Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9201332Official Purchasing Document Last updated 10/2017 All Phase Restoration Service Agreement Page 1 of 31 SERVICES AGREEMENT THIS AGREEMENT made and entered into the day and year set forth below by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and ALL PHASE RESTORATION, INC, hereinafter referred to as "Service Provider". WITNESSETH: In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows: 1. Scope of Services. The Service Provider agrees to provide services in accordance with the scope of services attached hereto as Exhibit A, consisting of Twenty Three (23) pages and incorporated herein by this reference. Irrespective of references in Exhibit A to certain named third parties, Service Provider shall be solely responsible for performance of all duties hereunder. 2. Time of Commencement and Completion of Services. The services to be performed pursuant to this Agreement shall be initiated within two (2) days following execution of this Agreement. Services shall be completed no later than November 30, 2020. Time is of the essence. Any extensions of the time limit set forth above must be agreed upon in a writing signed by the parties. 3. Contract Period. This Agreement shall commence September 9, 2020, and shall continue in full force and effect until November 30, 2020, unless sooner terminated as herein provided 4. Delay. If either party is prevented in whole or in part from performing its obligations by unforeseeable causes beyond its reasonable control and without its fault or negligence, then the party so prevented shall be excused from whatever performance is prevented by such cause. To the extent that the performance is actually prevented, the Service Provider must provide written notice to the City of such condition within fifteen (15) days from the onset of such condition. 5. Early Termination by City/Notice. Notwithstanding the time periods contained herein, the City may terminate this Agreement at any time without cause by providing written notice of termination to the Service Provider. Such notice shall be delivered at least fifteen (15) days prior to the termination date contained in said notice unless otherwise agreed in writing by the parties. All notices provided under this Agreement shall be effective when mailed, postage prepaid and sent to the following addresses: DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 Official Purchasing Document Last updated 10/2017 All Phase Restoration Service Agreement Page 2 of 31 Service Provider: City: Copy to: All Phase Restoration, Inc Attn: Nate Tenold 7355 Green Ridge Rd. Unit C Windsor, CO 80550 City of Fort Collins Attn: Matt Schaefer PO Box 580 Fort Collins, CO 80522 City of Fort Collins Attn: Purchasing Dept. PO Box 580 Fort Collins, CO 80522 In the event of early termination by the City, the Service Provider shall be paid for services rendered to the date of termination, subject only to the satisfactory performance of the Service Provider's obligations under this Agreement. Such payment shall be the Service Provider's sole right and remedy for such termination. 6. Contract Sum. The City shall pay the Service Provider for the performance of this Contract, subject to additions and deletions provided herein, Ninety Three Thousand Two Hundred Fifty Four Dollars and Thirty Six Cents ($93,254.36) as per the attached Exhibit "A", consisting of Twenty-Three (23) pages, and incorporated herein by this reference. 7. City Representative. The City will designate, prior to commencement of the work, its representative who shall make, within the scope of his or her authority, all necessary and proper decisions with reference to the services provided under this agreement. All requests concerning this agreement shall be directed to the City Representative. 8. Independent Service provider. The services to be performed by Service Provider are those of an independent service provider and not of an employee of the City of Fort Collins. The City shall not be responsible for withholding any portion of Service Provider's compensation hereunder for the payment of FICA, Workmen's Compensation or other taxes or benefits or for any other purpose. 9. Subcontractors. Service Provider may not subcontract any of the Work set forth in the Exhibit A, Statement of Work without the prior written consent of the city, which shall not be unreasonably withheld. If any of the Work is subcontracted hereunder (with the consent of the City), then the following provisions shall apply: (a) the subcontractor must be a reputable, qualified firm with an established record of successful performance in its respective trade performing identical or substantially similar work, (b) the subcontractor will be required to comply with all applicable terms of this Agreement, (c) the subcontract will not create any contractual relationship between any such subcontractor and the City, nor will it obligate the City to pay or see to the payment of any subcontractor, and (d) the work of the subcontractor will be subject to inspection by the City to the same extent as the work of the Service Provider. 10. Personal Services. It is understood that the City enters into the Agreement based on the special abilities of the Service Provider and that this Agreement shall be considered as an agreement for personal services. Accordingly, the Service Provider shall neither assign any responsibilities nor delegate any duties arising under the Agreement without the prior written consent of the City. 11. Acceptance Not Waiver. The City's approval or acceptance of, or payment for any of the DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 Official Purchasing Document Last updated 10/2017 All Phase Restoration Service Agreement Page 3 of 31 services shall not be construed to operate as a waiver of any rights or benefits provided to the City under this Agreement or cause of action arising out of performance of this Agreement. 12. Warranty. a. Service Provider warrants that all work performed hereunder shall be performed with the highest degree of competence and care in accordance with accepted standards for work of a similar nature. b. Unless otherwise provided in the Agreement, all materials and equipment incorporated into any work shall be new and, where not specified, of the most suitable grade of their respective kinds for their intended use, and all workmanship shall be acceptable to City. c. Service Provider warrants all equipment, materials, labor and other work, provided under this Agreement, except City-furnished materials, equipment and labor, against defects and nonconformances in design, materials and workmanship/workwomanship for a period beginning with the start of the work and ending twelve (12) months from and after final acceptance under the Agreement, regardless whether the same were furnished or performed by Service Provider or by any of its subcontractors of any tier. Upon receipt of written notice from City of any such defect or nonconformances, the affected item or part thereof shall be redesigned, repaired or replaced by Service Provider in a manner and at a time acceptable to City. 13. Default. Each and every term and condition hereof shall be deemed to be a material element of this Agreement. In the event either party should fail or refuse to perform according to the terms of this agreement, such party may be declared in default thereof. 14. Remedies. In the event a party has been declared in default, such defaulting party shall be allowed a period of ten (10) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to (a) terminate the Agreement and seek damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail himself of any other remedy at law or equity. If the non-defaulting party commences legal or equitable actions against the defaulting party, the defaulting party shall be liable to the non-defaulting party for the non-defaulting party's reasonable attorney fees and costs incurred because of the default. 15. Binding Effect. This writing, together with the exhibits hereto, constitutes the entire agreement between the parties and shall be binding upon said parties, their officers, employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. 