Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 9114 EAST PARK DISTRICT MAINTENANCE FACILITY AND BUCKING HORSE PARKWork Order Form Official Purchasing Form Last updated 10/2017 WORK ORDER FORM PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND CLARK ENERSEN PARTNERS WORK ORDER NUMBER: PR-600313 PROJECT TITLE: East Park District Maintenance Facility. ORIGINAL BID/RFP NUMBER & NAME: RFP 9114 MASTER AGREEMENT EFFECTIVE DATE: June 1, 2020 WORK ORDER COMMENCEMENT DATE: June 8, 2020 WORK ORDER COMPLETION DATE: September 25, 2020 MAXIMUM FEE: (time and reimbursable direct costs): $99,983.00 (Phase I - $37,840, Phase II - $62,143) PROJECT DESCRIPTION/SCOPE OF SERVICES: Provide all design services to work with existing Parks maintenance building proto-type and City staff to work through Schematic and Design Development for both the Facility Maintenance Building along with the new Bucking Horse Park. The designs shall comply with current ADA standards and the maintenance facility shall be designed to achieve LEED Gold certification and include infrastructure for a Net Zero Solar PV system to be installed on the roof. The designs shall be coordinated with the Operation Services Design and Construction Standards and any Park Planning Standards. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of Fourteen (14) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Date: Phil Walter, Principal ACCEPTANCE: Date: Craig Kisling, Park Planning PM ACCEPTANCE: Date: Brian Hergott, Operation Service PM REVIEWED: Date: Elliot Dale, Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) 400702451.521120.3 = $68,853, 270703900.521120.3 = $31,130 DocuSign Envelope ID: 1356DEF1-A55E-44F2-B42D-6857C9BDD488 RFP 9114 East Park District Maintenance Facility and Bucking Horse Park Page 4 of 34 I. GENERAL INFORMATION A. Introduction The City of Fort Collins Operations Services and Park Planning & Development is intending to add a new East Park District maintenance facility and yard to service the parks in the eastern part of town (See Attachment 1 for the East District Maintenance Facility Service Map), along with a 6.1-acre neighborhood park in the Bucking Horse Neighborhood. The City’s current intention is to modify the floor plans of the existing maintenance facilities at Fossil Creek and/or Spring Canyon Parks for the new maintenance facility (see Attachment 2 for the Proposed Maintenance Facility Site Layout & Attachment 3 for the Conceptual Review Application Packet). The City of Fort Collins is also requesting architectural services to assist the Park Planning and Development Department on the 6.1-acre park in the Bucking Horse neighborhood. This park is near the maintenance facility site, and architectural characteristics and elements could be similar at both sites. The services desired include architectural, mechanical, electrical/lighting, structural, and other park- specific design efforts. a. The existing maintenance facilities at Fossil Creek and Spring Canyon parks are roughly 5,600 SF and include office admin services and maintenance bays along with yard space for equipment and material storage. For reference, see Attachment 4 for the Spring Canyon Park Maintenance Facility Floor and Site Plans. b. Preliminary concept alternatives are currently being produced for Bucking Horse Park and will be presented to the public toward the end of March 2020. Bucking Horse Park is a 6.1-acre park site and will include a restroom, picnic pavilion, playground, no programed open turf area and may also have other architectural elements depending on the final concept plan. See Attachment 5 for the Bucking Horse Park Site Location Map. c. Site planning for both projects will be led by Park Planning & Development’s Landscape Architects. Further site development for both project sites will be required by the selected Professional. B. General The City of Fort Collins is seeking qualifications and the best possible combination of site planning, architectural design and engineering services for the design services to update the maintenance facility prototype and bring the design up to current codes. The new facility shall achieve LEED Gold certification and incorporate a solar photovoltaic system, thereby striving for Net Zero energy. The City of Fort Collins strives to design all new projects per the 2030 Energy Challenge. All new construction and major renovations will need to earn a minimum “Gold” certification using the US Green Building Councils (USGBC) LEED Green Rating System. The most current version of LEED™ at the time of project design shall be used. The energy goals for our City facilities is as follows: • New Construction to have an Energy Use Intensity (EUI) of 30 kBtu/sf/yr. • New Construction to achieve Energy Star rating of 100 with certification • Renovation projects to have 50 kBtu/sf/yr • Renovation projects to achieve Energy Star rating of 85 with certification DocuSign Envelope ID: 1356DEF1-A55E-44F2-B42D-6857C9BDD488 RFP 9114 East Park District Maintenance Facility and Bucking Horse Park Page 5 of 34 A response is requested with pricing for each phase listed below for both project sites and included under two separate line items. Total price for both projects should then be listed to capture the overall project fee. Phase I – 30% Conceptual & Schematic Design Phase II – 60% Design Development Phase III – 95% Construction Documents Phase IV – Construction Administration and Design Support a. Provide all design services including architectural, landscaping, structural, mechanical, electrical & civil b. Team should include, and be prepared to perform HVAC, electrical, lighting, energy consulting, geotechnical, and construction estimating c. Design team will be required to coordinate with Landscape Architecture, Civil Engineering and Irrigation design firms d. Design team will be responsible for coordinating with City Departments to submit 30%, 60%, 95% drawings for review and provide cost estimates at the end of each phase e. Design team will be responsible for providing construction administration throughout project duration C. Requirements The successful team will be responsible for ALL disciplines required for the design, engineering, ADA guidelines, cost estimating, planning, LEED, renewable energy