640 FT Directional Bore - two 2" L&P conduits for secondary $13.25 $8,480.00
2,341 FT Directional Bore - one 2" L&P conduit for secondary $11.75 $27,506.75
Notes:
- Quote above is for labor only. L&P will provide materials for the new conduits to be used for electric operations. AEG will use the telecom stock for the Connexion portion fo the job.
- Open Trench line item does not include any hardscape restoration
- Except for the items described above, AEG will utilize any current telecom line items (i.e. traffic control, etc.) necessary for completion of the work
- Any necessary engineering effort associated with this work will be invoiced at $85/hour
TOTAL ESTIMATED UNDERGROUND CONSTRUCTION LABOR
ESTIMATED UNDERGROUND CONSTRUCTION LABOR
$35,986.75
Item #
Estimated
Quantity
UOM Description
Extended
Price
AEG Rate