Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 8844 MISCELLANEOUS CONCRETE (42)Utilities Work Order Form Official Purchasing Form Last updated 10/2017 WORK ORDER PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND LIGHTFIELD ENTERPRISES, INC WORK ORDER NUMBER: 50400440074-01 PROJECT TITLE: Ross Dr. Inlet Replacements ORIGINAL BID/RFP NUMBER & NAME: 8844, Miscellaneous Concrete MASTER AGREEMENT EFFECTIVE DATE: February 1, 2019 ARCHITECT/ENGINEER: NA OWNER’S REPRESENTATIVE: Douglas Groves WORK ORDER COMMENCEMENT DATE: October 12, 2020 WORK ORDER COMPLETION DATE: November 16, 2020 MAXIMUM FEE: (time and reimbursable direct costs): $24,665.00 PROJECT DESCRIPTION/SCOPE OF SERVICES: Replace 4 combo inlets, 6” drive-over curb & gutter sidewalk including traffic control, flagging hours, dump fees, temp patching, base material, and backfill. Actual cost will be invoiced at contract unit prices. See attached supporting documentation. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of two (2) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Lightfield Enterprises, Inc. By: Date: Name: Title: Page 1 of 7 DocuSign Envelope ID: 7B1F10C0-D2D0-4036-ABAA-94D7305EAF92 Lucia Lightfield October 19, 2020 President Utilities Work Order Form Official Purchasing Form Last updated 10/2017 OWNER’S ACCEPTANCE & EXECUTION: This Work Order and the attached Contract Documents are hereby accepted and incorporated herein by this reference. ACCEPTANCE: Date: Douglas Groves, Manager, Stormwater Maintenance Operations REVIEWED: Date: Elliot Dale, Senior Buyer REQUISITION ENTERED BY: Date: ACCEPTANCE: Date: Andrew Gingerich, Director, Water Field Operations ACCEPTANCE: Date: Matt Fater, Interim Deputy Director, Water Engineering & Field Services ACCEPTANCE: Date: Kevin Gertig, Utilities Executive Director (if greater than $1,000,000) ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) ACCEPTANCE: Date: Darin Atteberry, City Manager (if greater than $1,000,000) ATTEST: Date: City Clerk (if greater than $1,000,000) Page 2 of 7 DocuSign Envelope ID: 7B1F10C0-D2D0-4036-ABAA-94D7305EAF92 Melissa Walker Coordinator, Finance October 19, 2020 October 19, 2020 October 19, 2020 October 19, 2020 October 19, 2020 Utilities Work Order Form Official Purchasing Form Last updated 10/2017 ATTACHMENT A WORK ORDER COST AND SCOPE DETAIL Page 3 of 7 DocuSign Envelope ID: 7B1F10C0-D2D0-4036-ABAA-94D7305EAF92 Total 202.02 Sawcut Concrete/Asphalt (4" < 6") Lineal Foot 100 $3.65 $365.00 202.03 Sawcut Concrete/Asphalt (6" < 8") Lineal Foot 100 $4.00 $400.00 202.08 Remove Monolithic Curb, Gutter & Sidewalk Square Foot 600 $3.95 $2,370.00 202.14 Remove Inlet Each 4 $539.00 $2,156.00 604.15 Install New Modified Type 13 Curb Inlet (includes new Frame, Grate & Adjustable Curb Bonnet) (Detail 13-A) Each 4 $2,366.00 $9,464.00 608.01 Driveover Curb, Gutter & 6" Sidewalk Lineal Foot 100 $44.07 $4,407.00 608.43 Expansion Material Lineal Foot 60 $4.21 $252.60 608.44 Joint Sealant (Pavement) Lineal Foot 60 $5.29 $317.40 SUB TOTAL COST $19,732.00 25% CONTINGENCY for Traffic Control Devices, Flagging Hours, Dump Fees, Temp Patching, Base Material, Backfill, Top Soil. Actual costs will be invoiced at contractual unit prices. 25% $ 4,933.00 ESTIMATED TOTAL COST $24,665.00 Item No. Description COST ESTIMATE FOR ROSS DR. INLET REPLACEMENTS Unit Quantity 2020 Revised Unit Price Page 1 of 1 Page 4 of 7 DocuSign Envelope ID: 7B1F10C0-D2D0-4036-ABAA-94D7305EAF92 Utilities Work Order Form Official Purchasing Form Last updated 10/2017 ATTACHMENT B WORK ORDER SCHEDULE DETAIL Page 5 of 7 DocuSign Envelope ID: 7B1F10C0-D2D0-4036-ABAA-94D7305EAF92 10/12/2020 10/12/2020 11/16/2020 Project Notice to Proceed Project Construction Project Final Completion/Acceptance Ross Dr. Inlet Replacements Page 6 of 7 DocuSign Envelope ID: 7B1F10C0-D2D0-4036-ABAA-94D7305EAF92 Utilities Work Order Form Official Purchasing Form Last updated 10/2017 ATTACHMENT C CERTIFICATE OF INSURANCE CONTRACTOR shall submit Certificate of Insurance in compliance with the Contract Documents. Page 7 of 7 DocuSign Envelope ID: 7B1F10C0-D2D0-4036-ABAA-94D7305EAF92