HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9201332Official Purchasing Document
Last updated 10/2017
All Phase Restoration Service Agreement Page 1 of 31
SERVICES AGREEMENT
THIS AGREEMENT made and entered into the day and year set forth below by and
between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter
referred to as the "City" and ALL PHASE RESTORATION, INC, hereinafter referred to as "Service
Provider".
WITNESSETH:
In consideration of the mutual covenants and obligations herein expressed, it is agreed by
and between the parties hereto as follows:
1. Scope of Services. The Service Provider agrees to provide services in accordance with the
scope of services attached hereto as Exhibit A, consisting of Twenty Three (23) pages and
incorporated herein by this reference. Irrespective of references in Exhibit A to certain
named third parties, Service Provider shall be solely responsible for performance of all
duties hereunder.
2. Time of Commencement and Completion of Services. The services to be performed
pursuant to this Agreement shall be initiated within two (2) days following execution of this
Agreement. Services shall be completed no later than November 30, 2020. Time is of the
essence. Any extensions of the time limit set forth above must be agreed upon in a writing
signed by the parties.
3. Contract Period. This Agreement shall commence September 9, 2020, and shall continue
in full force and effect until November 30, 2020, unless sooner terminated as herein
provided
4. Delay. If either party is prevented in whole or in part from performing its obligations by
unforeseeable causes beyond its reasonable control and without its fault or negligence, then
the party so prevented shall be excused from whatever performance is prevented by such
cause. To the extent that the performance is actually prevented, the Service Provider must
provide written notice to the City of such condition within fifteen (15) days from the onset of
such condition.
5. Early Termination by City/Notice. Notwithstanding the time periods contained herein, the
City may terminate this Agreement at any time without cause by providing written notice of
termination to the Service Provider. Such notice shall be delivered at least fifteen (15) days
prior to the termination date contained in said notice unless otherwise agreed in writing by
the parties. All notices provided under this Agreement shall be effective when mailed,
postage prepaid and sent to the following addresses:
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
Official Purchasing Document
Last updated 10/2017
All Phase Restoration Service Agreement Page 2 of 31
Service Provider: City: Copy to:
All Phase Restoration, Inc
Attn: Nate Tenold
7355 Green Ridge Rd. Unit C
Windsor, CO 80550
City of Fort Collins
Attn: Matt Schaefer
PO Box 580
Fort Collins, CO 80522
City of Fort Collins
Attn: Purchasing Dept.
PO Box 580
Fort Collins, CO 80522
In the event of early termination by the City, the Service Provider shall be paid for services
rendered to the date of termination, subject only to the satisfactory performance of the
Service Provider's obligations under this Agreement. Such payment shall be the Service
Provider's sole right and remedy for such termination.
6. Contract Sum. The City shall pay the Service Provider for the performance of this Contract,
subject to additions and deletions provided herein, Ninety Three Thousand Two Hundred
Fifty Four Dollars and Thirty Six Cents ($93,254.36) as per the attached Exhibit "A",
consisting of Twenty-Three (23) pages, and incorporated herein by this reference.
7. City Representative. The City will designate, prior to commencement of the work, its
representative who shall make, within the scope of his or her authority, all necessary and
proper decisions with reference to the services provided under this agreement. All requests
concerning this agreement shall be directed to the City Representative.
8. Independent Service provider. The services to be performed by Service Provider are those
of an independent service provider and not of an employee of the City of Fort Collins. The
City shall not be responsible for withholding any portion of Service Provider's compensation
hereunder for the payment of FICA, Workmen's Compensation or other taxes or benefits or
for any other purpose.
9. Subcontractors. Service Provider may not subcontract any of the Work set forth in the
Exhibit A, Statement of Work without the prior written consent of the city, which shall not be
unreasonably withheld. If any of the Work is subcontracted hereunder (with the consent of
the City), then the following provisions shall apply: (a) the subcontractor must be a reputable,
qualified firm with an established record of successful performance in its respective trade
performing identical or substantially similar work, (b) the subcontractor will be required to
comply with all applicable terms of this Agreement, (c) the subcontract will not create any
contractual relationship between any such subcontractor and the City, nor will it obligate the
City to pay or see to the payment of any subcontractor, and (d) the work of the subcontractor
will be subject to inspection by the City to the same extent as the work of the Service
Provider.
10. Personal Services. It is understood that the City enters into the Agreement based on the
special abilities of the Service Provider and that this Agreement shall be considered as an
agreement for personal services. Accordingly, the Service Provider shall neither assign any
responsibilities nor delegate any duties arising under the Agreement without the prior written
consent of the City.
11. Acceptance Not Waiver. The City's approval or acceptance of, or payment for any of the
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
Official Purchasing Document
Last updated 10/2017
All Phase Restoration Service Agreement
Page 3 of 31
services shall not be construed to operate as a waiver of any rights or benefits provided to
the City under this Agreement or cause of action arising out of performance of this
Agreement.
12. Warranty.
a. Service Provider warrants that all work performed hereunder shall be performed with the
highest degree of competence and care in accordance with accepted standards for work
of a similar nature.
b. Unless otherwise provided in the Agreement, all materials and equipment incorporated
into any work shall be new and, where not specified, of the most suitable grade of their
respective kinds for their intended use, and all workmanship shall be acceptable to City.
c. Service Provider warrants all equipment, materials, labor and other work, provided under
this Agreement, except City-furnished materials, equipment and labor, against defects
and nonconformances in design, materials and workmanship/workwomanship for a
period beginning with the start of the work and ending twelve (12) months from and after
final acceptance under the Agreement, regardless whether the same were furnished or
performed by Service Provider or by any of its subcontractors of any tier. Upon receipt
of written notice from City of any such defect or nonconformances, the affected item or
part thereof shall be redesigned, repaired or replaced by Service Provider in a manner
and at a time acceptable to City.
13. Default. Each and every term and condition hereof shall be deemed to be a material element
of this Agreement. In the event either party should fail or refuse to perform according to the
terms of this agreement, such party may be declared in default thereof.
14. Remedies. In the event a party has been declared in default, such defaulting party shall be
allowed a period of ten (10) days within which to cure said default. In the event the default
remains uncorrected, the party declaring default may elect to (a) terminate the Agreement
and seek damages; (b) treat the Agreement as continuing and require specific performance;
or (c) avail himself of any other remedy at law or equity. If the non-defaulting party
commences legal or equitable actions against the defaulting party, the defaulting party shall
be liable to the non-defaulting party for the non-defaulting party's reasonable attorney fees
and costs incurred because of the default.
15. Binding Effect. This writing, together with the exhibits hereto, constitutes the entire
agreement between the parties and shall be binding upon said parties, their officers,
employees, agents and assigns and shall inure to the benefit of the respective survivors,
heirs, personal representatives, successors and assigns of said parties.
16. Indemnity/Insurance.
a. The Service Provider agrees to indemnify and save harmless the City, its officers, agents
and employees against and from any and all actions, suits, claims, demands or liability
of any character whatsoever brought or asserted for injuries to or death of any person
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
Official Purchasing Document
Last updated 10/2017
All Phase Restoration Service Agreement
Page 4 of 31
or persons, or damages to property arising out of, result from or occurring in connection
with the performance of any service hereunder.
b. The Service Provider shall take all necessary precautions in performing the work
hereunder to prevent injury to persons and property.
c. Without limiting any of the Service Provider's obligations hereunder, the Service Provider
shall provide and maintain insurance coverage naming the City as an additional insured
under this Agreement of the type and with the limits specified within Exhibit B, consisting
of one (1) page, attached hereto and incorporated herein by this reference. The Service
Provider before commencing services hereunder, shall deliver to the City's Purchasing
Director, P. O. Box 580, Fort Collins, Colorado 80522, one copy of a certificate
evidencing the insurance coverage required from an insurance company acceptable to
the City.
17. Entire Agreement. This Agreement, along with all Exhibits and other documents
incorporated herein, shall constitute the entire Agreement of the parties. Covenants or
representations not contained in this Agreement shall not be binding on the parties.
18. Law/Severability. The laws of the State of Colorado shall govern the construction
interpretation, execution and enforcement of this Agreement. In the event any provision of
this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction,
such holding shall not invalidate or render unenforceable any other provision of this
Agreement.
19. Prohibition Against Employing Illegal Aliens. Pursuant to Section 8-17.5-101, C.R.S., et.
seq., Service Provider represents and agrees that:
a. As of the date of this Agreement:
1. Service Provider does not knowingly employ or contract with an illegal alien who will
perform work under this Agreement; and
2. Service Provider will participate in either the e-Verify program created in Public Law
208, 104th Congress, as amended, and expanded in Public Law 156, 108th
Congress, as amended, administered by the United States Department of Homeland
Security (the “e-Verify Program”) or the Department Program (the “Department
Program”), an employment verification program established pursuant to Section 8-
17.5-102(5)(c) C.R.S. in order to confirm the employment eligibility of all newly hired
employees to perform work under this Agreement.
b. Service Provider shall not knowingly employ or contract with an illegal alien to perform
work under this Agreement or knowingly enter into a contract with a subcontractor that
knowingly employs or contracts with an illegal alien to perform work under this
Agreement.
c. Service Provider is prohibited from using the e-Verify Program or Department Program
procedures to undertake pre-employment screening of job applicants while this
Agreement is being performed.
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
Official Purchasing Document
Last updated 10/2017
All Phase Restoration Service Agreement
Page 5 of 31
d. If Service Provider obtains actual knowledge that a subcontractor performing work under
this Agreement knowingly employs or contracts with an illegal alien, Service Provider
shall:
1. Notify such subcontractor and the City within three days that Service Provider has
actual knowledge that the subcontractor is employing or contracting with an illegal
alien; and
2. Terminate the subcontract with the subcontractor if within three days of receiving the
notice required pursuant to this section the subcontractor does not cease employing
or contracting with the illegal alien; except that Service Provider shall not terminate
the contract with the subcontractor if during such three days the subcontractor
provides information to establish that the subcontractor has not knowingly employed
or contracted with an illegal alien.
e. Service Provider shall comply with any reasonable request by the Colorado Department
of Labor and Employment (the “Department”) made in the course of an investigation that
the Department undertakes or is undertaking pursuant to the authority established in
Subsection 8-17.5-102 (5), C.R.S.
f. If Service Provider violates any provision of this Agreement pertaining to the duties
imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If
this Agreement is so terminated, Service Provider shall be liable for actual and
consequential damages to the City arising out of Service Provider’s violation of
Subsection 8-17.5-102, C.R.S.
g. The City will notify the Office of the Secretary of State if Service Provider violates this
provision of this Agreement and the City terminates the Agreement for such breach.