16. Indemnity/Insurance. a. The Service Provider agrees to indemnify and save harmless the City, its officers, agents and employees against and from any and all actions, suits, claims, demands or liability of any character whatsoever brought or asserted for injuries to or death of any person DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 Official Purchasing Document Last updated 10/2017 All Phase Restoration Service Agreement Page 4 of 31 or persons, or damages to property arising out of, result from or occurring in connection with the performance of any service hereunder. b. The Service Provider shall take all necessary precautions in performing the work hereunder to prevent injury to persons and property. c. Without limiting any of the Service Provider's obligations hereunder, the Service Provider shall provide and maintain insurance coverage naming the City as an additional insured under this Agreement of the type and with the limits specified within Exhibit B, consisting of one (1) page, attached hereto and incorporated herein by this reference. The Service Provider before commencing services hereunder, shall deliver to the City's Purchasing Director, P. O. Box 580, Fort Collins, Colorado 80522, one copy of a certificate evidencing the insurance coverage required from an insurance company acceptable to the City. 17. Entire Agreement. This Agreement, along with all Exhibits and other documents incorporated herein, shall constitute the entire Agreement of the parties. Covenants or representations not contained in this Agreement shall not be binding on the parties. 18. Law/Severability. The laws of the State of Colorado shall govern the construction interpretation, execution and enforcement of this Agreement. In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such holding shall not invalidate or render unenforceable any other provision of this Agreement. 19. Prohibition Against Employing Illegal Aliens. Pursuant to Section 8-17.5-101, C.R.S., et. seq., Service Provider represents and agrees that: a. As of the date of this Agreement: 1. Service Provider does not knowingly employ or contract with an illegal alien who will perform work under this Agreement; and 2. Service Provider will participate in either the e-Verify program created in Public Law 208, 104th Congress, as amended, and expanded in Public Law 156, 108th Congress, as amended, administered by the United States Department of Homeland Security (the “e-Verify Program”) or the Department Program (the “Department Program”), an employment verification program established pursuant to Section 8- 17.5-102(5)(c) C.R.S. in order to confirm the employment eligibility of all newly hired employees to perform work under this Agreement. b. Service Provider shall not knowingly employ or contract with an illegal alien to perform work under this Agreement or knowingly enter into a contract with a subcontractor that knowingly employs or contracts with an illegal alien to perform work under this Agreement. c. Service Provider is prohibited from using the e-Verify Program or Department Program procedures to undertake pre-employment screening of job applicants while this Agreement is being performed. DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 Official Purchasing Document Last updated 10/2017 All Phase Restoration Service Agreement Page 5 of 31 d. If Service Provider obtains actual knowledge that a subcontractor performing work under this Agreement knowingly employs or contracts with an illegal alien, Service Provider shall: 1. Notify such subcontractor and the City within three days that Service Provider has actual knowledge that the subcontractor is employing or contracting with an illegal alien; and 2. Terminate the subcontract with the subcontractor if within three days of receiving the notice required pursuant to this section the subcontractor does not cease employing or contracting with the illegal alien; except that Service Provider shall not terminate the contract with the subcontractor if during such three days the subcontractor provides information to establish that the subcontractor has not knowingly employed or contracted with an illegal alien. e. Service Provider shall comply with any reasonable request by the Colorado Department of Labor and Employment (the “Department”) made in the course of an investigation that the Department undertakes or is undertaking pursuant to the authority established in Subsection 8-17.5-102 (5), C.R.S. f. If Service Provider violates any provision of this Agreement pertaining to the duties imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If this Agreement is so terminated, Service Provider shall be liable for actual and consequential damages to the City arising out of Service Provider’s violation of Subsection 8-17.5-102, C.R.S. g. The City will notify the Office of the Secretary of State if Service Provider violates this provision of this Agreement and the City terminates the Agreement for such breach. 20. Special Provisions. Special provisions or conditions relating to the services to be performed pursuant to this Agreement are set forth in Exhibit C - Confidentiality, consisting of one (1) page, attached hereto and incorporated herein by this reference. DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 Official Purchasing Document Last updated 10/2017 All Phase Restoration Service Agreement Page 6 of 31 THE CITY OF FORT COLLINS, COLORADO By: Gerry Paul Purchasing Director DATE: ATTEST: APPROVED AS TO FORM: ALL PHASE RESTORATION, INC. By: Printed: Title: CORPORATE PRESIDENT OR VICE PRESIDENT Date: DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 9/14/2020 Estimator Nate Tenold Assistant City Attorney ll 9/14/2020 City Clerk 1 All Phase Restoration 7355 Green Ridge Rd Unit C Windsor CO 80550 www,aprestoration.com Client: City of Fort Collins 212 Atten: Matt Home: (646) 761-4031 Property: 212 W Mountian Fort Collins , CO Operator: MGARCIA Estimator: Nate Tenold Business: (970) 381-1978 Business: 7355 Greenridge Rd Suite C Windsor , CO 80550 Type of Estimate: Water Damage Date Entered: 5/19/2020 Date Assigned: Price List: COFC8X_DEC19 Labor Efficiency: Restoration/Service/Remodel Estimate: 2020-05-19-1353-1--3 This estimate is based off putting the property back to pre loss condition. It the City requires a permit and items need to be brought up to code, we would generate a supplement as needed. If the bid is accepted, I would want to complete a walk through with Matt or others with the City of Fort Collins to ensure the estimate is accurate for the work they are expecting. If damages are found during the duration of the repairs that need to be replaced, I would generate a supplement as needed. Exhibit A Scope of Service DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 2 All Phase Restoration 7355 Green Ridge Rd Unit C Windsor CO 80550 www,aprestoration.com 2020-05-19-1353-1--3 9/4/2020 Page: 2 2020-05-19-1353-1--3 General DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Taxes, insurance, permits & fees (Bid 1.00 EA 0.00 0.00 0.00 0.00 0.00 Item) Dumpster load - Approx. 30 yards, 5-7 1.00 EA 550.00 0.00 0.00 110.00 660.00 tons of debris Item is to haul of the miscellaneous debris and waste Finish Carpenter - per hour 8.00 HR 0.00 77.52 0.00 124.04 744.20 Item is to detach and reset trim in order to complete the necessary drywall repairs with wood trims Commercial Supervision / Project 24.00 HR 0.00 65.54 0.00 314.60 1,887.56 Management - per hour Electrician - per hour 24.00 HR 0.00 94.96 0.00 455.80 2,734.84 Item is to inspect all electrical wiring and install outlets as needed. Based on the last walk through, additional labor of 8 hours has been made due to the damaged conduits throughout.. HVAC Technician - per hour 12.00 HR 0.00 98.00 0.00 235.20 1,411.20 Item is to inspect and/or replace the ducting R&R Steel door, 3' x 7' 6.00 EA 15.01 280.13 0.00 354.18 2,125.02 Paint door slab only - 2 coats (per side) 12.00 EA 0.00 34.88 0.00 83.72 502.28 Paint door or window opening - 2 coats 12.00 EA 0.00 29.44 0.00 70.66 423.94 (per side) Door knob - interior 6.00 EA 0.00 43.67 0.00 52.40 314.42 Insulation Installer - per hour 6.00 HR 0.00 65.00 0.00 78.00 468.00 Material Only Batt insulation - 4" - 250.00 SF 0.00 0.45 0.00 22.50 135.00 R13 - unfaced batt Cleaning Technician - per hour 8.00 HR 0.00 47.26 0.00 75.62 453.70 Item is to clean the existing carpet that will not be replace Totals: General 0.00 1,976.72 11,860.16 Main Level W. Bathroom Janitor Closet Torreys Peak Storage Entry Break Room M. Bathroom Hallway 4 (1) Closet (4) Laurie Klith Hallway File Closet File Closet (3) (2) Longs Peak Pikes Peak Hallway 2 (5) Colleen Lyon Hallway 5 (6) Check-In Office Hallway 3 (7) Office Office2 Greys Peak Mount Elbert Storage Area/Room (9) Office 3 UA1 (1) 2' 8" 3' 6" 3' 2" 3 All Phase Restoration 7355 Green Ridge Rd Unit C Windsor CO 80550 www,aprestoration.com 2020-05-19-1353-1--3 9/4/2020 Page: 3 CONTINUED - Entry DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 1/2" - drywall per