WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
MICHAEL BAKER INTERNATIONAL, INC.
DATED: August 12, 2020
Work Order No. _______ENG-MB-254902200-2020-01__________
Purchase Order No. City PO Number (Michael Baker PO Number)
Project title: Prospect Undercrossing Joint Mitigation Study
Commencement Date: May 28, 2020
Completion Date: September 15, 2020
Maximum Fee: $20,993.75 (See attached Fee Schedule) (Note: Cost of completing the work is
being split 50/50 with CSU and the City)
PROJECT DESCRIPTION:
The project is to investigate options to mitigate leaking at precast roof joints in the West Prospect Road
Undercrossing at Center Avenue. Scope includes inspecting the structure, identifying leak and possible
solutions, and providing recommendations for leak repair.
CONTRACT TYPE:
This contract will be Time & Materials (Not to Exceed) contract type. Rates will follow the job category rate
table established with the Master Contract Renewal.
TEAM RESPONSIBILITIES AND AUTHORITY:
Michael Baker is the prime engineering consultant and will be responsible for managing all consultant related
activities for this project, as authorized and directed by the City. There are no subconsultants included on the
Michael Baker Team at this time, but subconsultant forensic, geophysical, or other testing may be required, as
directed by the City.
All deliverables will be in the following current software platforms:
• PDF, Microsoft Word, Excel, and Access
• Others as applicable
GUIDELINES AND REFERENCES (CURRENT VERSION UNLESS NOTED OTHERWISE):
Applicable standards include:
• AASHTO LRFD Bridge Design Specifications, 8th edition
• AASHTO Manual for Bridge Evaluation, 2nd edition
• FHWA Bridge Inspector’s Reference Manual (Publication No. FHWA NHI 12-049)
DocuSign Envelope ID: 9D9EEDEC-59B1-4F23-8400-0A358C5EEAAB
Exhibit A - Work Order Form
Steel Plate Rehabilitation or Concrete Box Replacement of Cherry Street over Arthur Ditch
October 2019 2 of 3
• CDOT Bridge Rating Manual
• CDOT Bridge Design Manual
• CDOT Standard Specifications for Road and Bridge Construction
• Michael Baker Inspection Reporting and Database Tool
• Any other applicable documents as approved by the City
SCOPE OF SERVICES
There are seven primary elements that will be completed as part of this project. These are:
I. Project Management / Administration and Quality Control
II. Inspection and Report
III. Field Verification of Structure and Joint Conditions
IV. Alternative Waterproofing Identification
V. Testing Evaluation
VI. Observation of Planter Removal and Waterproofing Condition
VII. Develop Cost and Construction Schedule for Replacing Waterproofing Membrane
I. Project Management / Administration and QC
Upon notice to proceed, Baker will perform project administration duties throughout the length of the contract.
• Invoices will be provided to the City monthly and will include a billing summary for work performed
during the current billing period and project to date.
• All project deliverables will receive a quality assurance and quality control (QA/QC) review, in
accordance with the Michael Baker Quality Controls Procedures prior to submittal.
• The following meetings are anticipated:
• Field verification meeting (outlined in Section III below)
• Alternatives Review Meeting
II. Inspection and Report
Michael Baker performed structural inspection and reporting at the direction of City of Fort Collins on
5/28/2020. Report was provided on 6/4/2020 via email.
III. Field Verification of Structure and Joint Conditions
Michael Baker personnel will visit the Prospect Undercrossing to verify the overall site conditions and inspect
the current joint condition. This field meeting is anticipated to include bridge representative(s) from the City
and two engineers from Michael Baker. Scheduling will be coordinated by Michael Baker after task order is
approved. Meeting minutes detailing discussion and field observations will be provided by Michael Baker.
IV. Alternative Waterproofing Identification
• Research potential solutions for repair including hydrophilic water-stops and slab-to-wall cap joints for
feasibility.
• Review any literature available on the applicability and effectiveness of the repair solutions in similar situations
DocuSign Envelope ID: 9D9EEDEC-59B1-4F23-8400-0A358C5EEAAB
Exhibit A - Work Order Form
Steel Plate Rehabilitation or Concrete Box Replacement of Cherry Street over Arthur Ditch
October 2019 3 of 3
• Determine and report LF/SF costs for materials for repair alternatives
• Determine approximate schedule durations for each option
• Report finding in short memo or table.
• Review alternatives with the city at an Alternatives Review Meeting conducted via teleconference
V. Testing Evaluation
• Research if there is a forensic, geophysical or other test the City can do to determine the source of water
• Investigate cost to execute any applicable testing. This step will not include the testing. Subcontractor will
need to be negotiated separately from this task order if testing is determined to be necessary.
• Research if any testing changes the repair solution
VI. Observation of Planter Removal and Waterproofing Condition
• Site Visit during planter removal to validate waterproofing membrane condition
• Provide findings report with photos
VII. Develop cost and construction schedule for replacing waterproofing Membrane
• Develop rough order of magnitude construction and engineering cost to remove pavement and fill material to
uncover the top slab and replace waterproofing membrane with more durable material.
• Develop estimated construction schedule duration to perform work.
DELIVERABLES
The following is an estimate of the deliverables required for this project. As the project develops, the type and
number of deliverables may vary. Refer to the detailed discussions above for further information. All inspection
information shall be compiled onto a single CD and delivered to the City at the end of the project.
• Monthly progress reports with monthly invoices, as required depending on schedule
• Meeting and telephone conversation documentation
• Inspection Memo for 5/28/2020 inspection provided 6/4/2020
• Meeting minutes from the Field Verification of Structure and Joint Condition
• Alternative Waterproofing Identification Summary Email
• Observation of Planter Removal and Waterproofing Condition Memo providing findings
• Cost and Construction Schedule and list of assumptions for replacement of waterproofing
SCHEDULE
Work is expected to begin on or before July 7th, 2020 (except the inspection which occurred 5/28/2020)
All work completed by September 15th, 2020
Attachments:
- Fee Proposal
DocuSign Envelope ID: 9D9EEDEC-59B1-4F23-8400-0A358C5EEAAB
Robert Mosbey 8/24/2020
Tom Ritz 9/1/2020
Description: Date: 8/12/2020
Prospect Ped Undercrossing Study
Group Manager
Senior Project
Manager
Civil Associate II
$220 $185 $115
8 8 $1,760.00
12 12 $2,220.00
7 6 13 $1,985.00
4 26 30 $3,870.00
2 18 20 $2,510.00
6 6 12 $1,800.00
8 42 50 $6,590.00
145 $20,735.00
Mileage (3 trips x 150 mi x $0.575 / mi) -- $258.75
-- $258.75
0 $0.00
0 $0.00
Fee
$20,993.75
City of Fort Collins
Prospect Ped Undercrossing Study
PRIMARY DESIGN TASK ELEMENTS
WORK ORDER
TOTAL
Subtotal
REIMBURSABLE EXPENSES: (Approximate)
SUBCONSULTANTS:
III. Field Verification of Structure & Joint Conditions
VI. Observation of Planter Removal and Waterproofing Condition
V. Testing Evaluation
VII. Develop Cost and Construction Schedule for Replacing Waterproofing Membrane
Subtotal
Subtotal
IV. Alternative Waterproofing Identification
I. Project Management / Administration & QC
II. Inspection and Report
LABOR
Per hour rates
TOTAL HOURS FEE
8/12/2020 1 of 1