20. Special Provisions. Special provisions or conditions relating to the services to be performed
pursuant to this Agreement are set forth in Exhibit C - Confidentiality, consisting of one (1)
page, attached hereto and incorporated herein by this reference.
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
Official Purchasing Document
Last updated 10/2017
All Phase Restoration Service Agreement Page 6 of 31
THE CITY OF FORT COLLINS, COLORADO
By:
Gerry Paul
Purchasing Director
DATE:
ATTEST:
APPROVED AS TO FORM:
ALL PHASE RESTORATION, INC.
By:
Printed:
Title:
CORPORATE PRESIDENT OR VICE PRESIDENT
Date:
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
9/14/2020
Estimator
Nate Tenold
Assistant City Attorney ll
9/14/2020
City Clerk
1
All Phase Restoration
7355 Green Ridge Rd Unit C
Windsor CO 80550
www,aprestoration.com
Client: City of Fort Collins 212 Atten: Matt Home: (646) 761-4031
Property: 212 W Mountian
Fort Collins , CO
Operator: MGARCIA
Estimator: Nate Tenold Business: (970) 381-1978
Business: 7355 Greenridge Rd Suite C
Windsor , CO 80550
Type of Estimate: Water Damage
Date Entered: 5/19/2020 Date Assigned:
Price List: COFC8X_DEC19
Labor Efficiency: Restoration/Service/Remodel
Estimate: 2020-05-19-1353-1--3
This estimate is based off putting the property back to pre loss condition. It the City requires a permit and items need to be
brought up to code, we would generate a supplement as needed. If the bid is accepted, I would want to complete a walk through
with Matt or others with the City of Fort Collins to ensure the estimate is accurate for the work they are expecting. If damages
are found during the duration of the repairs that need to be replaced, I would generate a supplement as needed.
Exhibit A
Scope of Service
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
2
All Phase Restoration
7355 Green Ridge Rd Unit C
Windsor CO 80550
www,aprestoration.com
2020-05-19-1353-1--3 9/4/2020 Page: 2
2020-05-19-1353-1--3
General
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
Taxes, insurance, permits & fees (Bid 1.00 EA 0.00 0.00 0.00 0.00 0.00
Item)
Dumpster load - Approx. 30 yards, 5-7 1.00 EA 550.00 0.00 0.00 110.00 660.00
tons of debris
Item is to haul of the miscellaneous debris and waste
Finish Carpenter - per hour 8.00 HR 0.00 77.52 0.00 124.04 744.20
Item is to detach and reset trim in order to complete the necessary drywall repairs with wood trims
Commercial Supervision / Project 24.00 HR 0.00 65.54 0.00 314.60 1,887.56
Management - per hour
Electrician - per hour 24.00 HR 0.00 94.96 0.00 455.80 2,734.84
Item is to inspect all electrical wiring and install outlets as needed. Based on the last walk through, additional labor of 8 hours has been made due to
the damaged conduits throughout..
HVAC Technician - per hour 12.00 HR 0.00 98.00 0.00 235.20 1,411.20
Item is to inspect and/or replace the ducting
R&R Steel door, 3' x 7' 6.00 EA 15.01 280.13 0.00 354.18 2,125.02
Paint door slab only - 2 coats (per side) 12.00 EA 0.00 34.88 0.00 83.72 502.28
Paint door or window opening - 2 coats 12.00 EA 0.00 29.44 0.00 70.66 423.94
(per side)
Door knob - interior 6.00 EA 0.00 43.67 0.00 52.40 314.42
Insulation Installer - per hour 6.00 HR 0.00 65.00 0.00 78.00 468.00
Material Only Batt insulation - 4" - 250.00 SF 0.00 0.45 0.00 22.50 135.00
R13 - unfaced batt
Cleaning Technician - per hour 8.00 HR 0.00 47.26 0.00 75.62 453.70
Item is to clean the existing carpet that will not be replace
Totals: General 0.00 1,976.72 11,860.16
Main Level
W. Bathroom
Janitor Closet
Torreys Peak Storage
Entry
Break Room
M. Bathroom
Hallway 4 (1)
Closet (4)
Laurie Klith
Hallway
File Closet File Closet (3) (2) Longs Peak
Pikes Peak
Hallway 2 (5)
Colleen Lyon
Hallway 5 (6)
Check-In Office
Hallway 3 (7)
Office
Office2 Greys Peak
Mount Elbert
Storage Area/Room (9)
Office 3
UA1 (1)
2' 8" 3' 6"
3' 2"
3
All Phase Restoration
7355 Green Ridge Rd Unit C
Windsor CO 80550
www,aprestoration.com
2020-05-19-1353-1--3 9/4/2020 Page: 3
CONTINUED - Entry
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
1/2" - drywall per LF - up to 2' tall 81.17 LF 0.00 7.93 0.00 128.74 772.42
1/2" drywall - hung, taped, ready for 40.00 SF 0.00 1.79 0.00 14.32 85.92
texture
Texture drywall - heavy hand texture 303.51 SF 0.00 0.80 0.00 48.56 291.37
Seal/prime then paint the surface area 303.51 SF 0.00 0.90 0.00 54.64 327.80
(2 coats)
Paint part of the walls - one coat - 2 544.02 SF 0.00 0.74 0.00 80.52 483.09
colors
Floor prep (scrape rubber back residue) 185.63 SF 0.00 0.44 0.00 16.34 98.02
Glue down carpet - High grade 273.08 SF 0.00 3.08 0.00 168.22 1,009.31
Cove base molding - rubber or vinyl, 4" 81.17 LF 0.00 1.72 0.00 27.92 167.53
high
Suspended ceiling grid - High grade - 2' 185.63 SF 0.00 1.56 0.00 57.92 347.50
x 4'
Suspended ceiling tile - High grade - 2' 185.63 SF 0.00 1.99 0.00 73.88 443.28
x 4'
Install Fluorescent light fixture 2.00 EA 0.00 45.26 0.00 18.10 108.62
Install Exit sign - wired in 2.00 EA 0.00 45.26 0.00 18.10 108.62
Install Recessed light fixture 3.00 EA 0.00 79.39 0.00 47.64 285.81
Sheathing - plywood - 1/2" CDX 32.00 SF 0.00 1.74 0.00 11.14 66.82
Item is to build a false door to the North office area
Final cleaning - construction - 185.63 SF 0.00 0.22 0.00 8.16 49.00
Commercial
Totals: Entry 0.00 774.20 4,645.11
W. Bathroom
Janitor Closet
Torreys Peak Storage
Entry
Break Room
M. Bathroom
Hallway 4 (1)
Closet (4)
Laurie Klith
Hallway
File Closet (3) File Closet (2) Longs Peak
Pikes Peak
Hallway 2 (5)
Colleen Lyon
Check-In Office
Storage Area/Room (9)
UA1 (1)
7' 8"
8'
7' 1"
7' 5"
2' 6"
1' 1"
1' 3"
4' 1"
4' 5"
W. Bathroom Height: 8'
236.00 SF Walls
4
All Phase Restoration
7355 Green Ridge Rd Unit C
Windsor CO 80550
www,aprestoration.com
2020-05-19-1353-1--3 9/4/2020 Page: 4
CONTINUED - W. Bathroom
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
Floor preparation for resilient 54.31 SF 0.00 0.45 0.00 4.88 29.32
flooring
Vinyl plank flooring 54.31 SF 0.00 5.36 0.00 58.22 349.32
R&R Cove base molding - rubber or 29.50 LF 0.29 1.72 0.00 11.86 71.16
vinyl, 4" high
Totals: W. Bathroom 0.00 171.34 1,028.04
W. Bathroom
Janitor Closet
Torreys Peak Storage
Entry
Break Room
M. Bathroom
Hallway 4 (1)
Closet (4)
Laurie Klith
Hallway
File Closet (3) File Closet (2) Longs Peak
Pikes Peak
Hallway 2 (5)
Colleen Lyon
Hallway 5 (6)
Check-In Office
Hallway 3 (7)
Office
Greys Peak
Office2
Storage Area/Room (9)
UA1 (1)
5' 9"
5' 5"
7' 1"
2' 6"
1'
1' 2"
1' 11"
2' 1"
M. Bathroom Height: 8'
200.00 SF Walls
238.37 SF Walls & Ceiling
4.26 SY Flooring
25.00 LF Ceil. Perimeter
38.37 SF Ceiling
38.37 SF Floor
25.00 LF Floor Perimeter
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
1/2" - drywall per LF - up to 2' tall 25.00 LF 0.00 7.93 0.00 39.66 237.91
Drywall patch / small repair, ready for 2.00 EA 0.00 61.17 0.00 24.46 146.80
paint
Texture drywall - heavy hand texture 94.18 SF 0.00 0.80 0.00 15.06 90.40
Seal/prime then paint the surface area 94.18 SF 0.00 0.90 0.00 16.96 101.72
(2 coats)
Paint the walls and ceiling - one coat 238.37 SF 0.00 0.62 0.00 29.56 177.35
5
All Phase Restoration
7355 Green Ridge Rd Unit C
Windsor CO 80550
www,aprestoration.com
2020-05-19-1353-1--3 9/4/2020 Page: 5
W. Bathroom
Janitor Closet
Torreys Peak Storage
Entry
Break Room
M. Bathroom
Hallway 4 (1)
Closet (4)
Laurie Klith
Hallway
File Closet (3) File Closet (2) Longs Peak
Pikes Peak
Hallway 2 (5)
Colleen Lyon
Hallway 5 (6)
Check-In Office
Hallway 3 (7)
Office
Greys Peak
Office2
Mount Elbert
Storage Area/Room (9)
Office 3
UA1 (1)
7' 7"
7' 1"
2' 6" 5"
4"
6"
3' 9"
3' 3"
Janitor Closet Height: 8'
165.47 SF Walls
188.56 SF Walls & Ceiling
2.56 SY Flooring
20.68 LF Ceil. Perimeter
23.08 SF Ceiling
23.08 SF Floor
20.68 LF Floor Perimeter
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
1/2" - drywall per LF - up to 2' tall 20.68 LF 0.00 7.93 0.00 32.80 196.79
Texture drywall - heavy hand texture 62.05 SF 0.00 0.80 0.00 9.92 59.56
Seal/prime then paint the surface area 62.05 SF 0.00 0.90 0.00 11.18 67.03
