Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9201575. 640 FT Directional Bore - two 2" L&P conduits for secondary $13.25 $8,480.00 2,341 FT Directional Bore - one 2" L&P conduit for secondary $11.75 $27,506.75 Notes: - Quote above is for labor only. L&P will provide materials for the new conduits to be used for electric operations. AEG will use the telecom stock for the Connexion portion fo the job. - Open Trench line item does not include any hardscape restoration - Except for the items described above, AEG will utilize any current telecom line items (i.e. traffic control, etc.) necessary for completion of the work - Any necessary engineering effort associated with this work will be invoiced at $85/hour TOTAL ESTIMATED UNDERGROUND CONSTRUCTION LABOR ESTIMATED UNDERGROUND CONSTRUCTION LABOR $35,986.75 Item # Estimated Quantity UOM Description Extended Price AEG Rate