Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 9053 TIMBERLINE ROAD DESIGN - STETSON CREEK TO TRILBY ROADOfficial Purchasing Document Last updated 10/2017 Professional Services Agreement – Work Order Type 9053 Timberline Road Design – Stetson Creek to Trilby Road Page 8 of 27 EXHIBIT A WORK ORDER FORM PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND J-U-B ENGINEERS, INC. WORK ORDER NUMBER: PROJECT TITLE: ORIGINAL BID/RFP NUMBER & NAME: 9053 Timberline Road Design - Stetson Creek to Trilby Road MASTER AGREEMENT EFFECTIVE DATE: January 14, 2020 WORK ORDER COMMENCEMENT DATE: WORK ORDER COMPLETION DATE: MAXIMUM FEE: (time and reimbursable direct costs): PROJECT DESCRIPTION/SCOPE OF SERVICES: Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of ( ) page(s) are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. PROFESSIONAL: Date: ACCEPTANCE: Date: REVIEWED: Date: DocuSign Envelope ID: 3F9A9E78-E937-4E36-B76D-55E7489C6531 400903823-JUB-2020-01 South Timberline Pedestrian Underpass Full Design September 1, 2020 December 31, 2021 $107,596.00 See attached eleven 11 ACCEPTANCE: Date: REVIEWED: Date: DocuSign Envelope ID: CF1F3E25-C6BF-4CD8-BD9E-BCF2BFE7EA72 Jeff Temple 9/15/2020 Area Manager Caleb Feaver 9/15/2020 Civil Engineer II Dan Woodward Engineering - Capital Projects 9/24/2020 Sr Buyer 9/24/2020 Elliot Dale Gerry Paul 9/24/2020 Purchasing Director J-U-B Engineers, Inc. AGREEMENT FOR PROFESSIONAL SERVICES FOR 9053 – Timberline Road Design – Stetson Creek to Trilby Road City of Fort Collins, CO Scope of Services, Schedule, and Basis of Fee September 2020 PROJECT UNDERSTANDING J-U-B Engineers provided the City with preliminary engineering design services (30% design – FIR), defining project foot print, environmental review, drainage design, landscape design, and traffic analysis, for the Timberline Road Improvements from Stetson Creek Drive to Trilby Road. The City has decided to retain J-U-B Engineers to provide final design (90% design – FOR). During the course of the preliminary design, the City Parks Department indicated they have future plans for a pedestrian underpass beneath Timberline Road, and expressed interest in constructing as part of this project. It is understood that the Parks Department does not have funding for the full construction of the underpass spurs & trails, but would like to install the box at the same time as the roadway work. However, it is understood that the design will include a full design of the underpass, trails, spurs, and potential retaining walls. Design of this project is being funded through local funds. Collaboration with various City departments, as well as Colorado Department of Transportation, private utility and communication companies and adjacent land development owners will be involved in the coordination / design process. The Timberline Road design project involves widening Timberline road from the existing two lane roadway to four lane arterial section with median islands, utility installations, sidewalks, bike facilities, landscaping, and street lights from Stetson Creek to Trilby Road. The project will include interfacing with three traffic signals and the widening of one structure. This project will include coordination with a private development known as the Hansen Farms project, located on a 10-acre parcel north west of the Timberline Road and Zypher Road intersection. The development has fully designed their frontage improvements and the signal at Timberline Road and Zypher Road. Modifications will be made to this design to accommodate Timberline Road north and south of this development. PROJECT STANDARDS, GUIDELINES AND SPECIFICATIONS: The following is a list of technical references applicable to the work and are the basis for design criteria, details and specifications for the project. The Consultant will be responsible for complying with the current editions of the listed reference documents as of the Notice to Proceed date. The Consultant should anticipate regular updates to the reference documents over the course of the design schedule. Major design revisions due to newly issued design guide revisions will be reviewed and approved by the City’s project manager as additional work.  