Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 9005 HAIL ROOF REPLACEMENTS AND REPAIR PROJECT (2)FACILITIES REQUISITION FORM VENDOR DATE REQ BY: Work Order # CHARGE# TOTAL COST: - BUYER: OTY DESCRIPTION COST ADDITIONAL INFO COMPUTER INPUT INFORMATION: VENDOR# REQUISITION # DATE ENTERED: Billable? Y/N AAA Roofing & Construction, LLC 8-10-2020 Matthew Schaefer, Proj. Mgr. 1 (PR-600340) N 100510122.533110 $23,258.48 Jake Rector, Senior Buyer 1 4316 LaPorte Avenue: Roof Replacement at Water Treatment Facility - Change Order No. 4 COR 15: Time Extension COR 17: Waste disposal costs in excess of scope of work COR 18: Labor to install roof patches COR 19: Loss of labor due to Owner operation COR 20: SOS Building system modification COR 21: Deductive: Cost to repair Owner fiber optic cable $23,258.48 Change Order Form (for Work Orders) Official Purchasing Form Last updated 10/2017 CHANGE ORDER NO. 4 PROJECT TITLE: 4316 West LaPorte Ave. Roof Replacement SERVICE PROVIDER: AAA Roofing & Construction WORK ORDER NUMBER: 1 (PR-600340) PO NUMBER: 9200292 DESCRIPTION: 1. Reason for Change: To address time extension, additional disposal costs, miscellaneous labor, lost labor cost due to Owner operation, roof system change for SOS Building. 2. Description of Change: COR 15: Time extension (associated with COR 20) 30 consecutive calendar days (ccd) COR 17: Waste disposal costs in excess of scope of work $13,750.00 COR 18: Labor to install roof patches (Lighting Protection System) $910.00 (1 ccd) COR 19: Loss of labor cost due to owner operation $2,600.00 COR 20: SOS Building system modification (associated with COR 15) $6,139.34 COR 21: Deductive: Cost to repair Owner fiber optic cable ($140.86) 3. Change in Work Order Price: $23,258.48 4. Change in Work Order Time: 31 consecutive calendar days Revised Substantial Completion Date: July 25, 2020 Revised Final Completion Date: August 24, 2020 ORIGINAL WORK ORDER PRICE $ 806,313.87 TOTAL APPROVED CHANGE ORDER 134,701.24 TOTAL PENDING CHANGE ORDER 0.00 TOTAL THIS CHANGE ORDER $23,258.48 TOTAL % OF THIS CHANGE ORDER 2.47% TOTAL C.O.% OF ORIGINAL WORK ORDER 19.59% ADJUSTED WORK ORDER COST $ 964,273.59 SERVICE PROVIDER: Date: Joshua Morales, AAA Roofing & Construction ACCEPTANCE: Date: Matthew Schaefer, Project Manager REVIEWED: Date: Ken Mannon, Director of Operation Services DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C 8/7/2020 8/7/2020 8/10/2020 CHANGE ORDER REQUEST (PROPOSAL) Project: Water Treatment Facility Hail Replacement To: City of Fort Collins- Matt Shaefer Re: Time Extension Change Order Request Number: 15 From (Contractor): AAA Roofing & Construction Date: 04/05/20 A/E Project Number: Contract For: This Change Order Request (C.O.R.) contains an itemized quotation for changes in the Contract Sum or Contract Time in response to proposed modifications to the Contract Documents based on Proposal Request No. . Description of Proposed Change: AAA Roofing & Construction is requesting a formal time extension of 30 days for delay in issuing approval for SOS building Time extension was also requested for previous COs Liquidated damages start on June 1. 2020. We do not have enough time to complete all work before then Attached supporting information from: Subcontractor Supplier Permit Reciept Reason For Change: Time extension was also requested for previous COs We request time extension due to all the change orders, snow days, snow removal days, and delay in issuing approval to proceed with SOS Liquidated damages start on June 1. 