Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 8844 MISCELLANEOUS CONCRETE (43)Work Order Form Official Purchasing Form Last updated 10/2017 WORK ORDER FORM PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND LIGHTFIELD ENTERPRISES WORK ORDER NUMBER: USTS 2020-39 PROJECT TITLE: 155 Boardwalk Dr. ORIGINAL BID/RFP NUMBER & NAME: U8844 MASTER AGREEMENT EFFECTIVE DATE: U2/1/2019 WORK ORDER COMMENCEMENT DATE: 10/1/2020 WORK ORDER COMPLETION DATE: U11/20/2020 MAXIMUM FEE: (time and reimbursable direct costs): 10,500.00 PROJECT DESCRIPTION/SCOPE OF SERVICES: Remove and Replace damaged pedestrian ramps and adjacent 8” Apron on either side of the entrance to this commercial driveway. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of U U ( ) page(s) are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Date: Lucia Lightfield, President ACCEPTANCE: Date: Angel Ontiveros, Project Manager REVIEWED: Date: Elliot Dale, Buyer or Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) six 6 DocuSign Envelope ID: 323EB2BA-8912-4272-A887-A463D0937E2C 10/12/2020 10/12/2020 10/22/2020 202.01 Sawcut Concrete/Asphalt (0" < 4") Lineal Foot $ 3.50 $ - 202.02 Sawcut Concrete/Asphalt (4" < 6") Lineal Foot $ 3.65 $ - 202.03 Sawcut Concrete/Asphalt (6" < 8") Lineal Foot $ 4.00 $ - 202.04 Sawcut Concrete/Asphalt (8" ≤ 10") Lineal Foot $ 5.75 $ - 202.05 Sawcut - Additional 1" Depth Lineal Foot $ 1.25 $ - 202.06 Remove Concrete Sidewalk Square Foot $ 3.85 275.00 $ 1,058.75 202.07 Remove Concrete Curb & Gutter Lineal Foot $ 6.67 10.00 $ 66.70 202.08 Remove Monolithic Curb, Gutter & Sidewalk Square Foot $ 3.95 $ - 202.09 Remove Concrete Driveway/Apron/Crosspan Square Foot $ 3.85 190.00 $ 731.50 202.10 Remove Concrete Pavement - 10" Square Foot $ 4.11 $ - 202.11 Remove Concrete Pavement - Additional 1" Depth Square Foot $ 1.08 $ - 202.12 Remove Asphalt - 6" Square Foot $ 3.08 $ - 202.13 Remove Asphalt - Additional 1" Depth Square Foot $ 1.08 $ - 202.14 Remove Inlet Each $ 539.00 $ - 202.15 Remove and Haul Driveway Fillet Each $ 51.33 $ - 202.16 Remove Flagstone Square Foot $ 3.85 $ - 203.01 Excavation - General Less Than 50 CY Cubic Yard $ 42.00 5.00 $ 210.00 203.02 Excavation - General Over 50 CY Cubic Yard $ 32.00 $ - 203.03 Excavation - Walls Only Cubic Yard $ 22.00 $ - 203.04 Excavation - New Inlet Each $ 385.00 $ - 203.05 Borrow - Less than 100 Ton Ton $ 22.00 $ - 203.06 Borrow - Over 100 Ton Ton $ 21.00 $ - 207.01 Imported Topsoil Cubic Yard $ 45.00 2.00 $ 90.00 208.01 Stormwater Protection - Rock Filled Wattle Lineal Foot $ 10.27 $ - 208.02 Stormwater Protection - Recycled Rubber Filled Wattle Lineal Foot $ 17.45 $ - 208.03 Stormwater Protection - Straw Bales Each $ 21.00 $ - Unit PROJECT ESTMATE UNITS TOTAL 155 Boardwalk Dr. 2020 Revised Unit Price ADDENDUM 2 BID SCHEDULE 1 - BASE BID (Non-Federal) Item No. Description DocuSign Envelope ID: 323EB2BA-8912-4272-A887-A463D0937E2C 208.04 SWMP Maintenance Log - 14 Day Inspection Each $ 97.53 $ - 210.01 Reset Flagstone Square Foot $ 5.13 $ - 210.02 Reset Brick Pavers Square Foot $ 8.21 $ - 210.03 Adjust Manhole Each $ 107.80 $ - 210.04 Adjust Valve Box Each $ 107.80 $ - 304.01 Aggregate Base Course/Recycled Concrete Base ≤ 5 Tons Ton $ 41.04 $ - 304.02 Aggregate Base Course/Recycled Concrete Base > 5 Tons Ton $ 40.01 7.00 $ 280.07 304.03 Recycled Asphalt Base Ton $ 26.27 $ - 403.01 Asphalt Surface Preservation Lineal Foot $ 5.13 $ - 403.02 Temporary Asphalt Patching Ton $ 202.10 4.00 $ 808.40 601.01 Exposed Sand