WORK ORDER
PURSUANT TO A MASTER AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
HYDRO CONSTRUCTION, INC.
WORK ORDER NUMBER: H-WRF-2020-8
PROJECT TITLE: DWRF Digester 611 Failure Investigation
Support
ORIGINAL BID/RFP NUMBER & NAME: 8286, Construction Contractor for Projects
at the Water and Wastewater Treatment
Facilities
MASTER AGREEMENT EFFECTIVE DATE: June 20, 2016
ARCHITECT/ENGINEER: NA
OWNER’S REPRESENTATIVE: Christina Schroeder
WORK ORDER COMMENCEMENT DATE: October 14, 2020
WORK ORDER COMPLETION DATE: December 31, 2020
MAXIMUM FEE: (time and reimbursable direct costs): $70,375.00
PROJECT DESCRIPTION/SCOPE OF SERVICES: Support services associated with DWRF
Digester 611 Root Cause Failure Analysis. Services include scaffolding installation and safety
watch during site investigation. Two months of scaffolding rental are included in this work order.
Additional rental fees incurred for construction repair will be included with the construction repair
estimate and work order. See the attached supporting documentation.
Service Provider agrees to perform the services identified above and on the attached forms in
accordance with the terms and conditions contained herein and in the Master Agreement
between the parties. In the event of a conflict between or ambiguity in the terms of the Master
Agreement and this Work Order (including the attached forms) the Master Agreement shall
control.
The attached forms consisting of ten (10) pages are hereby accepted and incorporated herein,
by this reference, and Notice to Proceed is hereby given after all parties have signed this
document.
SERVICE PROVIDER: Hydro Construction, Inc.
By: Date:
Name: Title:
Page 1 of 15
DocuSign Envelope ID: 5B311A47-6B6F-4F8C-9C2C-323F6DBCF39B
James Eurich
October 22, 2020
Senior Project Manager
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
OWNER’S ACCEPTANCE & EXECUTION:
This Work Order and the attached Contract Documents are hereby accepted and incorporated
herein by this reference.
ACCEPTANCE: Date:
Christina Schroeder, Civil Engineer III
REVIEWED: Date:
Pat Johnson, Senior Buyer
REQISITION ENTERED BY: Date:
Melissa Walker, Finance Coordinator
ACCEPTANCE: Date:
Matt Fater, Civil Engineering Director
ACCEPTANCE: Date:
Jason Graham, Plant Operations Director
ACCEPTANCE: Date:
Mark Kempton, Interim Deputy Director – Water Resources & Treatment
ACCEPTANCE: Date:
Kevin Gertig, Utilities Executive Director
(if greater than $1,000,000)
ACCEPTANCE: Date:
Gerry Paul, Purchasing Director
(if greater than $60,000)
ACCEPTANCE: Date:
Darin Atteberry, City Manager
(if greater than $1,000,000)
ATTEST: Date:
City Clerk
(if greater than $1,000,000)
Page 2 of 15
DocuSign Envelope ID: 5B311A47-6B6F-4F8C-9C2C-323F6DBCF39B
October 19, 2020
October 21, 2020
October 21, 2020
October 23, 2020
October 26, 2020
October 26, 2020
October 26, 2020
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT A
WORK ORDER SCOPE & COST OF SERICES
Page 3 of 15
DocuSign Envelope ID: 5B311A47-6B6F-4F8C-9C2C-323F6DBCF39B
DWRF Digester 611 Failure Investigation Support
Hydro Cost Estimate
Page 4 of 15
DocuSign Envelope ID: 5B311A47-6B6F-4F8C-9C2C-323F6DBCF39B
Hydro Construction DWRF Digester Lid 611 Coating Repairs Page 1
Scaffolding and Inspection Estimate
Page 5 of 15
DocuSign Envelope ID: 5B311A47-6B6F-4F8C-9C2C-323F6DBCF39B
Hydro Construction DWRF Digester Lid 611 Coating Repairs Page 2
Scaffolding and Inspection Estimate
Description Takeoff Quantity Total Cost/Unit Labor Quantity Labor Price Labor Amount Material Price Material Amount Sub Price Sub Amount Equip Price Equip Amount Other Price Other Amount
Total Amount
GENERAL CONDITIONS
Site Supervision
Project Superintendent 40.00 hr 45.00 /hr 40 hr 45.00 /hr 1,800 - - - - 0.00 /hr 0 0.00 /hr 0 1,800