(2 coats)
Paint the walls and ceiling - one coat 188.56 SF 0.00 0.62 0.00 23.38 140.29
Cove base molding - rubber or vinyl, 4" 20.68 LF 0.00 1.72 0.00 7.12 42.69
high
Floor preparation for resilient flooring 23.08 SF 0.00 0.45 0.00 2.08 12.47
Vinyl floor covering (sheet goods) - 42.08 SF 0.00 3.91 0.00 32.90 197.43
High grade
Install Laundry tub 1.00 EA 0.00 220.73 0.00 44.14 264.87
R&R Angle stop valve 2.00 EA 5.00 33.86 0.00 15.54 93.26
R&R Plumbing fixture supply line 2.00 EA 5.00 18.93 0.00 9.58 57.44
Final cleaning - construction - 23.08 SF 0.00 0.22 0.00 1.02 6.10
6
All Phase Restoration
7355 Green Ridge Rd Unit C
Windsor CO 80550
www,aprestoration.com
2020-05-19-1353-1--3 9/4/2020 Page: 6
CONTINUED - Torreys Peak Storage
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
Glue down carpet - High grade 161.00 SF 0.00 3.08 0.00 99.18 595.06
Cove base molding - rubber or vinyl, 4" 38.31 LF 0.00 1.72 0.00 13.18 79.07
high
Suspended ceiling grid - High grade - 2' 86.50 SF 0.00 1.56 0.00 26.98 161.92
x 4'
Suspended ceiling tile - High grade - 2' 86.50 SF 0.00 1.99 0.00 34.42 206.56
x 4'
Install Fluorescent light fixture 2.00 EA 0.00 45.26 0.00 18.10 108.62
Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04
24"
Smoke detector 1.00 EA 0.00 50.61 0.00 10.12 60.73
Final cleaning - construction - 86.50 SF 0.00 0.22 0.00 3.80 22.83
Commercial
Totals: Torreys Peak Storage 0.00 359.10 2,154.60
W. Bathroom
Janitor Closet
Torreys Peak Storage
Entry
Break Room
M. Bathroom
Hallway 4 (1)
Closet (4)
Laurie Klith
Hallway
File Closet File (3) Closet (2) Longs Peak
Pikes Peak
Hallway 2 (5)
Colleen Lyon
Hallway 5 (6)
Check-In Office
Hallway4 (8)
Hallway 3 (7)
Office
Greys Peak
Office2
Mount Bierstadt
Mount Elbert
Storage Area/Room (9)
Office4
Office 3
UA1 (1)
8' 11"
9' 1"
5' 4"
5'
2' 11"
2' 11"
12' 3"
11' 11"
2' 11" 2' 6"
3' 1"
6' 5"
7
All Phase Restoration
7355 Green Ridge Rd Unit C
Windsor CO 80550
www,aprestoration.com
2020-05-19-1353-1--3 9/4/2020 Page: 7
CONTINUED - Break Room
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
Smoke detector 1.00 EA 0.00 50.61 0.00 10.12 60.73
Cabinetry - lower (base) units - High 8.75 LF 0.00 222.76 0.00 389.84 2,338.99
grade
Countertop - flat laid plastic laminate 8.75 LF 0.00 38.92 0.00 68.12 408.67
Install Sink - double 1.00 EA 0.00 114.31 0.00 22.86 137.17
Install Sink faucet - Kitchen 1.00 EA 0.00 76.82 0.00 15.36 92.18
Install Garbage disposer 1.00 EA 0.00 110.37 0.00 22.08 132.45
R&R Angle stop valve 2.00 EA 5.00 33.86 0.00 15.54 93.26
R&R Plumbing fixture supply line 2.00 EA 5.00 18.93 0.00 9.58 57.44
Install Range - freestanding - electric 1.00 EA 0.00 69.46 0.00 13.90 83.36
Install Refrigerator - top freezer - 14 to 1.00 EA 0.00 24.00 0.00 4.80 28.80
18 cf
Install Dishwasher 1.00 EA 0.00 128.02 0.00 25.60 153.62
Final cleaning - construction - 189.17 SF 0.00 0.22 0.00 8.32 49.94
Commercial
Totals: Break Room 0.00 1,205.32 7,231.82
Torreys Peak Storage
Hallway 4 (1)
Laurie Klith
y
Closet (2) Longs Peak
Pikes Peak
on
ay 5 (6)
3 (7)
Greys Peak
Office 3
UA1 (1)
6' 9"
6' 9"
2' 6"
2"
11' 7"
11' 5"
3' 3"
3' 5"
10' 1"
10' 9"
14' 10"
15' 2" Laurie Klith Height: 8'
398.67 SF Walls
548.24 SF Walls & Ceiling
16.62 SY Flooring
49.83 LF Ceil. Perimeter
149.57 SF Ceiling
149.57 SF Floor
49.83 LF Floor Perimeter
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
1/2" - drywall per LF - up to 2' tall 24.92 LF 0.00 7.93 0.00 39.52 237.14
Texture drywall - heavy hand texture 74.76 SF 0.00 0.80 0.00 11.96 71.77
Seal/prime then paint the surface area 74.76 SF 0.00 0.90 0.00 13.46 80.74
(2 coats)
8
All Phase Restoration
7355 Green Ridge Rd Unit C
Windsor CO 80550
www,aprestoration.com
2020-05-19-1353-1--3 9/4/2020 Page: 8
CONTINUED - Laurie Klith
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
Totals: Laurie Klith 0.00 287.20 1,723.17
W. Bathroom
Janitor Closet
Torreys Peak Storage
Entry
Break Room
M. Bathroom
Hallway 4 (1)
Closet (4)
Laurie Klith
Hallway
File Closet File (Closet 3) (2) Longs Peak
Pikes Peak
Hallway 2 (5)
Colleen Lyon
Hallway 5 (6)
Check-In Office
Hallway4 (8)
Hallway 3 (7)
Office
Office2 Greys Peak
File Room
Mount Bierstadt
Mount Elbert
Storage Area/Room (9)
S. Office
Office4
Office 3
Unaffected area
UA1 (1)
3' 8"
4'
6' 6"
6' 4"
11" 4' 9" 1' 8"
7' 3"
7' 3" 9' 6"
9' 6"
15' 2"
15'
3' 6"
3' 2"
4' 10" 3' 8"
1' 4"
2' 6"
3' 4"
3' 2"
3' 2"
1'
3' 1"
11" 1'
2' 2"
9
All Phase Restoration
7355 Green Ridge Rd Unit C
Windsor CO 80550
www,aprestoration.com
2020-05-19-1353-1--3 9/4/2020 Page: 9
CONTINUED - Hallway
Torreys Peak Storage
Break Room
Hallway 4 (1)
Laurie Klith
Hallway
File Closet (3) File Closet (2) Longs Peak
Pikes Peak
Colleen Lyon
Hallway 5 (6)
Hallway 3 (7)
Greys Peak
Office2
(9)
Office4
Office 3
UA1 (1)
3'
3' 2" 1'
10"
1' 2"
1'
3' 4"
1' 7"
3' 5" 1' 9"
3' 5"
Subroom: File Closet (2) Height: 8'
106.89 SF Walls
121.89 SF Walls & Ceiling
1.67 SY Flooring
16.00 LF Ceil. Perimeter
15.00 SF Ceiling
15.00 SF Floor
12.83 LF Floor Perimeter
Missing Wall - Goes to Floor 3' 2" X 6' 8" Opens into HALLWAY
W. Bathroom
Janitor Closet
Torreys Peak Storage
Entry
Break Room
M. Bathroom
Hallway 4 (1)
Closet (4)
Laurie Klith
Hallway
File Closet (3)File Closet (2) Longs Peak
Pikes Peak
Hallway 2 (5)
Colleen Lyon
Hallway 5 (6)
Check-In Office
Hallway4 (8)
Hallway 3 (7)
Office
10
All Phase Restoration
7355 Green Ridge Rd Unit C
Windsor CO 80550
www,aprestoration.com
2020-05-19-1353-1--3 9/4/2020 Page: 10
CONTINUED - Hallway
W. Bathroom
Janitor Closet
Torreys Peak Storage
Entry
Break Room
M. Bathroom
Hallway 4 (1)
Closet (4)
Laurie Klith
Hallway
File Closet File (Closet 3) (2) Longs Peak
Pikes Peak
Hallway 2 (5)
Colleen Lyon
Hallway 5 (6)
Check-In Office
Hallway4 (8)
Hallway 3 (7)
Office
Office2 Greys Peak
File Room
Mount Bierstadt
Mount Elbert
Storage Area/Room (9)
S. Office
Office4
Office 3
Unaffected area
UA1 (1)
2' 6" 12' 4"
9" 12' 6"
2' 6"
1' 11"
3' 9"
3' 5"
21' 6"
21' 8"
11'
3' 7" 10' 10"
2' 6"
13' 2"
Subroom: Hallway 3 (7) Height: 8'
664.69 SF Walls
797.48 SF Walls & Ceiling
14.75 SY Flooring
85.52 LF Ceil. Perimeter
132.79 SF Ceiling
132.79 SF Floor
82.60 LF Floor Perimeter
Missing Wall - Goes to Floor 2' 11" X 6' 8" Opens into HALLWAY4
Torreys Peak Storage
Break Room
Hallway 4 (1)
11
All Phase Restoration
7355 Green Ridge Rd Unit C
Windsor CO 80550
www,aprestoration.com
2020-05-19-1353-1--3 9/4/2020 Page: 11
Torreys Peak Storage
Hallway 4 (1)
Laurie Klith
Closet (2) Longs Peak
Pikes Peak
5 (6)
(7)
Greys Peak
Office 3
Unaffected area
UA1 (1)
10' 8"
10' 6"
11' 5"
7' 1"
7' 1"
2' 6"5"
4"
6"
11' 7" Longs Peak Height: 8'
350.67 SF Walls
470.54 SF Walls & Ceiling
13.32 SY Flooring
43.83 LF Ceil. Perimeter
119.88 SF Ceiling
119.88 SF Floor
43.83 LF Floor Perimeter
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
1/2" - drywall per LF - up to 2' tall 21.92 LF 0.00 7.93 0.00 34.76 208.59
Texture drywall - heavy hand texture 65.76 SF 0.00 0.80 0.00 10.52 63.13
Seal/prime then paint the surface area 65.76 SF 0.00 0.90 0.00 11.84 71.02
(2 coats)
Paint the walls - one coat 350.67 SF 0.00 0.62 0.00 43.48 260.90
Floor prep (scrape rubber back residue) 119.88 SF 0.00 0.44 0.00 10.56 63.31
Glue down carpet - High grade 195.08 SF 0.00 3.08 0.00 120.18 721.03
Cove base molding - rubber or vinyl, 4" 43.83 LF 0.00 1.72 0.00 15.08 90.47
high
Suspended ceiling grid - High grade - 2' 119.88 SF 0.00 1.56 0.00 37.40 224.41
x 4'
Suspended ceiling tile - High grade - 2' 119.88 SF 0.00 1.99 0.00 47.72 286.28
x 4'
Install Fluorescent light fixture 2.00 EA 0.00 45.26 0.00 18.10 108.62
Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04
24"
Final cleaning - construction - 119.88 SF 0.00 0.22 0.00 5.28 31.65
Commercial
Totals: Longs Peak 0.00 362.76 2,176.45
Torreys Peak Storage
Break Room
Hallway 4 (1)
Closet (4)
Laurie Klith
Hallway
File Closet File (3) Closet (2) Longs Peak
12
All Phase Restoration
7355 Green Ridge Rd Unit C
Windsor CO 80550
www,aprestoration.com
2020-05-19-1353-1--3 9/4/2020 Page: 12
CONTINUED - Pikes Peak