AASHTO Roadside Design Guide (“Green Book”)  Manual on Uniform Traffic Control Devices (MUTCD)  Public Right-of-Way Accessibility Guidelines (PROWAG)  City of Fort Collins  Larimer County Urban Area Street Standards (LCUASS)  CDOT Standard Specifications for Road and Bridge Construction  CDOT M & S Standard Plans DocuSign Envelope ID: CF1F3E25-C6BF-4CD8-BD9E-BCF2BFE7EA72 PART 1 – SCOPE OF SERVICES (through Construction Drawings) A. Basic Services – J-U-B’s Basic Services under this Agreement are limited to the following tasks. CLIENT reserves the right to add subsequent phases or related work to the scope of services upon mutual agreement of scope, fees, and schedule. The following abbreviations are used in this scope: J-U-B – J-U-B Engineers, Inc. City – City of Fort Collins RockSol – RockSol Consulting Group Clanton – Clanton & Associates, Inc. The design work for this project will consist of advancing the conceptual underpass design (15%) to an interim final construction drawings. This includes: plans, Engineer’s estimates, specifications, and design report(s), as required. J-U-B and/or its subconsultants shall perform or supply all necessary services as specified in this document with regards to surveying, research, analysis, design and other associated engineering work. All engineering design work shall be performed under the direction and supervision of a Licensed Professional Engineer registered with the Colorado State Board of Registration for Professional Engineers and Professional Land Surveyors. All land surveying work shall be performed by a Professional Land Surveyor registered with the Colorado State Board of Registration for Professional Engineers and Professional Land Surveyors. Some activities may require work on land not controlled by the City. In such cases, the City shall obtain the necessary written permission to enter the premises. Included in this written permission will be the names and telephone numbers of persons to contact should notification prior to entry be necessary. These written permissions will apply to City of Fort Collins personnel as well as Consultant personnel. Signed copies of the written permission will be submitted to the City’s Project Manager prior to entering private property for survey work. TASK 1 – PROJECT MANAGEMENT - TASKS 1-4 REPRESENTS INITIAL PROJECT START-UP AND MANAGEMENT Scope Task Scope of Services Deliverables 1. Weekly Progress Meetings & Coordination Weekly progress meetings will be attended by the J-U-B project manager or project engineer and other key staff members as needed. These meetings may be a combination of phone conference meetings or in-person meetings, as requested by the City of Fort Collins. Subconsultants will attend as required. J-U- B will prepare an agenda and meeting minutes. Meeting Agenda & Minutes 2. Monthly Progress Reports & Invoicing J-U-B’s project manager will prepare monthly progress reports that will be submitted with the invoice. This item also includes time for J-U-B clerical staff to assemble and prepare invoices. Progress Report & Invoice 3. Management & Administration This item includes general coordination efforts by J-U-B’s project principal and project manager. Scheduling and resource loading is included in this item. Coordination with sub-consultants is included in this task. Coordination with other stakeholders will be included in this item. N/A 4. Expenses Expenses includes car mileage, and any client requested expenses. Small format paper copying is included in J-U-B’s overhead and will not be charged. Included in Invoice DocuSign Envelope ID: CF1F3E25-C6BF-4CD8-BD9E-BCF2BFE7EA72 TASK 2 – FINAL DESIGN (CONSTRUCTION DOCUMENTS) – TASKS 5-25 REPRESENTS THE TASKS NECESSARY TO ADVANCE THE CONCEPTUAL DESIGN (15% FIR) to CONSTRUCTION DOCUMENTS. Scope Task Scope of Services Deliverables 5. Update Geotechnical Report RockSol will include a foundation recommendation within the Timberline Road Geotechnical report to assist J-U-B’s structural engineer in the design of the box culvert and wingwalls associated with the underpass. Updated Geotechnical Report 6. Plan Sheets (Includes necessary engineering design time) The following list (Items 7 – 20) includes sheets that are anticipated for the underpass construction. J-U-B will discuss any major change with the City of Fort Collins before developing plan sheets. The plan sheets will be developed using AutoCAD Civil 3D 2019 and will be setup at a 22”x34” format, and printed at half size 11”x17”. All design sheets include time to research, investigate, and apply engineering standards, guidelines, and judgement. Final Design Plans 7. General Sheets J-U-B will prepare and/or modify the following plan sheets