LF - up to 2' tall 81.17 LF 0.00 7.93 0.00 128.74 772.42 1/2" drywall - hung, taped, ready for 40.00 SF 0.00 1.79 0.00 14.32 85.92 texture Texture drywall - heavy hand texture 303.51 SF 0.00 0.80 0.00 48.56 291.37 Seal/prime then paint the surface area 303.51 SF 0.00 0.90 0.00 54.64 327.80 (2 coats) Paint part of the walls - one coat - 2 544.02 SF 0.00 0.74 0.00 80.52 483.09 colors Floor prep (scrape rubber back residue) 185.63 SF 0.00 0.44 0.00 16.34 98.02 Glue down carpet - High grade 273.08 SF 0.00 3.08 0.00 168.22 1,009.31 Cove base molding - rubber or vinyl, 4" 81.17 LF 0.00 1.72 0.00 27.92 167.53 high Suspended ceiling grid - High grade - 2' 185.63 SF 0.00 1.56 0.00 57.92 347.50 x 4' Suspended ceiling tile - High grade - 2' 185.63 SF 0.00 1.99 0.00 73.88 443.28 x 4' Install Fluorescent light fixture 2.00 EA 0.00 45.26 0.00 18.10 108.62 Install Exit sign - wired in 2.00 EA 0.00 45.26 0.00 18.10 108.62 Install Recessed light fixture 3.00 EA 0.00 79.39 0.00 47.64 285.81 Sheathing - plywood - 1/2" CDX 32.00 SF 0.00 1.74 0.00 11.14 66.82 Item is to build a false door to the North office area Final cleaning - construction - 185.63 SF 0.00 0.22 0.00 8.16 49.00 Commercial Totals: Entry 0.00 774.20 4,645.11 W. Bathroom Janitor Closet Torreys Peak Storage Entry Break Room M. Bathroom Hallway 4 (1) Closet (4) Laurie Klith Hallway File Closet (3) File Closet (2) Longs Peak Pikes Peak Hallway 2 (5) Colleen Lyon Check-In Office Storage Area/Room (9) UA1 (1) 7' 8" 8' 7' 1" 7' 5" 2' 6" 1' 1" 1' 3" 4' 1" 4' 5" W. Bathroom Height: 8' 236.00 SF Walls 4 All Phase Restoration 7355 Green Ridge Rd Unit C Windsor CO 80550 www,aprestoration.com 2020-05-19-1353-1--3 9/4/2020 Page: 4 CONTINUED - W. Bathroom DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Floor preparation for resilient 54.31 SF 0.00 0.45 0.00 4.88 29.32 flooring Vinyl plank flooring 54.31 SF 0.00 5.36 0.00 58.22 349.32 R&R Cove base molding - rubber or 29.50 LF 0.29 1.72 0.00 11.86 71.16 vinyl, 4" high Totals: W. Bathroom 0.00 171.34 1,028.04 W. Bathroom Janitor Closet Torreys Peak Storage Entry Break Room M. Bathroom Hallway 4 (1) Closet (4) Laurie Klith Hallway File Closet (3) File Closet (2) Longs Peak Pikes Peak Hallway 2 (5) Colleen Lyon Hallway 5 (6) Check-In Office Hallway 3 (7) Office Greys Peak Office2 Storage Area/Room (9) UA1 (1) 5' 9" 5' 5" 7' 1" 2' 6" 1' 1' 2" 1' 11" 2' 1" M. Bathroom Height: 8' 200.00 SF Walls 238.37 SF Walls & Ceiling 4.26 SY Flooring 25.00 LF Ceil. Perimeter 38.37 SF Ceiling 38.37 SF Floor 25.00 LF Floor Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 1/2" - drywall per LF - up to 2' tall 25.00 LF 0.00 7.93 0.00 39.66 237.91 Drywall patch / small repair, ready for 2.00 EA 0.00 61.17 0.00 24.46 146.80 paint Texture drywall - heavy hand texture 94.18 SF 0.00 0.80 0.00 15.06 90.40 Seal/prime then paint the surface area 94.18 SF 0.00 0.90 0.00 16.96 101.72 (2 coats) Paint the walls and ceiling - one coat 238.37 SF 0.00 0.62 0.00 29.56 177.35 5 All Phase Restoration 7355 Green Ridge Rd Unit C Windsor CO 80550 www,aprestoration.com 2020-05-19-1353-1--3 9/4/2020 Page: 5 W. Bathroom Janitor Closet Torreys Peak Storage Entry Break Room M. Bathroom Hallway 4 (1) Closet (4) Laurie Klith Hallway File Closet (3) File Closet (2) Longs Peak Pikes Peak Hallway 2 (5) Colleen Lyon Hallway 5 (6) Check-In Office Hallway 3 (7) Office Greys Peak Office2 Mount Elbert Storage Area/Room (9) Office 3 UA1 (1) 7' 7" 7' 1" 2' 6" 5" 4" 6" 3' 9" 3' 3" Janitor Closet Height: 8' 165.47 SF Walls 188.56 SF Walls & Ceiling 2.56 SY Flooring 20.68 LF Ceil. Perimeter 23.08 SF Ceiling 23.08 SF Floor 20.68 LF Floor Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 1/2" - drywall per LF - up to 2' tall 20.68 LF 0.00 7.93 0.00 32.80 196.79 Texture drywall - heavy hand texture 62.05 SF 0.00 0.80 0.00 9.92 59.56 Seal/prime then paint the surface area 62.05 SF 0.00 0.90 0.00 11.18 67.03 (2 coats) Paint the walls and ceiling - one coat 188.56 SF 0.00 0.62 0.00 23.38 140.29 Cove base molding - rubber or vinyl, 4" 20.68 LF 0.00 1.72 0.00 7.12 42.69 high Floor preparation for resilient flooring 23.08 SF 0.00 0.45 0.00 2.08 12.47 Vinyl floor covering (sheet goods) - 42.08 SF 0.00 3.91 0.00 32.90 197.43 High grade Install Laundry tub 1.00 EA 0.00 220.73 0.00 44.14 264.87 R&R Angle stop valve 2.00 EA 5.00 33.86 0.00 15.54 93.26 R&R Plumbing fixture supply line 2.00 EA 5.00 18.93 0.00 9.58 57.44 Final cleaning - construction - 23.08 SF 0.00 0.22 0.00 1.02 6.10 6 All Phase Restoration 7355 Green Ridge Rd Unit C Windsor CO 80550 www,aprestoration.com 2020-05-19-1353-1--3 9/4/2020 Page: 6 CONTINUED - Torreys Peak Storage DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Glue down carpet - High grade 161.00 SF 0.00 3.08 0.00 99.18 595.06 Cove base molding - rubber or vinyl, 4" 38.31 LF 0.00 1.72 0.00 13.18 79.07 high Suspended ceiling grid - High grade - 2' 86.50 SF 0.00 1.56 0.00 26.98 161.92 x 4' Suspended ceiling tile - High grade - 2' 86.50 SF 0.00 1.99 0.00 34.42 206.56 x 4' Install Fluorescent light fixture 2.00 EA 0.00 45.26 0.00 18.10 108.62 Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04 24" Smoke detector 1.00 EA 0.00 50.61 0.00 10.12 60.73 Final cleaning - construction - 86.50 SF 0.00 0.22 0.00 3.80 22.83 Commercial Totals: Torreys Peak Storage 0.00 359.10 2,154.60 W. Bathroom Janitor Closet Torreys Peak Storage Entry Break Room M. Bathroom Hallway 4 (1) Closet (4) Laurie Klith Hallway File Closet File (3) Closet (2) Longs Peak Pikes Peak Hallway 2 (5) Colleen Lyon Hallway 5 (6) Check-In Office Hallway4 (8) Hallway 3 (7) Office Greys Peak Office2 Mount Bierstadt Mount Elbert Storage Area/Room (9) Office4 Office 3 UA1 (1) 8' 11" 9' 1" 5' 4" 5' 2' 11" 2' 11" 12' 3" 11' 11" 2' 11" 2' 6" 3' 1" 6' 5" 7 All Phase Restoration 7355 Green Ridge Rd Unit C Windsor CO 80550 www,aprestoration.com 2020-05-19-1353-1--3 9/4/2020 Page: 7 CONTINUED - Break Room DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Smoke detector 1.00 EA 0.00 50.61 0.00 10.12 60.73 Cabinetry - lower (base) units - High 8.75 LF 0.00 222.76 0.00 389.84 2,338.99 grade Countertop - flat laid plastic laminate 8.75 LF 0.00 38.92 0.00 68.12 408.67 Install Sink - double 1.00 EA 0.00 114.31 0.00 22.86 137.17 Install Sink faucet - Kitchen 1.00 EA 0.00 76.82 0.00 15.36 92.18 Install Garbage disposer 1.00 EA 0.00 110.37 0.00 22.08 132.45 R&R Angle stop valve 2.00 EA 5.00 33.86 0.00 15.54 93.26 R&R Plumbing fixture supply line 2.00 EA 5.00 18.93 0.00 9.58 57.44 Install Range - freestanding - electric 1.00 EA 0.00 69.46 0.00 13.90 83.36 Install Refrigerator - top freezer - 14 to 1.00 EA 0.00 24.00 0.00 4.80 28.80 18 cf Install Dishwasher 1.00 EA 0.00 128.02 0.00 25.60 153.62 Final cleaning - construction - 189.17 SF 0.00 0.22 0.00 8.32 49.94 Commercial Totals: Break Room 0.00 1,205.32 7,231.82 Torreys Peak Storage Hallway 4 (1) Laurie Klith y Closet (2) Longs Peak Pikes Peak on ay 5 (6) 3 (7) Greys Peak Office 3 UA1 (1) 6' 9" 6' 9" 2' 6" 2" 11' 7" 11' 5" 3' 3" 3' 5" 10' 1" 10' 9" 14' 10" 15' 2" Laurie Klith Height: 8' 398.67 SF Walls 548.24 SF Walls & Ceiling 16.62 SY Flooring 49.83 LF Ceil. Perimeter 149.57 SF Ceiling 149.57 SF Floor 49.83 LF Floor Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 1/2" - drywall per LF - up to 2' tall 24.92 LF 0.00 7.93 0.00 39.52 237.14 Texture drywall - heavy hand texture 74.76 SF 0.00 0.80 0.00 11.96 71.77 Seal/prime then paint the surface area 74.76 SF 0.00 0.90 0.00 13.46 80.74 (2 coats) 8 All Phase Restoration 7355 Green Ridge Rd Unit C Windsor CO 80550 www,aprestoration.com 2020-05-19-1353-1--3 9/4/2020 Page: 8 CONTINUED - Laurie Klith DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Totals: Laurie Klith 0.00 287.20 1,723.17 W. Bathroom Janitor Closet Torreys Peak Storage Entry Break Room M. Bathroom Hallway 4 (1) Closet (4) Laurie Klith Hallway File Closet File (Closet 3) (2) Longs Peak Pikes Peak Hallway 2 (5) Colleen Lyon Hallway 5 (6) Check-In Office Hallway4 (8) Hallway 3 (7) Office Office2 Greys Peak File Room Mount Bierstadt Mount Elbert Storage Area/Room (9) S. Office Office4 Office 3 Unaffected area UA1 (1) 3' 8" 4' 6' 6" 6' 4" 11" 4' 9" 1' 8" 7' 3" 7' 3" 9' 6" 9' 6" 15' 2" 15' 3' 6" 3' 2" 4' 10" 3' 8" 1' 4" 2' 6" 3' 4" 3' 2" 3' 2" 1' 3' 1" 11" 1' 2' 2" 9 All Phase Restoration 7355 Green Ridge Rd Unit C Windsor CO 80550 www,aprestoration.com 2020-05-19-1353-1--3 9/4/2020 Page: 9 CONTINUED - Hallway Torreys Peak Storage Break Room Hallway 4 (1) Laurie Klith Hallway File Closet (3) File Closet (2) Longs Peak Pikes Peak Colleen Lyon Hallway 5 (6) Hallway 3 (7) Greys Peak Office2 (9) Office4 Office 3 UA1 (1) 3' 3' 2" 1' 10" 1' 2" 1' 3' 4" 1' 7" 3' 5" 