2020. We do not have enough time to complete all work before then Does Proposed Change involve a change in Contract Sum? No Yes [Increase] [Decrease] $ 0.00 Does Proposed Change involve a change in Contract Time? No Yes [Increase] [Decrease] 30 days. Attached pages: Proposal Worksheet Summary: Proposal Worksheet Detail(s): Signed by: Joshua Morales Date: 04/27/2020 Copies: Owner Consultants File Copyright 1994, Construction Specifications Institute, 99 Canal Center Plaza, Suite 300 Alexandria, VA 22314 Page of July 1994 CSI Form 13.6A DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C CHANGE ORDER REQUEST (PROPOSAL) Project: Water Treatment Facility Hail Replacement To: City of Fort Collins- Matt Shaefer Re: Dumpster fees Change Order Request Number: 17 From (Contractor): AAA Roofing & Construction Date: 06/14/20 A/E Project Number: Contract For: This Change Order Request (C.O.R.) contains an itemized quotation for changes in the Contract Sum or Contract Time in response to proposed modifications to the Contract Documents based on Proposal Request No. . Description of Proposed Change: This CO is for additional dumpsters not originally included in insurance loss scope of work Original alotment was 9 dumpsters 6 dumpsters were credited to Risk removal for ACM removal per original proposal This resulted in only 3 dumpsters for roof removal and original proposal asked for additional dumpsters needed Attached supporting information from: Subcontractor Supplier Permit Reciept Reason For Change: At the beginning of job I stated that we needes many more dumpsters for waste. air volume and construction waste not calculated Actuall number of 30 yard dumpsters used is 28 not including South Filter Bay 28-3 = 25 dumpsters to be billed for 25 * $550 = $13,750.00 Does Proposed Change involve a change in Contract Sum? No Yes [Increase] [Decrease] $ 13,750.00 Does Proposed Change involve a change in Contract Time? No Yes [Increase] [Decrease] days. Attached pages: Proposal Worksheet Summary: Heimbuck Disposal Transaction Report Proposal Worksheet Detail(s): Signed by: Joshua Morales Date: 06/14/2020 Copies: Owner Consultants File Copyright 1994, Construction Specifications Institute, 99 Canal Center Plaza, Suite 300 Alexandria, VA 22314 Page of July 1994 CSI Form 13.6A DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C AAA Roofing and Construction, LLC TRANSACTION REPORT January 1 - June 2, 2020 Accrual Basis Tuesday, June 2, 2020 03:51 PM GMT-06:00 1/1 DATE TRANSACTION TYPE NUM NAME MEMO/DESCRIPTION ACCOUNT SPLIT AMOUNT BALANCE Cost of Goods Sold Dump Fees 02/12/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 900.00 900.00 02/19/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 450.00 1,350.00 02/19/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 511.20 1,861.20 02/20/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 532.80 2,394.00 02/21/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 1,106.80 3,500.80 02/22/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 1,812.00 5,312.80 02/28/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 450.00 5,762.80 03/03/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 450.00 6,212.80 03/05/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 450.00 6,662.80 03/07/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 450.00 7,112.80 03/10/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 150.00 7,262.80 03/12/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 508.00 7,770.80 03/17/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 1,800.00 9,570.80 03/18/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 450.00 10,020.80 03/21/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 450.00 10,470.80 03/24/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 1,800.00 12,270.80 03/26/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 450.00 12,720.80 03/27/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 450.00 13,170.80 