of Unit Price Work based on the number of units completed, and in accordance with the General Requirements concerning Unit Price Work. Prior to Substantial Completion, Owner will be entitled to withhold as contract retainage five percent (5%) of each progress payment, but, in each case, less the aggregate of payments previously made and less such amounts as OWNER may withhold, in accordance with paragraph 14.7 of the General Conditions. If, in the sole discretion of Owner, Owner determines that the character and progress of the Work have been satisfactory to OWNER, OWNER may determine that as long as the character and progress of the Work remain satisfactory to them, there will be no additional retainage on account of Work completed in which case the remaining progress payments prior to Substantial Completion will be in an amount equal to 100% of the Work completed. 95% of materials and equipment not incorporated in the Work (but delivered, suitably stored and accompanied by documentation satisfactory to OWNER as provided in paragraph 14.2 of the General Conditions) may be included in the application Section 00960. Upon Substantial Completion payment will be made in an amount sufficient, if necessary, to increase total payments to CONTRACTOR to 95% of the Contract Price, less such amounts as OWNER may withhold in accordance with paragraph 14.7 of the General Conditions or as provided by law. Upon Final Completion and Acceptance of the Work in accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the remainder of the Contract Price as provided in said paragraph 14.13. 6. EXECUTION. Work Order Documents must be executed in DocuSign within fifteen (15) calendar days of the date of this Notice of Award. Contractor shall attach Payment and Performance Bonds and Certificate of Insurance(COI) to the Work Order Documents in DocuSign. In addition, one original set of executed Bonds and COI shall be provided to the Buyer. Failure to comply with these conditions within the time specified will entitle OWNER to consider your Work Order Proposal abandoned and to annul this Work Order & Notice of Award. CONTRACTOR’S NOTICE OF AWARD REPRESENTATION & EXECUTION: 8820 Directional Boring & Trenching RFP Page 39 of 133 CONTRACTOR agrees to perform the services identified above, in accordance with the terms and conditions contained herein, the MASTER AGREEMENT, and the NOTICE OF AWARD between the parties. In the event of a conflict between or ambiguity in the terms of the MASTER AGREEMENT or specific Work Orders, the MASTER AGREEMENT shall control. CONTRACTOR: Company Name By: Date: Name: Title: 8820 Directional Boring & Trenching RFP Page 40 of 133 OWNER’S ACCEPTANCE & EXECUTION: This Work Order and the attached Documents are hereby accepted and incorporated herein by this reference. ACCEPTANCE: Date: Name, Project Manager REVIEWED: Date: Name, Buyer or Senior Buyer APPROVED AS TO FORM: Date: Name,City Attorney's Title (if greater than $1,000,000) ACCEPTANCE: Date: Name, Title ACCEPTANCE: Date: Name, Title ACCEPTANCE: Date: Kevin Gertig, Utilities Executive Director (if greater than $1,000,000) ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) ACCEPTANCE: Date: Darin Atteberry, City Manager (if greater than $1,000,000) ATTEST: Date: City Clerk (if greater than $1,000,000) 8820 Directional Boring & Trenching RFP Page 41 of 133 BID SCHEDULE Insert Work Order Quote/Proposal Here 8820 Directional Boring & Trenching RFP Page 42 of 133 SECTION 00530 WORK ORDER NOTICE TO PROCEED NOTICE TO PROCEED DATE: WORK ORDER TITLE: WORK ORDER NUMBER: TO: Attn: This notice is to advise you: That the Work Order and all amendments and supplements to the Work Order Documents covering the above described Work have been fully executed by the CONTRACTOR and the OWNER. That the required CONTRACTOR's Performance and Payment Bonds and insurance have been received by the OWNER. That the OWNER has approved the said Work Order and Work Order Documents. Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and directed to proceed within ( ) calendar days from receipt of this notice as required by the Work Order and the AGREEMENT. The dates for Substantial Completion and Final Acceptance shall be , and , respectively. Dated this _____________ day of ___________, _____. CITY OF FORT COLLINS (OWNER) By: Name, Title ACKNOWLEDGMENT OF NOTICE Receipt of the above Work Order Notice to Proceed is hereby acknowledged this Day day of Month, Year. (CONTRACTOR) By: ___________________________________________ Name, Title 8820 Directional Boring & Trenching RFP Page 2 of 133 SECTION 00600 BONDS AND CERTIFICATES 00610 Performance Bond 00615 Payment Bond 00630 Certificate of Insurance 00635 Certificate of Substantial Completion 00640 Certificate of Final Acceptance 00650 Lien Waiver Release (CONTRACTOR) 00651 Lien Waiver Release (SUBCONTRACTOR) 00660 Consent of Surety 00670 Application for Exemption Certificate 8820 Directional Boring & Trenching RFP Page 3 of 133 SECTION 00610 PERFORMANCE BOND Bond No __ KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 LaPorte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Master Agreement with the OWNER, dated the Day day of Month, Year, a copy of which is hereto attached and made a part hereof, for the performance of The City of Fort Collins Work Order, titled Work Order Project Title, Work Order Number PM's Tracking #, dated Work Order Date, a copy of which is hereto attached and made a part hereof. NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions and agreements of said Work Order and Master Agreement during the original term thereof, and any extensions thereof which may be granted by the OWNER, with or without Notice to the Surety and during the life of the guaranty period, and if the Principal shall satisfy all claims and demands incurred under such Work Order and Master Agreement, and shall fully indemnify and save harmless the OWNER from all cost and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER may incur in making good any default, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Work Order and Master Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Work Order and Master Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. 