that will be included into the overall Timberline Roadway plan set:  Updated Cover Sheet  Updated Standard Note(s)  Standard Plans List  Updated Survey Tabulations  Updated Typical sections  Updated Quantity Tabulations  Updated Earthwork Tabulation  Updated Summary of approximate quantities Final Design Plans 8. Plan & Profile Sheets (Underpass & Trails) The underpass and trails plan and profile sheets will be advanced to a final design level, and will include a plan view and corresponding profile view (if applicable) that will include existing and proposed improvements. The plan views will callout all proposed design elements and references to other sheets will be included. It is anticipated that a 20 scale will be used. Matchlines and a key map will be utilized to clearly identify the horizontal location. Final Design Plans 9. Utility Sheets (Waterline Lowering) Develop plan sheets showing all existing and proposed utilities. Utility owner(s) will be identified on plans. Any potential conflicts will be identified on plans. Utility plans will include quality level A information. It is anticipated that an existing waterline will need to be lowered. This lowering will be included on a waterline plan and profile sheet within the utility subset. Final Design Plans 10. Grading Sheets J-U-B will advance the preliminary plan sheets to include surface grading and proposed contours. Elevations of Timberline Road, trails, and spurs will be included. Additional detailed grading plans will be included, where necessary. Matchlines will clearly be represented on these sheets. Grades will be identified. A corridor model will be created in AutoCAD Civil 3D with a proposed surface. Some detailed grading will be shown on these sheets. Final Design Plans 11. Storm Drainage Sheets (Including Pump System) Drainage sheets will include horizontal design information and vertical information. Storm profiles will be developed at this phase. J-U-B will evaluate the vertical depths of utilities, proposed storm pipes, and other constraints to Final Design Plans DocuSign Envelope ID: CF1F3E25-C6BF-4CD8-BD9E-BCF2BFE7EA72 Scope Task Scope of Services Deliverables determine the feasibility of the drainage infrastructure. Level A testhole information will be included in storm profiles. It is anticipated that the underpass will include a pump system to drain the underpass. J-U-B will design and spec out the appropriate pump system and control center. It is anticipated that the drainage system for the underpass will not be required to handle/drain the major storm event. It is anticipated that the underpass will need to drain a lesser (minor) storm event. 12. Structure Sheets At this time, we anticipate full replacement of the Mail Creek ditch structure, based on the recommendation from the Structure Selection memo. The following structure components will be illustrated on the FOR plans: - Structure Notes & Tabulations - Structure layout - Structure Foundation & Construction Layout - Retaining Wall Layout - Retaining Wall Details - Railing Details - Electrical & Lighting Plans Final Design Plans 13. Structure Notes & Tabulations Structure notes following CDOT & LCUASS will be included. Structure quantities will be tabulated and included on this sheet. Final Design Plans 14. Structure Layout This sheet will provide a plan and section views of the box culvert along with a roadway profile grade over the box culvert. Dimensioning and annotation will be included to a Final Design level. Final Design Plans 15. Structure Foundation & Construction Layout This sheet will provide a plan view of the box culvert and wingwall layout with dimensions and culvert joint details. The foundation recommendation from RockSol will be illustrated on this sheet. Final Design Plans 16. Retaining Wall Layout A plan view showing the geometry and layout of the wingwalls will be included on this sheet(s). References will be included to refer to wingwall details sheets for rebar and foundation requirements. Final Design Plans 17. Retaining Wall Details Wingwall details will be included. Details will show height of wall, rebar requirements, concrete material, dimensioning, etc. Final Design Plans 18. Railing Details Any steel pedestrian railing needed will be included on this sheets. A plan view showing the layout will be included along with type of material of the railing and general dimensions of the railing. Final Design Plans 19. Electrical & Lighting