03/27/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 450.00 13,620.80 04/07/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 450.00 14,070.80 04/08/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 900.00 14,970.80 04/09/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 900.00 15,870.80 04/11/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 900.00 16,770.80 04/15/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 450.00 17,220.80 04/16/2020 Expense Heimbuck Disposal HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 450.00 17,670.80 04/22/2020 Expense heimbuck disposal inc Cost of Goods Sold:Dump Fees Capital One - 6999 691.50 18,362.30 05/06/2020 Expense Brandon Schershlit HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 450.00 18,812.30 05/22/2020 Expense Brandon Schershlit HEIMBUCK DISPOSAL INC Cost of Goods Sold:Dump Fees Capital One - 6999 450.00 19,262.30 Total for Dump Fees $19,262.30 Total for Cost of Goods Sold $19,262.30 TOTAL $19,262.30 DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C CHANGE ORDER REQUEST (PROPOSAL) Project: Water Treatment Facility Hail Replacement To: City of Fort Collins- Matt Shaefer Re: Lightning protection Change Order Request Number: 18 From (Contractor): AAA Roofing & Construction Date: 06/14/20 A/E Project Number: Contract For: This Change Order Request (C.O.R.) contains an itemized quotation for changes in the Contract Sum or Contract Time in response to proposed modifications to the Contract Documents based on Proposal Request No. . Description of Proposed Change: Cost to install patches for Lighting protection 2 man x 4hrs x 1days = 10hrs Material: $260.00 10hrs x $65/hr = $650.00 Attached supporting information from: Subcontractor Supplier Permit Reciept Reason For Change: All alloted price to replace lightning protection was credited back to facility. System needs a sacrificial piece of TPO installed on each bracket to prevent wear from cables Does Proposed Change involve a change in Contract Sum? No Yes [Increase] [Decrease] $ 910.00 Does Proposed Change involve a change in Contract Time? No Yes [Increase] [Decrease] 1 days. Attached pages: Proposal Worksheet Summary: Proposal Worksheet Detail(s): Signed by: Joshua Morales Date: 06/15/2020 Copies: Owner Consultants File Copyright 1994, Construction Specifications Institute, 99 Canal Center Plaza, Suite 300 Alexandria, VA 22314 Page of July 1994 CSI Form 13.6A DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C CHANGE ORDER REQUEST (PROPOSAL) Project: Water Treatment Facility Hail Replacement To: City of Fort Collins- Matt Shaefer Re: Lost hours Change Order Request Number: 19 From (Contractor): AAA Roofing & Construction Date: 07/7/20 A/E Project Number: Contract For: This Change Order Request (C.O.R.) contains an itemized quotation for changes in the Contract Sum or Contract Time in response to proposed modifications to the Contract Documents based on Proposal Request No. . Description of Proposed Change: This COR is for the lost hours onsite for 10 men for 4 hours Attached supporting information from: Subcontractor Supplier Permit Reciept Reason For Change: Floride truck came to fill tanks and crew lost 4hours and 15min waiting on the truck to fill tank. T These lost hours still were paid to crew. No notification was givin to account for lost time. 10 men x 4hrs=40hrs 40hrsx$65/hr=$2,600.00 Does Proposed Change involve a change in Contract Sum? No Yes [Increase] [Decrease] $ 2,600.00 Does Proposed Change involve a change in Contract Time? No Yes [Increase] [Decrease] 0 days. Attached pages: Proposal Worksheet Summary: Proposal Worksheet Detail(s): Signed by: Joshua Morales Date: 07/7/2020 Copies: Owner Consultants File Copyright 1994, Construction Specifications