8820 Directional Boring & Trenching RFP Page 4 of 133 IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this _____ day of ___________, _____. IN PRESENCE OF: Principal (Title) (Title) (Corporate Seal) (Address) IN PRESENCE OF: Other Partners _____________________________ By: _____________________________ By: IN PRESENCE OF: Surety _____________________________ By: _____________________________ (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Work Order. If CONTRACTOR is Partnership, all partners should execute Bond. 8820 Directional Boring & Trenching RFP Page 5 of 133 SECTION 00615 PAYMENT BOND Bond No __ KNOW ALL MEN BY THESE PRESENTS: that (Firm) (Address) (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) (Address) hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 LaPorte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Master Agreement with the OWNER, dated the Day day of Month, Year, a copy of which is hereto attached and made a part hereof, for the performance of The City of Fort Collins Work Order, titled Work Order Project Title, Work Order Number PM's Tracking #, dated Work Order Date, a copy of which is hereto attached and made a part hereof. NOW, THEREFORE, if the Principal shall make payment to all persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the Work provided for in such Work Order and Master Agreement and any authorized extension or modification thereof, including all amounts due for materials, lubricants, repairs on machinery, equipment and tools, consumed, rented or used in connection with the construction of such Work, and all insurance premiums on said Work, and for all labor, performed in such Work whether by subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Work Order and Master Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Work Order and Master Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. 8820 Directional Boring & Trenching RFP Page 6 of 133 IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this _____ day of ___________, _____. IN PRESENCE OF: Principal (Title) (Title) (Corporate Seal) (Address) IN PRESENCE OF: Other Partners _____________________________ By: _____________________________ By: IN PRESENCE OF: Surety _____________________________ By: _____________________________ (Address) (Surety Seal) NOTE: Date of Bond must not be prior to date of Work Order. If CONTRACTOR is Partnership, all partners should execute Bond. 8820 Directional Boring & Trenching RFP Page 7 of 133 SECTION 00630 CERTIFICATE OF INSURANCE CONTRACTOR shall submit Certificate of Insurance in compliance with the Work Order Documents. 8820 Directional Boring & Trenching RFP Page 8 of 133 SECTION 00635 CERTIFICATE OF SUBSTANTIAL COMPLETION TO: CITY OF FORT COLLINS (OWNER) PROJECT TITLE: DATE OF SUBSTANTIAL COMPLETION: LOCATION: Fort Collins, Colorado OWNER: City of Fort Collins PROJECT OR SPECIFIED PART SHALL CONTRACTOR: INCLUDE: WORK ORDER DATE: The Work performed under this Work Order, pursuant to the Work Order Documents, has been inspected by authorized representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project (or specified part of the project, as indicated above) is hereby declared to be substantially completed on the above date. A tentative list of items to be completed or corrected is appended hereto. This list may not be exhaustive, and the failure to include an item on it does not alter the responsibility of the CONTRACTOR to complete all the Work in accordance with the Work Order Documents. _____________________________ By: __________________________ ________ PROJECT MANAGER AUTHORIZED REPRESENTATIVE DATE The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to complete and correct the items on the tentative list within the time indicated. _____________________________ By: __________________________ ________ CONTRACTOR AUTHORIZED REPRESENTATIVE DATE The OWNER accepts the project or specified area of the project as substantially complete and will assume full possession of the project or specified area of the project at 12:01 a.m., on . The responsibility for heat, utilities, security, and insurance under the Work Order Documents shall be as set forth under "Remarks" below. CITY OF FORT COLLINS ________ By: __________________________ ________ OWNER AUTHORIZED REPRESENTATIVE DATE REMARKS: _________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ 8820 Directional Boring & Trenching RFP Page 9 of 133 SECTION 00640 CERTIFICATE OF FINAL ACCEPTANCE DATE: TO: You are hereby notified that on the Day day of Month, Year, the City of Fort Collins, Colorado, has accepted the Work completed by Contractor Company Name, for the City of Fort Collins Work Order, titled Project Title, Work Order Number PM's Tracking #. Your continuing obligations and guarantees for the Project will be as provided in the Work Order and Work Order Documents. Sincerely, City of Fort Collins OWNER By: ___________________________________________ ___________________________________________ Name, Title 8820 Directional Boring & Trenching RFP Page 10 of 133 SECTION 00650 LIEN WAIVER RELEASE (CONTRACTOR) TO: City of Fort Collins, Colorado (OWNER) FROM: Company Name (CONTRACTOR) WORK ORDER TITLE: WORK ORDER NUMBER: 1. The CONTRACTOR acknowledges having received payment, except retainage from the OWNER for all work, labor, skill and material furnished, delivered and performed by the CONTRACTOR for the OWNER or for anyone in the construction, design, improvement, alteration, addition or repair of the above described project. 2. In consideration of such payment and other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the CONTRACTOR voluntarily waives all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights which the CONTRACTOR may now or may afterward have, claim or assert for all and any work, labor, skill or materials furnished, delivered or performed for the construction, design, improvement, alteration, addition or repair of the above described project, against the OWNER or its officers, agents, employees or assigns, against any fund of or in the possession or control of the OWNER, against the project or against all land and the buildings on and appurtenances to the land improved by the project. 