HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8451 VINE DRIVE AT LAKE CANAL REPLACEMENT DESIGN SERVICES (3)VINE DRIVE BRIDGE REPLACEMENT DESIGN SERVICES REQUEST FOR CHANGE ORDER 5 – REVISE PROFILE Scope-1 This change order deals with two different changes: 1. Change the roadway profile to tie back down to existing grades as soon as possible but keeping the vertical clearance and horizontal alignment of the bridge adequate for when the nearby development raises the grade and modifies the horizontal alignment in the future. 2. Addition of two more bore holes for geotechnical investigation due to the final configuration of the bridge. 1. Roadway Profile Change This change order covers the effort we would need to get the alignment adjusted to tie back to the existing roadway and to set the vertical profile of the structure for future conditions We initially set up the alignment and profile to accommodate the existing condition and to avoid any work within the Railroad ROW so we set a minimum 10’ offset from the Railroad ROW as our horizontal control element. Vertically, we were controlled by the Gas line perpendicular to Vine Drive in the vicinity of the structure. We set the bridge deck to provide adequate clearance for the gas line and other utilities in the area. When we received the information about the Developer’s plans to improve Vine Dr., adjacent to their property, we had to modify our alignments, horizontally and vertically, to match their proposed design. We had to adjust the structure to align with the Developer’s proposed street section for Vine Dr. and modify the vertical profile to match the Developer’s intent of a constant grade from the east over the bridge. In developing the profile for Vine Dr. to match the Developer’s profile, we discovered that the fill slopes along the south side of the road extended outside the ROW and was not included in the surface contours provided by the Developer. We discovered the vertical difference when we attempted to find the extent of ROW and Easement needs for the improvements. After further review, we needed to shift the structure to the south to provide additional room for the head and wing walls on the north side of the road, which reduced the distance from the Railroad ROW to 8 feet. It appears the new profile will probably raise the centerline of the road by around 1.5’ over the bridge. The horizontal alignment will shift the road centerline around 8’ – 10’ to the north to align with the future improvements by the Developer and avoid work outside the ROW in the Railroad property. We can accommodate the developers proposed centerline profile grade by designing a vertical curve east of the structure that ties back to existing. This will create a temporary drainage concern because we will be creating a low point in Vine Dr. on the East side of the structure that we will need to drain. We are able to accommodate future conditions with the structure but the interim condition will cause a bit of a wiggle in the road both vertically and horizontally. 2. Additional borings for geotechnical investigation. a. Arrange for underground utility locates in the project location. VINE DRIVE BRIDGE REPLACEMENT DESIGN SERVICES REQUEST FOR CHANGE ORDER 5 – REVISE PROFILE Scope-2 b. Drill two (2) additional bridge borings, to approximate depths of 60 feet for bridge foundation design recommendations. KDG Engineering will provide approximate locations of the proposed bridge borings. c. A representative of Yeh and Associates, Inc. will log the borings in the field and recover soil and/or bedrock samples. d. Borings will be backfilled with auger cuttings upon completion. Borings through asphalt or concrete pavement will be patched with non‐shrink grout or equivalent materials. e. Borings will be marked by Yeh and Associates, Inc. and surveyed by KDG Engineering. f. Conduct laboratory testing on recovered samples as needed to classify the site soils and bedrock. Laboratory tests will include sieve analysis, Atterberg limits, natural moisture content, dry density, water soluble sulfate content, water soluble chloride content, pH, resistivity, swell/consolidation and other tests needed for the work. g. Prepare a draft geotechnical engineering report in accordance with the original proposal dated June 9, 2017. In addition, recommendations for new retaining walls about 7 feet tall to be supported on spread footings will also be included in the report. Upon notice to proceed Yeh and Associates, Inc will obtain a City of Fort Collins permit. Yeh will notify UNCC to get site utility clearances before the field investigation. Yeh anticipates that they can begin performing the field investigation within one week after clearance of the utilities and obtaining access permit. Yeh estimates that the additional field investigation will take two days to complete and approximately two weeks to test soils. Preliminary geotechnical engineering information can be provided within approximately one week after completion of investigation and soil testing and the draft geotechnical report will be available within about three weeks after completion of field investigation and soil testing. The final geotechnical report will be submitted after receiving comments on the draft report. Job No. K17050.5 Labor Hours Scope Item Engineering VP (Sr. Br.) Bridge Engineer IV Designer I Subs Expenses Total Billing Rates: $153.60 $119.00 $104.00 REVISED PROFILE 48.0 20.0 64.0 132.0 $16,408.80 $4,000.00 $0.00 $20,408.80 0.0 $0.00 $0.00 Adjust profile of road and bridge 8.0 8.0 16.0 32.0 $3,844.80 $2,500.00 $6,344.80 Revised cross sections and toe of slopes; Adjust bridge elevations and details for Urban Designer 8.0 8.0 16.0 32.0 $3,844.80 $1,500.00 $5,344.80 Revised details 8.0 4.0 24.0 36.0 $4,200.80 $4,200.80 Coordination 24.0 8.0 32.0 $4,518.40 $4,518.40 0.0 $0.00 $0.00 ADDITIONAL BORINGS (2) 4.0 2.0 4.0 10.0 $1,268.40 $0.00 $1,268.40 0.0 $0.00 $0.00 Add two more borings and analysis 4.0 2.0 4.0 10.0 $1,268.40 $10,200.00 $11,468.40 0.0 $0.00 $0.00 0.0 $0.00 $0.00 Subtotal Design 52.0 22.0 68.0 142.0 $17,677.20 $9,100.00 $0.00 $26,777.20 $0.00 Total Project Not to Exceed Fees 52.0 22.0 68.0 142.0 $17,677.20 $9,100.00 $0.00 $26,777.20 8541 VINE DRIVE BRIDGE AT LAKE CANAL CHANGE ORDER REQUEST NO. 5 - REVISE PROFILE 7/22/2020 Tot. Hrs. Labor EXHIBIT A ESTIMATE OF ENGINEERING FEES