Plans Electrical and lighting plans will be developed. Refer to Clanton’s scope for additional information. Final Design Plans 20. Erosion Control Sheets Traffic control plans will be included in this set of plans. J-U-B will include advanced warning plan sheet with traffic control details and/or detour plans. Final Design Plans DocuSign Envelope ID: CF1F3E25-C6BF-4CD8-BD9E-BCF2BFE7EA72 Scope Task Scope of Services Deliverables 21. Traffic Control Sheets Traffic control plans will be included in this set of plans. J-U-B will include advanced warning plan sheet with traffic control details and/or detour plans. Final Design Plans 22. Details Any details related to the underpass that are not included in the structure subset will be included with the plans. Final Design Plans 23. QA/QC Prior to the submittal, J-U-B will perform a QA/QC process which includes sending drawings to other J-U-B staff members for review and comment. A thorough QA/QC will be performed by both the Project Principal and Project Manager. All comments will be reviewed with the design staff and incorporated into the plans, if relevant. QA/QC plans (if requested) 24. Technical Specifications Technical specifications will be provided with this submittal. That will include the necessary project special provisions and standard special provisions. The specifications will follow the 2019 CDOT Standard Specifications for Road and Bridge Construction. Technical Specifications 25. Prepare an Engineers Opinion of probably construction cost (OPCC) The OPCC will include expected bid items developed during final design. Quantities will be developed from the design sheets. Items not on the tabulation sheets will be documented in a computation book. Costs will be developed from various sources including past bid tabs. The OPCC will have a reduced contingency from the conceptual OPCC at this point. The contingency will be coordinated with the City of Fort Collins, prior to submittal. Standard CDOT pay items will be used as a basis for the cost opinion. OPCC 26. Complete submittal of necessary documents and plans to CDOT and City for review and comment This item includes preparing all design drawings, reports, and design information in preparation for submittal to the City of Fort Collins. This will include reviewing sub-consultants deliverables (i.e. specifications, cost estimates, design drawings, etc.) to ensure a cohesive and accurate submittal. QA/QC plans (if requested) 27. FOR Meeting (Includes attendance, meeting agenda and minutes. The FOR meeting will be attended by J-U-B’s structural engineer. Other J-U-B staff will be at the meeting, as part of the Timberline Roadway work. Meeting agenda and meeting minutes. DocuSign Envelope ID: CF1F3E25-C6BF-4CD8-BD9E-BCF2BFE7EA72 TASK 3 – Construction assistance and Bid Administration Assistance – TASKS 28-30 REPRESENTS THE TASKS NECESSARY TO ADVANCE THE PROJECT THROUGH CONSTRUCTION. 28. Provide Bid Administration assistance to the City by attending pre-bid meeting and assistance with preparing bid addendums J-U-B’s Project Manager will attend the pre-bid meeting. J-U-B will coordinate with the City on any revisions throughout the advertisement period. Plans & Specifications will be updated accordingly. J-U-B will assist the City in answering any questions throughout the advertisement period. N/A 29. Review, Respond and address RFIs and submittals Through the construction period, J-U-B will review RFI’s and material submittals submitted by the contractor. J-U-B will approve, request additional information, or reject the Contractor’s submittals. Each RFI will be submitted back in the form a transmission letter. Each submittal will include an approval block signed by the reviewer. Submittals & RFI letters 30. Construction Support and coordination Through the construction period, J-U-B will be available to attend field meetings, site inspections, and general coordination with the City Project Manager and/or the Contractor. These hours shall not exceed those shown in the attached fee spreadsheet. N/A ASSUMPTIONS The above Scope of Services is based on the following assumptions:  It is assumed that the underpass plan sheets will be a separate plan set and separate bid documents from the Timberline Roadway documents.  It is assumed that the underpass and Mail Creek box ditch will be packaged together, bid together and constructed as part of the same contract.  