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
Paint the walls - one coat 380.62 SF 0.00 0.62 0.00 47.20 283.18
Floor prep (scrape rubber back residue) 122.64 SF 0.00 0.44 0.00 10.80 64.76
Glue down carpet - High grade 198.50 SF 0.00 3.08 0.00 122.28 733.66
Cove base molding - rubber or vinyl, 4" 47.58 LF 0.00 1.72 0.00 16.36 98.20
high
Suspended ceiling grid - High grade - 2' 122.64 SF 0.00 1.56 0.00 38.26 229.58
x 4'
Suspended ceiling tile - High grade - 2' 122.64 SF 0.00 1.99 0.00 48.82 292.87
x 4'
Install Fluorescent light fixture 2.00 EA 0.00 45.26 0.00 18.10 108.62
Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04
24"
Heat/AC register - Mechanically 1.00 EA 0.00 21.04 0.00 4.20 25.24
attached
Final cleaning - construction - 122.64 SF 0.00 0.22 0.00 5.40 32.38
Commercial
Totals: Pikes Peak 0.00 443.26 2,659.48
room
Closet
Torreys Peak Storage
Entry
Break Room
room
Hallway 4 (1)
Closet (4)
Laurie Klith
Hallway
File Closet (File 3) Closet (2) Longs Peak
Pikes Peak
Hallway 2 (5)
Colleen Lyon
Hallway 5 (6)
k-In Office
Hallway4 (8)
Hallway 3 (7)
Office
Greys Peak
Office2
nt Bierstadt
unt Elbert
Storage Area/Room (9)
Office4
Office 3
Unaffected area
UA1 (1)
6' 6"
6' 4"
2' 6"
3"
2' 1"
1' 11"
8' 7"
13
All Phase Restoration
7355 Green Ridge Rd Unit C
Windsor CO 80550
www,aprestoration.com
2020-05-19-1353-1--3 9/4/2020 Page: 13
CONTINUED - Colleen Lyon
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
Install Fluorescent light fixture 2.00 EA 0.00 45.26 0.00 18.10 108.62
Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04
24"
Heat/AC register - Mechanically 1.00 EA 0.00 21.04 0.00 4.20 25.24
attached
Final cleaning - construction - 104.43 SF 0.00 0.22 0.00 4.60 27.57
Commercial
Totals: Colleen Lyon 0.00 393.48 2,360.87
W. Bathroom
Janitor Closet
Torreys Peak Storage
Entry
Break Room
M. Bathroom
Hallway 4 (1)
Closet (4)
Laurie Klith
Hallway
File Closet File (3) Closet (2) Longs Peak
Pikes Peak
Hallway 2 (5)
Colleen Lyon
Hallway 5 (6)
Check-In Office
Hallway4 (8)
Hallway 3 (7)
Office
Greys Peak
Office2
File Room
Mount Bierstadt
Mount Elbert
Storage Area/Room (9)
S. Office
Office4
Office 3
Unaffected area
UA1 (1)
15' 1"
15' 5"
10' 5"
2' 6"
3' 4" 2'
3' 6"
7' 3"
7' 3"
2' 6" 6' 3" Check-In Office Height: 8'
407.99 SF Walls
565.10 SF Walls & Ceiling
17.46 SY Flooring
51.00 LF Ceil. Perimeter
157.11 SF Ceiling
14
All Phase Restoration
7355 Green Ridge Rd Unit C
Windsor CO 80550
www,aprestoration.com
2020-05-19-1353-1--3 9/4/2020 Page: 14
W. Bathroom
Torreys Peak Storage
Entry
Break Room
Hallway 4 (1)
Closet (4)
Laurie Klith
Hallway
File Closet File (3) Closet (2) Longs Peak
Pikes Peak
Hallway 2 (5)
Colleen Lyon
Hallway 5 (6)
Check-In Office
Hallway4 (8)
Hallway 3 (7)
Office
Greys Peak
Office2
File Room
Mount Bierstadt
Mount Elbert
Storage Area/Room (9)
S. Office
Office4
Office 3
Unaffected area
UA1 (1)
17' 11"
17' 7"
10' 5"
6"
2' 6" 6"
11'
3' 7" 10' 10"
Office Height: 8'
447.98 SF Walls
631.12 SF Walls & Ceiling
20.35 SY Flooring
56.00 LF Ceil. Perimeter
183.14 SF Ceiling
183.14 SF Floor
56.00 LF Floor Perimeter
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
1/2" - drywall per LF - up to 2' tall 42.00 LF 0.00 7.93 0.00 66.62 399.68
Texture drywall - heavy hand texture 126.00 SF 0.00 0.80 0.00 20.16 120.96
Seal/prime then paint the surface area 126.00 SF 0.00 0.90 0.00 22.68 136.08
(2 coats)
Paint the walls - one coat 447.98 SF 0.00 0.62 0.00 55.56 333.31
Floor prep (scrape rubber back residue) 183.14 SF 0.00 0.44 0.00 16.12 96.70
Glue down carpet - High grade 259.17 SF 0.00 3.08 0.00 159.64 957.88
Cove base molding - rubber or vinyl, 4" 56.00 LF 0.00 1.72 0.00 19.26 115.58
high
Suspended ceiling grid - High grade - 2' 183.14 SF 0.00 1.56 0.00 57.14 342.84
15
All Phase Restoration
7355 Green Ridge Rd Unit C
Windsor CO 80550
www,aprestoration.com
2020-05-19-1353-1--3 9/4/2020 Page: 15
CONTINUED - Office2
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
Paint the walls - one coat 454.30 SF 0.00 0.62 0.00 56.34 338.01
Floor prep (scrape rubber back residue) 200.45 SF 0.00 0.44 0.00 17.64 105.84
Glue down carpet - High grade 282.58 SF 0.00 3.08 0.00 174.08 1,044.43
Cove base molding - rubber or vinyl, 4" 56.79 LF 0.00 1.72 0.00 19.54 117.22
high
Suspended ceiling grid - High grade - 2' 200.45 SF 0.00 1.56 0.00 62.54 375.24
x 4'
Suspended ceiling tile - High grade - 2' 200.45 SF 0.00 1.99 0.00 79.78 478.68
x 4'
Install Fluorescent light fixture 5.00 EA 0.00 45.26 0.00 45.26 271.56
Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04
24"
Heat/AC register - Mechanically 1.00 EA 0.00 21.04 0.00 4.20 25.24
attached
Final cleaning - construction - 200.45 SF 0.00 0.22 0.00 8.82 52.92
Commercial
Totals: Office2 0.00 624.02 3,744.11
Torreys Peak Storage
Room
Hallway 4 (1)
Laurie Klith
Hallway
Closet File (3) Closet (2) Longs Peak
Pikes Peak
Colleen Lyon
Hallway 5 (6)
Hallway 3 (7)
Greys Peak
Office2
m (9)
Office4
Office 3
Unaffected area
UA1 (1)
10' 11"
10' 7"
11'
11' 4"
2' 5"
2' 7"
2' 6"
1' 11"
13' 2"
5' 10"
5' 10"
11' 11"
12' 2" Greys Peak Height: 8'
498.31 SF Walls
705.51 SF Walls & Ceiling
23.02 SY Flooring
62.29 LF Ceil. Perimeter
207.21 SF Ceiling
16
All Phase Restoration
7355 Green Ridge Rd Unit C
Windsor CO 80550
www,aprestoration.com
2020-05-19-1353-1--3 9/4/2020 Page: 16
CONTINUED - Greys Peak
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
Install Fluorescent light fixture 4.00 EA 0.00 45.26 0.00 36.20 217.24
Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04
24"
Smoke detector 1.00 EA 0.00 50.61 0.00 10.12 60.73
Final cleaning - construction - 207.21 SF 0.00 0.22 0.00 9.12 54.71
Commercial
Totals: Greys Peak 0.00 611.24 3,667.36
W. Bathroom
Janitor Closet
Torreys Peak Storage
Entry
Break Room
M. Bathroom
Hallway 4 (1)
Closet (4)
Laurie Klith
Hallway
File Closet File (3) Closet (2) Longs Peak
Pikes Peak
Hallway 2 (5)
Colleen Lyon
Hallway 5 (6)
Check-In Office
Hallway4 (8)
Hallway 3 (7)
Office
Office2 Greys Peak
File Room
Mount Bierstadt
Mount Elbert
Storage Area/Room (9)
S. Office
Office4
Office 3
Unaffected area
UA1 (1)
19' 3"
19' 7"
10' 9"
3"
5"
19'
18' 10"
10' 5" Mount Elbert Height: 8'
474.66 SF Walls
675.16 SF Walls & Ceiling
22.28 SY Flooring
59.33 LF Ceil. Perimeter
200.51 SF Ceiling
200.51 SF Floor
59.33 LF Floor Perimeter
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
17
All Phase Restoration
7355 Green Ridge Rd Unit C
Windsor CO 80550
www,aprestoration.com
2020-05-19-1353-1--3 9/4/2020 Page: 17
Hallway4 (8)
Hallway 3 (7)
File Room
Mount Bierstadt
Mount Elbert
S. Office
Office4
Office 3
Unaffected area
12' 7"
12' 5" 2"
2' 6"
3' 10"
4' 2"
2' 3"
2' 7"
8"
4' 4"
4' 4"
1' 2"
1' 6"
3"
10' 5"
10' 9"
12' 6"
12' 10"
Mount Bierstadt Height: 8'
407.65 SF Walls
562.77 SF Walls & Ceiling
17.24 SY Flooring
50.96 LF Ceil. Perimeter
155.12 SF Ceiling
155.12 SF Floor
50.96 LF Floor Perimeter
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
1/2" - drywall per LF - up to 2' tall 50.96 LF 0.00 7.93 0.00 80.82 484.93
Texture drywall - heavy hand texture 152.87 SF 0.00 0.80 0.00 24.46 146.76
Seal/prime then paint the surface area 152.87 SF 0.00 0.90 0.00 27.52 165.10
(2 coats)
Paint the walls - one coat 407.65 SF 0.00 0.62 0.00 50.54 303.28
Floor prep (scrape rubber back residue) 155.12 SF 0.00 0.44 0.00 13.66 81.91
Glue down carpet - High grade 236.50 SF 0.00 3.08 0.00 145.68 874.10
Cove base molding - rubber or vinyl, 4" 50.96 LF 0.00 1.72 0.00 17.54 105.19
high
Suspended ceiling grid - High grade - 2' 155.12 SF 0.00 1.56 0.00 48.40 290.39
x 4'
Suspended ceiling tile - High grade - 2' 155.12 SF 0.00 1.99 0.00 61.74 370.43
x 4'
Install Fluorescent light fixture 2.00 EA 0.00 45.26 0.00 18.10 108.62
Final cleaning - construction - 155.12 SF 0.00 0.22 0.00 6.82 40.95
Commercial
Totals: Mount Bierstadt 0.00 495.28 2,971.66
W. Bathroom
Torreys Peak Storage
18
All Phase Restoration
7355 Green Ridge Rd Unit C
Windsor CO 80550
www,aprestoration.com
2020-05-19-1353-1--3 9/4/2020 Page: 18
CONTINUED - File Room