Institute, 99 Canal Center Plaza, Suite 300 Alexandria, VA 22314 Page of July 1994 CSI Form 13.6A DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C CHANGE ORDER REQUEST (PROPOSAL) Project: Water Treatment Facility Hail Replacement To: City of Fort Collins- Matt Shaefer Re: Price difference on SOS overlay Change Order Request Number: 20 From (Contractor): AAA Roofing & Construction Date: 07/9/20 A/E Project Number: Contract For: This Change Order Request (C.O.R.) contains an itemized quotation for changes in the Contract Sum or Contract Time in response to proposed modifications to the Contract Documents based on Proposal Request No. . Description of Proposed Change: This COR is for the supplemented cost to complete SOS building including ovelay and skylights Attached supporting information from: Subcontractor Supplier Permit Reciept Reason For Change: Original cost of SOS building was $124,901.13 . Final approved amount is $131,040.47 Does Proposed Change involve a change in Contract Sum? No Yes [Increase] [Decrease] $ 6,139.34 Does Proposed Change involve a change in Contract Time? No Yes [Increase] [Decrease] days. Attached pages: Proposal Worksheet Summary: Proposal Worksheet Detail(s): Signed by: Joshua Morales Date: 07/9/2020 Copies: Owner Consultants File Copyright 1994, Construction Specifications Institute, 99 Canal Center Plaza, Suite 300 Alexandria, VA 22314 Page of July 1994 CSI Form 13.6A DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C 1 AAA Roofing & Construction Roofing Contractor Client: Fort Collins Water Treatement Facility Property: 4316 Laporte Ave. Fort Collins , CO 80521 Operator: JOSH Estimator: Joshua Morales Business: (970) 682-0010 E-mail: josh@aaaroofing- construction.com Company: AAA Roofing and Construction Business: 1326 Bowwood Ct Loveland, CO 80538 Type of Estimate: Hail Date Entered: 2/23/2020 Date Assigned: Date Est. Completed: 2/25/2020 Date Job Completed: Price List: COFC8X_SEP19 Labor Efficiency: Restoration/Service/Remodel Estimate: 2020-02-23-1551 DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C 2 AAA Roofing & Construction Roofing Contractor 2020-02-23-1551 2/27/2020 Page: 2 2020-02-23-1551 General Conditions DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 1. Dumpster load - Approx. 30 22.00 EA 550.00 0.00 0.00 12,100.00 yards, 5-7 tons of debris 2. Telehandler/forklift and operator 320.00 HR 0.00 114.80 0.00 36,736.00 3. Temporary toilet (per month) 2.00 MO 0.00 170.84 0.00 341.68 4. Job-site cargo/storage container - 40' 2.00 MO 0.00 115.84 22.13 253.81 long - per month 5. Job-site cargo container - pick 2.00 EA 0.00 99.40 0.00 198.80 up/del. (each way) 16'-40' 6. Taxes, insurance, permits & fees 1.00 EA 0.00 2,334.00 0.00 2,334.00 (Bid Item) Totals: General Conditions 22.13 51,964.29 North Filter Bay DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 7. Glass mat gypsum - 1/2" - primed 104.80 SQ 0.00 176.73 806.88 19,328.18 8. Tear off, haul and dispose of 3 ply 104.80 SQ 50.25 0.00 0.00 5,266.20 built-up roofing 9. R&R Insulation - ISO board, 2" 104.80 SQ 37.54 219.82 1,015.65 27,986.98 10. R&R Fiberboard - 1/2" 10,480. SF 0.42 0.77 260.22 12,731.42 00 11. R&R Single ply membrane - 109.30 SQ 66.58 340.40 1,522.93 46,005.84 Mechanically attached - 60 mil 12. R&R Cap flashing 84.75 LF 0.54 18.42 87.25 1,694.12 13. R&R Aluminum termination bar / 32.00 LF 0.55 2.24 2.14 91.42 flashing for membrane roofs 14. R&R Counterflashing - Apron 124.25 LF 0.54 8.90 14.95 1,187.88 flashing 15. R&R Exhaust fan - large room 4.00 EA 17.40 1,403.76 411.45 6,096.09 16. Packaged air conditioning unit - 1.00 EA 0.00 871.11 0.00 871.11 Detach & reset 17. Additional charge for high roof (2 104.80 SQ 4.91 0.00 0.00 514.57 stories or greater) 