General project expenses, which include mileage and out-serviced printing, are estimated to be $500 for this project (The cost of general project in-house copying is included in J-U-B’s overhead cost).  It is assumed that all aspects of the design will be funded through City funds, and will not include any state or federal monies.  Electronic CAD files will be supplied to the City in a format that is useable and acceptable by the City of Fort Collins.  It is assumed that the City will prepare legal descriptions and exhibits necessary for R.O.W. acquisition.  It is assumed that the City will handle R.O.W. acquisition.  It is assumed the City will coordinate and provide J-U-B with right of entry documentation, prior to survey operations. PART 2 – SCHEDULE OF SERVICES A. The following table summarizes the anticipated schedule for the identified Basic Services predicated upon timely receipt of CLIENT-provided information, typical review periods, and active direction during work. DocuSign Envelope ID: CF1F3E25-C6BF-4CD8-BD9E-BCF2BFE7EA72 CLIENT acknowledges that J-U-B will not be responsible for impacts to the schedule by events or actions of others over which J-U-B has no control. NTP December 2019 Kick-Off Meeting January, 2020 Conceptual Design January – February 2020 Environmental Services January – August 2020 FIR Submittal (30%) April 30, 2020 Public open house July 15, 2020 Complete top part of Form 128 September 2020 Prepare Legal Descriptions & Exhibits July 2020 Present R.O.W. to City Council August 2020 Prepare CDOT R.O.W. Plans July - August 2020 CDOT R.O.W. Review & Approval August – October 2020 Acquisition November 2020 – January 2021 FOR Submittal (Final) TBD ROWPR Meeting TBD Utility Relocation Complete TBD CDOT Concurrence TBD Advertisement TBD Construction TBD PART 4 – BASIS OF FEE A. The hours and fees for each task are presented on the attached spreadsheet. B. Rates and Period of Service: Rates will be in accordance with the on-call contract. If the period of service for the task identified above is extended beyond 12 months, the compensation amount for J-U-B’s services may be appropriately adjusted to account for inflation and salary adjustments. DocuSign Envelope ID: CF1F3E25-C6BF-4CD8-BD9E-BCF2BFE7EA72 $185 $150 $162 $135 $107 $98.00 $72 1 Weekly Progress Meetings & Coordination 24 8 $4,680 $4,680 2 Monthly Progress Reports & Invoicing 8 8 $1,776 $1,776 3 Management & Administration 4 16 $3,140 $3,140 4 Expenses $0 $500 $500 Totals 4 48 0 8 0 0 8 $9,596 $0 $10,096 5 Update Geotechnical Report 2 2 2 $766 $750 $1,516 6 Plan Sheets (Includes necessary engineering design time) 7 General Sheets (Including Tabulations) 4 8 12 $2,856 $2,856 8 Plan & Profile Sheets (Underpass & Trails) 8 40 40 $9,400 $9,400 9 Utility Sheets (Waterline Lowering) 4 4 16 4 $3,244 $3,244 10 Grading Sheets 4 24 24 8 $7,192 $7,192 11 Storm Drainage Sheets (Including Pump System) 24 40 8 $8,664 $8,664 12 Structure Sheets (Underpass Box Culvert) 13 Structure Notes & Tabulations 2 4 4 $1,256 $1,256 14 Structure Layout 4 16 4 $3,200 $3,200 15 Structure Foundation & Construction Layout 4 16 4 $3,200 $3,200 16 Retaining Wall Layout 4 16 4 $3,200 $3,200 17 Retaining Wall Details 4 24 4 $4,280 $4,280 18 Railing Details 4 16 4 $3,200 $3,200 19 Electrical & Lighting Plans 2 4 4 $1,256 $12,160 $13,416 20 Erosion Control Sheets 8 8 16 $3,848 $3,848 21 Traffic Control Sheets 8 8 16 $3,848 $3,848 22 Details 4 2 4 16 $3,032 $3,032 23 QA/QC 8 16 8 $4,960 $4,960 24 Technical Specifications 4 6 $1,572 $1,572 25 Prepare an Engineers Opinion of Probable Construction Cost 8 8 $1,984 $1,984 26 Complete submittal of necessary documents and plans to CDOT and City for review and comment 8 4 $1,848 $1,848 27 FOR Meeting (Includes attendance, meeting agenda and minutes) 4 $648 $648 Totals 8 102 40 162 120 158 0 $73,454 $12,910 $86,364 28 Provide Bid Administration assistance to the City by attending pre-bid meeting and assistance with preparing bid addendums 6 $900 $900 29 Review, Respond and address RFIs and submittals 6 16 16 $5,060 $5,060 30 Construction Support and coordination 8 16 8 $5,176 $5,176 $0 $0 Totals 8 28 24 0 0 16 0 $11,136 $11,136 Design Total 20 178 64 170 120 174 8 $83,050 $12,910 $500.00 $107,596 Project Principal ($/HR) Project Manager ($/HR) Design Engineer & CAD Tech ($/HR) TASK 1 - Project Management Task Number Task Description TASK 2 - Final Design (Construction Documents) TASK 3 - Construction assistance and Bid Administration Assistance JUB FEE Task