Project Superintendent - Vehicle 1.00 wk 563.85 /wk 1 wk 0.00 /wk 0 - - - - 402.75 /wk 403 161.10 /wk 161 564
Project Superintendent - Computer/Software 1.00 wk 121.36 /wk 1 wk /wk - - - - 121.36 /wk 121 0.00 /wk 0 121
OSHA & Safety
Safety Manager 40.00 hr 41.75 /hr 40 hr 41.75 /hr 1,670 - - /hr 0.00 /hr 0 0.00 /hr 0 1,670
Safety - Confined Space Equipment 2.00 mo 1,020.30 /mo 23 mh 0.00 /mh 0 - - /mo 859.20 /mo 1,718 161.10 /mo 322 2,041
Set up & Monitoring Labor 1.00 wk 2,361.10 /wk 40 ch 55.00 /ch 2,200 - - /wk 0.00 /wk 0 161.10 /wk 161 2,361
Scaffolding - Subcontract & Rental - Colorado Scaffolding
Labor,Travel, Per Diem 1.00 ls 26,530.00 /ls 1 ls 0.00 /ls 0 0.00 /ls 0 26,530.00 /ls 26,530 0.00 /ls 0 - - 26,530
Frieght - Delivery/Return 1.00 ls 2,072.00 /ls 1 ls /ls /ls 2,072.00 /ls 2,072 0.00 /ls 0 - - 2,072
Crane Rental 1.00 ls 9,690.00 /ls 1 ls /ls /ls 9,690.00 /ls 9,690 0.00 /ls 0 - - 9,690
Misc. Direct Costs 1.00 ls 4,569.00 /ls 1 ls /ls /ls 4,569.00 /ls 4,569 0.00 /ls 0 - - 4,569
Monthly Rental 2.00 mo 2,139.00 /mo 2 mo /mo /mo 2,139.00 /mo 4,278 0.00 /mo 0 - - 4,278
Estimate Totals
Description Amount Totals Rate Percent of Total
Labor 5,670 8.06%
Material
Subcontract 47,139 66.98%
Equipment 2,243 3.19%
Other 644 0.92%
55,696 55,696 79.14% 79.14%
Labor Burden 2,155 38.000 % 3.06%
Contingency 5,550 10.000 % 7.89%
7,705 63,401 10.95% 90.09%
Profit & Overhead 6,974 11.000 % 9.91%
6,974 70,375 9.91% 100.00%
Total 70,375
Page 6 of 15
DocuSign Envelope ID: 5B311A47-6B6F-4F8C-9C2C-323F6DBCF39B
Colorado Scaffolding Quote
Page 7 of 15
DocuSign Envelope ID: 5B311A47-6B6F-4F8C-9C2C-323F6DBCF39B
Will,
The revised pricing you requested for the DWRF Digester 611 Repair project is shown below.
Let me know if you need a formal proposal.
CD will provide the crane, rigging, and certified rigger to rig the equipment in and out of the tank.
Hydro Construction will provide air sampling, ventilation and lighting in the tank.
Page 8 of 15
DocuSign Envelope ID: 5B311A47-6B6F-4F8C-9C2C-323F6DBCF39B
Labor, Travel, Per-Diem $26,528.52
28 day Rental $2,138.14
Freight / Delivery /
Return $2,071.82
Crane Rental $9,690.00
Engineering $0.00
Other Direct Job Costs $4,407.17
Applicable Tax 7.55% $161.43
Total Lump Sum $44,997.07
Greg K Curtis
Senior Sales / Estimator
INDUSTRIAL | COMMERCIAL | INSULATION | SCAFFOLDING
Cell: 303-435-6862 Direct: 720-356-4343 Email: GCurtis@CDSpecialtyContractors.com
Office: 303-287-3333 Fax: 303-288-5088
Address 4540 E. 60th Avenue, Commerce City, CO 80022
Page 9 of 15
DocuSign Envelope ID: 5B311A47-6B6F-4F8C-9C2C-323F6DBCF39B
SAFETY BY CULTURE NOT BY CHANCE
Page 10 of 15
DocuSign Envelope ID: 5B311A47-6B6F-4F8C-9C2C-323F6DBCF39B
Safway Scaffolding Quote
Page 11 of 15
DocuSign Envelope ID: 5B311A47-6B6F-4F8C-9C2C-323F6DBCF39B
P: 303 286 8422 | C: 720 584 8040
From: Will Martin <WMartin@hydroconstruction.com>
Sent: Friday, September 4, 2020 4:12 PM
To: Carey, Jason <JCarey@brandsafway.com>
Subject: RE: [EXTERNAL]: DWRF Digester 611 Re-Coating
Thanks Jason, much appreciated.
We’ve presented this to the City and based on some discussions about how they want to approach
these repairs there are some changes that they would like us to make to allow for them to erect the
scaffolding ahead of time for use by a 3rd party inspector prior to the primary repair contract.
Essentially, the City is planning on contracting the scaffold erection ahead of time themselves so that it
is in place for their inspection and would remain in place for 2-3 rental periods for the coatings to be
completed as well.
Could you please also provide or address the following:
• Revised scaffolding layout that includes access to the concrete ballast and vertical skirt section.