18. Additional charge for high roof (2 104.80 SQ 0.00 25.43 0.00 2,665.06 stories or greater) 19. R&R Flashing - pipe jack 1.00 EA 6.54 37.98 0.80 45.32 20. R&R Flashing - pipe jack - split 1.00 EA 6.54 71.43 3.67 81.64 boot DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C 3 AAA Roofing & Construction Roofing Contractor 2020-02-23-1551 2/27/2020 Page: 3 CONTINUED - North Filter Bay DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 21. Roofing (Bid Item) 22.00 EA 0.00 25.00 0.00 550.00 support boot 22. R&R Roof drain - cast iron - 2" to 6.00 EA 39.78 427.95 143.34 2,949.72 6" outlet 23. R&R Counterflashing - Apron 48.50 LF 0.54 8.90 5.84 463.68 flashing 24. R&R Flashing - pipe jack 1.00 EA 6.54 37.98 0.80 45.32 25. R&R Exhaust cap - through roof - 1.00 EA 8.34 80.38 3.15 91.87 6" to 8" 26. R&R Flashing - pipe jack 4.00 EA 6.54 37.98 3.20 181.28 27. R&R Flashing - pipe jack - split 11.00 EA 6.54 71.43 40.42 898.09 boot 28. R&R Exhaust cap - through roof - 2.00 EA 8.34 80.38 6.30 183.74 6" to 8" 29. Expansion joint - Roof - neoprene 162.75 LF 0.00 33.07 497.36 5,879.50 w/alum. cover, 2"-3" actual number 316lf paid 162 lf 30. Roofing - walkway boards 570.00 SF 0.00 3.47 72.40 2,050.30 31. R&R Exhaust cap - through roof 7.00 EA 8.34 80.38 22.06 643.10 - 6" to 8" 32. Roofing - General Laborer - per 2.00 HR 0.00 40.45 0.00 80.90 hour 33. R&R Roof drain - cast iron - 2" to 1.00 EA 39.78 427.95 23.89 491.62 6" outlet 34. Roofing (Bid Item) 2.00 EA 0.00 25.00 0.00 50.00 support boot 35. R&R Exhaust fan - large room 4.00 EA 17.40 1,403.76 411.45 6,096.09 36. R&R Insulation - ISO board, 3" 91.60 SQ 37.54 295.17 1,181.13 31,657.36 Totals: North Filter Bay 6,537.28 176,878.40 South Filter Bay DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 37. R&R Insulation - ISO board, 3 13.00 SQ 37.54 346.77 203.10 5,199.13 1/2" 38. Glass mat gypsum - 1/2" - primed 13.00 SQ 0.00 176.73 100.09 2,397.58 39. Tear off, haul and dispose of 3 ply 13.00 SQ 50.25 0.00 0.00 653.25 built-up roofing DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C 4 AAA Roofing & Construction Roofing Contractor 2020-02-23-1551 2/27/2020 Page: 4 CONTINUED - South Filter Bay DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 40. R&R Insulation - ISO board, 1 13.00 SQ 37.54 184.23 92.37 2,975.38 1/2" 41. R&R Fiberboard - 1/2" 13.00 SF 0.42 0.77 0.32 15.79 42. R&R Single ply membrane - 13.00 SQ 66.58 340.40 181.13 5,471.87 Mechanically attached - 60 mil 43. Additional charge for high roof (2 13.00 SQ 4.91 0.00 0.00 63.83 stories or greater) 44. Additional charge for high roof (2 13.00 SQ 0.00 25.43 0.00 330.59 stories or greater) 45. Roofing (Bid Item) 18.00 EA 0.00 25.00 0.00 450.00 support boot 46. R&R Roof drain - cast iron - 2" to 8.00 EA 39.78 427.95 191.12 3,932.96 6" outlet 47. Expansion joint - Roof - neoprene 140.50 LF 0.00 33.07 429.37 5,075.71 w/alum. cover, 2"-3" Totals: South Filter Bay 1,197.50 26,566.09 T3 DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 48. R&R Insulation - ISO board, 1" 120.03 SQ 37.54 158.77 718.26 24,281.35 49. R&R Insulation - ISO board, 1 120.03 SQ 37.54 184.23 852.84 27,471.90 1/2" 50. Glass mat gypsum - 1/2" - 120.03 SQ 0.00 176.73 924.14 22,137.04 primed 51. Tear off, haul and dispose of 3 120.03 SQ 50.25 0.00 0.00 6,031.51 ply built-up roofing 52. R&R Fiberboard - 1/2" 120.03 SF 0.42 0.77 2.98 145.81 53. R&R Single ply membrane - 125.19 SQ 66.58 340.40 1,744.33 52,694.16 Mechanically attached - 60 mil 54. Additional charge for high roof 125.19 SQ 4.91 0.00 0.00 614.68 (2 stories or greater) 55. Additional charge for high roof 125.09 SQ 0.00 25.43 0.00 3,181.04 (2 stories or greater) 56. Expansion joint - Roof - neoprene 462.00 LF 0.00 33.07 1,411.87 16,690.21 w/alum. cover, 