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
Floor prep (scrape rubber back residue) 77.63 SF 0.00 0.44 0.00 6.84 41.00
Glue down carpet - High grade 154.17 SF 0.00 3.08 0.00 94.96 569.80
Cove base molding - rubber or vinyl, 4" 37.34 LF 0.00 1.72 0.00 12.84 77.06
high
Suspended ceiling grid - High grade - 2' 77.63 SF 0.00 1.56 0.00 24.22 145.32
x 4'
Suspended ceiling tile - High grade - 2' 77.63 SF 0.00 1.99 0.00 30.90 185.38
x 4'
Install Fluorescent light fixture 2.00 EA 0.00 45.26 0.00 18.10 108.62
Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04
24"
Final cleaning - construction - 77.63 SF 0.00 0.22 0.00 3.42 20.50
Commercial
Totals: File Room 0.00 333.46 2,000.82
Hallway 2 (5)
Hallway 5 (6)
Hallway4 (8)
Hallway 3 (7)
Office
Greys Peak
Office2
File Room
Mount Bierstadt
Mount Elbert
Storage Area/Room (9)
S. Office
Office4
Office 3
Unaffected area
UA1 (1)
12' 11"
8'
12' 5"
8' 6"
S. Office Height: 8'
326.72 SF Walls
426.08 SF Walls & Ceiling
11.04 SY Flooring
40.84 LF Ceil. Perimeter
99.36 SF Ceiling
99.36 SF Floor
40.84 LF Floor Perimeter
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
1/2" - drywall per LF - up to 2' tall 20.42 LF 0.00 7.93 0.00 32.38 194.31
Texture drywall - heavy hand texture 61.26 SF 0.00 0.80 0.00 9.80 58.81
Seal/prime then paint the surface area 61.26 SF 0.00 0.90 0.00 11.02 66.15
(2 coats)
Paint the walls - one coat 326.72 SF 0.00 0.62 0.00 40.52 243.09
Floor prep (scrape rubber back residue) 99.36 SF 0.00 0.44 0.00 8.74 52.46
Glue down carpet - High grade 173.25 SF 0.00 3.08 0.00 106.72 640.33
Final cleaning - construction - 99.36 SF 0.00 0.22 0.00 4.38 26.24
Commercial
19
All Phase Restoration
7355 Green Ridge Rd Unit C
Windsor CO 80550
www,aprestoration.com
2020-05-19-1353-1--3 9/4/2020 Page: 19
Closet (4)
File Closet File (3) Closet (2) Longs Peak
Pikes Peak
Hallway 2 (5)
Colleen Lyon
Hallway 5 (6)
ck-In Office
Hallway4 (8)
Hallway 3 (7)
Office
Greys Peak
Office2
File Room
unt Bierstadt
ount Elbert
Storage Area/Room (9)
S. Office
Office4
Office 3
Unaffected area
UA1 (1)
9' 7"
9' 5"
10' 5"
10' 8"
2' 6"
10' 5"
21' 6"
21' 8"
14' 6"
14'
Office 3 Height: 8'
558.93 SF Walls
857.63 SF Walls & Ceiling
33.19 SY Flooring
69.87 LF Ceil. Perimeter
298.70 SF Ceiling
298.70 SF Floor
69.87 LF Floor Perimeter
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
1/2" - drywall per LF - up to 2' tall 69.87 LF 0.00 7.93 0.00 110.82 664.89
1/2" drywall - hung, taped, ready for 8.00 SF 0.00 1.79 0.00 2.86 17.18
texture
Texture drywall - heavy hand texture 221.60 SF 0.00 0.80 0.00 35.46 212.74
Seal/prime then paint the surface area 221.60 SF 0.00 0.90 0.00 39.88 239.32
(2 coats)
Paint the walls - one coat 558.93 SF 0.00 0.62 0.00 69.30 415.84
Floor prep (scrape rubber back residue) 298.70 SF 0.00 0.44 0.00 26.28 157.71
Glue down carpet - High grade 381.00 SF 0.00 3.08 0.00 234.70 1,408.18
Cove base molding - rubber or vinyl, 4" 69.87 LF 0.00 1.72 0.00 24.04 144.22
high
Suspended ceiling grid - High grade - 2' 298.70 SF 0.00 1.56 0.00 93.20 559.17
x 4'
Suspended ceiling tile - High grade - 2' 298.70 SF 0.00 1.99 0.00 118.88 713.29
20
All Phase Restoration
7355 Green Ridge Rd Unit C
Windsor CO 80550
www,aprestoration.com
2020-05-19-1353-1--3 9/4/2020 Page: 20
CONTINUED - Office4
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
Item is to be replace the metal framing above the door
1/2" - drywall per LF - up to 2' tall 20.75 LF 0.00 7.93 0.00 32.92 197.47
1/2" drywall - hung, taped, ready for 8.00 SF 0.00 1.79 0.00 2.86 17.18
texture
Texture drywall - heavy hand texture 74.25 SF 0.00 0.80 0.00 11.88 71.28
Seal/prime then paint the surface area 74.25 SF 0.00 0.90 0.00 13.36 80.19
(2 coats)
Paint the walls - one coat 331.92 SF 0.00 0.62 0.00 41.16 246.95
Floor prep (scrape rubber back residue) 107.59 SF 0.00 0.44 0.00 9.46 56.80
Glue down carpet - High grade 182.42 SF 0.00 3.08 0.00 112.38 674.23
Cove base molding - rubber or vinyl, 4" 41.49 LF 0.00 1.72 0.00 14.28 85.64
high
Suspended ceiling grid - High grade - 2' 107.59 SF 0.00 1.56 0.00 33.56 201.40
x 4'
Suspended ceiling tile - High grade - 2' 107.59 SF 0.00 1.99 0.00 42.82 256.92
x 4'
Install Fluorescent light fixture 1.00 EA 0.00 45.26 0.00 9.06 54.32
Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04
24"
Smoke detector 1.00 EA 0.00 50.61 0.00 10.12 60.73
Final cleaning - construction - 107.59 SF 0.00 0.22 0.00 4.74 28.41
Commercial
Totals: Office4 0.00 406.44 2,438.60
W. Bathroom
Janitor Closet
Torreys Peak Storage
Entry
Break Room
M. Bathroom
Hallway 4 (1)
Closet (4)
Laurie Klith
Hallway
File File Closet Closet (3) (Longs 2) Peak
Pikes Peak
Hallway 2 (5)
Colleen Lyon
Hallway 5 (6)
Check-In Office
Hallway4 (8)
Hallway 3 (7)
Office
Office2 Greys Peak
File Room
Mount Bierstadt
Mount Elbert
Storage Area/Room (9)
S. Office
Office4
Office 3
Unaffected area
UA1 (1)
21
All Phase Restoration
7355 Green Ridge Rd Unit C
Windsor CO 80550
www,aprestoration.com
2020-05-19-1353-1--3 9/4/2020 Page: 21
CONTINUED - Unaffected area
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
Remove Glue down carpet - High 1,296.54 SF 0.63 0.00 0.00 163.36 980.18
grade
Floor prep (scrape rubber back residue) 1,296.54 SF 0.00 0.44 0.00 114.10 684.58
Glue down carpet - High grade 1,477.50 SF 0.00 3.08 0.00 910.14 5,460.84
Final cleaning - construction - 1,296.54 SF 0.00 0.22 0.00 57.04 342.28
Commercial
Totals: Unaffected area 0.00 1,244.64 7,467.88
Total: Main Level 0.00 13,526.44 81,157.98
Labor Minimums Applied
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
Framing labor minimum 1.00 EA 0.00 160.04 0.00 32.00 192.04
Finish hardware labor minimum 1.00 EA 0.00 36.82 0.00 7.36 44.18
Totals: Labor Minimums Applied 0.00 39.36 236.22
Line Item Totals: 2020-05-19-1353-1--3 0.00 15,542.52 93,254.36
Grand Total Areas:
12,595.19 SF Walls 4,707.83 SF Ceiling 17,303.02 SF Walls and Ceiling
4,707.83 SF Floor 523.09 SY Flooring 1,567.43 LF Floor Perimeter
0.00 SF Long Wall 0.00 SF Short Wall 1,609.26 LF Ceil. Perimeter
4,707.83 Floor Area 5,034.86 Total Area 12,595.19 Interior Wall Area
2,990.74 Exterior Wall Area 332.30 Exterior Perimeter of
Walls
0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length
0.00 Total Ridge Length 0.00 Total Hip Length
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
22
All Phase Restoration
7355 Green Ridge Rd Unit C
Windsor CO 80550
www,aprestoration.com
2020-05-19-1353-1--3 9/4/2020 Page: 22
Summary
Line Item Total 77,711.84
Overhead 7,771.26
Profit 7,771.26
Replacement Cost Value $93,254.36
Net Claim $93,254.36
Nate Tenold
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
23
2020-05-19-1353-1--3 9/4/2020 Page: 23
Main Level
W. Bathroom
Janitor Closet
Torreys Peak Storage
Entry
Break Room
M. Bathroom
Hallway 4 (1)
Closet (4)
Laurie Klith
Hallway
File Closet File Closet (3) (2) Longs Peak
Pikes Peak
Hallway 2 (5)
Colleen Lyon
Hallway 5 (6)
Check-In Office
Hallway4 (8)
Hallway 3 (7)
Office
Office2 Greys Peak
File Room
Mount Bierstadt
Mount Elbert
Storage Area/Room (9)
S. Office
Office4
Office 3
Unaffected area
UA1 (1)
Main Level
2' 11"
5' 2" 3' 5"
8' 8"
8' 6"
12' 3"
11' 11"
7' 11"
7' 3"
8'
5' 5"
7' 5"
5' 9"
5' 5"
8' 11"
13' 2"
12' 10"
11' 10"
2' 11"
5' 4"
5'
10' 5"
3' 3"
3' 6"
3'
7' 8"
8' 2"
5' 3"
Official Purchasing Document
Last updated 10/2017
All Phase Restoration Services Agreement Page 30 of 31
EXHIBIT B
INSURANCE REQUIREMENTS
1. The Service Provider will provide, from insurance companies acceptable to the City, the
insurance coverage designated hereinafter and pay all costs. Before commencing work
under this bid, the Service Provider shall furnish the City with certificates of insurance
showing the type, amount, class of operations covered, effective dates and date of
expiration of policies, and containing substantially the following statement:
“The insurance evidenced by this Certificate will not reduce coverage or limits and
will not be cancelled, except after thirty (30) days written notice has been received
by the City of Fort Collins.”
