HomeMy WebLinkAboutCORRESPONDENCE - BID - 8983 BURN BUILDING SITE WORK FOR POUDRE FIRE AUTHORITY (2)SECTION 00950 CHANGE ORDER NO. PROJECT TITLE: 8983 Burn Building Site Work for Poudre Fire Authority CONTRACTOR: Brinkman Construction, Inc. DESCRIPTION: 1. Reason for change: 2. Description of Change: 3. Change in Contract Cost: 4. Change in Contract Time: ORIGINAL CONTRACT COST $ .00 TOTAL APPROVED CHANGE ORDER .00 TOTAL PENDING CHANGE ORDER .00 TOTAL THIS CHANGE ORDER .00 TOTAL % OF THIS CHANGE ORDER % TOTAL C.O.% OF ORIGNINAL CONTRACT % ADJUSTED CONTRACT COST $ .00 (Assuming all change orders approved) ACCEPTED BY: DATE: Contractor's Representative ACCEPTED BY: DATE: Project Manager REVIEWED BY: DATE: Title: APPROVED BY: DATE: Title: APPROVED BY: DATE: Purchasing Agent over $60,000 cc: City Clerk Contractor Engineer Project File Architect Purchasing DocuSign Envelope ID: 044A52BE-FD42-4996-82D1-1B56235FA8D5 284,918 21.5 14.5 36,127 248,791 80,518 168,273 14 days $36,127.00 Seeding, screen trees, drip irrigation and temporary irrigation. Addition of landscape scope of work not included during bid. Landscape 003 DocuSign Envelope ID: 308AFD68-669BADAD-4DB3554B-C01F-1C89-1DED-44A5-4B55-4508-82B6-81B7-B721-6F2EC3D91982 9B1DF902A0E6 33DCFC321C13 July 14, 2020 CHANGE REQUEST DESCRIPTION COST BREAKDOWN SCOPE DESCRIPTION UNIT COST HR $ 340.00 HR $ 260.00 HR $ 1,360.00 LS $ 31,785.00 $ - $ - $ - $ - $ - $ - $ 33,745.00 $ - $ 337.45 $ 2,044.95 $ (0.40) $ 36,127.00 SCHEDULE IMPACT CHANGE REQUEST STATUS Architect/Owner Brinkman Construction, Inc. Signature: Signature: Date: Date: This duration will extend the overall schedule by: 14 days The Owner agrees to pay for all changes in the Work performed by the Contractor under this Change Item according to the terms of the Agreement. The amount paid by the Owner shall be full compensation for all Work requested and for all effects of this document on the Work. The Owner understands that this Change Item, along with other approved Change Items, will be complied into a Change Order at a later date. ROUNDING CORRECTION CHANGE ITEM TOTAL This duration will have no impact on the overall schedule: This duration will accelerate the overall schedule by: SUBTOTAL COSTS CITY & COUNTY TAX 0.00% INSURANCE 1.00% CONTACTOR OH&P 6.00% $ - $ - $ - $ - $ - $ - 01-01-100 BCI Project Superintendent $ 85.00 16 02-90-100 ZGL Landscaping w/Temporary Irrigation $ 31,785.00 1 01-01-010 BCI Project Manager $ 85.00 4 01-01-040 BCI Project Engineer $ 65.00 4 Fort Collins, CO 80521 CHANGE ITEM #: OCO #3 Option A Rev.1 This change order represents the addition of the landscape scope of work to the project that was excluded at time of bid and includes the following items: Furnish and install (8) 6' Rocky Mountain Juniper trees, drip irrigation to (8) RMJ trees and connect to existing smart irrigation controller, prep soil for native seed, drill seed and hydro mulch cover, install temporary irrigation system with new controller for native seeded areas. Landscape subcontractor is Zak George Landscaping, abbreviated ZGL below. COST CODE SUBCONTRACTOR COST QUANTITY OWNER CHANGE ITEM PROJECT NAME: PFA Burn Bldg Site Work PROJECT #: 19-0034 PROJECT ADDRESS: 3400 W Vine Dr 7/6/2020 DocuSign Envelope ID: 308AFD68-669BADAD-4DB3554B-C01F-1C89-1DED-44A5-4B55-4508-82B6-81B7-B721-6F2EC3D91982 9B1DF902A0E6 33DCFC321C13