infrastructure, and official review services necessary for completion of the project from design development through final design, construction documents, construction administration and project close-out as required. The design Professional will be responsible for ushering the design through the development review process. The successful team will be responsible for meeting all state and local licensing requirements in the design of the facility. The standards referenced and included in this RFP are intended to establish the expectations the City has for this project regarding quality and performance. a. Cost of Proposal Preparation. No reimbursement will be made by the City of Fort Collins for any costs incurred prior to a formal Notice to Proceed. b. Proposals to be in Effect. Each proposal shall state it is valid for a period of not less than ninety (90) days from the date of receipt. c. The City of Fort Collins has developed a Building Design & Construction Standards Manual. Design will follow these standards unless exempted by the City. This manual is available online and can be viewed at: http://www.fcgov.com/opserv/design-standards.php d. The City of Fort Collins is exempt from all state taxation including state sales and use taxes. e. One principal participant of the project team must be a LEED Accredited Professional. DocuSign Envelope ID: 1356DEF1-A55E-44F2-B42D-6857C9BDD488 RFP 9114 East Park District Maintenance Facility and Bucking Horse Park Page 6 of 34 f. One principal participant must be familiar with LEED Gold Building design. g. Total anticipated project budget range is $6 – 7 Million including design, sitework, landscaping, construction and soft costs. D. Project Goals and Objectives Primary Objectives a. Assist Park Planning & Development in developing the site plan for the new maintenance shop and yard and Bucking Horse Park. b. Develop site engineering plans for both sites that meet current development code requirements within the City of Fort Collins c. Design for new 5,600 SF maintenance shop & offices using the Fossil Creek and Spring Canyon Parks maintenance facilities prototypes d. Parking lot for staff and visitors e. Design for yard layout to facilitate equipment and material storage f. Design architectural elements such as a restroom and picnic pavilion for the neighborhood park Significant Maintenance Shop design elements shall include a. Maximizing use of natural light, varied task and ambient lighting b. Compliance with NFPA 30A, 52, 70, International Fire Code, International Building Code, International Electrical Code and the International Mechanical Code c. Welding area d. Vehicle exhaust extraction system for service bays e. Coordination of IT/Data needs with the City of Fort Collins IT Dept. f. Cost containment for ongoing facility maintenance (e.g., high efficiency, easy to replace, low cost, long life light bulbs, durable furnishings, finishes and fabrics throughout that meet the City’s design standards and expectations) g. The project will be required to be designed and constructed to meet the requirements to obtain a LEED Gold Certification under the new NC – New Construction and Major Renovation category, and, will need to be designed with a goal of creating a “net zero energy impact” to the building. The most current version of LEED™ at the time of project design shall be used. II. SCOPE OF PROPOSAL A. Scope of Work The following is an outline of a general scope of work. The Professional firm/team should expand each of the tasks listed below. Additional tasks that the Professional firm/team determines necessary to assure a good deliverable design product and ultimately a high- quality construction project should be added to this list. DocuSign Envelope ID: 1356DEF1-A55E-44F2-B42D-6857C9BDD488 RFP 9114 East Park District Maintenance Facility and Bucking Horse Park Page 7 of 34 Phase I – Conceptual & Schematic Design 1. Professional and consultants are to participate with City personnel and City contracted Energy Molder in an approximately 4-hour IDAP (Integrated Design Assistance Program) design charrette, team meetings and conduct a review of the SD energy model report. For more information please visit: https://www.fcgov.com/utilities/business/improve-efficiency/rebates- incentives/integrated-design-assistance/ Or contact Matt Schaefer, Project Manager at (970) 416-4303 or mschaefer@fcgov.com. 2. Present schematic building alternatives to the Project Team, screen alternatives and develop recommendations on meeting the Project Goals and Objectives described in Section I.D. Identify the preferred alternative to move forward to conceptual design. 3. Present schematic park architectural element(s) alternatives to the Project Team, screen alternatives and develop recommendations on meeting the Project Goals and Objectives described in Section I.D. Identify the preferred alternative to move forward to conceptual design. 4. Prepare site engineering plans for both sites that meet current development code requirements within the City of Fort Collins. 5. Prepare conceptual building plans including conceptual floorplans, elevations and renderings. Prepare sufficient concept level structural, architectural details and finishes, mechanical, electrical details. 6. Coordinate neighborhood meetings to share and gather input on design. 7. Modify existing building prototype systems to include electrical, plumbing, fire sprinkler and HVAC to meet current standards and energy goals. 8. Modify existing prototype layout to work best with current staff use. 9. Code review of ADA requirements. 10. Code review including parking considerations and provide conceptual (TIS) Traffic Impact Study. 11. All AutoCAD & Revit design drawings will be provided to the City at the end of the project. 12. Utility Coordination – Develop conceptual utility service requirements for recommended building layout including HVAC, electrical, fire protection, etc. Prepare site utility plans showing existing utilities within the project limits and proposed utilities to serve the project. Coordinate utility services and relocations with City and other outside utility owners. 13. Landscaping/Urban Design – Help assist Park Planning & Development with the preliminary landscape plans for the site. 14. Storm Drainage –Identify locations for storm water detention and water quality features. Prepare conceptual grading and drainage plans. 