1' 9" 3' 5" Subroom: File Closet (2) Height: 8' 106.89 SF Walls 121.89 SF Walls & Ceiling 1.67 SY Flooring 16.00 LF Ceil. Perimeter 15.00 SF Ceiling 15.00 SF Floor 12.83 LF Floor Perimeter Missing Wall - Goes to Floor 3' 2" X 6' 8" Opens into HALLWAY W. Bathroom Janitor Closet Torreys Peak Storage Entry Break Room M. Bathroom Hallway 4 (1) Closet (4) Laurie Klith Hallway File Closet (3)File Closet (2) Longs Peak Pikes Peak Hallway 2 (5) Colleen Lyon Hallway 5 (6) Check-In Office Hallway4 (8) Hallway 3 (7) Office 10 All Phase Restoration 7355 Green Ridge Rd Unit C Windsor CO 80550 www,aprestoration.com 2020-05-19-1353-1--3 9/4/2020 Page: 10 CONTINUED - Hallway W. Bathroom Janitor Closet Torreys Peak Storage Entry Break Room M. Bathroom Hallway 4 (1) Closet (4) Laurie Klith Hallway File Closet File (Closet 3) (2) Longs Peak Pikes Peak Hallway 2 (5) Colleen Lyon Hallway 5 (6) Check-In Office Hallway4 (8) Hallway 3 (7) Office Office2 Greys Peak File Room Mount Bierstadt Mount Elbert Storage Area/Room (9) S. Office Office4 Office 3 Unaffected area UA1 (1) 2' 6" 12' 4" 9" 12' 6" 2' 6" 1' 11" 3' 9" 3' 5" 21' 6" 21' 8" 11' 3' 7" 10' 10" 2' 6" 13' 2" Subroom: Hallway 3 (7) Height: 8' 664.69 SF Walls 797.48 SF Walls & Ceiling 14.75 SY Flooring 85.52 LF Ceil. Perimeter 132.79 SF Ceiling 132.79 SF Floor 82.60 LF Floor Perimeter Missing Wall - Goes to Floor 2' 11" X 6' 8" Opens into HALLWAY4 Torreys Peak Storage Break Room Hallway 4 (1) 11 All Phase Restoration 7355 Green Ridge Rd Unit C Windsor CO 80550 www,aprestoration.com 2020-05-19-1353-1--3 9/4/2020 Page: 11 Torreys Peak Storage Hallway 4 (1) Laurie Klith Closet (2) Longs Peak Pikes Peak 5 (6) (7) Greys Peak Office 3 Unaffected area UA1 (1) 10' 8" 10' 6" 11' 5" 7' 1" 7' 1" 2' 6"5" 4" 6" 11' 7" Longs Peak Height: 8' 350.67 SF Walls 470.54 SF Walls & Ceiling 13.32 SY Flooring 43.83 LF Ceil. Perimeter 119.88 SF Ceiling 119.88 SF Floor 43.83 LF Floor Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 1/2" - drywall per LF - up to 2' tall 21.92 LF 0.00 7.93 0.00 34.76 208.59 Texture drywall - heavy hand texture 65.76 SF 0.00 0.80 0.00 10.52 63.13 Seal/prime then paint the surface area 65.76 SF 0.00 0.90 0.00 11.84 71.02 (2 coats) Paint the walls - one coat 350.67 SF 0.00 0.62 0.00 43.48 260.90 Floor prep (scrape rubber back residue) 119.88 SF 0.00 0.44 0.00 10.56 63.31 Glue down carpet - High grade 195.08 SF 0.00 3.08 0.00 120.18 721.03 Cove base molding - rubber or vinyl, 4" 43.83 LF 0.00 1.72 0.00 15.08 90.47 high Suspended ceiling grid - High grade - 2' 119.88 SF 0.00 1.56 0.00 37.40 224.41 x 4' Suspended ceiling tile - High grade - 2' 119.88 SF 0.00 1.99 0.00 47.72 286.28 x 4' Install Fluorescent light fixture 2.00 EA 0.00 45.26 0.00 18.10 108.62 Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04 24" Final cleaning - construction - 119.88 SF 0.00 0.22 0.00 5.28 31.65 Commercial Totals: Longs Peak 0.00 362.76 2,176.45 Torreys Peak Storage Break Room Hallway 4 (1) Closet (4) Laurie Klith Hallway File Closet File (3) Closet (2) Longs Peak 12 All Phase Restoration 7355 Green Ridge Rd Unit C Windsor CO 80550 www,aprestoration.com 2020-05-19-1353-1--3 9/4/2020 Page: 12 CONTINUED - Pikes Peak DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Paint the walls - one coat 380.62 SF 0.00 0.62 0.00 47.20 283.18 Floor prep (scrape rubber back residue) 122.64 SF 0.00 0.44 0.00 10.80 64.76 Glue down carpet - High grade 198.50 SF 0.00 3.08 0.00 122.28 733.66 Cove base molding - rubber or vinyl, 4" 47.58 LF 0.00 1.72 0.00 16.36 98.20 high Suspended ceiling grid - High grade - 2' 122.64 SF 0.00 1.56 0.00 38.26 229.58 x 4' Suspended ceiling tile - High grade - 2' 122.64 SF 0.00 1.99 0.00 48.82 292.87 x 4' Install Fluorescent light fixture 2.00 EA 0.00 45.26 0.00 18.10 108.62 Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04 24" Heat/AC register - Mechanically 1.00 EA 0.00 21.04 0.00 4.20 25.24 attached Final cleaning - construction - 122.64 SF 0.00 0.22 0.00 5.40 32.38 Commercial Totals: Pikes Peak 0.00 443.26 2,659.48 room Closet Torreys Peak Storage Entry Break Room room Hallway 4 (1) Closet (4) Laurie Klith Hallway File Closet (File 3) Closet (2) Longs Peak Pikes Peak Hallway 2 (5) Colleen Lyon Hallway 5 (6) k-In Office Hallway4 (8) Hallway 3 (7) Office Greys Peak Office2 nt Bierstadt unt Elbert Storage Area/Room (9) Office4 Office 3 Unaffected area UA1 (1) 6' 6" 6' 4" 2' 6" 3" 2' 1" 1' 11" 8' 7" 13 All Phase Restoration 7355 Green Ridge Rd Unit C Windsor CO 80550 www,aprestoration.com 2020-05-19-1353-1--3 9/4/2020 Page: 13 CONTINUED - Colleen Lyon DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Install Fluorescent light fixture 2.00 EA 0.00 45.26 0.00 18.10 108.62 Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04 24" Heat/AC register - Mechanically 1.00 EA 0.00 21.04 0.00 4.20 25.24 attached Final cleaning - construction - 104.43 SF 0.00 0.22 0.00 4.60 27.57 Commercial Totals: Colleen Lyon 0.00 393.48 2,360.87 W. Bathroom Janitor Closet Torreys Peak Storage Entry Break Room M. Bathroom Hallway 4 (1) Closet (4) Laurie Klith Hallway File Closet File (3) Closet (2) Longs Peak Pikes Peak Hallway 2 (5) Colleen Lyon Hallway 5 (6) Check-In Office Hallway4 (8) Hallway 3 (7) Office Greys Peak Office2 File Room Mount Bierstadt Mount Elbert Storage Area/Room (9) S. Office Office4 Office 3 Unaffected area UA1 (1) 15' 1" 15' 5" 10' 5" 2' 6" 3' 4" 2' 3' 6" 7' 3" 7' 3" 2' 6" 6' 3" Check-In Office Height: 8' 407.99 SF Walls 565.10 SF Walls & Ceiling 17.46 SY Flooring 51.00 LF Ceil. Perimeter 157.11 SF Ceiling 14 All Phase Restoration 7355 Green Ridge Rd Unit C Windsor CO 80550 www,aprestoration.com 2020-05-19-1353-1--3 9/4/2020 Page: 14 W. Bathroom Torreys Peak Storage Entry Break Room Hallway 4 (1) Closet (4) Laurie Klith Hallway File Closet File (3) Closet (2) Longs Peak Pikes Peak Hallway 2 (5) Colleen Lyon Hallway 5 (6) Check-In Office Hallway4 (8) Hallway 3 (7) Office Greys Peak Office2 File Room Mount Bierstadt Mount Elbert Storage Area/Room (9) S. Office Office4 Office 3 Unaffected area UA1 (1) 17' 11" 17' 7" 10' 5" 6" 2' 6" 6" 11' 3' 7" 10' 10" Office Height: 8' 447.98 SF Walls 631.12 SF Walls & Ceiling 20.35 SY Flooring 56.00 LF Ceil. Perimeter 183.14 SF Ceiling 183.14 SF Floor 56.00 LF Floor Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 1/2" - drywall per LF - up to 2' tall 42.00 LF 0.00 7.93 0.00 66.62 399.68 Texture drywall - heavy hand texture 126.00 SF 0.00 0.80 0.00 20.16 120.96 Seal/prime then paint the surface area 126.00 SF 0.00 0.90 0.00 22.68 136.08 (2 coats) Paint the walls - one coat 447.98 SF 0.00 0.62 0.00 55.56 333.31 Floor prep (scrape rubber back residue) 183.14 SF 0.00 0.44 0.00 16.12 96.70 Glue down carpet - High grade 259.17 SF 0.00 3.08 0.00 159.64 957.88 Cove base molding - rubber or vinyl, 4" 56.00 LF 0.00 1.72 0.00 19.26 115.58 high Suspended ceiling grid - High grade - 2' 183.14 SF 0.00 1.56 0.00 57.14 342.84 15 All Phase Restoration 7355 Green Ridge Rd Unit C Windsor CO 80550 www,aprestoration.com 2020-05-19-1353-1--3 9/4/2020 Page: 15 CONTINUED - Office2 DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Paint the walls - one coat 454.30 SF 0.00 0.62 0.00 56.34 338.01 Floor prep (scrape rubber back residue) 200.45 SF 0.00 0.44 0.00 17.64 105.84 Glue down carpet - High grade 282.58 SF 0.00 3.08 0.00 174.08 1,044.43 Cove base molding - rubber or vinyl, 4" 56.79 LF 0.00 1.72 0.00 19.54 117.22 high Suspended ceiling grid - High grade - 2' 200.45 SF 0.00 1.56 0.00 62.54 375.24 x 4' Suspended ceiling tile - High grade - 2' 200.45 SF 0.00 1.99 0.00 79.78 478.68 x 4' Install Fluorescent light fixture 5.00 EA 0.00 45.26 0.00 45.26 271.56 Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04 24" Heat/AC register - Mechanically 1.00 EA 0.00 21.04 0.00 4.20 25.24 attached Final cleaning - construction - 200.45 SF 0.00 0.22 0.00 8.82 52.92 Commercial Totals: Office2 0.00 624.02 3,744.11 Torreys Peak Storage Room Hallway 4 (1) Laurie Klith Hallway Closet File (3) Closet (2) Longs Peak Pikes Peak Colleen Lyon Hallway 5 (6) Hallway 3 (7) Greys Peak Office2 m (9) Office4 Office 3 Unaffected area UA1 (1) 10' 11" 10' 7" 11' 11' 4" 2' 5" 2' 7" 2' 6" 1' 11" 13' 2" 5' 10" 5' 10" 11' 11" 12' 2" Greys Peak Height: 8' 498.31 SF Walls 705.51 SF Walls & Ceiling 23.02 SY Flooring 62.29 LF Ceil. Perimeter 207.21 SF Ceiling 16 All Phase Restoration 7355 Green Ridge Rd Unit C Windsor CO 80550 www,aprestoration.com 2020-05-19-1353-1--3 9/4/2020 Page: 16 CONTINUED - Greys Peak DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Install Fluorescent light fixture 4.00 EA 0.00 45.26 0.00 36.20 217.24 Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04 24" Smoke