3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or performed to or for the construction, design, improvement, alteration, addition or repair of the project were furnished, delivered or performed by the CONTRACTOR or its agents, employees, and servants, or by and through the CONTRACTOR by various Subcontractors or materialmen or their agents, employees and servants and further affirms the same have been paid in full and have released in full any and all existing or possible future mechanic's liens or rights or claims against the project or any funds in the OWNER'S possession or control concerning the project or against the OWNER or its officers, agents, employees or assigns arising out of the project. 4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if any, and the Surety on the project against and from any claim hereinafter made by the CONTRACTOR's Subcontractors, materialmen, employees, servants, agents or assigns against the project or against the OWNER or its officers, employees, agents or assigns arising out of the project for all loss, damage and costs, including reasonable attorneys fees, incurred as a result of such claims. 5. The parties acknowledge that the description of the project set forth above constitutes an adequate description of the property and improvements to which this Lien Waiver Release pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and may be relied upon by the OWNER, the lender, if any, and Surety on any labor and material bonds for the project. 8820 Directional Boring & Trenching RFP Page 11 of 133 Signed this ______ day of __________, ___. CONTRACTOR: Company Name By: ___________________________________________ ___________________________________________ Name, Title ATTEST: _____________________________ Secretary STATE OF COLORADO ) )ss. COUNTY OF LARIMER ) Subscribed and sworn to before me this _________ day of __________, _____, by ________________________________________________________________. Witness my hand and official seal. My Commission Expires: ___________________________. _________________________ Notary Public 8820 Directional Boring & Trenching RFP Page 12 of 133 SECTION 00650 LIEN WAIVER RELEASE (SUBCONTRACTOR) TO: City of Fort Collins, Colorado (OWNER) FROM: Company Name (CONTRACTOR) WORK ORDER TITLE: WORK ORDER NUMBER: 1. The Subcontractor acknowledges having received payment from the CONTRACTOR for all work, labor, skill and material furnished, delivered and performed by the Subcontractor for the CONTRACTOR or for anyone in the construction, design, improvement, alteration, addition or repair of the above described project. 2. In consideration of such payment and other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the Subcontractor voluntarily waives all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights which the Subcontractor may now or may afterward have, claim or assert for all and any work, labor, skill or materials furnished, delivered or performed for the construction, design, improvement, alteration, addition or repair of the above described project, against the CONTRACTOR or its officers, agents, employees or assigns, against the project or against all land and the buildings on and appurtenances to the land improved by the project. 3. The Subcontractor affirms that all work, labor and materials, furnished, delivered or performed to or for the construction, design, improvement, alteration, addition or repair of the project were furnished, delivered or performed by the Subcontractor or its agents, employees, and servants, or by and through the Subcontractor by various sub- subcontractors or materialmen or their agents, employees and servants, and further affirms the same have been paid in full and have released in full any and all existing or possible future mechanic's liens or rights or claims against the project or against the CONTRACTOR or its officers, agents, employees or assigns arising out of the project. 4. The Subcontractor agrees to defend and hold harmless the CONTRACTOR, the lender, if any, and the Surety on the project against and from any claim hereinafter made by the Subcontractor's sub-subcontractors, materialmen, employees, servants, agents or assigns against the project or against the CONTRACTOR or OWNER, lender or Surety or their officers, employees, agents or assigns arising out of the project for all loss, damage and costs, including reasonable attorneys fees, incurred as a result of such claims. 5. The parties acknowledge that the description of the project set forth above constitutes an adequate description of the property and improvements to which this Lien Waiver Release pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and may be relied upon by the CONTRACTOR, OWNER, the lender, if any, and Surety on any labor and material bonds for the project. 8820 Directional Boring & Trenching RFP Page 13 of 133 Signed this ______ day of _________, ___. SUBCONTRACTOR: By: ___________________________________________ ___________________________________________ Name, Title ATTEST: _____________________________ Secretary STATE OF COLORADO ) )ss. COUNTY OF LARIMER ) Subscribed and sworn to before me this _________ day of __________, _____, by __________________________________________________________________. Witness my hand and official seal. My Commission Expires: ___________________________. __________________________________ Notary Public 8820 Directional Boring & Trenching RFP Page 14 of 133 SECTION 00660 CONSENT OF SURETY TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER") CONTRACTOR: Company Name TITLE: WORK ORDER NUMBER: WORK ORDER DATE: In accordance with the provisions of the Work Order and Master Agreement between the OWNER and the CONTRACTOR as indicated above, for the Work Order titled Work Order Project Title on bond of , (Surety) _______________________________________ hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final Payment to the CONTRACTOR shall not relieve the Surety Company of any of its obligations to the OWNER, as set forth in the said Surety Company's Bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this _________ day of _________ _, _____. ____________________________________________ (Surety Company) By: ________________________________________ (Name) Attorney-in-Fact ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-Fact. 8820 Directional Boring & Trenching RFP Page 1 of 133 8820 Directional Boring & Trenching RFP Page 2 of 133 8820 Directional Boring & Trenching RFP Page 3 of 133 8820 Directional Boring & Trenching RFP Page 4 of 133 SECTION 00900 ADDENDA, MODIFICATIONS AND PAYMENT 00950 Change Order 00960 Application for Payment 8820 Directional Boring & Trenching RFP Page 2 of 133 SECTION 00950 CHANGE ORDER NO. PROJECT TITLE: CONTRACTOR: [Contractor] WORK ORDER NUMBER: PO NUMBER: DESCRIPTION: 1. Reason for Change: Why is the change required? 