In case of the breach of any provision of the Insurance Requirements, the City, at its
option, may take out and maintain, at the expense of the Service Provider, such
insurance as the City may deem proper and may deduct the cost of such insurance from
any monies which may be due or become due the Service Provider under this
Agreement. The City, its officers, agents and employees shall be named as additional
insureds on the Service Provider 's general liability and automobile liability insurance
policies for any claims arising out of work performed under this Agreement.
2. Insurance coverages shall be as follows:
A. Workers' Compensation & Employer's Liability. The Service Provider shall
maintain during the life of this Agreement for all of the Service Provider's
employees engaged in work performed under this agreement:
1. Workers' Compensation insurance with statutory limits as required by
Colorado law.
2. Employer's Liability insurance with limits of $100,000 per accident,
$500,000 disease aggregate, and $100,000 disease each employee.
B. Commercial General & Vehicle Liability. The Service Provider shall maintain
during the life of this Agreement such commercial general liability and automobile
liability insurance as will provide coverage for damage claims of personal injury,
including accidental death, as well as for claims for property damage, which may
arise directly or indirectly from the performance of work under this Agreement.
Coverage for property damage shall be on a "broad form" basis. The amount of
insurance for each coverage, Commercial General and Vehicle, shall not be less
than $1,000,000 combined single limits for bodily injury and property damage.
In the event any work is performed by a subcontractor, the Service Provider shall
be responsible for any liability directly or indirectly arising out of the work
performed under this Agreement by a subcontractor, which liability is not covered
by the subcontractor's insurance.
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
Official Purchasing Document
Last updated 10/2017
All Phase Restoration Services Agreement Page 30 of 31
EXHIBIT C
CONFIDENTIALITY
IN CONNECTION WITH SERVICES provided to the City of Fort Collins (the “City”) pursuant to
this Agreement (the “Agreement”), the Service Provider hereby acknowledges that it has been
informed that the City has established policies and procedures with regard to the handling of
confidential information and other sensitive materials.
In consideration of access to certain information, data and material (hereinafter individually and
collectively, regardless of nature, referred to as “information”) that are the property of and/or relate
to the City or its employees, customers or suppliers, which access is related to the performance
of services that the Service Provider has agreed to perform, the Service Provider hereby
acknowledges and agrees as follows:
That information that has or will come into its possession or knowledge in connection with the
performance of services for the City may be confidential and/or proprietary. The Service Provider
agrees to treat as confidential (a) all information that is owned by the City, or that relates to the
business of the City, or that is used by the City in carrying on business, and (b) all information
that is proprietary to a third party (including but not limited to customers and suppliers of the City).
The Service Provider shall not disclose any such information to any person not having a legitimate
need-to-know for purposes authorized by the City. Further, the Service Provider shall not use
such information to obtain any economic or other benefit for itself, or any third party, except as
specifically authorized by the City.
The foregoing to the contrary notwithstanding, the Service Provider understands that it shall have
no obligation under this Agreement with respect to information and material that (a) becomes
generally known to the public by publication or some means other than a breach of duty of this
Agreement, or (b) is required by law, regulation or court order to be disclosed, provided that the
request for such disclosure is proper and the disclosure does not exceed that which is required.
In the event of any disclosure under (b) above, the Service Provider shall furnish a copy of this
Agreement to anyone to whom it is required to make such disclosure and shall promptly advise
the City in writing of each such disclosure.
In the event that the Service Provider ceases to perform services for the City, or the City so
requests for any reason, the Service Provider shall promptly return to the City any and all
information described hereinabove, including all copies, notes and/or summaries (handwritten or
mechanically produced) thereof, in its possession or control or as to which it otherwise has
access.
The Service Provider understands and agrees that the City’s remedies at law for a breach of the
Service Provider’s obligations under this Confidentiality Agreement may be inadequate and that
the City shall, in the event of any such breach, be entitled to seek equitable relief (including without
limitation preliminary and permanent injunctive relief and specific performance) in addition to all
other remedies provided hereunder or available at law.
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
5' 1"
9' 6"
9' 6" 12' 2"
3' 2"
3' 4"
9' 6"
9' 10"
3' 3"
3' 6"
2' 1"
2' 1"
6' 9"
6' 9"
15' 2"
15'
10' 1"
10' 9"
14' 10"
15' 2"
7' 3"
7' 4"
4'
3' 8"
3' 3"
4' 2"
3' 8"
11' 7"
11' 5"
5' 4"
5'
5' 4"
5'
10' 8"
10' 6"
3'
3' 4"
6"
6' 6"
3' 3"
3' 5"
15' 1"
8' 4"
8' 5"
15' 6"
3' 3"
17' 1"
16' 11"
8' 7"
17' 4"
8' 3"
3' 9"
2' 1" 10' 1"
6' 4"
12' 2"
5' 10"
5' 10"
2' 8"
6' 8"
6' 10"
13' 2"
3' 9"
17' 7"
7' 7"
7' 1"
2' 5"
2' 7"
11' 11"
12' 2"
10' 11"
10' 7"
11'
11' 4"
15' 5"
15' 3"
15' 9"
13' 2"
19'
18' 10"
1' 6"
4' 4"
4' 4"
8"
12' 6"
12' 10"
3' 10"
10' 8"
10' 4"
3' 11"
4' 1"
10' 5"
4'
4' 2"
21' 6"
21' 8"
19' 3"
52' 11"
8' 7"
6' 3" 9' 3"
10' 9"
2"
12' 11"
6' 7"
12' 7"
12' 5"
3' 11"
8' 2' 5"
8' 6"
14' 6"
14'
10' 9"
14'
13' 10" 10' 8"
10' 5"
10' 8"
9' 7"
9' 5"
53' 4"
53' 10"
35' 2"
35' 8"
11' 1"
11' 5"
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
53' 4"
53' 10"
11'
11' 4"
3' 5"
14' 6"
14'
9' 5"
10' 8"
10' 9"
10' 5"
14'
8' 13' 10"
35' 2"
35' 8"
Unaffected area Height: 8'
1,416.56 SF Walls
2,583.61 SF Walls & Ceiling
129.67 SY Flooring
177.07 LF Ceil. Perimeter
1,167.06 SF Ceiling
1,167.06 SF Floor
177.07 LF Floor Perimeter
Torreys Peak Storage
Hallway 4 (1)
Laurie Klith
Closet (2) Longs Peak
Pikes Peak
n
y 5 (6)
(7)
Greys Peak
UA1 (1)
11' 5"
11' 1"
11' 5"
11' 11"
12' 2"
2' 6"
2' 8" 8' 5"
8' 5"
Subroom: UA1 (1) Height: 8'
364.36 SF Walls
493.84 SF Walls & Ceiling
14.39 SY Flooring
45.54 LF Ceil. Perimeter
129.48 SF Ceiling
129.48 SF Floor
45.54 LF Floor Perimeter
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
x 4'
Install Fluorescent light fixture 6.00 EA 0.00 45.26 0.00 54.32 325.88
Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04
24"
Smoke detector 1.00 EA 0.00 50.61 0.00 10.12 60.73
Final cleaning - construction - 298.70 SF 0.00 0.22 0.00 13.14 78.85
Commercial
Totals: Office 3 0.00 840.84 5,045.04
om
set
Torreys Peak Storage
try
Break Room
m
Hallway 4 (1)
Closet (4)
Laurie Klith
Hallway
File Closet (3) File Closet (2) Longs Peak
Pikes Peak
Hallway 2 (5)
Colleen Lyon
Hallway 5 (6)
n Office
Hallway4 (8)
Hallway 3 (7)
ice
Greys Peak
Office2
e Room
Bierstadt
Elbert
Storage Area/Room (9)
Office
Office4
Office 3
Unaffected area
UA1 (1)
10' 9"
10' 5"
7' 3" 2' 6"
7' 5"
7"
9"
10' 8"
10' 8"
10' 4"
Office4 Height: 8'
331.92 SF Walls
439.51 SF Walls & Ceiling
11.95 SY Flooring
41.49 LF Ceil. Perimeter
107.59 SF Ceiling
107.59 SF Floor
41.49 LF Floor Perimeter
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
Drywall Installer / Finisher - per hour 4.00 HR 0.00 75.01 0.00 60.00 360.04
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
Cove base molding - rubber or vinyl, 4" 40.84 LF 0.00 1.72 0.00 14.04 84.28
high
Totals: S. Office 0.00 227.60 1,365.67
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
Entry
Break Room
M. Bathroom
Hallway 4 (1)
Closet (4)
Laurie Klith
