Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9201563Vendor: Today's Date: 10.14.2020 Address: Ship To: Requisition No.: Date Required: Date Entered: Vendor #: Date Approved: Date Denied: Item # Quantity Unit Description Total Charge Number $118,119.25 $0.00 $0.00 $0.00 $118,119.25 5016012799.535010.3660 Requested By: Authorized By: Authorized By: S:\Purchasing\FORMS\Blank Requisition.xls Total: Milfred Lane Overhead/Underground Conversion Project UTILITIES REQUISITION FORM FOR ACCOUNTS PAYABLE USE ONLY Tim McCollough, Light & Power Operations Deputy Director Janet McTague, Project Engineer Division Manager AEG Comments: Luke Unruh, Electric Utility Project Manager Unit Price 629081 66999 10/20/20 - hh 1,020 FT Directional Bore - one 4" conduit + two 2" conduits $36.40 $37,128.00 220 FT Directional Bore - one 4" conduit $26.00 $5,720.00 70 FT Directional Bore - Four 2" conduits $29.00 $2,030.00 625 FT Directional Bore - two 2" conduits $13.25 $8,281.25 2,560 FT Directional Bore - one 2" conduit $11.75 $30,080.00 80 FT Directional Bore - one 4" conduit + three 2" conduits $40.00 $3,200.00 302 FT Directional Bore - one 4" conduit + one 2" conduits $30.00 $9,060.00 80 FT Directional Bore - one 4" conduit + four 2" conduits $42.00 $3,360.00 270 FT Open Trench / Hand Digging - estimating 10' per house/meter location $16.00 $4,320.00 0 EA Setup Fee for non-contiguous spans <1000' $2,500.00 $0.00 17 EA Install Secondary Vault (13x24x24) $300.00 $5,100.00 200 SQ FT Cut & Restore Concrete or Asphalt - over 4" thick $36.00 $7,200.00 12 EA Pothole for existing utilities - Hardscape only $220.00 $2,640.00 Notes: - Quote above is for labor only. Materials required will be used from the telecom stock (if available), or will be quoted separately. - Except for the items described above, AEG will utilize any current telecom line items (i.e. traffic control, etc.) necessary for completion of the work - AEG engineering associated with this work will be charged at $85 per hour Extended Price AEG COST ESTIMATE FOR L&P CONVERSION IN MILFRED ESTATES Item # Estimated Quantity UOM Description AEG Rate TOTAL ESTIMATED UNDERGROUND CONSTRUCTION LABOR $118,119.25 ESTIMATED UNDERGROUND CONSTRUCTION LABOR