15. Prepare conceptual plan package including building plans, site plans, utility plans, grading and drainage plans, landscape plans, and conceptual cost estimate. DocuSign Envelope ID: 1356DEF1-A55E-44F2-B42D-6857C9BDD488 RFP 9114 East Park District Maintenance Facility and Bucking Horse Park Page 8 of 34 16. Submit conceptual plan package and attend or conduct conceptual plan review meetings with City staff and other referral agencies. The design Professional will usher the project through the City development review process at all levels and to any extent as may be necessary to complete the project for each Phase. 17. Document conceptual plan revisions, revise conceptual plans, and resubmit record set of the conceptual plan package. 18. Prepare a cost estimate for all building and site construction with three (3) additional totals that include escalation for construction commencing in one (1), two (2) and three (3) years. Phase II - Design Development 1. Design team and consultants are to participate in IDAP DD energy meetings and conduct a review of DD energy model reports. 2. Prepare preliminary building plans including preliminary floorplans, elevations and renderings. Prepare sufficient concept level structural, architectural details and finishes, mechanical, electrical details and cost estimating services. 3. Prepare preliminary park architectural elements, including preliminary floorplans, elevations and renderings. Prepare sufficient concept level structural, architectural details and finishes, mechanical, electrical details and cost estimating services. 4. Refine Site Engineering Plans for both sites that meet current development code requirements within the City of Fort Collins 5. Building assessment including electrical, plumbing and HVAC. 6. Code review of ADA requirements. 7. Code review including parking considerations and provide (TIS) Traffic Impact Study. 8. Virtual tour capability priced separately (e.g. AutoCAD Revit.) 9. All AutoCAD, & Revit design drawings will be provided to the City at the end of the project. 10. Utility Coordination – Develop preliminary utility service requirements for recommended building layout including HVAC, electrical, fire protection, etc. Prepare site utility plans showing existing utilities within the project limits and proposed utilities to serve the project. Coordinate utility services and relocations with City and other outside utility owners. 11. Landscaping/Urban Design – Continue to assist Park Planning & Development with the preliminary landscape plans for the site. 12. Storm Drainage – Prepare a drainage and erosion control report in accordance with City Stormwater Utility Department requirements. Prepare preliminary grading and drainage plans. 13. Prepare preliminary plan package including building plans, site plans, utility plans, grading and drainage plans, landscape plans, roadway plan and profile sheets, cross- sections. 14. Submit preliminary plan package and attend or conduct preliminary plan review meetings with City staff and other referral agencies. The design professional will usher DocuSign Envelope ID: 1356DEF1-A55E-44F2-B42D-6857C9BDD488 RFP 9114 East Park District Maintenance Facility and Bucking Horse Park Page 9 of 34 the project through the City development review process at all levels and to any extent as may be necessary to complete the project for each Phase. 15. Document plan revisions, revise preliminary plans, and resubmit record set of the preliminary plan package. Phase III - Construction Documents 1. Design team and consultants are to participate in all IDAP energy meetings. 2. Prepare final architectural plans for the park elements and maintenance shop including floor plans, elevations structural, architectural details and finishes, mechanical, electrical and fire protection. a. Follow all ADA requirements. i. The City will utilize a third-party ADA consultant to review the drawings for ADA compliance before submitting the documents for a permit. b. City of Fort Collins requires blower door test to be performed in order to receive a Certificate of Occupancy. 3. Utility Coordination – Develop final utility service requirements for the maintenance building including HVAC, electrical, fire protection, etc. Prepare site utility plans showing existing and proposed utilities. 4. Landscaping/Urban Design – Prepare final landscape plans for the site. 5. Storm Drainage – Prepare final grading, drainage and erosion control plans including plan and profile of storm drainage systems, drainage and erosion control details, detention pond and water quality design. 6. Prepare final plan package including building plans, site plans, utility plans, grading and drainage plans, landscape plans, roadway plan and profile sheets, cross-sections, special provisions and final cost estimate. 7. Submit final plan package and conduct final plan review meeting with City staff and other referral agencies. 8. Document plan revisions, revise and resubmit record set of final plan package. Phase IV - Construction Contract Administration and Design Support 1. Provide all customary design support and contract administration services from construction bidding phase through project close-out, such as, but not limited to: submittal and product review, change order and application for payment review & certification, issue ASI’s, respond to RFI’s, address any other construction design criteria and coordinate construction close-out with the owner. If there are any questions about this scope, please contact the City representative (project manager) for clarification. III. SPECIAL INTERFACES 1. SUSTAINABLE DESIGN It is the policy of the City of Fort Collins that all new buildings and major renovations earn enough credits using the US Green Building Council’s (USGBC) LEED™ Green Building Rating System to earn a minimum “Gold” certification. The most current version of LEED™ at the time of project design shall be used. Specific projects may DocuSign Envelope ID: 1356DEF1-A55E-44F2-B42D-6857C9BDD488 RFP 9114 East Park District Maintenance Facility and Bucking Horse Park Page 10 of 34 have goals above and beyond this minimum requirement, either in overall rating or for minimum numbers of credits from specific categories. It is not the intent to “chase LEED points”, but to earn them through good high-performance building design. 