This would ideally be accomplished by having a perimeter walkway/platform below the upper
deck. Please see the attached section view of the lid that shows the area that we are talking
about. ---- revised pricing to accommodate the perimeter skirt work level in addition to lid
“dancefloor” = $64,300.00 (engineering layout not included, additional $1,200 if required)
• Lead time for material and crew availability from the execution of a contract. ---- approximate
lead time from contract execution is 1.5 weeks
• Durations for erection and dismantling ---- erection estimate = 8-10 days, dismantle estimate 4-5
days
• Include pricing to provide crane services for hoisting material into the tank, if possible. If this is
not a possibility, please let us know so the City can make crane arrangements. ---- erection &
dismantle crane service estimate = $14,000.00
• What is the minimum size access necessary for fitting material into the tank? ---- 5’ x 5’, bigger is
better as this will be all crane service
• Also, since the City has requested this information, they will need a detailed breakdown of the
costs included to be able to write the contract (monthly rates, labor, additional fees, etc.)
----- Labor = $52,395.00
----- Monthly Rent = $7,000.00
----- Hardcosts/Forklift/Trucking = $4,905.00
----- Engineering = $1,200.00
----- Crane Service = $14,000.00
-------- plus applicable taxes
Page 12 of 15
DocuSign Envelope ID: 5B311A47-6B6F-4F8C-9C2C-323F6DBCF39B
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT B
WORK ORDER SCHEDULE DETAIL
Page 13 of 15
DocuSign Envelope ID: 5B311A47-6B6F-4F8C-9C2C-323F6DBCF39B
Oct-20 Nov-20 Dec-20
Support Services
Key Dates: Commencement Date: October 14, 2020 Completion Date: December 31, 2020
DWRF Digester 611 Failure Investigation Support - Hydro Construction
SCHEDULE
Project Schedule
Page 14 of 15
DocuSign Envelope ID: 5B311A47-6B6F-4F8C-9C2C-323F6DBCF39B
Utilities Work Order Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT C
CERTIFICATE OF INSURANCE
CONTRACTOR shall submit Certificate of Insurance in compliance with the Contract
Documents.
Page 15 of 15
DocuSign Envelope ID: 5B311A47-6B6F-4F8C-9C2C-323F6DBCF39B
10/21/2020
Flood and Peterson
PO Box 578
Greeley CO 80632
Dana Stewart, CIC, CISR
(970) 266-7149 (970) 506-6845
DStewart@floodpeterson.com
Hydro Construction Company Inc.
77 NW Frontage Road
Fort Collins CO 80524
Phoenix Insurance Company 25623
Charter Oak Fire Insurance Company 25615
Travelers Property Casualty Company of America 25674
Pinnacol Assurance 41190
GL/AU/WC/XS x4/21
A DT-CO-8G990899-PHX-20 04/01/2020 04/01/2021
1,000,000
300,000
10,000
1,000,000
2,000,000
2,000,000
B 810-9L108491-20-26-G 04/01/2020 04/01/2021
1,000,000
C
10,000
CUP-2J40080A-20-26 04/01/2020 04/01/2021
10,000,000
10,000,000
D Y 2091550 04/01/2020 04/01/2021
1,000,000
1,000,000
1,000,000
Hydro Project #21-01-613, Owner's project # H-WRF-2020-8.
Project Name: DWRF Digester 611 Failure Investigation Support
City of Fort Collins is included as Additional Insured as required by written contract with respects to liability arising out of work performed by the named
insured.
City of Fort Collins
700 Wood St
Fort Collins CO 80521
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
INSURER(S) AFFORDING COVERAGE
INSURER F :
INSURER E :
INSURER D :
INSURER C :
INSURER B :
INSURER A :
NAIC #
NAME:
CONTACT
(A/C, No):
FAX
E-MAIL
ADDRESS:
PRODUCER
(A/C, No, Ext):
PHONE
INSURED
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR
WVD
ADDL
INSD
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
$
$
$
PROPERTY DAMAGE $
BODILY INJURY (Per accident)
BODILY INJURY (Per person)
COMBINED SINGLE LIMIT
AUTOS ONLY
AUTOS ONLY AUTOS
NON-OWNED
OWNED SCHEDULED
ANY AUTO
AUTOMOBILE LIABILITY
Y / N
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under
ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT
ER
OTH-
STATUTE
PER
(MM/DD/YYYY) LIMITS
POLICY EXP
(MM/DD/YYYY)
POLICY EFF
LTR TYPE OF INSURANCE POLICY NUMBER
INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
EXCESS LIAB
UMBRELLA LIAB EACH OCCURRENCE $
AGGREGATE $
$
OCCUR
CLAIMS-MADE
DED RETENTION $
PRODUCTS - COMP/OP AGG $
GENERAL AGGREGATE $
PERSONAL & ADV INJURY $
MED EXP (Any one person) $
EACH OCCURRENCE $
DAMAGE TO RENTED
PREMISES (Ea occurrence) $
COMMERCIAL GENERAL LIABILITY
CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:
POLICY
PRO-
JECT LOC
CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
CANCELLATION
AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.
CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED
AUTOS ONLY
DocuSign Envelope ID: 5B311A47-6B6F-4F8C-9C2C-323F6DBCF39B