Finish - Additional Charge Square Foot $ 4.11 $ - 602.01 Reinforcing Steel Pound $ 3.95 $ - 602.02 Reinforcing Steel - Epoxy Coated Pound $ 5.00 $ - 604.01 Install New Area Inlet Each $ 1,413.00 $ - 604.02 Area Inlet – Additional Foot Depth Lineal Foot $ 105.05 $ - 604.03 Reconstruct Area Inlet Deck – Remove & Replace Each $ 814.07 $ - 604.04 Reconstruct Area Inlet Deck - Additional Foot Opening – Remove & Replace Lineal Foot $ 105.02 $ - 604.05 Reconstruct Catch Basin Deck - Remove & Replace Each $ 814.12 $ - 604.06 Reconstruct Catch Basin Deck - Additional Foot Opening – Remove & Replace Lineal Foot $ 105.04 $ - 604.07 Install New Curb Inlet – 4’ Opening Each $ 2,074.67 $ - 604.08 Curb Inlet – Additional Foot Depth Lineal Foot $ 105.04 $ - 604.09 Reconstruct Curb Inlet Deck – Remove and Replace Each $ 814.07 $ - 604.10 Reconstruct Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot $ 105.04 $ - 604.11 Install New Type R Inlet - 5' Opening Each $ 3,571.17 $ - 604.12 Type R Inlet – Additional Foot Depth Lineal Foot $ 105.05 $ - 604.13 Reconstruct Type R Inlet Deck – Remove and Replace Each $ 1,313.08 $ - 604.14 Reconstruct Type R Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot $ 131.31 $ - 604.15 Install New Modified Type 13 Curb Inlet (includes new Frame, Grate & Adjustable Curb Bonnet) Each $ 2,366.00 $ - 604.16 Modified Type 13 Curb Inlet – Additional Foot Depth Lineal Foot $ 105.05 $ - 604.17 Reconstruct Modified Type 13 Curb Inlet Deck – Remove & Replace Each $ 814.07 $ - 604.18 Reconstruct Modified Type 13 Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot $ 105.05 $ - DocuSign Envelope ID: 323EB2BA-8912-4272-A887-A463D0937E2C 604.19 Modified Type 13 Curb Inlet – Materials only - (Frame, Grate, & adjustable bonnet (East Jordan Iron Works 7030 or Equivalent Material) Each $ 840.33 $ - 604.20 Concrete Sidewalk Culvert – 4’ opening Each $ 1,017.50 $ - 604.21 Metal Sidewalk Culvert - 2' Opening, Remove & Replace Each $ 815.67 $ - 604.22 Metal Sidewalk Culvert - 2' Opening, Materials Only Each $ 1,632.33 $ - 604.23 Additional Square Foot 5/8" Plate Square Foot $ 158.10 $ - 608.01 Driveover Curb, Gutter & 6" Sidewalk Lineal Foot $ 44.07 $ - 608.02 Driveover Curb and Gutter - No Sidewalk Lineal Foot $ 26.12 $ - 608.03 Vertical Curb, Gutter and 6" Sidewalk Lineal Foot $ 44.07 $ - 608.04 Vertical Curb and Gutter - No Sidewalk Lineal Foot $ 27.11 10.00 $ 271.10 608.05 Out Fall Curb & Gutter Lineal Foot $ 26.02 $ - 608.06 Hollywood Curb, Gutter and 6" Sidewalk Lineal Foot $ 39.66 $ - 608.07 Hollywood Curb and Gutter - No Sidewalk Lineal Foot $ 22.01 $ - 608.08 Highback Curb and Gutter - No Sidewalk Lineal Foot $ 38.89 $ - 608.09 Barrier Curb - 6" x 18" Lineal Foot $ 25.92 $ - 608.10 Barrier Curb - Key Way Style Lineal Foot $ - $ - 608.11 Barrier Curb - Epoxy Lineal Foot $ - $ - 608.12 Mountable Curb - 12" x 18" Lineal Foot $ 25.92 $ - 608.13 Mountable Curb - Keyway Style Lineal Foot $ - $ - 608.14 Mountable Curb – Epoxy Lineal Foot $ - $ - 608.15 Pedestrian Access Ramp Square Foot $ 8.62 150.00 $ 1,293.00 608.16 Pedestrian Access Ramp, Highback Curb Square Foot $ 8.88 $ - 608.17 Truncated Dome Panel Square Foot $ 43.09 20.00 $ 861.80 608.18 Apron - 8" Square Foot $ 8.91 190.00 $ 1,692.90 608.19 Crosspan - 8" Square Foot $ 8.89 $ - 608.20 Valley Pan - 6" Square Foot $ 7.79 $ - 608.21 Flatwork - 4" Square Foot $ 5.06 $ - 608.22 Flatwork - 6" Square Foot $ 6.11 125.00 $ 763.75 608.23 Replace Flatwork - 1" Additional Depth Square Foot $ 1.14 $ - 