2. CM/GC The City of Fort Collins plans to hire a CM/GC to work as an integral member of the integrated design team. The design team will coordinate the plan review and budget update with this firm. The design team should also provide a separate cost estimate for comparison. 3. ENERGY MODELING The City of Fort Collins will provide the energy modeling services and the design team will be asked to coordinate the modeling and LEED design with this firm. 4. COMMISSIONING The City of Fort Collins will provide the commissioning firm and the design team will be asked to coordinate the design and construction with this commissioning agent. 5. ART IN PUBLIC PLACES The design team will be requested to work with an artist from the City’s “Art in Public Places” (APP) Program with the intent to design artistic elements into the project concept and are within the APP budget for this project. A member of the design team will be added to the committee that selects the artist. The City will contract directly with that artist. 6. FURNITURE DESIGN AND INSTALLATION The City of Fort Collins will be responsible for the furniture procurement. It is intended the design professional will provide the design and coordination of this effort as the furniture design and procurement effort will need to proceed at the same time as the building design effort. 7. TESTING SERVICES The City of Fort Collins will be responsible, by separate contract for all the testing services (geo-tech, soils, concrete, asphalt, structural steel, etc.). It is intended the design team will assist in the coordination of this effort. 8. COMMUNICATION WORK Design team will be responsible for the design of communication (telephone and computer cabling), fire alarm, security and fiber optic cabling. 9. SOLAR PV SYSTEM The City of Fort Collins will contract for design and installation of a solar PV system to go on the roof. The design team will need to make sure the design can handle this load and have infrastructure in place for the feeders to run from roof to electrical gear. 10. GEO-THERMAL EXPLORATION The City of Fort Collins has been working with outside firms for preliminary studies to use the ground for a possible Geo-Thermal system. DocuSign Envelope ID: 1356DEF1-A55E-44F2-B42D-6857C9BDD488 RFP 9114 East Park District Maintenance Facility and Bucking Horse Park Page 11 of 34 B. Milestones and Preliminary Phasing Schedule The following represents the City’s target project schedule. Preliminary Phasing Schedule: Notice to Proceed Design Team April 22, 2020 Phase One Completion June 26, 2020 Phase One Budget Estimate July 10, 2020 Phase Two Completion August 28, 2020 Phase Two Budget Update September 11, 2020 Phase Three Completion November 25, 2020 Phase Four Contracting/Permitting November 25, 2020 – January 30, 2021 Phase Four Project Completion November 20, 2021 C. Anticipated Project Award Schedule The following represents the City’s target schedule for the RFP. The City reserves the right to amend the target schedule at any time. Procurement Schedule: DATE RFP to Proposers March 12, 2020 Pre-proposal meeting March 18, 2020, 2:00 PM MST Questions due date March 24, 2020, 5:00 PM MST Proposals due date April 2, 2020, 3:00 PM MST (our clock) Design Team Interview Week of April 13th, 2020 D. Interviews In addition to submitting a written proposal, the top-rated Vendors may be interviewed by the RFP assessment team and asked to participate in an oral presentation to provide an overview of the company, approach to the project and to address questions. The evaluation criteria for the oral interviews will be the same as the criteria for the written evaluations and is included in Section IV. E. Travel & Expenses Vendors are to provide a list of fees for reimbursable expenses. Reasonable expenses will be reimbursable per the current rates found at www.gsa.gov. F. Subcontractors Vendors will be responsible for identifying any subcontractors in their proposal. Please note that the City will contract solely with the awarded Vendor; therefore subcontractors will be the responsibility of the awarded Vendor. G. Fees, Licenses, Permits DocuSign Envelope ID: 1356DEF1-A55E-44F2-B42D-6857C9BDD488 HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL PHASE I - CONCEPTUAL & SCHEMATIC DESIGN Project Kickoff (Meeting) 2 $420 2 $290 2 $290 $0 2 $230 $0 $0 $0 $0 $0 $0 $1,230 Work Session 1 (Meeting) 2 $420 2 $290 2 $290 $0 2 $230 $0 1 $150 $0 1 $150 $0 $0 $1,530 IDAP Design Charette (Meeting) 4 $840 4 $580 4 $580 4 $580 0 $0 $0 2 $300 $0 2 $300 $0 $0 $3,180 Conceptual Plan Review (Meeting) 2 $420 2 $290 2 $290 $0 0 $0 $0 1 $150 $0 1 $150 $0 $0 $1,300 • Analyze and Update Prototypes 1 $210 1 $145 $0 $0 4 $460 $0 $0 $0 $0 $0 $0 $815 • Present Schematic Building Alternatives 1 $210 1 $145 $0 $0 2 $230 $0 $0 $0 $0 $0 $0 $585 • Prepare Conceptual Building Plans 1 $210 1 $145 2 $290 $0 4 $460 $0 2 $300 6 $660 1 $150 6 $480 2 $380 $3,075 • Perform Building Assessment 1 $210 1 $145 $0 $0 4 $460 $0 2 $300 6 $660 2 $300 6 $480 2 $380 $2,935 • Review ADA Code Requirements $0 1 $145 $0 $0 2 $230 $0 $0 $0 $0 $0 $0 $375 • Review Parking and Traffic Impact $0 1 $145 $0 $0 1 $115 $0 $0 $0 $0 $0 $0 $260 • Transmit ACAD and Revit Files $0 $0 $0 $0 1 $115 $0 $0 $0 $0 1 $80 1 $190 $385 • Utility Coordination 1 $210 1 $145 $0 $0 2 $230 $0 1 $150 $0 1 $150 $0 $0 $885 • Incorporate Preliminary City Landscape Plans $0 $0 $0 $0 $0 2 $220 $0 $0 $0 $0 $0 $220 • Prepare Conceptual Grading and Drainage Plans (See Civil) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 • Prepare and Submit Conceptual Design Package 1 $210 4 $580 2 $290 $0 8 $920 $0 2 $300 4 $440 1 $150 2 $160 2 $380 $3,430 • Revise Conceptual Design Package $0 $0 $0 $0 2 $230 $0 $0 $0 $0 $0 $0 $230 • Estimate of Construction Cost 1 $210 1 $145 $0 $0 $0 $0 1 $150 1 $110 1 $150 1 $80 1 $190 $1,035 $0 $0 SUBTOTALS 17 $3,570 22 $3,190 14 $2,030 4 $580 34 $3,910 2 $220 12 $1,800 17 $1,870 10 $1,500 16 $1,280 8 $1,520 $21,470 PHASE I SUBTOTAL $21,470 CIVIL SITE ENGINEERING (SEE NE BREAKDOWN) $5,182 IRRIGATION DESIGN (OLSSON) $250 PHASE I TOTAL $26,902 