Hallway
File Closet (3) File Closet (2) Longs Peak
Pikes Peak
Hallway 2 (5)
Colleen Lyon
Hallway 5 (6)
Check-In Office
Hallway4 (8)
Hallway 3 (7)
Office
Greys Peak
Office2
File Room
Mount Bierstadt
Mount Elbert
Storage Area/Room (9)
S. Office
Office4
Office 3
Unaffected area
UA1 (1)
12' 5"
1' 10" 2' 6"1' 11"
12' 7"
6' 3"
6' 7"
File Room Height: 8'
298.73 SF Walls
376.36 SF Walls & Ceiling
8.63 SY Flooring
37.34 LF Ceil. Perimeter
77.63 SF Ceiling
77.63 SF Floor
37.34 LF Floor Perimeter
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
1/2" - drywall per LF - up to 2' tall 37.34 LF 0.00 7.93 0.00 59.22 355.33
Texture drywall - heavy hand texture 112.02 SF 0.00 0.80 0.00 17.92 107.54
Seal/prime then paint the surface area 112.02 SF 0.00 0.90 0.00 20.16 120.98
(2 coats)
Paint the walls - one coat 298.73 SF 0.00 0.62 0.00 37.04 222.25
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
1/2" - drywall per LF - up to 2' tall 44.50 LF 0.00 7.93 0.00 70.58 423.47
Texture drywall - heavy hand texture 133.50 SF 0.00 0.80 0.00 21.36 128.16
Seal/prime then paint the surface area 133.50 SF 0.00 0.90 0.00 24.04 144.19
(2 coats)
Paint the walls - one coat 474.66 SF 0.00 0.62 0.00 58.86 353.15
Floor prep (scrape rubber back residue) 200.51 SF 0.00 0.44 0.00 17.64 105.86
Glue down carpet - High grade 276.75 SF 0.00 3.08 0.00 170.48 1,022.87
Cove base molding - rubber or vinyl, 4" 59.33 LF 0.00 1.72 0.00 20.42 122.47
high
Suspended ceiling grid - High grade - 2' 200.51 SF 0.00 1.56 0.00 62.56 375.36
x 4'
Suspended ceiling tile - High grade - 2' 200.51 SF 0.00 1.99 0.00 79.80 478.81
x 4'
Install Fluorescent light fixture 3.00 EA 0.00 45.26 0.00 27.16 162.94
Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04
24"
Final cleaning - construction - 200.51 SF 0.00 0.22 0.00 8.82 52.93
Commercial
Totals: Mount Elbert 0.00 569.56 3,417.25
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
207.21 SF Floor
62.29 LF Floor Perimeter
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
1/2" - drywall per LF - up to 2' tall 46.72 LF 0.00 7.93 0.00 74.10 444.59
Texture drywall - heavy hand texture 140.16 SF 0.00 0.80 0.00 22.42 134.55
Seal/prime then paint the surface area 140.16 SF 0.00 0.90 0.00 25.22 151.36
(2 coats)
Paint the walls - one coat 498.31 SF 0.00 0.62 0.00 61.80 370.75
Floor prep (scrape rubber back residue) 207.21 SF 0.00 0.44 0.00 18.24 109.41
Glue down carpet - High grade 288.33 SF 0.00 3.08 0.00 177.62 1,065.68
Cove base molding - rubber or vinyl, 4" 62.29 LF 0.00 1.72 0.00 21.42 128.56
high
Suspended ceiling grid - High grade - 2' 207.21 SF 0.00 1.56 0.00 64.66 387.91
x 4'
Suspended ceiling tile - High grade - 2' 207.21 SF 0.00 1.99 0.00 82.48 494.83
x 4'
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
x 4'
Suspended ceiling tile - High grade - 2' 183.14 SF 0.00 1.99 0.00 72.90 437.35
x 4'
Install Fluorescent light fixture 4.00 EA 0.00 45.26 0.00 36.20 217.24
Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04
24"
Final cleaning - construction - 183.14 SF 0.00 0.22 0.00 8.06 48.35
Commercial
Totals: Office 0.00 542.18 3,253.01
Bathroom
tor Closet
Torreys Peak Storage
Entry
Break Room
Bathroom
Hallway 4 (1)
Closet (4)
Laurie Klith
Hallway
File Closet File (3) Closet (2) Longs Peak
Pikes Peak
Hallway 2 (5)
Colleen Lyon
Hallway 5 (6)
heck-In Office
Hallway4 (8)
Hallway 3 (7)
Office
Greys Peak
Office2
Mount Bierstadt
Mount Elbert
Storage Area/Room (9)
Office4
Office 3
Unaffected area
UA1 (1)
13' 2"
13' 6"
2' 6" 12' 4"
9" 12' 6"
13' 2"
15' 5"
15' 3" Office2 Height: 8'
454.30 SF Walls
654.75 SF Walls & Ceiling
22.27 SY Flooring
56.79 LF Ceil. Perimeter
200.45 SF Ceiling
200.45 SF Floor
56.79 LF Floor Perimeter
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
1/2" - drywall per LF - up to 2' tall 56.79 LF 0.00 7.93 0.00 90.06 540.40
Texture drywall - heavy hand texture 170.36 SF 0.00 0.80 0.00 27.26 163.55
Seal/prime then paint the surface area 170.36 SF 0.00 0.90 0.00 30.66 183.98
(2 coats)
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
157.11 SF Floor
51.00 LF Floor Perimeter
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
1/2" - drywall per LF - up to 2' tall 38.25 LF 0.00 7.93 0.00 60.66 363.98
1/2" drywall - hung, taped, ready for 10.00 SF 0.00 1.79 0.00 3.58 21.48
texture
Texture drywall - heavy hand texture 129.75 SF 0.00 0.80 0.00 20.76 124.56
Seal/prime then paint the surface area 129.75 SF 0.00 0.90 0.00 23.36 140.14
(2 coats)
Paint the walls - one coat 407.99 SF 0.00 0.62 0.00 50.60 303.55
Floor prep (scrape rubber back residue) 157.11 SF 0.00 0.44 0.00 13.82 82.95
Glue down carpet - High grade 233.25 SF 0.00 3.08 0.00 143.68 862.09
Cove base molding - rubber or vinyl, 4" 51.00 LF 0.00 1.72 0.00 17.54 105.26
high
Suspended ceiling grid - High grade - 2' 157.11 SF 0.00 1.56 0.00 49.02 294.11
x 4'
Suspended ceiling tile - High grade - 2' 157.11 SF 0.00 1.99 0.00 62.54 375.19
x 4'
Install Fluorescent light fixture 2.00 EA 0.00 45.26 0.00 18.10 108.62
Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04
24"
Final cleaning - construction - 157.11 SF 0.00 0.22 0.00 6.92 41.48
Commercial
Totals: Check-In Office 0.00 478.42 2,870.45
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
8' 11"
12' 2"
3' 5"
3' 5"
5' 2"
5' Colleen Lyon Height: 8'
331.99 SF Walls
436.42 SF Walls & Ceiling
11.60 SY Flooring
41.50 LF Ceil. Perimeter
104.43 SF Ceiling
104.43 SF Floor
41.50 LF Floor Perimeter
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
1/2" - drywall per LF - up to 2' tall 41.50 LF 0.00 7.93 0.00 65.82 394.92
Texture drywall - heavy hand texture 124.50 SF 0.00 0.80 0.00 19.92 119.52
Seal/prime then paint the surface area 124.50 SF 0.00 0.90 0.00 22.42 134.47
(2 coats)
Paint the walls - one coat 331.99 SF 0.00 0.62 0.00 41.16 246.99
Floor prep (scrape rubber back residue) 104.43 SF 0.00 0.44 0.00 9.20 55.15
Cove base molding - rubber or vinyl, 4" 41.50 LF 0.00 1.72 0.00 14.28 85.66
high
Glue down carpet - High grade 181.50 SF 0.00 3.08 0.00 111.80 670.82
Suspended ceiling grid - High grade - 2' 104.43 SF 0.00 1.56 0.00 32.58 195.49
x 4'
Suspended ceiling tile - High grade - 2' 104.43 SF 0.00 1.99 0.00 41.56 249.38
x 4'
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
Pikes Peak
Hallway 2 (5)
Colleen Lyon
Hallway 5 (6)
ce
Hallway 3 (7)
Greys Peak
Office2
t
Storage Area/Room (9)
Office4
Office 3
UA1 (1)
8' 5"
8' 3"
12' 2"
1' 9"
3'
3' 4"
3' 4" 2' 6"
8' 5" 7' 1"
15' 6"
Pikes Peak Height: 8'
380.62 SF Walls
503.25 SF Walls & Ceiling
13.63 SY Flooring
47.58 LF Ceil. Perimeter
122.64 SF Ceiling
122.64 SF Floor
47.58 LF Floor Perimeter
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
1/2" - drywall per LF - up to 2' tall 47.58 LF 0.00 7.93 0.00 75.46 452.77
Texture drywall - heavy hand texture 142.73 SF 0.00 0.80 0.00 22.84 137.02
Seal/prime then paint the surface area 142.73 SF 0.00 0.90 0.00 25.70 154.16
(2 coats)
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
Closet (4)
Laurie Klith
Hallway
File Closet (3) File Closet (2) Longs Peak
Pikes Peak
Hallway 2 (5)
Colleen Lyon
Hallway 5 (6)
Hallway 3 (7)
Greys Peak
Office2
Storage Area/Room (9)
Office4
Office 3
UA1 (1)
2' 5"
3' 11"
3' 9"
2' 1"
1' 11"
2' 6"
2"
6" 1' 1"
Subroom: Storage Area/Room (9) Height: 8'
90.86 SF Walls
98.09 SF Walls & Ceiling
0.80 SY Flooring
11.36 LF Ceil. Perimeter
7.23 SF Ceiling
7.23 SF Floor
11.36 LF Floor Perimeter
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
1/2" - drywall per LF - up to 2' tall 383.27 LF 0.00 7.93 0.00 607.86 3,647.19
1/2" drywall - hung, taped, ready for 40.00 SF 0.00 1.79 0.00 14.32 85.92
texture
Texture drywall - heavy hand texture 1,209.81 SF 0.00 0.80 0.00 193.58 1,161.43
Seal/prime then paint the surface area 303.51 SF 0.00 0.90 0.00 54.64 327.80
(2 coats)
Paint the walls - one coat 3,121.93 SF 0.00 0.62 0.00 387.12 2,322.72
Floor prep (scrape rubber back residue) 650.92 SF 0.00 0.44 0.00 57.28 343.68
Glue down carpet - High grade 892.75 SF 0.00 3.08 0.00 549.94 3,299.61
Cove base molding - rubber or vinyl, 4" 383.27 LF 0.00 1.72 0.00 131.84 791.06
high
Suspended ceiling grid - High grade - 2' 650.92 SF 0.00 1.56 0.00 203.08 1,218.52
x 4'