2"-3" 57. R&R Flashing - pipe jack 6.00 EA 6.54 37.98 4.80 271.92 58. R&R Exhaust cap - through roof - 6.00 EA 8.34 80.38 18.91 551.23 6" to 8" 59. R&R Roof drain - cast iron - 2" to 6.00 EA 39.78 427.95 143.34 2,949.72 6" outlet DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C 5 AAA Roofing & Construction Roofing Contractor 2020-02-23-1551 2/27/2020 Page: 5 CONTINUED - T3 DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 60. Roofer - per hour 5.00 HR 0.00 127.01 0.00 635.05 61. R&R Cap flashing - large 362.00 LF 0.54 24.02 559.01 9,449.73 62. Insulation - ISO board, 3" 120.03 SQ 0.00 295.17 1,547.72 36,976.98 code item Totals: T3 7,928.20 204,082.33 Maintanence/Conference DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 63. R&R Insulation - ISO board, 1 40.87 SQ 37.54 184.23 290.39 9,354.13 1/2" 64. Glass mat gypsum - 1/2" - 40.87 SQ 0.00 176.73 314.67 7,537.63 primed 65. Tear off, haul and dispose of 3 40.87 SQ 50.25 0.00 0.00 2,053.72 ply built-up roofing 66. R&R Insulation - ISO board, 3 40.87 SQ 37.54 346.77 638.51 16,345.26 1/2" 67. R&R Fiberboard - 1/2" 4,087.00 SF 0.42 0.77 101.48 4,965.01 68. R&R Single ply membrane - 44.40 SQ 66.58 340.40 618.65 18,688.56 Mechanically attached - 60 mil 69. Additional charge for high roof 40.87 SQ 4.91 0.00 0.00 200.67 (2 stories or greater) 70. Additional charge for high roof 40.87 SQ 0.00 25.43 0.00 1,039.32 (2 stories or greater) 71. Retrofit curb - large 3.00 EA 0.00 2,266.42 572.14 7,371.40 72. R&R Cap flashing 259.00 LF 0.54 18.42 266.64 5,177.28 73. R&R Aluminum termination bar / 105.00 LF 0.55 2.24 7.02 299.97 flashing for membrane roofs 74. Roofing - walkway boards 780.00 SF 0.00 3.47 99.07 2,805.67 75. Packaged gas furnace & AC unit - 3.00 EA 0.00 913.76 0.00 2,741.28 Detach & reset Totals: Maintanence/Conference 2,908.57 78,579.90 Main building shed DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 76. R&R Metal roofing - ribbed - 26 105.00 SF 0.47 5.39 14.44 629.74 gauge - up to 1" DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C 6 AAA Roofing & Construction Roofing Contractor 2020-02-23-1551 2/27/2020 Page: 6 CONTINUED - Main building shed DESCRIPTION QTY REMOVE REPLACE TAX TOTAL Totals: Main building shed 14.44 629.74 SOS Building DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 77. R&R Metal roofing - Premium 11,286. SF 0.47 9.30 2,931.65 113,195.87 grade 00 78. R&R Corrugated fiberglass roofing 204.75 SF 0.38 3.10 24.44 736.98 (greenhouse type) 79. R&R Ridge cap - metal roofing 126.00 LF 3.00 5.38 26.83 1,082.71 80. R&R Ridge end cap for metal 2.00 EA 4.97 26.05 2.46 64.50 roofing 81. R&R Gable trim for metal roofing - 164.00 LF 0.77 5.68 39.62 1,097.42 26 gauge 82. R&R Endwall flashing for metal 23.25 LF 0.87 6.26 6.13 171.91 roofing - 26 gauge 83. R&R Closure strips for metal 573.75 LF 0.77 1.88 27.94 1,548.38 roofing - inside and/or outside 84. R&R Flashing - pipe jack 4.00 EA 6.54 37.98 3.20 181.28 85. R&R Exhaust cap - through roof - 16.00 EA 8.34 72.38 38.20 1,329.72 up to 4" 86. R&R Exhaust cap - through roof - 2.00 EA 8.34 80.38 6.30 183.74 6" to 8" 87. R&R Gutter / downspout - 275.25 LF 1.55 15.13 279.69 4,870.86 galvanized - concealed 88. Gutter / downspout - Detach & 96.00 LF 0.00 4.56 0.00 437.76 reset Totals: SOS Building 3,386.46 124,901.13 SOS shed DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 89. R&R Metal roofing - ribbed - 26 105.00 SF 0.47 5.39 14.44 629.74 gauge - up to 1" Totals: SOS shed 14.44 629.74 Contractor Shed DESCRIPTION QTY REMOVE REPLACE TAX TOTAL DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C 7 AAA Roofing & Construction Roofing Contractor 2020-02-23-1551 2/27/2020 Page: 7 CONTINUED - Contractor Shed DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 90. R&R Window screen, 1 - 9 SF 1.00 EA 3.50 39.41 3.33 46.24 91. R&R Metal roofing - corrugated - 1,530.00 SF 0.47 5.07 163.65 8,639.85 29 gauge. 