Total Total Project Engineer ($/HR) Structure Engineer ($/HR) Clerical ($/HR) Expenses Subconsult. RockSol 4699 Nautilus Court South, Suite 102 303-530-7229 Boulder, CO 80301 www.clantonassociates.com Date: June 29, 2020 Dan Tuttle J-U-B Engineers, Inc. 4745 Boardwalk Drive, Building D, Suite 200 Fort Collins, CO, 80525 970-377-3602 | dtuttle@jub.com Re: S Timberline Road Underpass Lighting and Electrical Design Consulting Proposal Clanton and Associates proposes to undertake the lighting and electrical consulting for the S Timberline Road Underpass in Fort Collins, CO. Estimated labor: $ 12,160 Estimated expenses: $ 100 Total Fee (labor and expenses): $ 12,260 The scope of work includes: 1. New pedestrian underpass under S Timberline Road Fees are lump sum, with invoicing occurring monthly on a percentage of tasks completed. Design services shall include the following: Project Management • Monthly invoices with progress reports FOR (60%) • Kickoff meeting by conference call • Establish basis of design • Preliminary lighting design • Luminaire selection • Preliminary lighting calculations • Preliminary electrical design • Preliminary tabulation of approximate quantities • Preliminary specifications • Utility coordination • Opinion of Probable Cost • Up to one (1) submittal (60% set) • Attendance at FOR Review meeting in Fort Collins, CO or by conference call Final Design (100% and Bid Set) • Incorporate comments from 60% Review • Final lighting layout • Final lighting details DocuSign Envelope ID: CF1F3E25-C6BF-4CD8-BD9E-BCF2BFE7EA72 S Timberline Road Underpass J-U-B Engineers, Inc. Page | 2 4699 Nautilus Court South, Suite 102 303-530-7229 Boulder, CO 80301 www.clantonassociates.com • Luminaire schedule • Final electrical design • Panel schedules • One line diagrams • Lighting Control Centers, including short circuit calculations and feeder sizing • Circuiting and conduit, including voltage drop calculations and conduit sizing • Electrical details • Final specifications • Tabulation of Approximate Quantities • Opinion of Probable Cost • Up to two (2) submittals (100% and final Bid sets) • Up to one (1) design meeting • Revise plans per 100% Review comments This scope of work is based upon normal project progress and within the time schedule agreed upon, without major redesign or change order work. Additional fees will be required if project timing is extended or project is put on hold and restarted at later date. If the project timing exceeds one year, additional services rates may increase. The scope is based on documents sent on 6/24/2020 and conversation with client on 6/26/2020. Not included in this scope of work but is available for extra services: • Additional meetings, site visits, or conference calls • Construction observation and/or services during construction • Any development, design, or detailing of custom luminaires • Drafting on non-digital backgrounds such as *.pdf or *.jpg files Specific exclusions from this scope are as follows: • Structural engineering • Equipment procurement • Commissioning • Survey control map or Right-of-Way plans • Subsurface Utility Engineering • Communication wiring to Traffic Signals Client will supply Clanton and Associates with review materials and backgrounds in AutoCAD or Micro Station format. Reimbursable expenses shall include printing costs, overnight delivery and travel expenses associated with the project and shall be charged in addition to the compensation for professional services. Payment for services is expected within 30 days of invoice unless other arrangements are made in writing. Additional services shall be charged per the rates in the attached Clanton & Associates Rates Table. Work shall commence upon receipt of a signed copy of this agreement. This agreement is valid for 60 days. DocuSign Envelope ID: CF1F3E25-C6BF-4CD8-BD9E-BCF2BFE7EA72 S Timberline Road Underpass J-U-B Engineers, Inc. Page | 3 4699 Nautilus Court South, Suite 102 303-530-7229 Boulder, CO 80301 www.clantonassociates.com ___________________________________ 6-29-2020__________ CLANTON & ASSOCIATES DATE _____________________________________ __________________ J-U-B ENGINEERS, INC DATE DocuSign Envelope ID: CF1F3E25-C6BF-4CD8-BD9E-BCF2BFE7EA72 Clanton EIT2 ($/HR) Project Number: 9053 Timberline Road Design - Underpass Design (60%) Prepared By: J-U-B Engineers September 10, 2020 Project Cost City of Fort Collins DocuSign Envelope ID: CF1F3E25-C6BF-4CD8-BD9E-BCF2BFE7EA72