Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8413 GEOTECHNICAL SERVICES ON-CALL (9)Work Order Form Official Purchasing Form Last updated 10/2017 WORK ORDER FORM PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND CTL THOMPSON WORK ORDER NUMBER: PROJECT TITLE: CITY PARK RESTROOM ORIGINAL BID/RFP NUMBER & NAME: MASTER AGREEMENT EFFECTIVE DATE: 08/18/2020 WORK ORDER COMMENCEMENT DATE: 09/04/2020 WORK ORDER COMPLETION DATE: 12/31/2020 MAXIMUM FEE: (time and reimbursable direct costs): $6,225 PROJECT DESCRIPTION/SCOPE OF SERVICES: material testing Service Provider agrees to perform the services identified above and on attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including attached forms) the Master Agreement shall control. The attached forms consisting of three(3) page(s) are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. CTL Thompson, Title ACCEPTANCE: Date: Jennifer Torrey, Project Manager REVIEWED: Date: Elliot Dale, Buyer or Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) SERVICE PROVIDER: Date: NA NA DocuSign Envelope ID: E6DBC981-234D-490B-B149-CA792950397D August 18, 2020 August 20, 2020 August 25, 2020 August 25, 2020 August 26, 2020 400 North Link Lane | Fort Collins, Colorado 80524 Telephone: 970-206-9455 Fax: 970-206-9441 May 18, 2020 Revised July 27, 2020 City of Fort Collins Park Planning and Development 215 North Mason Street P.O. Box 580 Fort Collins, CO 80522-0580 Attention: Ms. Jen Torrey Subject: Fee Estimate for Construction Observation and Materials Testing Services City Park Restroom Fort Collins, Colorado Proposal No. FC-20-0150 At your request, CTL|Thompson, Inc. is pleased to provide this fee estimate for Construction Observation and Materials Testing services for the City Park Restroom project located in Fort Collins, Colorado. We used the planset in preparation of our proposal. We have revised our previous proposal to include asphalt testing. We anticipate that the City will use our estimate for the basis of establishing a budget for the project and to issue a purchase order for our services. Our estimated scope of services and associated fees were prepared according to the terms and conditions of our professional services agreement with the City of Fort Collins and are presented below. Soil Compaction Testing: Compaction testing may be necessary for slab subgrade, foundation wall backfill, utility trench backfill, and sidewalk subgrade. We estimate 8 site visits and 2 proctors will be necessary. Soil Compaction Testing 8 days x 2 hrs/day x $70/hr $1,120.00 Proctor Test 2 tests x $100/test $200.00 Gradation Test 2 tests x $50/test $100.00 Atterberg Limits Test 2 tests x $70/test $140.00 Subtotal: $1,560.00 Reinforcing Steel Observation: Observation of the reinforcement prior to concrete placement for the structures may be necessary. We estimate 22 site visits will be necessary. Reinforcing Steel Observation 6 days x 1.5 hrs/day x $60/hr $540.00 Subtotal: $540.00 DocuSign Envelope ID: E6DBC981-234D-490B-B149-CA792950397D CITY OF FORT COLLINS CITY PARK RESTROOM CTL | T PROPOSAL NO. FC-20-0150 2 Concrete Testing: Concrete testing may be required for the restrooms and sidewalks. We estimate 10 tests will be necessary. Concrete Tests 10 tests x $180/test $1,800.00 Subtotal: $1,800.00 Asphalt Testing: Asphalt sampling and testing may be necessary for the new parking area. We estimate 1 day of paving and 1 sample will be necessary. Asphalt Testing 1 day x 8 hr/day x $70/hr $560.00 Max Theoretical Density Test 1 test x $90/test $90.00 AC/Gradation Test 1 test x $170/test $170.00 Subtotal: $820.00 Masonry Special Inspection: Masonry inspection and sampling may be necessary for the restroom walls. We estimate a total of 4 site visits and 1 set of grout and mortar samples will be necessary. Engineering Technician 3 days x 4 hrs/day x $70/hr $840.00 Grout Cores 4 cores/set x $40/core $160.00 Prisms 3 prisms/set x $80/prism $240.00 Mortar Cubes 1 set of 6 cubes x $125/set $125.00 Subtotal: $1,365.00 Structural Steel Observation: Observation of the structural welded and bolted connections may be necessary. We estimate 7 site visits will be necessary. Structural Steel Weld/Bolt 1 day x 2 hrs/day x $70/hr $140.00 Subtotal: $140.00 TOTAL ESTIMATED FEE: $6,225.00 It should be emphasized that this estimate is based upon assumptions of actual quantities and contractor’s schedule. The fee will be charged only for the actual hours and unit rates presented for tests and observations requested by the owner, contractor or subcontractors who schedule the services. DocuSign Envelope ID: E6DBC981-234D-490B-B149-CA792950397D CITY OF FORT COLLINS CITY PARK RESTROOM CTL | T PROPOSAL NO. FC-20-0150 3 If we can be of further assistance, please contact us at your convenience. Very truly yours, CTL | THOMPSON, INC. Heather Grubb Field Department Manager DocuSign Envelope ID: E6DBC981-234D-490B-B149-CA792950397D