PHASE II - DESIGN DEVELOPMENT Work Session 2 (Meeting) 2 $380 2 $280 $0 2 $240 $0 $0 1 $140 $0 1 $140 $0 $0 $1,180 Preliminary Plan Review (Meeting(s)) 2 $420 2 $290 $0 $0 2 $230 $0 1 $150 $0 1 $150 $0 $0 $1,240 IDAP DD Review (Meeting) 4 $760 4 $560 $0 4 $480 $0 $0 2 $280 $0 2 $280 $0 $0 $2,360 • Prepare DD Preliminary Documents 4 $760 4 $560 1 $140 2 $240 14 $1,680 $0 8 $1,120 10 $1,100 6 $840 12 $960 6 $1,140 $8,540 • Review Code Requirements and TIS 1 $190 1 $140 1 $140 2 $240 4 $480 $0 $0 $0 $0 $0 $0 $1,190 • Review Parking $0 1 $140 $0 $0 4 $480 2 $220 $0 $0 $0 $0 $0 $840 • Virtual Tour Production $0 0 $0 0 $0 $0 8 $960 $0 $0 $0 $0 $0 $0 $960 • Transmit ACAD and Revit Files $0 $0 $0 $0 1 $120 $0 $0 $0 $0 $0 $0 $120 • Utility Coordination 1 $190 2 $280 1 $140 $0 4 $480 $0 $0 $0 $0 $0 $0 $1,090 • Coordinate Preliminary City Landscape Plans $0 $0 $0 $0 $0 2 $220 $0 $0 $0 $0 $0 $220 • Prepare DD Grading and Drainage Plans (See Civil) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 • Prepare and Submit DD Review Package 1 $190 1 $140 $0 $0 10 $1,200 1 $110 8 $1,120 10 $1,100 10 $1,400 16 $1,280 12 $2,280 $8,820 • Revise DD Review Package 1 $190 1 $140 $0 $0 2 $240 $0 $0 $0 $0 $0 $0 $570 • Prepare Preliminary Plan Package $0 $0 $0 $0 4 $480 $0 $0 $0 $0 $0 $0 $480 • Submit Preliminary Plan Package 1 $190 1 $140 1 $140 1 $120 2 $240 1 $110 $0 1 $110 $0 1 $80 $0 $1,130 • Estimate of Construction Cost 2 $380 1 $140 $0 1 $120 1 $120 2 $220 1 $140 $0 1 $140 $0 1 $190 $1,450 SUBTOTALS 17 $3,270 19 $2,670 4 $560 11 $1,320 56 $6,590 6 $660 20 $2,810 21 $2,310 20 $2,810 29 $2,320 18 $3,420 $30,190 PHASE II SUBTOTAL $30,190 CIVIL SITE ENGINEERING (SEE NE BREAKDOWN) $11,326 IRRIGATION DESIGN (OLSSON) $435 PHASE II TOTAL $41,951 Alternate - Deduct Virtual Tour $ (960.00) PHASE II TOTAL W/ALTERNATE DEDUCTS $40,991 PHASE III - CONSTRUCTION DOCUMENTS Work Session 3 (Meeting) 2 $380 2 $280 2 $280 $0 2 $240 $0 $0 $0 $0 $0 $0 $1,180 Work Session 4 (Meeting) 2 $380 2 $280 $0 2 $240 $0 $0 2 $280 $0 2 $280 $0 $0 $1,460 IDAP CD Review (Meeting) 4 $760 4 $560 $0 4 $480 $0 $0 2 $280 $0 2 $280 $0 $0 $2,360 • Prepare Preliminary CD Documents 2 $380 4 $560 $0 2 $240 18 $2,160 $0 6 $840 18 $1,980 6 $840 20 $1,600 20 $3,800 $12,400 • Utility Coordination 1 $190 1 $140 $0 $0 2 $240 $0 1 $140 $0 1 $140 $0 $0 $850 • Incororate Final Landscape Plans $0 $0 $0 $0 2 $240 2 $220 $0 $0 $0 $0 $0 $460 • Prepare Final Grading and Drainage Plans $0 $0 $0 $0 2 $240 $0 $0 $0 $0 $0 $0 $240 • Prepare and Submit CD Review Package 2 $380 6 $840 2 $280 8 $960 2 $240 $0 8 $1,120 16 $1,760 8 $1,120 12 $960 6 $1,140 $8,800 • Revise CD Review Package 1 $190 4 $560 1 $140 2 $240 1 $120 $0 1 $140 2 $220 1 $140 2 $160 1 $190 $2,100 EAST PARK DISTRICT MAINTENANCE FACILITY Principal COST AND WORK HOURS • Coordinate Preliminary City Landscape Plans $0 $0 $0 $0 $0 2 $220 $0 $0 $0 $0 $0 $220 • Prepare DD Grading and Drainage Plans (See Civil) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 • Prepare and Submit DD Review Package 1 $190 1 $140 $0 $0 10 $1,200 1 $110 8 $1,120 10 $1,100 10 $1,400 16 $1,280 12 $2,280 $8,820 • Revise DD Review Package 1 $190 1 $140 $0 $0 2 $240 $0 $0 $0 $0 $0 $0 $570 • Prepare Preliminary Plan Package $0 $0 $0 $0 4 $480 $0 $0 $0 $0 $0 $0 $480 • Submit Preliminary Plan Package 1 $190 1 $140 1 $140 1 $120 2 $240 1 $110 $0 1 $110 $0 1 $80 $0 $1,130 • Estimate of Construction Cost 2 $380 1 $140 $0 1 $120 1 $120 2 $220 1 $140 $0 1 $140 $0 1 $190 $1,450 SUBTOTALS 17 $3,270 19 $2,670 4 $560 11 $1,320 56 $6,590 6 $660 20 $2,810 21 $2,310 20 $2,810 29 $2,320 18 $3,420 $30,190 PHASE II SUBTOTAL $30,190 CIVIL SITE ENGINEERING (SEE NE BREAKDOWN) $11,326 IRRIGATION DESIGN (OLSSON) $435 PHASE II TOTAL $41,951 Alternate - Deduct Virtual Tour $ (960.00) PHASE II TOTAL W/ALTERNATE DEDUCTS $40,991 PHASE III - CONSTRUCTION DOCUMENTS Work Session 3 (Meeting) 2 $380 2 $280 2 $280 $0 2 $240 $0 $0 $0 $0 $0 $0 $1,180 Work Session 4 (Meeting) 2 $380 2 $280 $0 2 $240 $0 $0 2 $280 $0 2 $280 $0 $0 $1,460 IDAP CD Review (Meeting) 4 $760 4 $560 $0 4 $480 $0 $0 2 $280 $0 2 $280 $0 $0 $2,360 • Prepare Preliminary CD Documents 2 $380 4 $560 $0 2 $240 18 $2,160 $0 6 $840 18 $1,980 6 $840 20 $1,600 20 $3,800 $12,400 • Utility Coordination 1 $190 1 $140 $0 $0 2 $240 $0 1 $140 $0 1 $140 $0 $0 $850 • Incororate Final Landscape Plans $0 $0 $0 $0 2 $240 2 $220 $0 $0 $0 $0 $0 $460 • Prepare Final Grading and Drainage Plans $0 $0 $0 $0 2 $240 $0 $0 $0 $0 $0 $0 $240 • Prepare and Submit CD Review Package 2 $380 6 $840 2 $280 8 $960 2 $240 $0 8 $1,120 16 $1,760 8 $1,120 12 $960 6 $1,140 $8,800 • Revise CD Review Package 1 $190 4 $560 1 $140 2 $240 1 $120 $0 1 $140 2 $220 1 $140 2 $160 1 $190 $2,100 • Estimate of Construction Cost 2 $380 5 $700 2 $280 3 $360 2 $240 $0 2 $280 3 $330 2 $280 3 $240 1 $190 $3,280 SUBTOTALS 12 $3,040 21 $3,920 3 $980 18 $2,520 27 $3,720 2 $220 20 $3,080 36 $4,290 20 $3,080 34 $2,960 27 $5,320 $33,130 PHASE III SUBTOTAL $33,130 CIVIL SITE ENGINEERING (SEE NE BREAKDOWN) $7,786 IRRIGATION DESIGN (OLSSON) $1,630 PHASE III TOTAL $42,546 PHASE IV - CCA AND DESIGN SUPPORT • Attend pre-construction meetings 3 $570 3 $420 $0 $0 $0 $0 3 $420 $0 3 $420 $0 $0 $1,410 • Attend OAC meetings throughout construction 6 $1,140 12 $1,680 $0 $0 $0 $0 6 $840 $0 6 $840 $0 $0 $3,660 • Respond to RFIs, Submittals, CORs, etc. 10 $1,900 40 $5,600 $0 4 $480 12 $1,440 $0 12 $1,680 6 $660 8 $1,120 4 $320 4 $760 $12,840 • Perform Punch Lists 2 $380 2 $280 $0 $0 2 $240 $0 2 $280 $0 2 $280 $0 $0 $1,180 • Attend Warranty Walk 1 $190 1 $140 $0 $0 1 $120 $0 1 $140 $0 1 $140 $0 $0 $590 • Issue As-Built Documents $0 2 $280 $0 $0 4 $480 $0 $0 4 $440 $0 4 $320 1 $190 $1,710 SUBTOTALS 22 $4,180 60 $8,400 0 $0 4 $480 19 $2,280 0 $0 24 $3,360 6 $1,100 20 $2,800 4 $640 4 $950 $21,390 PHASE IV SUBTOTAL $21,390 CIVIL SITE ENGINEERING (SEE NE BREAKDOWN) $4,176 IRRIGATION DESIGN (OLSSON) $685 PHASE IV TOTAL $26,251 TOTAL ALL PHASES $137,650 Alternate - Deduct Virtual Tour $ (960) TOTAL ALL PHASES W/ALTERNATE DEDUCTS $136,690 38 HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL PHASE I - CONCEPTUAL & SCHEMATIC DESIGN Project Kickoff (Meeting) 2 $420 2 $290 2 $290 $0 2 $230 $0 $0 $0 $0 $0 $0 $1,230 Work Session 1 (Meeting) 2 $420 2 $290 2 $290 $0 2 $230 $0 1 $150 $0 1 $150 $0 $0 $1,530 