Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 8522 ASPHALT SURFACE TREATMENT PROJECT (3)CHANGE ORDER NO. 1 PROJECT TITLE: 2020 Street Maintenance Program - Asphalt Surface Treatment Project SERVICE PROVIDER: A-1 Chipseal Co (Vendor #389648) PO NUMBER: 9200886 DESCRIPTION: 1. Reason for Change: 2. Description of Change: 3. Change in Contract Cost: $4,810.20 4. Change in Contract Time: none ORIGINAL CONTRACT COST $279,284.95 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $4,810.20 TOTAL % OF THIS CHANGE ORDER 1.72% TOTAL C.O. % OF ORIGINAL CONTRACT 1.72% ADJUSTED CONTRACT COST $284,095.15 SERVICE PROVIDER: ______________________________________________________ DATE: ___________________________ ACCEPTANCE: ____________________________________________________________ DATE: __________________________ Mike Knox, Project Manager REVIEWED: ____________________________________________________________ DATE: __________________________ Elliot Dale, Senior Buyer ACCEPTANCE: ____________________________________________________________ DATE: __________________________ Gerry Paul, Purchasing Director (if greater than $60,000) • The City is asking for A1 to not tab striping on the W. Elizabeth project and instead use traffic control devices to maintain traffic until striping can occur on the project. • A1 set barrels on project for 10 days and was also responsible for doing daily job checks as required by Traffic Operations on days they were not working and weekends. • Add 24 units to 630.02 • Add new line item 630.03 with 10 units • Add new line item 630.04 with 6 units Official Purchasing Document Last updated 10/2017 DocuSign Envelope ID: F41CCC25-33C6-472B-B131-4B5649301B20 8/25/2020 Danny Gryzmala 8/25/2020 8/25/2020 8/26/2020 ITEM NO DESCRIPTION UNIT Original Contract Quantities 2020 Unit Cost Original Contract Cost CO1- Change in Quantities CO1- Change in Cost Revised Contract Quantities Revised Contract Total Cost 105.01 SWEEPING - ALL STREET SURFACES EACH 2 $14,750.00 $29,500.00 $0.00 2 $29,500.00 105.02 SWEEPING - ALL PARKING LOT SURFACES EACH 1 $1,598.00 $1,598.00 $0.00 1 $1,598.00 208.01 STORMWATER PROTECTION - WATTLE (Supplied by the City) LINEAL FOOT 300 $5.86 $1,758.00 $0.00 300 $1,758.00 208.02 STORMWATER PROTECTION - WATTLE (New supplied by Contractor) LINEAL FOOT 20 $20.52 $410.40 $0.00 20 $410.40 208.03 STORMWATER INLET PROTECTION - Fabric and Wattle (Fabric supplied by Contractor, Wattle supplied by the City) EACH INLET 10 $133.25 $1,332.50 $0.00 10 $1,332.50 208.04 STORMWATER INLET PROTECTION -Fabric and Wattle (Both New, supplied by Contractor) EACH INLET 5 $442.41 $2,212.05 $0.00 5 $2,212.05 409.01 CHIP SEAL (ARTERIAL) SQUARE YARD 100 $3.35 $335.00 $0.00 100 $335.00 409.02 CHIP SEAL (COLLECTOR) SQUARE YARD 100 $3.35 $335.00 $0.00 100 $335.00 409.03 CHIP SEAL (RESIDENTIAL) SQUARE YARD 100 $3.35 $335.00 $0.00 100 $335.00 409.04 TYPE II SLURRY SEAL (ARTERIAL) SQUARE YARD 100 $2.66 $266.00 $0.00 100 $266.00 409.05 TYPE II SLURRY SEAL (COLLECTOR) SQUARE YARD 100 $2.60 $260.00 $0.00 100 $260.00 409.06 TYPE II SLURRY SEAL (RESIDENTIAL) SQUARE YARD 31,000 $2.54 $78,740.00 $0.00 31,000 $78,740.00 409.07 TYPE II SLURRY SEAL (PARKING LOTS) SQUARE YARD 100 $4.11 $411.00 $0.00 100 $411.00 409.08 CAPE SEAL (ARTERIAL) SQUARE YARD 28,500 $5.42 $154,470.00 $0.00 28,500 $154,470.00 409.09 CAPE SEAL (COLLECTOR) SQUARE YARD 100 $5.32 $532.00 $0.00 100 $532.00 410.10 CAPE SEAL (RESIDENTIAL) SQUARE YARD 100 $5.20 $520.00 $0.00 100 $520.00 409.11 SLURRY TRAV CRACK LEVELING (30" band width, 3/4 to 2" crack) LINEAL FOOT 50 $5.27 $263.50 $0.00 50 $263.50 409.12 SLURRY SURFACE LEVELING (1/4 to 1/2" thickness per lift;) SQUARE YARD 200 $12.79 $2,558.00 $0.00 200 $2,558.00 409.13 FOG SEAL SQUARE YARD 100 $0.36 $36.00 $0.00 100 $36.00 627.01 PAVEMENT MARK REMOVAL 4IN (SURFACE GRINDING) LINEAL FOOT 100 $2.15 $215.00 $0.00 100 $215.00 630.01 VARIABLE MESSAGE BOARD EA/DAY 5 $266.50 $1,332.50 $0.00 5 $1,332.50 630.02 ADDITIONAL FLAGGING PERSONNEL HOUR 50 $37.30 $1,865.00 24 $895.20 74 $2,760.20 630.03 TRAFFIC CONTROL BARRELS DAY 0 $175.50 $0.00 10 $1,755.00 10 $1,755.00 630.04 TRAFFIC CONTROL SITE INSPECTION DAY 0 $360.00 $0.00 6 $2,160.00 6 $2,160.00 2020 TOTAL $ 279,284.95 $4,810.20 $284,095.15 2020 BASE BID SCHEDULE DocuSign Envelope ID: F41CCC25-33C6-472B-B131-4B5649301B20 Proposal # 27381 City of Fort Collins 281 College Ave. Fort Collins, CO 80522- Attention Mike Knox (970) 221-6576 mknox@fcgov.com Change Order for City of Ft. Collins Asphalt surfacing program - Various Streets - Ft. Collins Proposal # 08/20/20 Date Item# Description Qnty/Unit Unit Price Total Price Change Order - Traffic Control Management 11271 Job # www.a-1chipseal.com 01 Traffic Control Barrels 135 @ $1.30/Day/Barrel QTC 10 DAY $175.50 $1,755.00 02 Flagging Hours to Set & Clear Barrels 24 HR $37.3000 $895.20 03 Traffic Control - Site Inspection - Trinity TC 6 DAY $360.00 $2,160.00 Authorized Agent(s) Accepted by:______________________________Date:__________Estimator: _John _---------Parks -________________________ jparks@asphaltrepair.com (720) 540-8288 Phone: 303.464.9267 Fax: 303.464.9261 2505 E 74th Ave - Denver, CO 80229 Accepted by:______________________________Date:__________ John Parks Orginal Contract Amount This Change Order Previous Change Orders Revised Contract Total $279,284.95 $4,810.20 $0.00 $284,095.15 DocuSign Envelope ID: F41CCC25-33C6-472B-B131-4B5649301B20