92. R&R Corrugated fiberglass roofing 150.00 SF 0.38 3.10 17.91 539.91 (greenhouse type) 93. R&R Drip edge 171.00 LF 0.31 2.16 11.10 433.47 Totals: Contractor Shed 195.99 9,659.47 Mechanical/electical/lightning DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 94. Lightning protection system - 24.00 EA 0.00 346.89 0.00 8,325.36 Detach & reset 95. Lightning protection system - 32.00 EA 0.00 346.89 0.00 11,100.48 Detach & reset Totals: Mechanical/electical/lightning 0.00 19,425.84 Roof accessories DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 96. Digital satellite system - Detach & 1.00 EA 0.00 34.52 0.00 34.52 reset Totals: Roof accessories 0.00 34.52 Supplement for Code Items and assembly requirement DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 97. Bid Item-Framing 1.00 EA 0.00 7,413.81 0.00 7,413.81 98. Bid Item-Vapor Barrier 1.00 EA 0.00 55,875.00 0.00 55,875.00 99. Roofing (Bid Item) 1.00 EA 0.00 7,100.00 0.00 7,100.00 Labor for tapered 100. Bid Item-Tapered insulation 1.00 EA 0.00 27,560.00 0.00 27,560.00 1/4"/ft Tapered EPS 101. Crane and operator - 50 ton 16.00 HR 0.00 195.00 0.00 3,120.00 capacity DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C 8 AAA Roofing & Construction Roofing Contractor 2020-02-23-1551 2/27/2020 Page: 8 CONTINUED - Supplement for Code Items and assembly requirement DESCRIPTION QTY REMOVE REPLACE TAX TOTAL This item is for detaching and resetting HVAC units on Maintanence/Conference roof . Units need to be raised up for adequate flashing. 102. Bid Item- Stairs- Welding 1.00 EA 0.00 1,150.50 0.00 1,150.50 Totals: Supplement for Code Items and assembly requirement 0.00 102,219.31 Line Item Totals: 2020-02-23-1551 22,205.01 795,570.76 DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C 9 AAA Roofing & Construction Roofing Contractor 2020-02-23-1551 2/27/2020 Page: 9 Summary Line Item Total 773,365.75 Material Sales Tax 22,182.88 Storage Rental Tax 22.13 Replacement Cost Value $795,570.76 Net Claim $795,570.76 Joshua Morales DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C 10 AAA Roofing & Construction Roofing Contractor 2020-02-23-1551 2/27/2020 Page: 10 Recap of Taxes Material Sales Tax Manuf. Home Tax (9.55%) Storage Rental Tax Local Food Tax (6.65%) (9.55%) (9.55%) Line Items 22,182.88 0.00 22.13 0.00 Total 22,182.88 0.00 22.13 0.00 DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C 11 AAA Roofing & Construction Roofing Contractor 2020-02-23-1551 2/27/2020 Page: 11 Recap by Room Estimate: 2020-02-23-1551 General Conditions 51,942.16 6.72% North Filter Bay 170,341.12 22.03% South Filter Bay 25,368.59 3.28% T3 196,154.13 25.36% Maintanence/Conference 75,671.33 9.78% Main building shed 615.30 0.08% SOS Building 121,514.67 15.71% SOS shed 615.30 0.08% Contractor Shed 9,463.48 1.22% Mechanical/electical/lightning 19,425.84 2.51% Roof accessories 34.52 Supplement for Code Items and assembly requirement 102,219.31 13.22% Subtotal of Areas 773,365.75 100.00% Total 773,365.75 100.00% DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C 12 AAA Roofing & Construction Roofing Contractor 2020-02-23-1551 2/27/2020 Page: 12 Recap by Category Items Total % CONTENT MANIPULATION 430.48 0.05% GENERAL DEMOLITION 83,243.17 10.46% ELECTRICAL - SPECIAL SYSTEMS 19,460.36 2.45% HEAVY EQUIPMENT 39,856.00 5.01% PERMITS AND FEES 2,334.00 0.29% HEAT, VENT & AIR CONDITIONING 21,641.73 2.72% PLUMBING 8,986.95 1.13% ROOFING 500,430.37 62.90% SOFFIT, FASCIA, & GUTTER 4,602.29 0.58% TEMPORARY REPAIRS 341.68 0.04% USER DEFINED ITEMS 91,999.31 11.56% WINDOW REGLAZING & REPAIR 39.41 0.00% Subtotal 773,365.75 