Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9201081DocuSign Envelope ID: 4623356B-5A05-4499-B4A9-FB38A0F3F615 WORK ORDER FORM PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND KONE INC. WORK ORDER NUMBER: 1 PROJECT TITLE: Lincoln Center Stage Lift Repairs ORIGINAL BID/RFP NUMBER & NAME: 8785 Elevator Maintenance & Repair MASTER AGREEMENT EFFECTIVE DATE: November 15, 2018 WORK ORDER COMMENCEMENT DATE: WORK ORDER COMPLETION DATE: MAXIMUM FEE: (time and reimbursable direct costs): $18628.19 PROJECT DESCRIPTION/SCOPE OF SERVICES: Furnish and install a new Maxton valve to replace the obsolete valve. Replace hydraulic packing on both cylinders to improve the reliability of the lift. Perform adjustments and return the unit to normal working condition. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of four (4) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Date: Frank Clark, KONE, INC ACCEPTANCE: Date: Justin Huntley, Project Manager REVIEWED: Date: Jake Rector, Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) Services Agreement – Work Order Type Official Purchasing Document Last updated 10/2017 July 20, 2020 August 31, 2020 Page 1 of 5 DocuSign Envelope ID: BE24A7C3-AFBA-4D68-9AD0-865D073E189C 7/20/2020 7/20/2020 7/23/2020 KONE Care™ PEOPLE FLOW REPAIR AND UPGRADE PROPOSAL REV 06/16 P6 Page 2 of 5 DocuSign Envelope ID: BE24A7C3-AFBA-4D68-9AD0-865D073E189C KONE Care™ PEOPLE FLOW REPAIR AND UPGRADE PROPOSAL REV 06/16 03/26/2020 City of Fort Collins Lincoln Center 417 West Magnolia St Fort Collins, CO 80521 Attn: Deedee Hosler Re: Lincoln Center Valve and Packing Proposal Dear Deedee, The safety, performance and reliability of your vertical transportation equipment are important to us. We understand the value of the equipment to your building and know that the following areas are important to you: ▪ Passenger and employee safety ▪ Code compliance ▪ Performance and reliability ▪ Accessibility ▪ Aesthetics ▪ Eco-efficiency Therefore, based on our detailed equipment evaluation, we thank you for the opportunity to submit the following proposal to you which will help improve your equipment in one or more of the above areas. Our trained service technicians will follow proven performance procedures to perform the recommended work in a safe, professional manner designed specifically for each piece of equipment. Upon your approval, please sign and return the following proposal to our local Branch Office for processing. Should you have any questions regarding this agreement, or if we can be of any further assistance, please contact me at 720-281-4613. Sincerely, Frank Clark Service Sales Consultant KONE Inc. Page 3 of 5 DocuSign Envelope ID: BE24A7C3-AFBA-4D68-9AD0-865D073E189C KONE Care™ PEOPLE FLOW REPAIR AND UPGRADE PROPOSAL REV 06/16 03/26/2020 City of Fort Collins Lincoln Center 417 West Magnolia St Fort Collins, CO 80521 Attn: Deedee Hosler Re: Lincoln Center Valve and Packing Proposal KONE Inc. 8585 Concord Center Dr Englewood, CO 80112 Tel 720-281-4613 Fax 303-799-3639 www.kone.us Frank.Clark@kone.com Page 4 of 5 DocuSign Envelope ID: BE24A7C3-AFBA-4D68-9AD0-865D073E189C KONE Care™ PEOPLE FLOW REPAIR AND UPGRADE PROPOSAL REV 06/16 Description of Work Valve and Packing Replacement As your maintenance provider it is our responsibility to provide you with safe, reliable elevators and lifts for your facility in order to better serve you and your tenants. The current valve on the stage lift is obsolete; and towards the end of its useful life. We will furnish and install a new Maxton valve to replace the obsolete valve. We will also replace the hydraulic packing on both cylinders improving the reliability of the lift. Once installation is complete, KONE will perform any necessary adjustments and return the unit to normal working condition. PLEASE NOTE: Current lead time on material is 4-6 weeks. Work will take approximately three (3) days to complete. Work will be completed during normal working hours. Price Our total price to perform the above-mentioned work amounts to: $18,628.19, including applicable taxes. Labor: $563.81 per team hour * 24 team hours = $13,531.44 Material: $5,096.75 Total: $18,628.19 Page 5 of 5 DocuSign Envelope ID: BE24A7C3-AFBA-4D68-9AD0-865D073E189C