HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8106 UTILITY INFRASTRUCTURE CONSTRUCTION SERVICES FOR WATER, WASTEWATER, AND STORMWATER FACILITIES CAPITAL IMPROVEMENTS (14)Change Order Form (for Work Orders)
Official Purchasing Form
Last updated 10/2017
CHANGE ORDER
NO. 1
PROJECT TITLE: 21-inch Stover Sewer Replacement Project
CONTRACTOR: Connell Resources, Inc.
WORK ORDER NUMBER: Stover-Connell-1
PO NUMBER: 9200109
DESCRIPTION:
1. Reason for Change: Cost
2. Description of Change: Connell performed all required tasks to complete the construction project
ahead of schedule. Significant reductions in work or cost included: flow fill in the street, manholes
and sewer service connections, dewatering, gravel surfacing, pipe stabilization materials, site
manager time on site.
3. Change in Work Order Price: $25,691.22
4. Completion Date (if changed): N/A
ORIGINAL WORK ORDER PRICE $327,376.00
TOTAL APPROVED CHANGE ORDER $ 0.00
TOTAL PENDING CHANGE ORDER $ 0.00
TOTAL THIS CHANGE ORDER $ 25,691.22
TOTAL % OF THIS CHANGE ORDER 7.8%
TOTAL C.O.% OF ORIGINAL WORK ORDER 7.8%
ADJUSTED WORK ORDER COST $ 301,684.78
CONTRACTOR: Connell Resources, Inc.
By: Date:
Name: Title:
ACCEPTANCE: Date:
Amy Johnston, Project Manager
REVIEWED: Date:
Pat Johnson, Senior Buyer
ACCEPTANCE: Date:
Matt Fater, Director, Civil Engineering
DocuSign Envelope ID: 77C6213D-861A-46AB-B434-0E004FD53937
August 31, 2020
August 31, 2020
August 31, 2020
Dan Giesler Project Manager
September 1, 2020
Change Order Form (for Work Orders)
Official Purchasing Form
Last updated 10/2017
ACCEPTANCE: Date:
Andrew Gingerich, Interim Deputy Director Water Engineering
ACCEPTANCE: Date:
Gerry Paul, Purchasing Director
(if greater than $60,000)
DocuSign Envelope ID: 77C6213D-861A-46AB-B434-0E004FD53937
September 1, 2020
September 1, 2020