detector 1.00 EA 0.00 50.61 0.00 10.12 60.73 Final cleaning - construction - 207.21 SF 0.00 0.22 0.00 9.12 54.71 Commercial Totals: Greys Peak 0.00 611.24 3,667.36 W. Bathroom Janitor Closet Torreys Peak Storage Entry Break Room M. Bathroom Hallway 4 (1) Closet (4) Laurie Klith Hallway File Closet File (3) Closet (2) Longs Peak Pikes Peak Hallway 2 (5) Colleen Lyon Hallway 5 (6) Check-In Office Hallway4 (8) Hallway 3 (7) Office Office2 Greys Peak File Room Mount Bierstadt Mount Elbert Storage Area/Room (9) S. Office Office4 Office 3 Unaffected area UA1 (1) 19' 3" 19' 7" 10' 9" 3" 5" 19' 18' 10" 10' 5" Mount Elbert Height: 8' 474.66 SF Walls 675.16 SF Walls & Ceiling 22.28 SY Flooring 59.33 LF Ceil. Perimeter 200.51 SF Ceiling 200.51 SF Floor 59.33 LF Floor Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 17 All Phase Restoration 7355 Green Ridge Rd Unit C Windsor CO 80550 www,aprestoration.com 2020-05-19-1353-1--3 9/4/2020 Page: 17 Hallway4 (8) Hallway 3 (7) File Room Mount Bierstadt Mount Elbert S. Office Office4 Office 3 Unaffected area 12' 7" 12' 5" 2" 2' 6" 3' 10" 4' 2" 2' 3" 2' 7" 8" 4' 4" 4' 4" 1' 2" 1' 6" 3" 10' 5" 10' 9" 12' 6" 12' 10" Mount Bierstadt Height: 8' 407.65 SF Walls 562.77 SF Walls & Ceiling 17.24 SY Flooring 50.96 LF Ceil. Perimeter 155.12 SF Ceiling 155.12 SF Floor 50.96 LF Floor Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 1/2" - drywall per LF - up to 2' tall 50.96 LF 0.00 7.93 0.00 80.82 484.93 Texture drywall - heavy hand texture 152.87 SF 0.00 0.80 0.00 24.46 146.76 Seal/prime then paint the surface area 152.87 SF 0.00 0.90 0.00 27.52 165.10 (2 coats) Paint the walls - one coat 407.65 SF 0.00 0.62 0.00 50.54 303.28 Floor prep (scrape rubber back residue) 155.12 SF 0.00 0.44 0.00 13.66 81.91 Glue down carpet - High grade 236.50 SF 0.00 3.08 0.00 145.68 874.10 Cove base molding - rubber or vinyl, 4" 50.96 LF 0.00 1.72 0.00 17.54 105.19 high Suspended ceiling grid - High grade - 2' 155.12 SF 0.00 1.56 0.00 48.40 290.39 x 4' Suspended ceiling tile - High grade - 2' 155.12 SF 0.00 1.99 0.00 61.74 370.43 x 4' Install Fluorescent light fixture 2.00 EA 0.00 45.26 0.00 18.10 108.62 Final cleaning - construction - 155.12 SF 0.00 0.22 0.00 6.82 40.95 Commercial Totals: Mount Bierstadt 0.00 495.28 2,971.66 W. Bathroom Torreys Peak Storage 18 All Phase Restoration 7355 Green Ridge Rd Unit C Windsor CO 80550 www,aprestoration.com 2020-05-19-1353-1--3 9/4/2020 Page: 18 CONTINUED - File Room DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Floor prep (scrape rubber back residue) 77.63 SF 0.00 0.44 0.00 6.84 41.00 Glue down carpet - High grade 154.17 SF 0.00 3.08 0.00 94.96 569.80 Cove base molding - rubber or vinyl, 4" 37.34 LF 0.00 1.72 0.00 12.84 77.06 high Suspended ceiling grid - High grade - 2' 77.63 SF 0.00 1.56 0.00 24.22 145.32 x 4' Suspended ceiling tile - High grade - 2' 77.63 SF 0.00 1.99 0.00 30.90 185.38 x 4' Install Fluorescent light fixture 2.00 EA 0.00 45.26 0.00 18.10 108.62 Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04 24" Final cleaning - construction - 77.63 SF 0.00 0.22 0.00 3.42 20.50 Commercial Totals: File Room 0.00 333.46 2,000.82 Hallway 2 (5) Hallway 5 (6) Hallway4 (8) Hallway 3 (7) Office Greys Peak Office2 File Room Mount Bierstadt Mount Elbert Storage Area/Room (9) S. Office Office4 Office 3 Unaffected area UA1 (1) 12' 11" 8' 12' 5" 8' 6" S. Office Height: 8' 326.72 SF Walls 426.08 SF Walls & Ceiling 11.04 SY Flooring 40.84 LF Ceil. Perimeter 99.36 SF Ceiling 99.36 SF Floor 40.84 LF Floor Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 1/2" - drywall per LF - up to 2' tall 20.42 LF 0.00 7.93 0.00 32.38 194.31 Texture drywall - heavy hand texture 61.26 SF 0.00 0.80 0.00 9.80 58.81 Seal/prime then paint the surface area 61.26 SF 0.00 0.90 0.00 11.02 66.15 (2 coats) Paint the walls - one coat 326.72 SF 0.00 0.62 0.00 40.52 243.09 Floor prep (scrape rubber back residue) 99.36 SF 0.00 0.44 0.00 8.74 52.46 Glue down carpet - High grade 173.25 SF 0.00 3.08 0.00 106.72 640.33 Final cleaning - construction - 99.36 SF 0.00 0.22 0.00 4.38 26.24 Commercial 19 All Phase Restoration 7355 Green Ridge Rd Unit C Windsor CO 80550 www,aprestoration.com 2020-05-19-1353-1--3 9/4/2020 Page: 19 Closet (4) File Closet File (3) Closet (2) Longs Peak Pikes Peak Hallway 2 (5) Colleen Lyon Hallway 5 (6) ck-In Office Hallway4 (8) Hallway 3 (7) Office Greys Peak Office2 File Room unt Bierstadt ount Elbert Storage Area/Room (9) S. Office Office4 Office 3 Unaffected area UA1 (1) 9' 7" 9' 5" 10' 5" 10' 8" 2' 6" 10' 5" 21' 6" 21' 8" 14' 6" 14' Office 3 Height: 8' 558.93 SF Walls 857.63 SF Walls & Ceiling 33.19 SY Flooring 69.87 LF Ceil. Perimeter 298.70 SF Ceiling 298.70 SF Floor 69.87 LF Floor Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 1/2" - drywall per LF - up to 2' tall 69.87 LF 0.00 7.93 0.00 110.82 664.89 1/2" drywall - hung, taped, ready for 8.00 SF 0.00 1.79 0.00 2.86 17.18 texture Texture drywall - heavy hand texture 221.60 SF 0.00 0.80 0.00 35.46 212.74 Seal/prime then paint the surface area 221.60 SF 0.00 0.90 0.00 39.88 239.32 (2 coats) Paint the walls - one coat 558.93 SF 0.00 0.62 0.00 69.30 415.84 Floor prep (scrape rubber back residue) 298.70 SF 0.00 0.44 0.00 26.28 157.71 Glue down carpet - High grade 381.00 SF 0.00 3.08 0.00 234.70 1,408.18 Cove base molding - rubber or vinyl, 4" 69.87 LF 0.00 1.72 0.00 24.04 144.22 high Suspended ceiling grid - High grade - 2' 298.70 SF 0.00 1.56 0.00 93.20 559.17 x 4' Suspended ceiling tile - High grade - 2' 298.70 SF 0.00 1.99 0.00 118.88 713.29 20 All Phase Restoration 7355 Green Ridge Rd Unit C Windsor CO 80550 www,aprestoration.com 2020-05-19-1353-1--3 9/4/2020 Page: 20 CONTINUED - Office4 DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Item is to be replace the metal framing above the door 1/2" - drywall per LF - up to 2' tall 20.75 LF 0.00 7.93 0.00 32.92 197.47 1/2" drywall - hung, taped, ready for 8.00 SF 0.00 1.79 0.00 2.86 17.18 texture Texture drywall - heavy hand texture 74.25 SF 0.00 0.80 0.00 11.88 71.28 Seal/prime then paint the surface area 74.25 SF 0.00 0.90 0.00 13.36 80.19 (2 coats) Paint the walls - one coat 331.92 SF 0.00 0.62 0.00 41.16 246.95 Floor prep (scrape rubber back residue) 107.59 SF 0.00 0.44 0.00 9.46 56.80 Glue down carpet - High grade 182.42 SF 0.00 3.08 0.00 112.38 674.23 Cove base molding - rubber or vinyl, 4" 41.49 LF 0.00 1.72 0.00 14.28 85.64 high Suspended ceiling grid - High grade - 2' 107.59 SF 0.00 1.56 0.00 33.56 201.40 x 4' Suspended ceiling tile - High grade - 2' 107.59 SF 0.00 1.99 0.00 42.82 256.92 x 4' Install Fluorescent light fixture 1.00 EA 0.00 45.26 0.00 9.06 54.32 Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04 24" Smoke detector 1.00 EA 0.00 50.61 0.00 10.12 60.73 Final cleaning - construction - 107.59 SF 0.00 0.22 0.00 4.74 28.41 Commercial Totals: Office4 0.00 406.44 2,438.60 W. Bathroom Janitor Closet Torreys Peak Storage Entry Break Room M. Bathroom Hallway 4 (1) Closet (4) Laurie Klith Hallway File File Closet Closet (3) (Longs 2) Peak Pikes Peak Hallway 2 (5) Colleen Lyon Hallway 5 (6) Check-In Office Hallway4 (8) Hallway 3 (7) Office Office2 Greys Peak File Room Mount Bierstadt Mount Elbert Storage Area/Room (9) S. Office Office4 Office 3 Unaffected area UA1 (1) 21 All Phase Restoration 7355 Green Ridge Rd Unit C Windsor CO 80550 www,aprestoration.com 2020-05-19-1353-1--3 9/4/2020 Page: 21 CONTINUED - Unaffected area DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Remove Glue down carpet - High 1,296.54 SF 0.63 0.00 0.00 163.36 980.18 grade Floor prep (scrape rubber back residue) 1,296.54 SF 0.00 0.44 0.00 114.10 684.58 Glue down carpet - High grade 1,477.50 SF 0.00 3.08 0.00 910.14 5,460.84 Final cleaning - construction - 1,296.54 SF 0.00 0.22 0.00 57.04 342.28 Commercial Totals: Unaffected area 0.00 1,244.64 7,467.88 Total: Main Level 0.00 13,526.44 81,157.98 Labor Minimums Applied DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Framing labor minimum 1.00 EA 0.00 160.04 0.00 32.00 192.04 Finish hardware labor minimum 1.00 EA 0.00 36.82 0.00 7.36 44.18 Totals: Labor Minimums Applied 0.00 39.36 236.22 Line Item Totals: 2020-05-19-1353-1--3 0.00 15,542.52 93,254.36 Grand Total Areas: 12,595.19 SF Walls 4,707.83 SF Ceiling 17,303.02 SF Walls and Ceiling 4,707.83 SF Floor 523.09 SY Flooring 1,567.43 LF Floor Perimeter 0.00 SF Long Wall 0.00 SF Short Wall 1,609.26 LF Ceil. Perimeter 4,707.83 Floor Area 5,034.86 Total Area 12,595.19 Interior Wall Area 2,990.74 Exterior Wall Area 332.30 Exterior Perimeter of Walls 0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length 0.00 Total Ridge Length 0.00 Total Hip Length DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 22 All Phase Restoration 7355 Green Ridge Rd Unit C Windsor CO 80550 www,aprestoration.com 2020-05-19-1353-1--3 9/4/2020 Page: 22 Summary Line Item Total 77,711.84 Overhead 7,771.26 Profit 7,771.26 Replacement Cost Value $93,254.36 Net Claim $93,254.36 Nate Tenold DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 23 2020-05-19-1353-1--3 9/4/2020 Page: 23 Main Level W. Bathroom Janitor Closet Torreys Peak Storage Entry Break Room M. Bathroom Hallway 4 (1) Closet (4) Laurie Klith Hallway File Closet File Closet (3) (2) Longs Peak Pikes Peak Hallway 2 (5) Colleen Lyon Hallway 5 (6) Check-In Office Hallway4 (8) Hallway 3 (7) Office Office2 Greys Peak File Room Mount Bierstadt Mount Elbert Storage Area/Room (9) S. Office Office4 Office 3 Unaffected area UA1 (1) Main Level 2' 11" 5' 2" 3' 5" 8' 8" 8' 6" 12' 3" 11' 11" 7' 11" 7' 3" 8' 5' 5" 7' 5" 5' 9" 5' 5" 8' 11" 13' 2" 12' 10" 11' 10" 2' 11" 5' 4" 5' 10' 5" 3' 3" 3' 6" 3' 7' 8" 8' 2" 5' 3" Official Purchasing Document Last updated 10/2017 All Phase Restoration Services Agreement Page 30 of 31 EXHIBIT B INSURANCE REQUIREMENTS 1. The Service Provider will provide, from insurance companies acceptable to the City, the insurance coverage designated hereinafter and pay all costs. Before commencing work under this bid, the Service Provider shall furnish the City with certificates of insurance showing the type, amount, class of operations covered, effective dates and date of expiration of policies, and containing substantially the following statement: “The insurance evidenced by this Certificate will not reduce coverage or limits and will not be cancelled, except after thirty (30) days written notice has been received by the City of Fort Collins.” In case of the breach of any provision of the Insurance Requirements, the City, at its option, may take out and maintain, at the expense of the Service Provider, such insurance as the City may deem proper and may deduct the cost of such insurance from any monies which may be due or become due the Service Provider under this Agreement. The City, its officers, agents and employees shall be named as additional insureds on the Service Provider 's general liability and automobile liability insurance policies for any claims arising out of work performed under this Agreement. 2. Insurance coverages shall be as follows: A. Workers' Compensation & Employer's Liability. The Service Provider shall maintain during the life of this Agreement for all of the Service Provider's employees engaged in work performed under this agreement: 1. Workers' Compensation insurance with statutory limits as required by Colorado law. 2. Employer's Liability insurance with limits of $100,000 per accident, $500,000 disease aggregate, and $100,000 disease each employee. B. Commercial General & Vehicle Liability. The Service Provider shall maintain during the life of this Agreement such commercial general liability and automobile liability insurance as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of work under this Agreement. Coverage for property damage shall be on a "broad form" basis. The amount of insurance for each coverage, Commercial General and Vehicle, shall not be less than $1,000,000 combined single limits for bodily injury and property damage. In the event any work is performed by a subcontractor, the Service Provider shall be responsible for any liability directly or indirectly arising out of the work performed under this Agreement by a subcontractor, which liability is not covered by the subcontractor's insurance. DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 Official Purchasing Document Last updated 10/2017 All Phase Restoration Services Agreement Page 30 of 31 EXHIBIT C CONFIDENTIALITY IN CONNECTION WITH SERVICES provided to the City of Fort Collins (the “City”) pursuant to this Agreement (the “Agreement”), the Service Provider hereby acknowledges that it has been informed that the City has established policies and procedures with regard to the handling of confidential information and other sensitive materials. In consideration of access to certain information, data and material (hereinafter individually and collectively, regardless of nature, referred to as “information”) that are the property of and/or relate to the City or its employees, customers or suppliers, which access is related to the performance of services that the Service Provider has agreed to perform, the Service Provider hereby acknowledges and agrees as follows: That information that has or will come into its possession or knowledge in connection with the performance of services for the City may be confidential and/or proprietary. The Service Provider agrees to treat as confidential (a) all information that is owned by the City, or that relates to the business of the City, or that is used by the City in carrying on business, and (b) all information that is proprietary to a third party (including but not limited to customers and suppliers of the City). The Service Provider shall not disclose any such information to any person not having a legitimate need-to-know for purposes authorized by the City. Further, the Service Provider shall not use such information to obtain any economic or other benefit for itself, or any third party, except as specifically authorized by the City. The foregoing to the contrary notwithstanding, the Service Provider understands that it shall have no obligation under this Agreement with respect to information and material that (a) becomes generally known to the public by publication or some means other than a breach of duty of this Agreement, or (b) is required by law, regulation or court order to be disclosed, provided that the request for such disclosure is proper and the disclosure does not exceed that which is required. In the event of any disclosure under (b) above, the Service Provider shall furnish a copy of this Agreement to anyone to whom it is required to make such disclosure and shall promptly advise the City in writing of each such disclosure. In the event that the Service Provider ceases to perform services for the City, or the City so requests for any reason, the Service Provider shall promptly return to the City any and all information described hereinabove, including all copies, notes and/or summaries (handwritten or mechanically produced) thereof, in its possession or control or as to which it otherwise has access. The Service Provider understands and agrees that the City’s remedies at law for a breach of the Service Provider’s obligations under this Confidentiality Agreement may be inadequate and that the City shall, in the event of any such breach, be entitled to seek equitable relief (including without limitation preliminary and permanent injunctive relief and specific performance) in addition to all other remedies provided hereunder or available at law. DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 5' 1" 9' 6" 9' 6" 12' 2" 3' 2" 3' 4" 9' 6" 9' 10" 3' 3" 3' 6" 2' 1" 2' 1" 6' 9" 6' 9" 15' 2" 15' 10' 1" 10' 9" 14' 10" 15' 2" 7' 3" 7' 4" 4' 3' 8" 3' 3" 4' 2" 3' 8" 11' 7" 11' 5" 5' 4" 5' 5' 4" 5' 10' 8" 10' 6" 3' 3' 4" 6" 6' 6" 3' 3" 3' 5" 15' 1" 8' 4" 8' 5" 15' 6" 3' 3" 17' 1" 16' 11" 8' 7" 17' 4" 8' 3" 3' 9" 2' 1" 10' 1" 6' 4" 12' 2" 5' 10" 5' 10" 2' 8" 6' 8" 6' 10" 13' 2" 3' 9" 17' 7" 7' 7" 7' 1" 2' 5" 2' 7" 11' 11" 12' 2" 10' 11" 10' 7" 11' 11' 4" 15' 5" 15' 3" 15' 9" 13' 2" 19' 18' 10" 1' 6" 4' 4" 4' 4" 8" 12' 6" 12' 10" 3' 10" 10' 8" 10' 4" 3' 11" 4' 1" 10' 5" 4' 4' 2" 21' 6" 21' 8" 19' 3" 52' 11" 8' 7" 6' 3" 9' 3" 10' 9" 2" 12' 11" 6' 7" 12' 7" 12' 5" 3' 11" 8' 2' 5" 8' 6" 14' 6" 14' 10' 9" 14' 13' 10" 10' 8" 10' 5" 10' 8" 9' 7" 9' 5" 53' 4" 53' 10" 35' 2" 35' 8" 11' 1" 11' 5" DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 53' 4" 53' 10" 11' 11' 4" 3' 5" 14' 6" 14' 9' 5" 10' 8" 10' 9" 10' 5" 14' 8' 13' 10" 35' 2" 35' 8" Unaffected area Height: 8' 1,416.56 SF Walls 2,583.61 SF Walls & Ceiling 129.67 SY Flooring 177.07 LF Ceil. Perimeter 1,167.06 SF Ceiling 1,167.06 SF Floor 177.07 LF Floor Perimeter Torreys Peak Storage Hallway 4 (1) Laurie Klith Closet (2) Longs Peak Pikes Peak n y 5 (6) (7) Greys Peak UA1 (1) 11' 5" 11' 1" 11' 5" 11' 11" 12' 2" 2' 6" 2' 8" 8' 5" 8' 5" Subroom: UA1 (1) Height: 8' 364.36 SF Walls 493.84 SF Walls & Ceiling 14.39 SY Flooring 45.54 LF Ceil. Perimeter 129.48 SF Ceiling 129.48 SF Floor 45.54 LF Floor Perimeter DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 x 4' Install Fluorescent light fixture 6.00 EA 0.00 45.26 0.00 54.32 325.88 Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04 24" Smoke detector 1.00 EA 0.00 50.61 