HomeMy WebLinkAboutCORRESPONDENCE - BID - 8983 BURN BUILDING SITE WORK FOR POUDRE FIRE AUTHORITY (2)SECTION 00950
CHANGE ORDER NO.
PROJECT TITLE: 8983 Burn Building Site Work for Poudre Fire Authority
CONTRACTOR: Brinkman Construction, Inc.
DESCRIPTION:
1. Reason for change:
2. Description of Change:
3. Change in Contract Cost:
4. Change in Contract Time:
ORIGINAL CONTRACT COST $ .00
TOTAL APPROVED CHANGE ORDER .00
TOTAL PENDING CHANGE ORDER .00
TOTAL THIS CHANGE ORDER .00
TOTAL % OF THIS CHANGE ORDER %
TOTAL C.O.% OF ORIGNINAL CONTRACT %
ADJUSTED CONTRACT COST $ .00
(Assuming all change orders approved)
ACCEPTED BY: DATE:
Contractor's Representative
ACCEPTED BY: DATE:
Project Manager
REVIEWED BY: DATE:
Title:
APPROVED BY: DATE:
Title:
APPROVED BY: DATE:
Purchasing Agent over $60,000
cc: City Clerk Contractor Engineer
Project File Architect Purchasing
DocuSign Envelope ID: 044A52BE-FD42-4996-82D1-1B56235FA8D5
284,918
21.5
14.5
36,127
248,791
80,518
168,273
14 days
$36,127.00
Seeding, screen trees, drip irrigation and temporary irrigation.
Addition of landscape scope of work not included during bid.
Landscape
003
DocuSign Envelope ID: 308AFD68-669BADAD-4DB3554B-C01F-1C89-1DED-44A5-4B55-4508-82B6-81B7-B721-6F2EC3D91982 9B1DF902A0E6 33DCFC321C13
July 14, 2020
CHANGE REQUEST DESCRIPTION
COST BREAKDOWN
SCOPE DESCRIPTION UNIT COST
HR $ 340.00
HR $ 260.00
HR $ 1,360.00
LS $ 31,785.00
$ -
$ -
$ -
$ -
$ -
$ -
$ 33,745.00
$ -
$ 337.45
$ 2,044.95
$ (0.40)
$ 36,127.00
SCHEDULE IMPACT
CHANGE REQUEST STATUS
Architect/Owner Brinkman Construction, Inc.
Signature: Signature:
Date: Date:
This duration will extend the overall schedule by: 14 days
The Owner agrees to pay for all changes in the Work performed by the Contractor under this Change Item according to the terms of the Agreement. The
amount paid by the Owner shall be full compensation for all Work requested and for all effects of this document on the Work. The Owner understands
that this Change Item, along with other approved Change Items, will be complied into a Change Order at a later date.
ROUNDING CORRECTION
CHANGE ITEM TOTAL
This duration will have no impact on the overall schedule:
This duration will accelerate the overall schedule by:
SUBTOTAL COSTS
CITY & COUNTY TAX 0.00%
INSURANCE 1.00%
CONTACTOR OH&P 6.00%
$ -
$ -
$ -
$ -
$ -
$ -
01-01-100 BCI Project Superintendent $ 85.00 16
02-90-100 ZGL Landscaping w/Temporary Irrigation $ 31,785.00 1
01-01-010 BCI Project Manager $ 85.00 4
01-01-040 BCI Project Engineer $ 65.00 4
Fort Collins, CO 80521 CHANGE ITEM #: OCO #3 Option A Rev.1
This change order represents the addition of the landscape scope of work to the project that was excluded at time of bid and includes the following items:
Furnish and install (8) 6' Rocky Mountain Juniper trees, drip irrigation to (8) RMJ trees and connect to existing smart irrigation controller, prep soil for
native seed, drill seed and hydro mulch cover, install temporary irrigation system with new controller for native seeded areas. Landscape subcontractor is
Zak George Landscaping, abbreviated ZGL below.
COST CODE SUBCONTRACTOR COST QUANTITY
OWNER CHANGE ITEM
PROJECT NAME: PFA Burn Bldg Site Work PROJECT #: 19-0034
PROJECT ADDRESS: 3400 W Vine Dr
7/6/2020
DocuSign Envelope ID: 308AFD68-669BADAD-4DB3554B-C01F-1C89-1DED-44A5-4B55-4508-82B6-81B7-B721-6F2EC3D91982 9B1DF902A0E6 33DCFC321C13