Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - 9126 MINOR CARPENTRY CONSTRUCTION AND RENOVATION CONTRACTORWORK ORDER FORM PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND FINISHING TOUCH WORK ORDER NUMBER: PR-600390 PROJECT TITLE: 215 N Mason- Emergency Operations Center (EOC) Renovation ORIGINAL BID/RFP NUMBER & NAME: 9126 MASTER AGREEMENT EFFECTIVE DATE: 7/1/2020 WORK ORDER COMMENCEMENT DATE: 9/29/2020 WORK ORDER COMPLETION DATE: 11/6/2020 MAXIMUM FEE: (time and reimbursable direct costs): $75,350.90 PROJECT DESCRIPTION/SCOPE OF SERVICES: Provide Labor, materials and equipment to complete the EOC renovation project per permit documents dated 9/25/2020 and Proposal dated 9/28/2020 which shall include Alternates #1 and #2 which is for new gypsum walls with insulation and backing along with painting an wall surfaces in the entire space. Owner to have separate contracts for scopes associated with Electrical, HVAC and Flooring. Owner to pay for permit fees. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of Three (3) page(s) are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. ACCEPTANCE: REVIEWED: ACCEPTANCE: Gerry Paul, Purchasing Director (if greater than $60,000) City of k���� Work Order Form Datet/�Pfe Date: 7�9lo1o'1u Date l �9kac) Date: Date:------- Official Purchasing Form Last updated 10/2017 DocuSign Envelope ID: 49C7CCD7-1803-4E53-95CB-0CFCAAD8A218 9/29/2020 DocuSign Envelope ID: 49C7CCD7-1803-4E53-95CB-0CFCAAD8A218 Finishing Touch PO Box 1303 Phone: 970-389-2531 Ault, CO 80610 Fax: 970-834-2734 Email: George@Finishingtouchnoco.com Date: 9-28-20 PROPOSAL TO: Blake Visser Re: 215 Mason Emergency operations Thank you for the opportunity to bid this project: Below you will find our labor and material scope. Inclusions: 1. GC’s to manage & Coordinate work $3,250.00 2. Demo walls, cabinets and tops as shown: $1,000.00 3. Frame new walls at entry and conference room: $3,250.00 4. New plumbing: $2,900.00 5. Doors and frames (2) $2,800.00 6. Drywall at entry and conference room: $4,500.00 7. Paint at entry, accent walls and conference: $2,434.00 8. Concrete at south entry: $4,500.00 9. Steel railing at south entry: $2,950.00 Note: added mid rail, not shown on drawing. Powder coat railing (plug) $2,000.00 10. Install 6” vent for dryer: $1,000.00 11. Misc. Rework carpet & Sun Screens: $500.00 12. New cabinets and tops: $3,878.00 13. Insulate new conference wall: $450.00 14. Rework existing panels at offices: $3,500.00 15. Contingency: $2,500.00 Total: $41,412.00 O.H.P. $4,141.00 Total Bid: $45,553 .00 Notes: 1. No afterhours work included. DocuSign Envelope ID: 49C7CCD7-1803-4E53-95CB-0CFCAAD8A218 Exclusions: 1. Electrical & data 2. HVAC 3. Carpet and base: (by owner) 4. Permit. Adds: 1. Demo panels at offices and take to warehouse: $3,500.00 2. Frame new walls: $4,000.00 3. New doors and frames with sidelight: $4,334.00 4. Drywall: $5,235.00 5. Paint offices: $3,577.00 6. Paint entire area: $4,243.00 7. Insulate all walls: $2,200.00 Total: $27,089.00 O.H.P.: $2,708.90 Total Bid: $29,797.90 Exclusions and notes: 1. Same as above Thank You George Moore DocuSign Envelope ID: 49C7CCD7-1803-4E53-95CB-0CFCAAD8A218