0.00 10.12 60.73 Final cleaning - construction - 298.70 SF 0.00 0.22 0.00 13.14 78.85 Commercial Totals: Office 3 0.00 840.84 5,045.04 om set Torreys Peak Storage try Break Room m Hallway 4 (1) Closet (4) Laurie Klith Hallway File Closet (3) File Closet (2) Longs Peak Pikes Peak Hallway 2 (5) Colleen Lyon Hallway 5 (6) n Office Hallway4 (8) Hallway 3 (7) ice Greys Peak Office2 e Room Bierstadt Elbert Storage Area/Room (9) Office Office4 Office 3 Unaffected area UA1 (1) 10' 9" 10' 5" 7' 3" 2' 6" 7' 5" 7" 9" 10' 8" 10' 8" 10' 4" Office4 Height: 8' 331.92 SF Walls 439.51 SF Walls & Ceiling 11.95 SY Flooring 41.49 LF Ceil. Perimeter 107.59 SF Ceiling 107.59 SF Floor 41.49 LF Floor Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Drywall Installer / Finisher - per hour 4.00 HR 0.00 75.01 0.00 60.00 360.04 DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 Cove base molding - rubber or vinyl, 4" 40.84 LF 0.00 1.72 0.00 14.04 84.28 high Totals: S. Office 0.00 227.60 1,365.67 DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 Entry Break Room M. Bathroom Hallway 4 (1) Closet (4) Laurie Klith Hallway File Closet (3) File Closet (2) Longs Peak Pikes Peak Hallway 2 (5) Colleen Lyon Hallway 5 (6) Check-In Office Hallway4 (8) Hallway 3 (7) Office Greys Peak Office2 File Room Mount Bierstadt Mount Elbert Storage Area/Room (9) S. Office Office4 Office 3 Unaffected area UA1 (1) 12' 5" 1' 10" 2' 6"1' 11" 12' 7" 6' 3" 6' 7" File Room Height: 8' 298.73 SF Walls 376.36 SF Walls & Ceiling 8.63 SY Flooring 37.34 LF Ceil. Perimeter 77.63 SF Ceiling 77.63 SF Floor 37.34 LF Floor Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 1/2" - drywall per LF - up to 2' tall 37.34 LF 0.00 7.93 0.00 59.22 355.33 Texture drywall - heavy hand texture 112.02 SF 0.00 0.80 0.00 17.92 107.54 Seal/prime then paint the surface area 112.02 SF 0.00 0.90 0.00 20.16 120.98 (2 coats) Paint the walls - one coat 298.73 SF 0.00 0.62 0.00 37.04 222.25 DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 1/2" - drywall per LF - up to 2' tall 44.50 LF 0.00 7.93 0.00 70.58 423.47 Texture drywall - heavy hand texture 133.50 SF 0.00 0.80 0.00 21.36 128.16 Seal/prime then paint the surface area 133.50 SF 0.00 0.90 0.00 24.04 144.19 (2 coats) Paint the walls - one coat 474.66 SF 0.00 0.62 0.00 58.86 353.15 Floor prep (scrape rubber back residue) 200.51 SF 0.00 0.44 0.00 17.64 105.86 Glue down carpet - High grade 276.75 SF 0.00 3.08 0.00 170.48 1,022.87 Cove base molding - rubber or vinyl, 4" 59.33 LF 0.00 1.72 0.00 20.42 122.47 high Suspended ceiling grid - High grade - 2' 200.51 SF 0.00 1.56 0.00 62.56 375.36 x 4' Suspended ceiling tile - High grade - 2' 200.51 SF 0.00 1.99 0.00 79.80 478.81 x 4' Install Fluorescent light fixture 3.00 EA 0.00 45.26 0.00 27.16 162.94 Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04 24" Final cleaning - construction - 200.51 SF 0.00 0.22 0.00 8.82 52.93 Commercial Totals: Mount Elbert 0.00 569.56 3,417.25 DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 207.21 SF Floor 62.29 LF Floor Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 1/2" - drywall per LF - up to 2' tall 46.72 LF 0.00 7.93 0.00 74.10 444.59 Texture drywall - heavy hand texture 140.16 SF 0.00 0.80 0.00 22.42 134.55 Seal/prime then paint the surface area 140.16 SF 0.00 0.90 0.00 25.22 151.36 (2 coats) Paint the walls - one coat 498.31 SF 0.00 0.62 0.00 61.80 370.75 Floor prep (scrape rubber back residue) 207.21 SF 0.00 0.44 0.00 18.24 109.41 Glue down carpet - High grade 288.33 SF 0.00 3.08 0.00 177.62 1,065.68 Cove base molding - rubber or vinyl, 4" 62.29 LF 0.00 1.72 0.00 21.42 128.56 high Suspended ceiling grid - High grade - 2' 207.21 SF 0.00 1.56 0.00 64.66 387.91 x 4' Suspended ceiling tile - High grade - 2' 207.21 SF 0.00 1.99 0.00 82.48 494.83 x 4' DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 x 4' Suspended ceiling tile - High grade - 2' 183.14 SF 0.00 1.99 0.00 72.90 437.35 x 4' Install Fluorescent light fixture 4.00 EA 0.00 45.26 0.00 36.20 217.24 Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04 24" Final cleaning - construction - 183.14 SF 0.00 0.22 0.00 8.06 48.35 Commercial Totals: Office 0.00 542.18 3,253.01 Bathroom tor Closet Torreys Peak Storage Entry Break Room Bathroom Hallway 4 (1) Closet (4) Laurie Klith Hallway File Closet File (3) Closet (2) Longs Peak Pikes Peak Hallway 2 (5) Colleen Lyon Hallway 5 (6) heck-In Office Hallway4 (8) Hallway 3 (7) Office Greys Peak Office2 Mount Bierstadt Mount Elbert Storage Area/Room (9) Office4 Office 3 Unaffected area UA1 (1) 13' 2" 13' 6" 2' 6" 12' 4" 9" 12' 6" 13' 2" 15' 5" 15' 3" Office2 Height: 8' 454.30 SF Walls 654.75 SF Walls & Ceiling 22.27 SY Flooring 56.79 LF Ceil. Perimeter 200.45 SF Ceiling 200.45 SF Floor 56.79 LF Floor Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 1/2" - drywall per LF - up to 2' tall 56.79 LF 0.00 7.93 0.00 90.06 540.40 Texture drywall - heavy hand texture 170.36 SF 0.00 0.80 0.00 27.26 163.55 Seal/prime then paint the surface area 170.36 SF 0.00 0.90 0.00 30.66 183.98 (2 coats) DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 157.11 SF Floor 51.00 LF Floor Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 1/2" - drywall per LF - up to 2' tall 38.25 LF 0.00 7.93 0.00 60.66 363.98 1/2" drywall - hung, taped, ready for 10.00 SF 0.00 1.79 0.00 3.58 21.48 texture Texture drywall - heavy hand texture 129.75 SF 0.00 0.80 0.00 20.76 124.56 Seal/prime then paint the surface area 129.75 SF 0.00 0.90 0.00 23.36 140.14 (2 coats) Paint the walls - one coat 407.99 SF 0.00 0.62 0.00 50.60 303.55 Floor prep (scrape rubber back residue) 157.11 SF 0.00 0.44 0.00 13.82 82.95 Glue down carpet - High grade 233.25 SF 0.00 3.08 0.00 143.68 862.09 Cove base molding - rubber or vinyl, 4" 51.00 LF 0.00 1.72 0.00 17.54 105.26 high Suspended ceiling grid - High grade - 2' 157.11 SF 0.00 1.56 0.00 49.02 294.11 x 4' Suspended ceiling tile - High grade - 2' 157.11 SF 0.00 1.99 0.00 62.54 375.19 x 4' Install Fluorescent light fixture 2.00 EA 0.00 45.26 0.00 18.10 108.62 Install Ceiling diffuser - square, lay-in - 1.00 EA 0.00 39.20 0.00 7.84 47.04 24" Final cleaning - construction - 157.11 SF 0.00 0.22 0.00 6.92 41.48 Commercial Totals: Check-In Office 0.00 478.42 2,870.45 DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 8' 11" 12' 2" 3' 5" 3' 5" 5' 2" 5' Colleen Lyon Height: 8' 331.99 SF Walls 436.42 SF Walls & Ceiling 11.60 SY Flooring 41.50 LF Ceil. Perimeter 104.43 SF Ceiling 104.43 SF Floor 41.50 LF Floor Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 1/2" - drywall per LF - up to 2' tall 41.50 LF 0.00 7.93 0.00 65.82 394.92 Texture drywall - heavy hand texture 124.50 SF 0.00 0.80 0.00 19.92 119.52 Seal/prime then paint the surface area 124.50 SF 0.00 0.90 0.00 22.42 134.47 (2 coats) Paint the walls - one coat 331.99 SF 0.00 0.62 0.00 41.16 246.99 Floor prep (scrape rubber back residue) 104.43 SF 0.00 0.44 0.00 9.20 55.15 Cove base molding - rubber or vinyl, 4" 41.50 LF 0.00 1.72 0.00 14.28 85.66 high Glue down carpet - High grade 181.50 SF 0.00 3.08 0.00 111.80 670.82 Suspended ceiling grid - High grade - 2' 104.43 SF 0.00 1.56 0.00 32.58 195.49 x 4' Suspended ceiling tile - High grade - 2' 104.43 SF 0.00 1.99 0.00 41.56 249.38 x 4' DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 Pikes Peak Hallway 2 (5) Colleen Lyon Hallway 5 (6) ce Hallway 3 (7) Greys Peak Office2 t Storage Area/Room (9) Office4 Office 3 UA1 (1) 8' 5" 8' 3" 12' 2" 1' 9" 3' 3' 4" 3' 4" 2' 6" 8' 5" 7' 1" 15' 6" Pikes Peak Height: 8' 380.62 SF Walls 503.25 SF Walls & Ceiling 13.63 SY Flooring 47.58 LF Ceil. Perimeter 122.64 SF Ceiling 122.64 SF Floor 47.58 LF Floor Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 1/2" - drywall per LF - up to 2' tall 47.58 LF 0.00 7.93 0.00 75.46 452.77 Texture drywall - heavy hand texture 142.73 SF 0.00 0.80 0.00 22.84 137.02 Seal/prime then paint the surface area 142.73 SF 0.00 0.90 0.00 25.70 154.16 (2 coats) DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 Closet (4) Laurie Klith Hallway File Closet (3) File Closet (2) Longs Peak Pikes Peak Hallway 2 (5) Colleen Lyon Hallway 5 (6) Hallway 3 (7) Greys Peak Office2 Storage Area/Room (9) Office4 Office 3 UA1 (1) 2' 5" 3' 11" 3' 9" 2' 1" 1' 11" 2' 6" 2" 6" 1' 1" Subroom: Storage Area/Room (9) Height: 8' 90.86 SF Walls 98.09 SF Walls & Ceiling 0.80 SY Flooring 11.36 LF Ceil. Perimeter 7.23 SF Ceiling 7.23 SF Floor 11.36 LF Floor Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 1/2" - drywall per LF - up to 2' tall 383.27 LF 0.00 7.93 0.00 607.86 3,647.19 1/2" drywall - hung, taped, ready for 40.00 SF 0.00 1.79 0.00 14.32 85.92 texture Texture drywall - heavy hand texture 