2. Description of Change: Provide description of the changes to the Work 3. Change in Work Order Price: 4. Change in Work Order Time: ORIGINAL WORK ORDER PRICE $ .00 TOTAL APPROVED CHANGE ORDER .00 TOTAL PENDING CHANGE ORDER .00 TOTAL THIS CHANGE ORDER .00 TOTAL % OF THIS CHANGE ORDER % TOTAL C.O.% OF ORIGINAL WORK ORDER % ADJUSTED WORK ORDER COST $ .00 CONTRACTOR: Company Name By: Date: Name: Title: ACCEPTED: Date: City PM Name, Title REVIEWED: Date: Name, Buyer or Senior Buyer ACCEPTED: Date: Name, Title ACCEPTED: Date: Gerry Paul, Purchasing Director (if greater than $60,000) 8820 Directional Boring & Trenching RFP Page 3 of 133 SECTION 00960 APPLICATION FOR PAYMENT PROJECT Page 1 of 1 OWNER: ENGINEERS: ADDRESS: NUMBER DATE AMOUNT $ - $ - $ - NUMBER DATE AMOUNT FUND OBJECT Amount Due this Pay Application (before retainage): $ - $ - 0.00% Payment of the above Amount Due This Application has been reviewed by the OWNER'S Project Manager BY: DATE: DATE: NAME & TITLE: BY: DATE: NAME & TITLE: Official Purchasing Form Last updated 10/2017 Net Change by Change Order: Change order %: Original Contract Amount Net Change by Change Order Revised Current Contract Amount Total Work Completed to Date: Total Stored to Date: CHANGE ORDERS PAY APPLICATION Application is made for Payment as shown below in connection with the Contract. The present status of the account for this Contract is as follows: CONTRACTOR: $ - $ - RETAINAGE $ -NumbersCharge $ - $ - Less Previous Payments: Total Completed and Stored Materials to Date: Less Retainage $ - $ - $ - AMOUNT DUE THIS APPLICATION: $ - The above Amount Due this Application is requested by the CONTRACTOR's Project Manager. BY: PO NUMBER ADDRESS: ADDRESS: APPLICATION NUMBER APPLICATION DATE PERIOD BEGINNING PERIOD ENDING PROJECT NUMBER Retainage to Date: NAME & TITLE: Total (after retainage): Payment of the above Amount Due This Application is approved by the OWNER. The undersigned CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection with the WORK have been satisfied as required in paragraph 14.3 of the General Conditions 8820 Directional Boring & Trenching RFP Page 4 of 133 Unit Price Total Quanitity Total Quantity Total Quantity Total 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 $ - $ - $ - $ - $ - 0.00% $ - $ - $ - $ - $ - 0.00% Official Purchasing Form Last Updated 10/2017 Total to Date Less Retention Change Orders to Date (see attached) $ - $ - CONTRACT SUMMARY Total Due Adjusted Contract Amount $ - Total Change Order Work to Date (see attached) Value of Work in Place Percent Complete Including Stored Materials Less Retention @ 10% up to 50% complete, 5% beyond 50% of Adjusted Contract Crosscheck Total Completed to Date Total Materials Remaining @ Site $ - $ - $ - Original Contract Amount Less Previous Billings $ - $ - $ - $ - $ - 8820 Directional Boring & Trenching RFP Page 5 of 133 ATTACHMENT A DRAWING INDEX WORK ORDER # WORK ORDER TITLE BY: Company Name who last revised the drawings Sheet Title Drawing Revision Date 8820 Directional Boring & Trenching RFP Page 6 of 133 EXHIBIT CHANGE ORDER NO. PROJECT TITLE: SERVICE PROVIDER: Company Name WORK ORDER NUMBER: PO NUMBER: DESCRIPTION: 1. Reason for Change: Why is the change required? 2. Description of Change: Provide details of the changes to the Work 3. Change in Work Order Price: 4. Change in Work Order Time: ORIGINAL WORK ORDER PRICE $ .00 TOTAL APPROVED CHANGE ORDER .00 TOTAL PENDING CHANGE ORDER .00 TOTAL THIS CHANGE ORDER .00 TOTAL % OF THIS CHANGE ORDER % TOTAL C.O.% OF ORIGINAL WORK ORDER % ADJUSTED WORK ORDER COST $ .00 SERVICE PROVIDER: Company Name By: Date: Name: Title: ACCEPTANCE: Date: Name, Project Manager REVIEWED: Date: Name, Buyer or Senior Buyer ACCEPTANCE: Date: Name, Title 8820 Directional Boring & Trenching RFP Page 7 of 133 ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) 8820 Directional Boring & Trenching RFP Page 8 of 133 EXHIBIT C GENERAL SCOPE OF SERVICES 8820 Directional Boring & Trenching RFP Page 9 of 133 EXHIBIT D (BID SCHEDULE/COMPENSATION) 8820 Directional Boring & Trenching RFP Page 10 of 133 EXHIBIT E INSURANCE REQUIREMENTS 2. The Service Provider will provide, from insurance companies acceptable to the City, the insurance coverage designated hereinafter and pay all costs. Before commencing work under this bid, the Service Provider shall furnish the City with certificates of insurance showing the type, amount, class of operations covered, effective dates and date of expiration of policies, and containing substantially the following statement: “The insurance evidenced by this Certificate will not reduce coverage or limits and will not be cancelled, except after thirty (30) days written notice has been received by the City of Fort Collins.” In case of the breach of any provision of the Insurance Requirements, the City, at its option, may take out and maintain, at the expense of the Service Provider, such insurance as the City may deem proper and may deduct the cost of such insurance from any monies which may be due or become due the Service Provider under this Agreement. The City, its officers, agents and employees shall be named as additional insureds on the Service Provider 's general liability and automobile liability insurance policies for any claims arising out of work performed under this Agreement. 