Suspended ceiling tile - High grade - 2' 650.92 SF 0.00 1.99 0.00 259.06 1,554.39
x 4'
Install Fluorescent light fixture 7.00 EA 0.00 45.26 0.00 63.36 380.18
Install Exit sign - wired in 6.00 EA 0.00 45.26 0.00 54.32 325.88
Install Recessed light fixture 3.00 EA 0.00 79.39 0.00 47.64 285.81
Bypass (sliding) door set - Colonist 2.00 EA 0.00 157.26 0.00 62.90 377.42
Final cleaning - construction - 650.92 SF 0.00 0.22 0.00 28.64 171.84
Commercial
Totals: Hallway 0.00 2,715.58 16,293.45
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
Greys Peak
Office2
File Room
Mount Bierstadt
Mount Elbert
Storage Area/Room (9)
S. Office
Office4
Office 3
Unaffected area
6" 2' 6" 1' 1" UA1 (1)
1' 11"
2' 5"
2' 6"
2' 8"
7"
6"
2' 6"
2'
1' 10"
3' 4"
3' 6"
11" 4' 9" 1' 8"
8" 2' 6" 5"
3"
Subroom: Hallway 2 (5) Height: 8'
219.01 SF Walls
259.36 SF Walls & Ceiling
4.48 SY Flooring
31.33 LF Ceil. Perimeter
40.36 SF Ceiling
40.36 SF Floor
26.58 LF Floor Perimeter
Missing Wall - Goes to Floor 4' 9" X 6' 8" Opens into HALLWAY
Bathroom
itor Closet
Torreys Peak Storage
Entry
Break Room
Bathroom
Hallway 4 (1)
Closet (4)
Laurie Klith
Hallway
File Closet File (3) Closet (2) Longs Peak
Pikes Peak
Hallway 2 (5)
Colleen Lyon
Hallway 5 (6)
heck-In Office
Hallway4 (8)
Hallway 3 (7)
Office
Office2 Greys Peak
File Room
Mount Bierstadt
Mount Elbert
Storage Area/Room (9)
S. Office
Office4
Office 3
Unaffected area
UA1 (1)
15' 5"
15' 3"
5' 10"
5' 10"
2' 8"
8' 7" 8' 3"
3' 11" 17' 4"
3' 9"
Subroom: Hallway 5 (6) Height: 8'
380.43 SF Walls
433.40 SF Walls & Ceiling
5.89 SY Flooring
47.55 LF Ceil. Perimeter
52.97 SF Ceiling
52.97 SF Floor
47.55 LF Floor Perimeter
W. Bathroom
Janitor Closet
Torreys Peak Storage
Entry
Break Room
M. Bathroom
Hallway 4 (1)
Closet (4)
Laurie Klith
Hallway
File Closet File Closet (3) (2)Longs Peak
Pikes Peak
Hallway 2 (5)
Colleen Lyon
Hallway 5 (6)
Check-In Office
Hallway4 (8)
Hallway 3 (7)
Office
Office2 Greys Peak
File Room
Mount Bierstadt
Mount Elbert
Storage Area/Room (9)
S. Office
Office4
Office 3
Unaffected area
UA1 (1)
2' 6"
7' 3"
7' 5"
14'
13' 10"
3' 10"
4' 4"
1' 6"
19'
18' 10"
2' 11"
6" Subroom: Hallway4 (8) Height: 8'
680.14 SF Walls
835.26 SF Walls & Ceiling
17.23 SY Flooring
87.45 LF Ceil. Perimeter
155.11 SF Ceiling
155.11 SF Floor
84.53 LF Floor Perimeter
Missing Wall - Goes to Floor 2' 11" X 6' 8" Opens into HALLWAY_3
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
3' 8"
Hallway Height: 8'
609.52 SF Walls
801.06 SF Walls & Ceiling
21.28 SY Flooring
91.19 LF Ceil. Perimeter
191.54 SF Ceiling
191.54 SF Floor
73.19 LF Floor Perimeter
Torreys Peak Storage
Break Room
Hallway 4 (1)
4)
Laurie Klith
Hallway
File Closet (3) File Closet (2) Longs Peak
Pikes Peak
Colleen Lyon
Hallway 5 (6)
Hallway 3 (7)
Greys Peak
Office2
oom (9)
Office4
Office 3
UA1 (1)
2' 6"
2"
6" 4"
2' 6"
8"
2' 1" 6" 4' 3"
3' 6"
3' 2"
4' 10" 3' 8"
1' 4"
Subroom: Hallway 4 (1) Height: 8'
170.50 SF Walls
200.37 SF Walls & Ceiling
3.32 SY Flooring
25.34 LF Ceil. Perimeter
29.87 SF Ceiling
29.87 SF Floor
20.51 LF Floor Perimeter
Missing Wall - Goes to Floor 4' 10" X 6' 8" Opens into HALLWAY
Torreys Peak Storage
Break Room
Hallway 4 (1)
Closet (4)
Laurie Klith
Hallway
File Closet (3) File Closet (2) Longs Peak
Pikes Peak
Hallway 2 (5)
Colleen Lyon
Hallway 5 (6)
Greys Peak
Office2
Storage Area/Room (9)
UA1 (1)
3' 8"
4'
3'
2' 2" 9"
7"
1' 3"
11"
3' 8"
Subroom: Closet (4) Height: 8'
92.45 SF Walls
103.49 SF Walls & Ceiling
1.23 SY Flooring
13.36 LF Ceil. Perimeter
11.04 SF Ceiling
11.04 SF Floor
11.20 LF Floor Perimeter
Missing Wall - Goes to Floor 2' 2" X 6' 8" Opens into HALLWAY
Torreys Peak Storage
Break Room
Hallway 4 (1)
Closet (4)
Laurie Klith
Hallway
File Closet (3) File Closet (2) Longs Peak
Pikes Peak
2 (5)
Colleen Lyon
Hallway 5 (6)
Storage Area/Room (9)
UA1 (1)
5' 2"
5'
3'
3' 1" 1' 2"
1'
1' 1"
11"
Subroom: File Closet (3) Height: 8'
107.44 SF Walls
122.44 SF Walls & Ceiling
1.67 SY Flooring
16.00 LF Ceil. Perimeter
15.00 SF Ceiling
15.00 SF Floor
12.92 LF Floor Perimeter
Missing Wall - Goes to Floor 3' 1" X 6' 8" Opens into HALLWAY
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
Paint part of the walls - one coat - 2 299.00 SF 0.00 0.74 0.00 44.26 265.52
colors
Floor prep (scrape rubber back residue) 149.57 SF 0.00 0.44 0.00 13.16 78.97
Glue down carpet - High grade 229.08 SF 0.00 3.08 0.00 141.12 846.69
Cove base molding - rubber or vinyl, 4" 49.83 LF 0.00 1.72 0.00 17.14 102.85
high
Final cleaning - construction - 149.57 SF 0.00 0.22 0.00 6.58 39.49
Commercial
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
6' 7"
15' 2"
15'
2' 1"
2' 1"
Break Room Height: 8'
465.89 SF Walls
655.05 SF Walls & Ceiling
21.02 SY Flooring
58.24 LF Ceil. Perimeter
189.17 SF Ceiling
189.17 SF Floor
58.24 LF Floor Perimeter
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
1/2" - drywall per LF - up to 2' tall 58.24 LF 0.00 7.93 0.00 92.36 554.20
Texture drywall - heavy hand texture 174.71 SF 0.00 0.80 0.00 27.96 167.73
Seal/prime then paint the surface area 174.71 SF 0.00 0.90 0.00 31.44 188.68
(2 coats)
Paint the walls - one coat 465.89 SF 0.00 0.62 0.00 57.78 346.63
Floor prep (scrape rubber back residue) 189.17 SF 0.00 0.44 0.00 16.64 99.87
Glue down carpet - High grade 270.75 SF 0.00 3.08 0.00 166.78 1,000.69
Cove base molding - rubber or vinyl, 4" 58.24 LF 0.00 1.72 0.00 20.04 120.21
high
Suspended ceiling grid - High grade - 2' 189.17 SF 0.00 1.56 0.00 59.02 354.13
x 4'
Suspended ceiling tile - High grade - 2' 189.17 SF 0.00 1.99 0.00 75.30 451.75
x 4'
Install Fluorescent light fixture 4.00 EA 0.00 45.26 0.00 36.20 217.24
Install Ceiling diffuser - square, lay-in - 2.00 EA 0.00 39.20 0.00 15.68 94.08
24"
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
Commercial
Totals: Janitor Closet 0.00 189.66 1,137.93
Torreys Peak Storage
Break Room
Hallway 4 (1)
Closet (4)
Laurie Klith
Hallway
File Closet File (3) Closet (2) Longs Peak
Pikes Peak
ay 2 (5)
Colleen Lyon
Hallway 5 (6)
Hallway 3 (7)
Greys Peak
Office2
orage Area/Room (9)
UA1 (1)
2' 6"
8"
4' 3"
8' 11"
11' 10"
2' 11"
2' 6" 4' 6"
7"
5' 3"
5' 1"
6' 9"
6' 9"
Torreys Peak Storage Height: 8'
306.50 SF Walls
393.00 SF Walls & Ceiling
9.61 SY Flooring
38.31 LF Ceil. Perimeter
86.50 SF Ceiling
86.50 SF Floor
38.31 LF Floor Perimeter
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
1/2" - drywall per LF - up to 2' tall 38.31 LF 0.00 7.93 0.00 60.76 364.56
Texture drywall - heavy hand texture 114.94 SF 0.00 0.80 0.00 18.40 110.35
Seal/prime then paint the surface area 114.94 SF 0.00 0.90 0.00 20.70 124.15
(2 coats)
Paint the walls - one coat 306.50 SF 0.00 0.62 0.00 38.00 228.03
Floor prep (scrape rubber back residue) 86.50 SF 0.00 0.44 0.00 7.62 45.68
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
Cove base molding - rubber or vinyl, 4" 25.00 LF 0.00 1.72 0.00 8.60 51.60
high
Install Toilet 1.00 EA 0.00 204.84 0.00 40.96 245.80
Finish Carpenter - per hour 1.00 HR 0.00 77.52 0.00 15.50 93.02
Item is to install the partition
Paper towel dispenser 1.00 EA 0.00 69.14 0.00 13.82 82.96
Final cleaning - construction - 38.37 SF 0.00 0.22 0.00 1.68 10.12
Commercial
Floor preparation for resilient 38.37 SF 0.00 0.45 0.00 3.46 20.73
flooring
Vinyl plank flooring 38.37 SF 0.00 5.36 0.00 41.14 246.80
Totals: M. Bathroom 0.00 250.86 1,505.21
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
290.31 SF Walls & Ceiling
6.03 SY Flooring
29.50 LF Ceil. Perimeter
54.31 SF Ceiling
54.31 SF Floor
29.50 LF Floor Perimeter
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
Paint the walls and ceiling - one coat 290.31 SF 0.00 0.62 0.00 36.00 215.99
Detach & Reset Toilet 1.00 EA 239.08 0.00 0.00 0.00 47.82 286.90
R&R Angle stop valve 1.00 EA 5.00 33.86 0.00 7.78 46.64
R&R Plumbing fixture supply line 1.00 EA 5.00 18.93 0.00 4.78 28.71
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2
2' 11" 6' 5"
6' 7"
9' 6"
9' 6"
2' 6"
13' 2"
12' 10"
7' 1"
7' 5"
1' 11" 1'
3' 6"
Entry Height: 8'
649.35 SF Walls
834.98 SF Walls & Ceiling
20.63 SY Flooring
81.17 LF Ceil. Perimeter
185.63 SF Ceiling
185.63 SF Floor
81.17 LF Floor Perimeter
DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL
DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2