608.24 Concrete Pavement 8" (Joints Sealed) Square Foot $ 9.04 $ - 608.25 Alley Approach - 8" Square Foot $ 8.89 $ - 608.26 Enhanced Crosswalk - 10" Tile Red Square Foot $ 14.11 $ - DocuSign Envelope ID: 323EB2BA-8912-4272-A887-A463D0937E2C 608.27 Enhanced Crosswalk - 10" San Diego Buff Square Foot $ 13.60 $ - 608.28 Enhanced Crosswalk - 10" Brick Red, Stamped Square Foot $ 14.11 $ - 608.29 Colored Trail with Fibermesh - 5" Yosemite Brown Square Foot $ 8.39 $ - 608.30 Mow Strip - 4" x 12" Lineal Foot $ 9.75 $ - 608.31 Splashblock - 4" Exposed Aggregate Square Foot $ 7.75 $ - 608.32 Splashblock - 4" San Diego Buff Square Foot $ 8.17 $ - 608.33 Median Cover - 4" San Diego Buff Square Foot $ 8.17 $ - 608.34 Fibermesh - Added to Any Item - Additional Charge Pounds / Cubic Yard $ 11.34 $ - 608.35 24 Hour High Early Concrete - Added to Any Item - Additional Charge Cubic Yard $ 66.99 $ - 608.36 Stamp Pattern - Added to Any Item, Additional Charge Square Foot $ 3.08 $ - 608.37 6" Concrete Bollard Each $ 486.50 $ - 608.38 8" Concrete Bollard Each $ 574.00 $ - 608.39 Flowable Fill Cubic Yard $ 149.44 $ - 608.40 Non-reinforced Concrete Wall - 8" Square Face Foot $ 18.59 $ - 608.41 Non-reinforced Concrete Footer - 8" Square Foot $ 18.59 $ - 608.42 Concrete Staining/Sealing Square Foot $ 4.72 $ - 608.43 Expansion Material Lineal Foot $ 4.21 20.00 $ 84.20 608.44 Joint Sealant (Pavement) Lineal Foot $ 5.29 $ - 608.45 Irrigation Sleeve Lineal Foot $ 5.00 $ - 608.46 Dump Fee Ton $ 59.55 $ - 608.47 6" Concrete Median Barrier Curb, Placed (Detail FC703-Section B) (8" Bar paid under 608.48) Lineal Foot $ 21.68 $ - 608.48 6" Concrete Median Barrier Curb, Drilled (Detail FC703-Section C) Each $ 8.93 $ - 608.49 Add Domes to Existing Ramp - Remove and Replace Square Foot $ 38.99 608.5 Add Domes to Existing Ramp - Dryset Placement Square Foot $ 30.80 630.01 "NO PARKING" Sign With Stand Per Each Per Day $ 2.00 $ - 630.02 Vertical Panel Without Light Per Each Per Day $ 1.25 $ - 630.03 Channelizing Barrels Per Each Per Day $ 1.50 $ - 630.04 Type I/II Barricade Without Light Per Each 630.08 Size A Specialty Sign - Cost of Manufacturing Each $ 95.00 $ - 630.09 Size B Specialty Sign - Cost of Manufacturing Each $ 100.00 $ - 630.10 Cone With Reflective Strip Per Each Per Day $ 0.85 $ - 630.11 Safety Fence Per Roll Per Day $ 5.00 $ - 630.12 Light Per Each Per Day $ 1.00 $ - 630.13 Advance Warning Flashing or Sequencing Arrow Panel Per Each Per Day $ 45.00 $ - 630.14 Variable Message Board Per Each Per Day $ 90.00 $ - 630.15 Traffic Control Supervisor Per Day $ 436.33 $ - 630.16 Traffic Control Supervisor Hour $ 46.20 $ - 630.17 Flagging Hour $ 26.69 $ - $ - $ - FA1 Laborer Hour $ 33.88 $ - FA2 Foreman Hour $ 51.33 $ - FA3 Finisher Hour $ 46.20 $ - FA4 Form Setter Hour $ 46.20 $ - FA5 Skid Steer and Operator Hour $ 87.27 $ - FA6 Mini Trackhoe and Operator Hour $ 97.53 $ - FA7 Dump Truck and Operator Hour $ 77.00 $ - FA8 Backhoe and Operator Hour $ 97.53 $ - TOTAL COST $ - $ 8,212.17 Traffic Control Devices, Flagging Hours, Dump Fees, Temp Patching, Base Material, Backfill, Top Soil. Actual costs will be invoiced at contractual unit prices. 10,265.21 ADDITIONAL SERVICES DocuSign Envelope ID: 323EB2BA-8912-4272-A887-A463D0937E2C Per Day $ 1.00 $ - 630.05 Type III Barricade Without Light Per Each Per Day $ 5.00 $ - 630.06 Size A Sign With Stand Per Each Per Day $ 2.00 $ - 630.07 Size B Sign With Stand Per Each Per Day $ 2.00 $ - DocuSign Envelope ID: 323EB2BA-8912-4272-A887-A463D0937E2C