2. Insurance coverages shall be as follows: A. Workers' Compensation & Employer's Liability. The Service Provider shall maintain during the life of this Agreement for all of the Service Provider's employees engaged in work performed under this Agreement: 1. Workers' Compensation insurance with statutory limits as required by Colorado law. 2. Employer's Liability insurance with limits of $100,000 per accident, $500,000 disease aggregate, and $100,000 disease each employee. B. Commercial General & Vehicle Liability. The Service Provider shall maintain during the life of this Agreement such commercial general liability and automobile liability insurance as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of work under this Agreement. Coverage for property damage shall be on a "broad form" basis. The amount of insurance for each coverage, Commercial General and Vehicle, shall not be less than $1,000,000 combined single limits for bodily injury and property damage. In the event any work is performed by a subcontractor, the Service Provider shall be responsible for any liability directly or indirectly arising out of the work performed under this Agreement by a subcontractor, which liability is not covered by the subcontractor's insurance. Page 11 of 133 EXHIBIT F CONFIDENTIALITY IN CONNECTION WITH SERVICES provided to the City of Fort Collins (the “City”) pursuant to this Agreement (the “Agreement”), the Service Provider hereby acknowledges that it has been informed that the City has established policies and procedures with regard to the handling of confidential information and other sensitive materials. In consideration of access to certain information, data and material (hereinafter individually and collectively, regardless of nature, referred to as “information”) that are the property of and/or relate to the City or its employees, customers or suppliers, which access is related to the performance of services that the Service Provider has agreed to perform, the Service Provider hereby acknowledges and agrees as follows: That information that has or will come into its possession or knowledge in connection with the performance of services for the City may be confidential and/or proprietary. The Service Provider agrees to treat as confidential (a) all information that is owned by the City, or that relates to the business of the City, or that is used by the City in carrying on business, and (b) all information that is proprietary to a third party (including but not limited to customers and suppliers of the City). The Service Provider shall not disclose any such information to any person not having a legitimate need-to-know for purposes authorized by the City. Further, the Service Provider shall not use such information to obtain any economic or other benefit for itself, or any third party, except as specifically authorized by the City. The foregoing to the contrary notwithstanding, the Service Provider understands that it shall have no obligation under this Agreement with respect to information and material that (a) becomes generally known to the public by publication or some means other than a breach of duty of this Agreement, or (b) is required by law, regulation or court order to be disclosed, provided that the request for such disclosure is proper and the disclosure does not exceed that which is required. In the event of any disclosure under (b) above, the Service Provider shall furnish a copy of this Agreement to anyone to whom it is required to make such disclosure and shall promptly advise the City in writing of each such disclosure. In the event that the Service Provider ceases to perform services for the City, or the City so requests for any reason, the Service Provider shall promptly return to the City any and all information described hereinabove, including all copies, notes and/or summaries (handwritten or mechanically produced) thereof, in its possession or control or as to which it otherwise has access. The Service Provider understands and agrees that the City’s remedies at law for a breach of the Service Provider’s obligations under this Confidentiality Agreement may be inadequate and that the City shall, in the event of any such breach, be entitled to seek equitable relief (including without limitation preliminary and permanent injunctive relief and specific performance) in addition to all other remedies provided hereunder or available at law. Page 12 of 133 EXHIBIT G SECTION 00700 GENERAL CONDITIONS Page 13 of 133 Page 14 of 133 Page 15 of 133 Page 16 of 133 Page 17 of 133 Page 18 of 133 Page 19 of 133 Page 20 of 133 Page 21 of 133 Page 22 of 133 Page 23 of 133 Page 24 of 133 Page 25 of 133 Page 26 of 133 Page 27 of 133 Page 28 of 133 Page 29 of 133 Page 30 of 133 Page 31 of 133 Page 32 of 133 Page 33 of 133 Page 34 of 133 Page 35 of 133 Page 36 of 133 Page 37 of 133 Page 38 of 133 Page 39 of 133 Page 40 of 133 Page 41 of 133 Page 42 of 133 Page 43 of 133 Page 44 of 133 Page 45 of 133 Page 46 of 133 Page 47 of 133 Page 48 of 133 Page 49 of 133 Page 50 of 133 Page 51 of 133 Page 52 of 133 Page 53 of 133 Page 54 of 133 Page 55 of 133 Page 56 of 133 Page 57 of 133 Page 58 of 133 Page 59 of 133 Page 60 of 133 Page 61 of 133 Page 62 of 133 Page 63 of 133 Page 64 of 133 Page 65 of 133 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 66 of 133 EXHIBIT A MUTUAL NON-DISCLOSURE AGREEMENT (NOT TO BE COMPLETED AT THIS TIME) THIS MUTUAL NON-DISCLOSURE AGREEMENT (this “Agreement”), effective as of the day of , 20 , is between the City of Fort Collins, a Colorado home rule municipal corporation (the “City”), and (“Vendor”). The City and Vendor may hereinafter be referred to individually as a “Party” or collectively as the “Parties.” WHEREAS, Vendor and the City may engage in discussions concerning construction of the 27- Inch Poudre Canyon Raw Waterline Project and a potential business arrangement (the “Purpose”); and WHEREAS, in the course of discussions, communications, and/or negotiations each Party may disclose to and/or receive from the other Party certain information belonging to the disclosing Party or its affiliates (collectively, the “Discloser”) that includes trade secrets, privileged information, or confidential commercial and information (“Confidential Information”); NOW, THEREFORE, in consideration of the foregoing and of the mutual covenants and promises set forth herein and for other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the Parties agree as follows: 1. Records maintained by the City are subject to public disclosure pursuant to the Colorado Open Records Act (“CORA”). Certain confidential business records are exempt. If Vendor provides to the City documents that include trade secrets, privileged information, or confidential commercial or financial information, Vendor shall segregate any documents including such information from other documents provided to the City and shall clearly identify such documents with a stamp, watermark or other clear mark identifying the documents as confidential pursuant to CORA. 2. The Party receiving Confidential Information (the “Recipient”) (i) shall use such Confidential Information only for the Purpose; (ii) shall reproduce such Confidential Information only to the extent necessary for the Purpose; (iii) shall restrict disclosure of such Confidential Information to its, and its affiliates', employees and agents who need to know such Confidential Information to carry out the Purpose and who are not direct competitors of the Discloser (and require such employees and agents to undertake confidentiality and use obligations at least as restrictive as those Recipient assumes herein); (iv) shall not disclose such Confidential Information to any other Party without prior written approval of Discloser; and (v) shall protect such Confidential Information with at least the same degree of care as it normally exercises to protect its own proprietary information of a similar nature, which shall be no less than reasonable care. If Recipient discloses Confidential Information to an employee, affiliate, or other person in accordance with the terms of this Agreement, any subsequent disclosure or use of such Confidential Information by such employee, affiliate, or other person shall be deemed a disclosure or use by Recipient and Recipient shall be responsible for such disclosure or use. The Recipient shall immediately notify the Discloser upon the discovery of any loss or unauthorized disclosure or use of the Confidential Information of the Discloser. 3. The restrictions on use and disclosure of Confidential Information shall not apply unless such Confidential Information, when in tangible, electronic or viewable form is marked confidential or proprietary by Discloser, or when disclosed only orally is both identified as 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 67 of 133 confidential or proprietary at the time of disclosure and summarized in a writing so marked and provided to Recipient within thirty (30) days following the oral disclosure; except that any unmarked material and any verbally disclosed information that Recipient knows or reasonably should know to contain Confidential Information of the Discloser, including but not limited to business or technical information not generally known to the public, such as patents, copyrights, trademarks and trade secrets, as well as all written or oral pricing and contract proposals exchanged between the Parties shall be subject to the use and disclosure restrictions of this Agreement. Within the 30-day period referenced above, all Confidential Information communicated only orally shall be subject to the use and disclosure restrictions of this Agreement. 4. The restrictions on the use or disclosure of Confidential Information shall not apply to any information: a. Which is independently developed by the Recipient as evidenced by documentation in such Party's possession; or b. Which is lawfully received from another source free of restriction and without breach of this Agreement by the Recipient; or c. After it has become generally available to the public without breach of this Agreement by the Recipient; or d. Which at the time of disclosure to the Recipient was known to the Recipient free of restriction as evidenced by documentation in such Party's possession; or e. Which the Discloser agrees in writing is free of such restrictions. 5. All Confidential Information shall remain the exclusive property of the Discloser, and no license under any intellectual property right is either granted or implied by this Agreement or the conveying of Confidential Information to Recipient hereunder. Discloser makes no representations, warranties, assurances, guarantees or inducements of any kind, and, in particular, with respect to the non- infringement of any intellectual property rights, or other rights of third persons or of Discloser. 6. Neither this Agreement nor the disclosure or receipt of Confidential Information hereunder shall constitute or imply any promise or intention by either Party to enter into any transaction or business relationship, nor is it an inducement for either Party or its affiliated companies to spend funds or resources or purchase or provide products or services, nor is it any commitment by either Party or its affiliated companies with respect to the present or future marketing of any product or service. No such agreement will be binding unless and until stated in a separate writing signed by authorized representatives of both Parties. 7. Each Party agrees not to announce or disclose to any other person (other than persons described in Section 2(iii), above) the Confidential Information or the nature of any discussions concerning the Purpose without first securing the prior written approval of the other Party. All Confidential Information furnished hereunder shall be returned or destroyed upon written request or upon Recipient’s determination that it no longer has a need for such Confidential Information, except that Recipient’s legal counsel may retain one copy in counsel’s files solely to provide a record of such Confidential Information for archival purposes. 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 68 of 133 8. The restrictions on use and disclosure of Confidential Information disclosed hereunder shall survive for a period of three (3) years from the date of last disclosure of any such Confidential Information (except in the case of software, for an indefinite period). Either Party may terminate this Agreement upon thirty (30) days advance written notice to the other. 