IDAP Design Charette (Meeting) 4 $840 4 $580 4 $580 4 $580 0 $0 $0 2 $300 $0 2 $300 $0 $0 $3,180 Conceptual Plan Review (Meeting) 2 $420 2 $290 2 $290 $0 0 $0 $0 1 $150 $0 1 $150 $0 $0 $1,300 • Analyze and Update Prototypes 1 $210 1 $145 $0 $0 4 $460 $0 $0 $0 $0 $0 $0 $815 • Present Schematic Building Alternatives 1 $210 1 $145 $0 $0 2 $230 $0 $0 $0 $0 $0 $0 $585 • Prepare Conceptual Building Plans 1 $210 1 $145 2 $290 $0 4 $460 $0 2 $300 6 $660 1 $150 6 $480 2 $380 $3,075 • Perform Building Assessment 1 $210 1 $145 $0 $0 4 $460 $0 2 $300 6 $660 2 $300 6 $480 2 $380 $2,935 • Review ADA Code Requirements $0 1 $145 $0 $0 2 $230 $0 $0 $0 $0 $0 $0 $375 • Review Parking and Traffic Impact $0 1 $145 $0 $0 1 $115 $0 $0 $0 $0 $0 $0 $260 • Transmit ACAD and Revit Files $0 $0 $0 $0 1 $115 $0 $0 $0 $0 1 $80 1 $190 $385 39 COST AND WORK HOURS HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL PHASE I - CONCEPTUAL & SCHEMATIC DESIGN Project Kickoff (Meeting) 1 $210 1 $145 $0 $0 1 $115 $0 $0 $0 $0 $0 $0 $470 Work Session 1 (Meeting) 1 $210 1 $145 $0 $0 1 $115 $0 1 $150 $0 1 $150 $0 $0 $770 Conceptual Design Review (Meeting) 1 $210 1 $145 $0 $0 1 $115 $0 $0 $0 $0 $0 $0 $470 • Present Schematic Park Architectural Elements $0 1 $145 $0 $0 1 $115 2 $220 $0 $0 $0 $0 $0 $480 • Prepare Schematic Park Structural Plans $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 2 $380 $380 • Prepare Preliminary Lighting Plans $0 $0 $0 $0 $0 $0 $0 $0 2 $300 4 $320 $0 $620 • Prepare Preliminary Power Plans $0 $0 $0 $0 $0 $0 $0 $0 1 $150 2 $160 $0 $310 • Prepare Preliminary Mechanical Plans $0 $0 $0 $0 $0 $0 1 $150 2 $220 $0 $0 $0 $370 • Review ADA Code Requirements $0 $0 $0 $0 1 $115 $0 $0 $0 $0 $0 $0 $115 • Review Parking and Traffic Impact $0 $0 $0 $0 1 $115 $0 $0 $0 $0 $0 $0 $115 • Transmit ACAD and Revit Files $0 $0 $0 $0 1 $115 $0 $0 $0 $0 1 $80 1 $190 $385 • Utility Coordination $0 $0 $0 $0 $0 $0 $0 1 $110 1 $150 $0 $0 $260 • Incorporate Preliminary City Landscape Plans $0 $0 $0 $0 $0 2 $220 $0 $0 $0 $0 $0 $220 • Prepare Conceptual Grading and Drainage Plans (See Civil) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 • Prepare and Submit Conceptual Design Package $0 $0 $0 $0 1 $115 $0 $0 2 $220 $0 2 $160 1 $190 $685 • Revise Conceptual Design Package $0 $0 $0 $0 1 $115 $0 $0 $0 $0 $0 $0 $115 • Estimate of Construction Cost 1 $210 1 $145 $0 $0 $0 $0 $0 $0 $0 $0 $0 $355 SUBTOTALS 4 $840 5 $725 0 $0 0 $0 9 $1,035 4 $440 2 $300 5 $550 5 $750 9 $720 4 $760 $6,120 PHASE I SUBTOTAL $6,120 CIVIL SITE ENGINEERING (SEE NE BREAKDOWN) $4,318 IRRIGATION DESIGN (OLSSON) $500 PHASE I TOTAL $10,938 PHASE II - DESIGN DEVELOPMENT Work Session 2 (Meeting) 1 $190 1 $140 $0 $0 1 $120 $0 $0 $0 $0 $0 $0 $450 Preliminary Plan Review (Meeting(s)) 1 $190 1 $140 $0 $0 1 $120 $0 1 $140 $0 1 $140 $0 $0 $730 • Prepare DD Preliminary Documents 1 $190 1 $140 $0 $0 2 $240 $0 2 $280 6 $660 6 $840 12 $960 6 $1,140 $4,450 • Review Code Requirements and TIS $0 1 $140 $0 $0 1 $120 1 $110 $0 $0 $0 $0 $0 $370 • Review Parking $0 1 $140 $0 $0 $0 1 $110 $0 $0 $0 $0 $0 $250 • Transmit ACAD and Revit Files $0 $0 $0 $0 1 $120 $0 $0 $0 $0 $0 $0 $120 • Utility Coordination $0 $0 $0 $0 $0 $0 1 $140 $0 1 $140 $0 $0 $280 • Coordinate Preliminary City Landscape Plans $0 $0 $0 $0 $0 2 $220 $0 $0 $0 $0 $0 $220 • Prepare DD Grading and Drainage Plans (See Civil) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 • Prepare and Submit DD Review Package $0 1 $140 $0 $0 2 $240 1 $110 1 $140 2 $220 1 $140 2 $160 2 $380 $1,530 • Revise DD Review Package 1 2 $240 $0 $0 $0 $0 $0 $0 $240 • Prepare Preliminary Plan Package 2 $240 $0 $0 $0 $0 $0 $0 $240 • Submit Preliminary Plan Package $0 1 $140 1 $140 $0 1 $120 $0 $0 $0 $0 $0 $0 $400 • Estimate of Construction Cost 2 $380 1 $140 1 $140 1 $120 $0 1 $110 $0 1 $110 $0 1 $80 1 $190 $1,270 SUBTOTALS 3 $570 8 $980 1 $140 0 $0 13 $1,560 5 $550 5 $700 8 $880 9 $1,260 14 $1,120 8 $1,520 $10,550 PHASE II SUBTOTAL $10,550 CIVIL SITE ENGINEERING (SEE NE BREAKDOWN) $7,512 IRRIGATION DESIGN (OLSSON) $2,130 PHASE II TOTAL $20,192 PHASE III - CONSTRUCTION DOCUMENTS Work Session 3 (Meeting) 1 $190 1 $140 $0 $0 1 $120 $0 $0 $0 $0 $0 1 $190 $640 Work Session 4 (Meeting) 1 $190 1 $140 $0 $0 $0 $0 1 $140 $0 1 $140 $0 $0 $610 • Prepare Preliminary CD Documents 1 $190 1 $140 $0 $0 2 $240 $0 1 $140 2 $220 1 $140 8 $640 2 $380 $2,090 • Utility Coordination $0 1 $140 $0 $0 $0 $0 1 $140 $0 1 $140 $0 $0 $420 • Incorporate Final Landscape Plans $0 $0 $0 $0 $0 1 $110 $0 $0 $0 $0 $0 $110 • Prepare Final Grading and Drainage Plans (See Civil) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 • Prepare and Submit CD Review Package $0 1 $140 $0 $0 2 $240 $0 1 $140 2 $220 1 $140 6 $480 2 $380 $1,740 • Revise CD Review Package $0 1 $140 $0 $0 1 $120 $0 $0 1 $110 $0 1 $80 $0 $450 • Estimate of Construction Cost 2 $380 1 $140 $0 $0 2 $240 $0 1 $140 $0 1 $140 $0 1 $190 $1,230 SUBTOTALS 2 $950 5 $980 0 $0 0 $0 5 $960 1 $110 4 $700 5 $550 4 $700 15 $1,200 4 $1,140 $7,290 PHASE III SUBTOTAL $7,290 CIVIL SITE ENGINEERING (SEE NE BREAKDOWN) $6,392 Structural Engineer TOTAL COSTS 40 COST AND WORK HOURS • Transmit ACAD and Revit Files $0 $0 $0 $0 1 $120 $0 $0 $0 $0 $0 $0 $120 • Utility Coordination $0 $0 $0 $0 $0 $0 1 $140 $0 1 $140 $0 $0 $280 • Coordinate Preliminary City Landscape Plans $0 $0 $0 $0 $0 2 $220 $0 $0 $0 $0 $0 $220 • Prepare DD Grading and Drainage Plans (See Civil) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 • Prepare and Submit DD Review Package $0 1 $140 $0 $0 2 $240 1 $110 1 $140 2 $220 1 $140 2 $160 2 $380 $1,530 • Revise DD Review Package 1 2 $240 $0 $0 $0 $0 $0 $0 $240 • Prepare Preliminary Plan Package 2 $240 $0 $0 $0 $0 $0 $0 $240 • Submit Preliminary Plan Package $0 1 $140 1 $140 $0 1 $120 $0 $0 $0 $0 $0 $0 $400 • Estimate of Construction Cost 2 $380 1 $140 1 $140 1 $120 $0 1 $110 $0 1 $110 $0 1 $80 1 $190 $1,270 SUBTOTALS 3 $570 8 $980 1 $140 0 $0 13 $1,560 5 $550 5 $700 8 $880 9 $1,260 14 $1,120 8 $1,520 $10,550 PHASE II SUBTOTAL $10,550 CIVIL SITE ENGINEERING (SEE NE BREAKDOWN) $7,512 IRRIGATION DESIGN (OLSSON) $2,130 PHASE II TOTAL $20,192 PHASE III - CONSTRUCTION DOCUMENTS Work Session 3 (Meeting) 1 $190 1 $140 $0 $0 1 $120 $0 $0 $0 $0 $0 1 $190 $640 Work Session 4 (Meeting) 1 $190 1 $140 $0 $0 $0 $0 1 $140 $0 1 $140 $0 $0 $610 • Prepare Preliminary CD Documents 1 $190 1 $140 $0 $0 2 $240 $0 1 $140 2 $220 1 $140 8 $640 2 $380 $2,090 • Utility Coordination $0 1 $140 $0 $0 $0 $0 1 $140 $0 1 $140 $0 $0 $420 • Incorporate Final Landscape Plans $0 $0 $0 $0 $0 1 $110 $0 $0 $0 $0 $0 $110 • Prepare Final Grading and Drainage Plans (See Civil) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 • Prepare and Submit CD Review Package $0 1 $140 $0 $0 2 $240 $0 1 $140 2 $220 1 $140 6 $480 2 $380 $1,740 • Revise CD Review Package $0 1 $140 $0 $0 1 $120 $0 $0 1 $110 $0 1 $80 $0 $450 • Estimate of Construction Cost 2 $380 1 $140 $0 $0 2 $240 $0 1 $140 $0 1 $140 $0 1 $190 $1,230 SUBTOTALS 2 $950 5 $980 0 $0 0 $0 5 $960 1 $110 4 $700 5 $550 4 $700 15 $1,200 4 $1,140 $7,290 PHASE III SUBTOTAL $7,290 CIVIL SITE ENGINEERING (SEE NE BREAKDOWN) $6,392 IRRIGATION DESIGN (OLSSON) $2,500 PHASE III TOTAL $16,182 PHASE IV - CCA AND DESIGN SUPPORT • Attend pre-construction meetings 1 $190 1 $140 $0 $0 $0 $0 $0 $0 1 $140 $0 $0 $330 • Attend OAC meetings throughout construction 1 $190 4 $560 $0 $0 $0 $0 $0 $0 $0 $0 $0 $750 • Respond to RFIs, Submittals, CORs, etc. 1 $190 4 $560 $0 $0 4 $480 $0 1 $140 6 $660 2 $280 4 $320 4 $760 $3,110 • Perform Punch Lists 1 $190 1 $140 $0 $0 1 $120 $0 1 $140 $0 1 $140 $0 $0 $590 • Attend Warranty Walk 1 $190 1 $140 $0 $0 1 $120 $0 1 $140 $0 1 $140 $0 $0 $590 • Issue As-Built Documents $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 SUBTOTALS 5 $950 11 $1,540 0 $0 0 $0 6 $720 0 $0 3 $420 6 $660 5 $700 4 $320 4 $760 $5,370 PHASE IV SUBTOTAL $5,370 CIVIL SITE ENGINEERING (SEE NE BREAKDOWN) $4,176 IRRIGATION DESIGN (OLSSON) $870 PHASE IV TOTAL $10,416 TOTAL ALL PHASES $57,728 TOTAL ALL PHASES W/ALTERNATE DEDUCTS $57,728 HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL PHASE I - CONCEPTUAL & SCHEMATIC DESIGN Project Kickoff (Meeting) 1 $210 1 $145 $0 $0 1 $115 $0 $0 $0 $0 $0 $0 $470 Work Session 1 (Meeting) 1 $210 1 $145 $0 $0 1 $115 $0 1 $150 $0 1 $150 $0 $0 $770 Conceptual Design Review (Meeting) 1 $210 1 $145 $0 $0 1 $115 $0 $0 $0 $0 $0 $0 $470 • Present Schematic Park Architectural Elements $0 1 $145 $0 $0 1 $115 2 $220 $0 $0 $0 $0 $0 $480 • Prepare Schematic Park Structural Plans $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 2 $380 $380 • Prepare Preliminary Lighting Plans $0 $0 $0 $0 $0 $0 $0 $0 2 $300 4 $320 $0 $620 • Prepare Preliminary Power Plans $0 $0 $0 $0 $0 $0 $0 $0 1 $150 2 $160 $0 $310 • Prepare Preliminary Mechanical Plans $0 $0 $0 $0 $0 $0 1 $150 2 $220 $0 $0 $0 $370 • Review ADA Code Requirements $0 $0 $0 $0 1 $115 $0 $0 $0 $0 $0 $0 $115 • Review Parking and Traffic Impact $0 $0 $0 $0 1 $115 $0 $0 $0 $0 $0 $0 $115 • Transmit ACAD and Revit Files $0 $0 $0 $0 1 $115 $0 $0 $0 $0 1 $80 1 $190 $385 • Utility Coordination $0 $0 $0 $0 $0 $0 $0 1 $110 1 $150 $0 $0 $260 • Incorporate Preliminary City Landscape Plans $0 $0 $0 $0 $0 2 $220 $0 $0 $0 $0 $0 $220 41 COST AND WORK HOURS Maintenance Facility Project Name : East Park District Maint. Facility Project Number : BD20-041 Location : 3000 Environmental Dr, Fort Collins, CO Computation By : BAC Date : April 6, 2020 ENGINEERING SERVICES PHASE I - 30% Conceptual & Schematic Design Project Coordination (General, IDAP) Design - Site Design - Utility Coordination Design - Drainage City Staff Review / Revisions / Resubmittal Cost Estimate SUB-TOTAL 42 $5,182 $0 $5,182 PHASE II - 60% Design Development Project Coordination (General, IDAP) Design - Site Design - Utility Coordination Design - Drainage City Staff Review / Revisions / Resubmittal Cost Estimate SUB-TOTAL 92 $11,326 $0 $11,326 PHASE III - 95%/Final Construction Documents Project Coordination (General, IDAP) Design - Site Design - Utility Coordination Design - Drainage City Staff Review / Revisions / Resubmittal Cost Estimate SUB-TOTAL 64 $7,786 $0 $7,786 PHASE IV - Construction Administration & Design Support Project Coordination SUB-TOTAL 32 $4,176 $0 $4,176 Reimbursable Expenses Various (Mileage, prints, etc) SUB-TOTAL 0 $0 $1,000 $1,000 SUBTOTAL ALL EXPENSES 230 $28,470 $1,000 $29,470 Civil Engineering Subtotal $28,470 Civil Engineering Contingency 0% $0 Civil Engineering Total $28,470 Reimburseables Subtotal $1,000 Reimburseables Contingency 0% $0 Reimburseables Total $1,000 ESTIMATED PROJECT TOTAL $29,470 Northern Engineering Estimate Description Total Hours Labor Fee Expenses Total Cost Confidential 4/6/2020 Page 1 Bucking Horse Park Project Name : Bucking Horse Park Project Number : BD20-041 Location : Miles House Road, Fort Collins, CO Computation By : BAC Date : April 6, 2020 ENGINEERING SERVICES PHASE I - 30% Conceptual & Schematic Design Project Coordination (General, IDAP) Design - Site Design - Utility Coordination Design - Drainage City Staff Review / Revisions / Resubmittal Cost Estimate SUB-TOTAL 35 $4,318 $0 $4,318 PHASE II - 60% Design Development Project Coordination (General, IDAP) Design - Site Design - Utility Coordination Design - Drainage City Staff Review / Revisions / Resubmittal Cost Estimate SUB-TOTAL 60 $7,512 $0 $7,512 PHASE III - 95%/Final Construction Documents Project Coordination (General, IDAP) Design - Site Design - Utility Coordination Design - Drainage City Staff Review / Revisions / Resubmittal Cost Estimate SUB-TOTAL 53 $6,392 $0 $6,392 PHASE IV - Construction Administration & Design Support Project Coordination SUB-TOTAL 32 $4,176 $0 $4,176 Reimbursable Expenses Various (Mileage, prints, etc) SUB-TOTAL 0 $0 $1,000 $1,000 SUBTOTAL ALL EXPENSES 180 $22,398 $1,000 $23,398 Civil Engineering Subtotal $22,398 Civil Engineering Contingency 0% $0 Civil Engineering Total $22,398 Reimburseables Subtotal $1,000 Reimburseables Contingency 0% $0 Reimburseables Total $1,000 ESTIMATED PROJECT TOTAL $23,398 Northern Engineering Estimate Description Total Hours Labor Fee Expenses Total Cost Confidential 4/6/2020 PHASE I - CONCEPTUAL & SCHEMATIC DESIGN PHASE I TOTAL $26,902 $10,938 $37,840 PHASE II - DESIGN DEVELOPMENT PHASE II TOTAL $41,951 $20,192 $62,143 PHASE III - CONSTRUCTION DOCUMENTS PHASE III TOTAL $42,546 $16,182 $58,728 PHASE IV - CCA AND DESIGN SUPPORT PHASE IV TOTAL $26,251 $10,416 $36,667 TOTAL ALL PHASES FOR BOTH PROJECTS $137,650 $57,728 $195,378 TOTAL ALL PHASES W/ALTERNATE DEDUCTS $136,690 $57,728 $194,418 EAST PARK MAINTENANCE BUCKING HORSE PARK