1,209.81 SF 0.00 0.80 0.00 193.58 1,161.43 Seal/prime then paint the surface area 303.51 SF 0.00 0.90 0.00 54.64 327.80 (2 coats) Paint the walls - one coat 3,121.93 SF 0.00 0.62 0.00 387.12 2,322.72 Floor prep (scrape rubber back residue) 650.92 SF 0.00 0.44 0.00 57.28 343.68 Glue down carpet - High grade 892.75 SF 0.00 3.08 0.00 549.94 3,299.61 Cove base molding - rubber or vinyl, 4" 383.27 LF 0.00 1.72 0.00 131.84 791.06 high Suspended ceiling grid - High grade - 2' 650.92 SF 0.00 1.56 0.00 203.08 1,218.52 x 4' Suspended ceiling tile - High grade - 2' 650.92 SF 0.00 1.99 0.00 259.06 1,554.39 x 4' Install Fluorescent light fixture 7.00 EA 0.00 45.26 0.00 63.36 380.18 Install Exit sign - wired in 6.00 EA 0.00 45.26 0.00 54.32 325.88 Install Recessed light fixture 3.00 EA 0.00 79.39 0.00 47.64 285.81 Bypass (sliding) door set - Colonist 2.00 EA 0.00 157.26 0.00 62.90 377.42 Final cleaning - construction - 650.92 SF 0.00 0.22 0.00 28.64 171.84 Commercial Totals: Hallway 0.00 2,715.58 16,293.45 DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 Greys Peak Office2 File Room Mount Bierstadt Mount Elbert Storage Area/Room (9) S. Office Office4 Office 3 Unaffected area 6" 2' 6" 1' 1" UA1 (1) 1' 11" 2' 5" 2' 6" 2' 8" 7" 6" 2' 6" 2' 1' 10" 3' 4" 3' 6" 11" 4' 9" 1' 8" 8" 2' 6" 5" 3" Subroom: Hallway 2 (5) Height: 8' 219.01 SF Walls 259.36 SF Walls & Ceiling 4.48 SY Flooring 31.33 LF Ceil. Perimeter 40.36 SF Ceiling 40.36 SF Floor 26.58 LF Floor Perimeter Missing Wall - Goes to Floor 4' 9" X 6' 8" Opens into HALLWAY Bathroom itor Closet Torreys Peak Storage Entry Break Room Bathroom Hallway 4 (1) Closet (4) Laurie Klith Hallway File Closet File (3) Closet (2) Longs Peak Pikes Peak Hallway 2 (5) Colleen Lyon Hallway 5 (6) heck-In Office Hallway4 (8) Hallway 3 (7) Office Office2 Greys Peak File Room Mount Bierstadt Mount Elbert Storage Area/Room (9) S. Office Office4 Office 3 Unaffected area UA1 (1) 15' 5" 15' 3" 5' 10" 5' 10" 2' 8" 8' 7" 8' 3" 3' 11" 17' 4" 3' 9" Subroom: Hallway 5 (6) Height: 8' 380.43 SF Walls 433.40 SF Walls & Ceiling 5.89 SY Flooring 47.55 LF Ceil. Perimeter 52.97 SF Ceiling 52.97 SF Floor 47.55 LF Floor Perimeter W. Bathroom Janitor Closet Torreys Peak Storage Entry Break Room M. Bathroom Hallway 4 (1) Closet (4) Laurie Klith Hallway File Closet File Closet (3) (2)Longs Peak Pikes Peak Hallway 2 (5) Colleen Lyon Hallway 5 (6) Check-In Office Hallway4 (8) Hallway 3 (7) Office Office2 Greys Peak File Room Mount Bierstadt Mount Elbert Storage Area/Room (9) S. Office Office4 Office 3 Unaffected area UA1 (1) 2' 6" 7' 3" 7' 5" 14' 13' 10" 3' 10" 4' 4" 1' 6" 19' 18' 10" 2' 11" 6" Subroom: Hallway4 (8) Height: 8' 680.14 SF Walls 835.26 SF Walls & Ceiling 17.23 SY Flooring 87.45 LF Ceil. Perimeter 155.11 SF Ceiling 155.11 SF Floor 84.53 LF Floor Perimeter Missing Wall - Goes to Floor 2' 11" X 6' 8" Opens into HALLWAY_3 DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 3' 8" Hallway Height: 8' 609.52 SF Walls 801.06 SF Walls & Ceiling 21.28 SY Flooring 91.19 LF Ceil. Perimeter 191.54 SF Ceiling 191.54 SF Floor 73.19 LF Floor Perimeter Torreys Peak Storage Break Room Hallway 4 (1) 4) Laurie Klith Hallway File Closet (3) File Closet (2) Longs Peak Pikes Peak Colleen Lyon Hallway 5 (6) Hallway 3 (7) Greys Peak Office2 oom (9) Office4 Office 3 UA1 (1) 2' 6" 2" 6" 4" 2' 6" 8" 2' 1" 6" 4' 3" 3' 6" 3' 2" 4' 10" 3' 8" 1' 4" Subroom: Hallway 4 (1) Height: 8' 170.50 SF Walls 200.37 SF Walls & Ceiling 3.32 SY Flooring 25.34 LF Ceil. Perimeter 29.87 SF Ceiling 29.87 SF Floor 20.51 LF Floor Perimeter Missing Wall - Goes to Floor 4' 10" X 6' 8" Opens into HALLWAY Torreys Peak Storage Break Room Hallway 4 (1) Closet (4) Laurie Klith Hallway File Closet (3) File Closet (2) Longs Peak Pikes Peak Hallway 2 (5) Colleen Lyon Hallway 5 (6) Greys Peak Office2 Storage Area/Room (9) UA1 (1) 3' 8" 4' 3' 2' 2" 9" 7" 1' 3" 11" 3' 8" Subroom: Closet (4) Height: 8' 92.45 SF Walls 103.49 SF Walls & Ceiling 1.23 SY Flooring 13.36 LF Ceil. Perimeter 11.04 SF Ceiling 11.04 SF Floor 11.20 LF Floor Perimeter Missing Wall - Goes to Floor 2' 2" X 6' 8" Opens into HALLWAY Torreys Peak Storage Break Room Hallway 4 (1) Closet (4) Laurie Klith Hallway File Closet (3) File Closet (2) Longs Peak Pikes Peak 2 (5) Colleen Lyon Hallway 5 (6) Storage Area/Room (9) UA1 (1) 5' 2" 5' 3' 3' 1" 1' 2" 1' 1' 1" 11" Subroom: File Closet (3) Height: 8' 107.44 SF Walls 122.44 SF Walls & Ceiling 1.67 SY Flooring 16.00 LF Ceil. Perimeter 15.00 SF Ceiling 15.00 SF Floor 12.92 LF Floor Perimeter Missing Wall - Goes to Floor 3' 1" X 6' 8" Opens into HALLWAY DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 Paint part of the walls - one coat - 2 299.00 SF 0.00 0.74 0.00 44.26 265.52 colors Floor prep (scrape rubber back residue) 149.57 SF 0.00 0.44 0.00 13.16 78.97 Glue down carpet - High grade 229.08 SF 0.00 3.08 0.00 141.12 846.69 Cove base molding - rubber or vinyl, 4" 49.83 LF 0.00 1.72 0.00 17.14 102.85 high Final cleaning - construction - 149.57 SF 0.00 0.22 0.00 6.58 39.49 Commercial DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 6' 7" 15' 2" 15' 2' 1" 2' 1" Break Room Height: 8' 465.89 SF Walls 655.05 SF Walls & Ceiling 21.02 SY Flooring 58.24 LF Ceil. Perimeter 189.17 SF Ceiling 189.17 SF Floor 58.24 LF Floor Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 1/2" - drywall per LF - up to 2' tall 58.24 LF 0.00 7.93 0.00 92.36 554.20 Texture drywall - heavy hand texture 174.71 SF 0.00 0.80 0.00 27.96 167.73 Seal/prime then paint the surface area 174.71 SF 0.00 0.90 0.00 31.44 188.68 (2 coats) Paint the walls - one coat 465.89 SF 0.00 0.62 0.00 57.78 346.63 Floor prep (scrape rubber back residue) 189.17 SF 0.00 0.44 0.00 16.64 99.87 Glue down carpet - High grade 270.75 SF 0.00 3.08 0.00 166.78 1,000.69 Cove base molding - rubber or vinyl, 4" 58.24 LF 0.00 1.72 0.00 20.04 120.21 high Suspended ceiling grid - High grade - 2' 189.17 SF 0.00 1.56 0.00 59.02 354.13 x 4' Suspended ceiling tile - High grade - 2' 189.17 SF 0.00 1.99 0.00 75.30 451.75 x 4' Install Fluorescent light fixture 4.00 EA 0.00 45.26 0.00 36.20 217.24 Install Ceiling diffuser - square, lay-in - 2.00 EA 0.00 39.20 0.00 15.68 94.08 24" DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 Commercial Totals: Janitor Closet 0.00 189.66 1,137.93 Torreys Peak Storage Break Room Hallway 4 (1) Closet (4) Laurie Klith Hallway File Closet File (3) Closet (2) Longs Peak Pikes Peak ay 2 (5) Colleen Lyon Hallway 5 (6) Hallway 3 (7) Greys Peak Office2 orage Area/Room (9) UA1 (1) 2' 6" 8" 4' 3" 8' 11" 11' 10" 2' 11" 2' 6" 4' 6" 7" 5' 3" 5' 1" 6' 9" 6' 9" Torreys Peak Storage Height: 8' 306.50 SF Walls 393.00 SF Walls & Ceiling 9.61 SY Flooring 38.31 LF Ceil. Perimeter 86.50 SF Ceiling 86.50 SF Floor 38.31 LF Floor Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 1/2" - drywall per LF - up to 2' tall 38.31 LF 0.00 7.93 0.00 60.76 364.56 Texture drywall - heavy hand texture 114.94 SF 0.00 0.80 0.00 18.40 110.35 Seal/prime then paint the surface area 114.94 SF 0.00 0.90 0.00 20.70 124.15 (2 coats) Paint the walls - one coat 306.50 SF 0.00 0.62 0.00 38.00 228.03 Floor prep (scrape rubber back residue) 86.50 SF 0.00 0.44 0.00 7.62 45.68 DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 Cove base molding - rubber or vinyl, 4" 25.00 LF 0.00 1.72 0.00 8.60 51.60 high Install Toilet 1.00 EA 0.00 204.84 0.00 40.96 245.80 Finish Carpenter - per hour 1.00 HR 0.00 77.52 0.00 15.50 93.02 Item is to install the partition Paper towel dispenser 1.00 EA 0.00 69.14 0.00 13.82 82.96 Final cleaning - construction - 38.37 SF 0.00 0.22 0.00 1.68 10.12 Commercial Floor preparation for resilient 38.37 SF 0.00 0.45 0.00 3.46 20.73 flooring Vinyl plank flooring 38.37 SF 0.00 5.36 0.00 41.14 246.80 Totals: M. Bathroom 0.00 250.86 1,505.21 DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 290.31 SF Walls & Ceiling 6.03 SY Flooring 29.50 LF Ceil. Perimeter 54.31 SF Ceiling 54.31 SF Floor 29.50 LF Floor Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Paint the walls and ceiling - one coat 290.31 SF 0.00 0.62 0.00 36.00 215.99 Detach & Reset Toilet 1.00 EA 239.08 0.00 0.00 0.00 47.82 286.90 R&R Angle stop valve 1.00 EA 5.00 33.86 0.00 7.78 46.64 R&R Plumbing fixture supply line 1.00 EA 5.00 18.93 0.00 4.78 28.71 DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2 2' 11" 6' 5" 6' 7" 9' 6" 9' 6" 2' 6" 13' 2" 12' 10" 7' 1" 7' 5" 1' 11" 1' 3' 6" Entry Height: 8' 649.35 SF Walls 834.98 SF Walls & Ceiling 20.63 SY Flooring 81.17 LF Ceil. Perimeter 185.63 SF Ceiling 185.63 SF Floor 81.17 LF Floor Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL DocuSign Envelope ID: 15EF7773-4C53-4C2D-8FA1-B3634E615FE2