9. All notices or communications required or permitted as a part of this Agreement shall be in writing (unless another verifiable medium is expressly authorized) and shall be deemed delivered when: a. actually received, b. upon receipt by sender of a certified mail, return receipt signed by an employee or agent of the Party, c. upon receipt by sender of proof of email receipt, or d. if not actually received, ten (10) days after deposit with the United States Postal Service authorized mail center with proper postage (certified mail, return receipt requested) affixed and addressed to the respective other party at the address set forth in this Agreement or such other address as the Party may have designated by notice or Agreement amendment to the other Party. The consequences of failure to receive a notice due to improper notification by the intended Recipient of a new address will be borne by the intended Recipient. The addresses of the Parties to this Agreement are as follows: City of Fort Collins 215 N. Mason PO Box 580 Fort Collins, CO 80522 Attention: Project Manager Attention: Purchasing Director 10. This Agreement shall not be construed to limit either Party's right to independently develop or acquire products or services without use of the other Party's Confidential Information. 11. The restrictions on disclosure of Confidential Information under this Agreement shall not preclude Recipient, on the advice of counsel, from complying with applicable law, regulation, other governmental requirement or other demand under lawful process, including a discovery request in a civil litigation, if Recipient first gives Discloser notice of the required disclosure and cooperates with Discloser, at Discloser’s expense, in seeking reasonable protective arrangements. In no event shall Recipient be required to take any Action which, on the advice of Recipient’s counsel, could result in the imposition of any sanctions or other penalties by a court or government body. 12. Neither Party has any obligation to disclose Confidential Information to the other. Either Party may, at any time: (i) cease giving Confidential Information to the other Party without any liability, or (ii) request in writing return of Confidential Information previously disclosed. 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 69 of 133 13. Recipient acknowledges that Confidential Information provided under this Agreement may be subject to U.S. export laws or regulations. Recipient shall not use, distribute, transfer or transmit Confidential Information (even if incorporated into products, software or other information) except in compliance with such laws and regulations. If requested, Recipient shall sign written assurances and other export-related documents as may be required to comply with such laws or regulations. 14. Each Party agrees that all of its obligations undertaken herein as Recipient shall survive and continue after any termination of this Agreement, subject to Section 8 above. 15. No amendment or modification of this Agreement shall be valid or binding on the Parties unless made in writing and signed by duly authorized representatives of each Party. 16. Subject to the limitations set forth in this Agreement, this Agreement will inure to the benefit of and be binding upon the Parties. This Agreement may not be assigned by one Party without the other Party's prior written consent. 17. If any provision of this Agreement shall be held by a court of competent jurisdiction to be illegal, invalid or unenforceable, the remaining provisions shall remain in full force and effect to the greatest extent permitted by law. 18. No forbearance, failure or delay in exercising any right, power or privilege is waiver thereof, nor does any single or partial exercise thereof preclude any other or future exercise thereof, or the exercise of any other right, power or privilege. This Agreement is binding upon and inures to the benefit of the Parties and their heirs, executors, legal and personal representatives, successors and assigns, as the case may be. 19. This Agreement shall be governed by the laws of the State of Colorado, U.S.A., without regard to its conflicts of law principles. Each Party acknowledges and agrees that a breach by it or one of its affiliates, employees or representatives of any of the covenants set forth in this Agreement will cause irreparable injury to the other Party and its business for which damages, even if available, will not constitute an adequate remedy. Accordingly, each Party, for itself and its affiliates, employees and representatives, agrees that the other Party, in addition to any other remedy available at law or in equity, shall be entitled to the issuance of injunctive relief (including, without limitation, specific performance) by a court of competent jurisdiction in order to enforce the covenants and agreements contained herein. 20. Any judicial proceeding brought by or against any of the Parties on any dispute arising out of this Agreement or any matter related hereto shall be brought exclusively in the state district court sitting in Larimer County, Colorado, and by execution and delivery of this Agreement, each of the Parties accepts for itself the exclusive jurisdiction and venue of the aforesaid court as trial courts. Each Party expressly waives any objection (including, without limitation, objections based on forum non conveniens) which any Party may have now or hereafter to the laying of venue or to the jurisdiction of any such suit, action, or proceeding, and irrevocably submits generally and unconditionally to the jurisdiction of any such court in any such suit, action, or proceeding. Each Party agrees that its attorneys shall accept service of process. 