HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9201563Vendor: Today's Date: 10.14.2020
Address: Ship To: Requisition No.:
Date Required: Date Entered:
Vendor #: Date Approved:
Date Denied:
Item # Quantity Unit Description Total Charge Number
$118,119.25
$0.00
$0.00
$0.00
$118,119.25 5016012799.535010.3660
Requested By: Authorized By:
Authorized By:
S:\Purchasing\FORMS\Blank Requisition.xls
Total:
Milfred Lane Overhead/Underground
Conversion Project
UTILITIES REQUISITION FORM
FOR ACCOUNTS PAYABLE USE ONLY
Tim McCollough, Light & Power Operations Deputy Director
Janet McTague, Project Engineer Division Manager
AEG
Comments:
Luke Unruh, Electric Utility Project Manager
Unit Price
629081
66999
10/20/20 - hh
1,020 FT Directional Bore - one 4" conduit + two 2" conduits $36.40 $37,128.00
220 FT Directional Bore - one 4" conduit $26.00 $5,720.00
70 FT Directional Bore - Four 2" conduits $29.00 $2,030.00
625 FT Directional Bore - two 2" conduits $13.25 $8,281.25
2,560 FT Directional Bore - one 2" conduit $11.75 $30,080.00
80 FT Directional Bore - one 4" conduit + three 2" conduits $40.00 $3,200.00
302 FT Directional Bore - one 4" conduit + one 2" conduits $30.00 $9,060.00
80 FT Directional Bore - one 4" conduit + four 2" conduits $42.00 $3,360.00
270 FT
Open Trench / Hand Digging - estimating 10' per
house/meter location $16.00 $4,320.00
0 EA Setup Fee for non-contiguous spans <1000' $2,500.00 $0.00
17 EA Install Secondary Vault (13x24x24) $300.00 $5,100.00
200 SQ FT Cut & Restore Concrete or Asphalt - over 4" thick $36.00 $7,200.00
12 EA Pothole for existing utilities - Hardscape only $220.00 $2,640.00
Notes:
- Quote above is for labor only. Materials required will be used from the telecom stock (if available), or will be quoted separately.
- Except for the items described above, AEG will utilize any current telecom line items (i.e. traffic control, etc.) necessary for completion of the work
- AEG engineering associated with this work will be charged at $85 per hour
Extended
Price
AEG COST ESTIMATE FOR L&P CONVERSION IN MILFRED ESTATES
Item #
Estimated
Quantity
UOM Description AEG Rate
TOTAL ESTIMATED UNDERGROUND CONSTRUCTION LABOR $118,119.25
ESTIMATED UNDERGROUND CONSTRUCTION LABOR