97.21% Material Sales Tax 22,182.88 2.79% Storage Rental Tax 22.13 0.00% Total 795,570.76 100.00% DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C 1 AAA Roofing & Construction Roofing Contractor Client: SOS Building Property: 4316 Laporte Ave. Fort Collins , CO 80521 Operator: JOSH Estimator: Joshua Morales Business: (970) 682-0010 E-mail: josh@aaaroofing- construction.com Company: AAA Roofing and Construction Business: 1326 Bowwood Ct Loveland, CO 80538 Type of Estimate: Hail Date Entered: 5/8/2020 Date Assigned: Price List: COFC8X_AUG19 Labor Efficiency: Restoration/Service/Remodel Estimate: 2020-05-08-1713 DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C 2 AAA Roofing & Construction Roofing Contractor 2020-05-08-1713 5/8/2020 Page: 2 2020-05-08-1713 2020-05-08-1713 DESCRIPTION QTY REMOVE REPLACE TAX TOTAL 1. Single ply membrane - 111.26 SQ 0.00 340.40 0.00 37,872.90 Mechanically attached - 60 mil 2. Insulation - ISO board, 2" 111.26 SQ 0.00 227.60 0.00 25,322.78 3. Glass mat gypsum - 1/2" - primed 111.26 SQ 0.00 177.07 0.00 19,700.81 4. Curb flashing - PVC/TPO-large vent 40.00 LF 0.00 16.33 0.00 653.20 curb 5. Curb flashing - PVC/TPO-skylight 368.00 LF 0.00 16.33 0.00 6,009.44 curbs 6. Roofer - per hour 40.00 HR 0.00 127.00 0.00 5,080.00 this is for extra time to cut wood nailer and install between ribs 7. Commercial Supervision / Project 40.00 HR 0.00 65.54 0.00 2,621.60 Management - per hour 8. Drip edge - PVC/TPO clad metal 462.00 LF 0.00 4.19 0.00 1,935.78 9. 2" x 4" lumber - treated (.667 BF 300.00 LF 0.00 2.71 0.00 813.00 per LF)-nailer 10. R&R Flashing - pipe jack - split 4.00 EA 6.53 71.43 0.00 311.84 boot 11. R&R Gutter / downspout - 275.25 LF 0.47 9.28 0.00 2,683.69 aluminum - 6" 12. On-Site Evaluation and/or 40.00 HR 0.00 67.72 0.00 2,708.80 Supervisor/Admin - per hour 13. Telehandler/forklift (per week) - 2.00 WK 0.00 1,166.20 0.00 2,332.40 no operator 14. Roofing (Bid Item)-skylights 16.00 EA 0.00 899.00 0.00 14,384.00 15. Roofing (Bid Item)-skylight labor 16.00 EA 0.00 350.00 0.00 5,600.00 16. Gutter / downspout - Detach & 96.00 LF 0.00 4.55 0.00 436.80 reset 17. Sheathing - OSB - 1/2"-nailer 166.00 SF 0.00 1.45 0.00 240.70 strips of 1/2" OSB on top of 2x4 to equal 2" rib hight for nailer 18. Dumpster load - Approx. 20 yards, 1.00 EA 431.72 0.00 0.00 431.72 4 tons of debris 19. Taxes, insurance, permits & fees 1.00 EA 0.00 1,901.01 0.00 1,901.01 (Bid Item) Total: 2020-05-08-1713 0.00 131,040.47 Line Item Totals: 2020-05-08-1713 0.00 131,040.47 DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C 3 AAA Roofing & Construction Roofing Contractor 2020-05-08-1713 5/8/2020 Page: 3 Summary Line Item Total 131,040.47 Replacement Cost Value $131,040.47 Net Claim $131,040.47 Joshua Morales DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C 4 AAA Roofing & Construction Roofing Contractor 2020-05-08-1713 5/8/2020 Page: 4 Recap of Taxes DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C 5 AAA Roofing & Construction Roofing Contractor 2020-05-08-1713 5/8/2020 Page: 5 Recap by Room Estimate: 2020-05-08-1713 131,040.47 100.00% Subtotal of Areas 131,040.47 100.00% Total 131,040.47 100.00% DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C 6 AAA Roofing & Construction Roofing Contractor 2020-05-08-1713 5/8/2020 Page: 6 Recap by Category Items Total % CONT: GARMENT & SOFT GOODS CLN 2,708.80 2.07% GENERAL DEMOLITION 587.21 0.45% HEAVY EQUIPMENT 2,332.40 1.78% PERMITS AND FEES 1,901.01 1.45% FRAMING & ROUGH CARPENTRY 1,053.70 0.80% LABOR ONLY 2,621.60 2.00% ROOFING 116,844.63 89.17% SOFFIT, FASCIA, & GUTTER 2,991.12 2.28% Subtotal 131,040.47 100.00% DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C DocuSign Envelope ID: 1D9BA8F8-C2C2-4F95-9BD7-E370E0670A9C