HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8697 VENDOR SELECTION AND IMPLEMENTATION FOR A UTILITES-BROADBAND BILLING SYSTEM (3)PROJECT CHANGE REQUEST Date (yyyy-mm-dd):2020-Jun-02 PCR. No. 22 No. SAO: Priority (High-Medium-Low): High Project Change Request Form Page 1 of 2 Description of requirement/issue: Fort Collins needs the ability capture a new energy service attribute named “Terminal Node ID” in OSF. This new attribute will have the below requirements. ➢ Store the new attribute "Terminal Node ID" at the Product/Service Level. This will be an Alphanumeric field of size 10 characters. It should be all uppercase. ➢ Ability to send this value on an Install/Pull Meter Work Orders. ➢ Display and accept data on the Mobile Work Order Close screen. The technician will be entering the values into this field. ➢ Available only for Electric (Energy) products. ➢ Send this value to Maximo via the OSF-Maximo integration. ➢ Since the Terminal Node ID is not captured currently in Banner, there is no migration required. Terminal Node ID: This is an ID retrieved from Arc FM GIS system that identifies the substation from where the energy is received by the Meter. This is typically a location between the Transformer and the Meter. Description of the actions to follow: Open and CFC agreed on signing-off this change control for Open to develop this requirement as a customization. Description of the deliverables to generate: Customization would be generated and delivered to the project with the scope defined previously. Estimated impact of implementing requirement: The estimated effort is 79 hours with and additional cost of USD $9,164. This change request does not include changes in the functional configuration that could be required for the process. These change control will be billed upon delivery of the development requested and estimated. Requested by: Fort Collins Date of request: 2020-Jan-30 Responsibility/Position: NA Costs assumed by: NA Contract amendment required? (If yes, attach the ammended contract) YES NO X Estimations Estimated impact on time frame Estimated impact on resources Estimated impact on costs Notes Additional percentage NA 79 hours USD $9,164 This is out of the scope of the project TOTAL IMPACT: 79 hours $9,164 TIME FRAME Current Time Frame: N/A New Time Frame: N/A CASH FLOW Current Cashflow: N/A New Cashflow: N/A EXECUTION OF THE SOLUTION APPROVAL DocuSign Envelope ID: 6E60A91C-8122-492A-A494-F39D513BA47D PROJECT CHANGE REQUEST Date (yyyy-mm-dd):2020-Jun-02 PCR. No. 22 No. SAO: Priority (High-Medium-Low): High Project Change Request Form Page 2 of 2 By Open: By Client: Name: Diego López Position: Project Manager Date: 2020-jun-02 Signature: Name: Andrew Amato Position: Project Manager Date: 2020-jun-02 Signature: Approved X Rejected Approved X Rejected Proposed date for solution delivery: DocuSign Envelope ID: 6E60A91C-8122-492A-A494-F39D513BA47D Adam Bromley 8/11/2020 Lisa Rosintoski 8/11/2020 Gerry Paul 8/12/2020