21. This Agreement constitutes the entire understanding between the Parties as to the treatment of Confidential Information disclosed for the Purpose and merges all prior discussion between them relating thereto. Each Party has read this Agreement, 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 70 of 133 understands it and agrees to be bound by its terms and conditions. This Agreement may be executed in counterparts, each of which shall be deemed an original, but all of which taken together shall constitute one single agreement between the Parties. Signatures exchanged by facsimile or other electronic means are effective for all purposes hereunder to the same extent as original signatures. IN WITNESS WHEREOF, the Parties have executed this Agreement as of the date first set forth above. CITY OF FORT COLLINS, COLORADO By: By: Printed: Printed: Title: Title: 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 71 of 133 EXHIBIT B PREFERRED QUALIFICATIONS & EXPERIENCE Contractor shall complete the following checklist (Y/N). Examples and references are requested in the Proposal. A single project may be used to meet more than one of the described qualifications. In all instances, experience and projects completed must be within the past 10 years. Contractor may add rows to the table if explanations are required. Qualification Details Response (Y/N) 1 Experience installing water conveyance pipelines and infrastructure Contractor has completed at least two projects (including design and construction phase services) which included 24-inch (or larger) diameter pipe, greater than 500 LF in length. 2 Experience working in a flowing river Contractor has completed at least two projects in a flowing river which included water control, dewatering, and sediment management activities. 3 Experience working in tight, constrained corridors such as narrow alleys or roads Contractor has completed at least two infrastructure water, wastewater, or stormwater projects in constrained corridors. 4 Experience with excavation and pipe construction in highly variable subsurface conditions and oversized materials. Contractor or subcontractor on proposed Team has completed at least two infrastructure projects that required work in highly variable subsurface conditions including cobbles, large boulders, and oversized materials that required use of expansive grout, rock hammers, and blasting work to excavate oversized subsurface materials. 5 Experience performing work within strict permitting environments Contractor has completed at least two projects where strict permitting compliance was required and managed and included field verifications and documentation to support compliance. 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 72 of 133 EXHIBIT C CONTRACTOR SAFETY FORM Please complete the following form to provide information about your Company’s safety records and procedures. This information will be included in the evaluation of the submitted proposal. We reserve the right to request additional documentation, at any point, that supports the accuracy of this form. Section 1. General Information Company Name Number of Employees Full Time: Part Time: Seasonal: Insurance Carrier Self-insured for Workers Compensation? Y N Section 2. Health and Safety Professional Information Do you have a full-time dedicated Safety Officer? Y N If Yes, provide the following information for the dedicated Safety Officer: Name: Title: Phone Number: Email: If No, provide the following information of the person responsible for safety in your company: Name: Title: Phone Number: Email: Section 3. Health and Safety Program Is there a written Company Safety Program Y N Does the written Company Safety Program cover the work activities proposed by your Company for this project? Y N Does the written Company Safety Program include the following: Health and Safety Training Y N Employee/Management Responsibility Y N Hazard Recognition and Control Y N Incident Reporting and Investigation Y N Describe a typical job site safety briefing (time, location, frequency, topics, documentation) 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 73 of 133 How do you ensure safety to include subcontractor compliance through the project? Do you perform Job Hazard Analysis regularly and document them? Y N How often do you conduct Health and Safety audits or inspections? Do you have a corrective action plan for any findings? Y N Section 4. Training and Certifications List required safety training ALL employees receive: List specialized safety training employees receive as needed: Do you maintain records of all safety training and certifications? Y N Section 5. Health and Safety Records List the Company’s Experience Modification Rate (EMR) for the previous 3 years Year: EMR: Year: EMR: Year: EMR: For any EMR greater than 1, provide an explanation for the rating and describe the corrective action taken by the Company. Use additional pages if needed. 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 74 of 133 Provide the number of injuries and illnesses recorded (OSHA 300 log or equivalent) in the previous 3 years: Calendar Year Year: Year: Year: Number of Fatalities Number of OSHA recordable cases Number of OSHA restricted only cases Number of OSHA lost time cases OSHA recordable incident rate Number of recordable cases x 200,000 Number of hours worked OSHA restricted only incident rate Number of restricted only cases x 200,000 Number of hours worked OSHA lost time incident rate Number of lost time cases x 200,000 Number of hours worked Average number of employees on payroll Have any OSHA citations been issued to the Company in the past 3 years: Y N If yes, list the citations and for each, provide an explanation for the citation and describe the corrective action taken by the Company. Limit your response to projects that have occurred in the Rocky Mountain region. Use additional pages if needed. 9234 Contractor Services for 27” Poudre Canyon Raw Waterline Project Page 75 of 133 6 Experience with Alternative Project Delivery Systems Contractor Team has been part of at least two projects that utilized an Alternative Project Delivery System, CM/GC method, or other similar project delivery method that incorporated collaborate project teams and partnering with Owners, Engineers, and Contractors during both the design and construction phases. $ - Combined Total Completed to Date Total Contract Amount Total This Period Previous Billings Balance Remaining Percent Complete PAY REQUEST Item # Description Quantity Cost Remaining Percent UOMComplete Contract Summary This Period Previous Total to Date Period Ending: of the Contract. CERTIFICATION BU SCOPE OF WORK CHANGE ORDERS RECONCILIATION CHANGE ORDERS INVOICE NUMBER Total Change Order Work to Date: $ - $ - Retainage Previous: Change in Retainage: 5 Experience performing work within strict permitting environments Contractor has completed at least two projects where strict permitting compliance was required and managed and included