TOTAL PHASE COSTS/PHASE DocuSign Envelope ID: 1356DEF1-A55E-44F2-B42D-6857C9BDD488 • Prepare Conceptual Grading and Drainage Plans (See Civil) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 • Prepare and Submit Conceptual Design Package $0 $0 $0 $0 1 $115 $0 $0 2 $220 $0 2 $160 1 $190 $685 • Revise Conceptual Design Package $0 $0 $0 $0 1 $115 $0 $0 $0 $0 $0 $0 $115 • Estimate of Construction Cost 1 $210 1 $145 $0 $0 $0 $0 $0 $0 $0 $0 $0 $355 SUBTOTALS 4 $840 5 $725 0 $0 0 $0 9 $1,035 4 $440 2 $300 5 $550 5 $750 9 $720 4 $760 $6,120 PHASE I SUBTOTAL $6,120 CIVIL SITE ENGINEERING (SEE NE BREAKDOWN) $4,318 IRRIGATION DESIGN (OLSSON) $500 PHASE I TOTAL $10,938 PHASE II - DESIGN DEVELOPMENT Work Session 2 (Meeting) 1 $190 1 $140 $0 $0 1 $120 $0 $0 $0 $0 $0 $0 $450 Preliminary Plan Review (Meeting(s)) 1 $190 1 $140 $0 $0 1 $120 $0 1 $140 $0 1 $140 $0 $0 $730 • Prepare DD Preliminary Documents 1 $190 1 $140 $0 $0 2 $240 $0 2 $280 6 $660 6 $840 12 $960 6 $1,140 $4,450 • Review Code Requirements and TIS $0 1 $140 $0 $0 1 $120 1 $110 $0 $0 $0 $0 $0 $370 • Review Parking $0 1 $140 $0 $0 $0 1 $110 $0 $0 $0 $0 $0 $250 • Transmit ACAD and Revit Files $0 $0 $0 $0 1 $120 $0 $0 $0 $0 $0 $0 $120 • Utility Coordination $0 $0 $0 $0 $0 $0 1 $140 $0 1 $140 $0 $0 $280 • Coordinate Preliminary City Landscape Plans $0 $0 $0 $0 $0 2 $220 $0 $0 $0 $0 $0 $220 • Prepare DD Grading and Drainage Plans (See Civil) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 • Prepare and Submit DD Review Package $0 1 $140 $0 $0 2 $240 1 $110 1 $140 2 $220 1 $140 2 $160 2 $380 $1,530 • Revise DD Review Package 1 2 $240 $0 $0 $0 $0 $0 $0 $240 • Prepare Preliminary Plan Package 2 $240 $0 $0 $0 $0 $0 $0 $240 • Submit Preliminary Plan Package $0 1 $140 1 $140 $0 1 $120 $0 $0 $0 $0 $0 $0 $400 • Estimate of Construction Cost 2 $380 1 $140 1 $140 1 $120 $0 1 $110 $0 1 $110 $0 1 $80 1 $190 $1,270 SUBTOTALS 3 $570 8 $980 1 $140 0 $0 13 $1,560 5 $550 5 $700 8 $880 9 $1,260 14 $1,120 8 $1,520 $10,550 PHASE II SUBTOTAL $10,550 CIVIL SITE ENGINEERING (SEE NE BREAKDOWN) $7,512 IRRIGATION DESIGN (OLSSON) $2,130 PHASE II TOTAL $20,192 PHASE III - CONSTRUCTION DOCUMENTS Work Session 3 (Meeting) 1 $190 1 $140 $0 $0 1 $120 $0 $0 $0 $0 $0 1 $190 $640 Work Session 4 (Meeting) 1 $190 1 $140 $0 $0 $0 $0 1 $140 $0 1 $140 $0 $0 $610 • Prepare Preliminary CD Documents 1 $190 1 $140 $0 $0 2 $240 $0 1 $140 2 $220 1 $140 8 $640 2 $380 $2,090 • Utility Coordination $0 1 $140 $0 $0 $0 $0 1 $140 $0 1 $140 $0 $0 $420 • Incorporate Final Landscape Plans $0 $0 $0 $0 $0 1 $110 $0 $0 $0 $0 $0 $110 • Prepare Final Grading and Drainage Plans (See Civil) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 • Prepare and Submit CD Review Package $0 1 $140 $0 $0 2 $240 $0 1 $140 2 $220 1 $140 6 $480 2 $380 $1,740 • Revise CD Review Package $0 1 $140 $0 $0 1 $120 $0 $0 1 $110 $0 1 $80 $0 $450 • Estimate of Construction Cost 2 $380 1 $140 $0 $0 2 $240 $0 1 $140 $0 1 $140 $0 1 $190 $1,230 SUBTOTALS 2 $950 5 $980 0 $0 0 $0 5 $960 1 $110 4 $700 5 $550 4 $700 15 $1,200 4 $1,140 $7,290 PHASE III SUBTOTAL $7,290 CIVIL SITE ENGINEERING (SEE NE BREAKDOWN) $6,392 Structural Engineer TOTAL COSTS Dave Niemann $190/HR Design Architect Matt Glawatz $145/HR LEED Coordinator Andrea Anderson $145/HR Project Architect Kate Penning $115/HR Mech Engineer Brenton Boyer $150/HR Landscape Architect Sean Ray $110/HR Mech Designer Christian Denton $110/HR Elec Engineer Dan Wroblewski $150/HR Elec Designer Tanner Creviston $80/HR DESCRIPTION OF SERVICES $210/HR Principal Philip Walter Project Manager Casey Roberts $145/HR BUCKING HORSE PARK DocuSign Envelope ID: 1356DEF1-A55E-44F2-B42D-6857C9BDD488 Dave Niemann $190/HR Design Architect Matt Glawatz $145/HR LEED Coordinator Andrea Anderson $145/HR Project Architect Kate Penning $115/HR Mech Engineer Brenton Boyer $150/HR Landscape Architect Sean Ray $110/HR Mech Designer Christian Denton $110/HR Elec Engineer Dan Wroblewski $150/HR Elec Designer Tanner Creviston $80/HR DESCRIPTION OF SERVICES $210/HR Principal Philip Walter Project Manager Casey Roberts $145/HR BUCKING HORSE PARK HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL PHASE I - CONCEPTUAL & SCHEMATIC DESIGN Project Kickoff (Meeting) 1 $210 1 $145 $0 $0 1 $115 $0 $0 $0 $0 $0 $0 $470 Work Session 1 (Meeting) 1 $210 1 $145 $0 $0 1 $115 $0 1 $150 $0 1 $150 $0 $0 $770 Conceptual Design Review (Meeting) 1 $210 1 $145 $0 $0 1 $115 $0 $0 $0 $0 $0 $0 $470 • Present Schematic Park Architectural Elements $0 1 $145 $0 $0 1 $115 2 $220 $0 $0 $0 $0 $0 $480 • Prepare Schematic Park Structural Plans $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 2 $380 $380 • Prepare Preliminary Lighting Plans $0 $0 $0 $0 $0 $0 $0 $0 2 $300 4 $320 $0 $620 • Prepare Preliminary Power Plans $0 $0 $0 $0 $0 $0 $0 $0 1 $150 2 $160 $0 $310 • Prepare Preliminary Mechanical Plans $0 $0 $0 $0 $0 $0 1 $150 2 $220 $0 $0 $0 $370 • Review ADA Code Requirements $0 $0 $0 $0 1 $115 $0 $0 $0 $0 $0 $0 $115 • Review Parking and Traffic Impact $0 $0 $0 $0 1 $115 $0 $0 $0 $0 $0 $0 $115 • Transmit ACAD and Revit Files $0 $0 $0 $0 1 $115 $0 $0 $0 $0 1 $80 1 $190 $385 • Utility Coordination $0 $0 $0 $0 $0 $0 $0 1 $110 1 $150 $0 $0 $260 • Incorporate Preliminary City Landscape Plans $0 $0 $0 $0 $0 2 $220 $0 $0 $0 $0 $0 $220 • Prepare Conceptual Grading and Drainage Plans (See Civil) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 • Prepare and Submit Conceptual Design Package $0 $0 $0 $0 1 $115 $0 $0 2 $220 $0 2 $160 1 $190 $685 • Revise Conceptual Design Package $0 $0 $0 $0 1 $115 $0 $0 $0 $0 $0 $0 $115 • Estimate of Construction Cost 1 $210 1 $145 $0 $0 $0 $0 $0 $0 $0 $0 $0 $355 SUBTOTALS 4 $840 5 $725 0 $0 0 $0 9 $1,035 4 $440 2 $300 5 $550 5 $750 9 $720 4 $760 $6,120 PHASE I SUBTOTAL $6,120 CIVIL SITE ENGINEERING (SEE NE BREAKDOWN) $4,318 IRRIGATION DESIGN (OLSSON) $500 PHASE I TOTAL $10,938 PHASE II - DESIGN DEVELOPMENT Work Session 2 (Meeting) 1 $190 1 $140 $0 $0 1 $120 $0 $0 $0 $0 $0 $0 $450 Preliminary Plan Review (Meeting(s)) 1 $190 1 $140 $0 $0 1 $120 $0 1 $140 $0 1 $140 $0 $0 $730 • Prepare DD Preliminary Documents 1 $190 1 $140 $0 $0 2 $240 $0 2 $280 6 $660 6 $840 12 $960 6 $1,140 $4,450 • Review Code Requirements and TIS $0 1 $140 $0 $0 1 $120 1 $110 $0 $0 $0 $0 $0 $370 • Review Parking $0 1 $140 $0 $0 $0 1 $110 $0 $0 $0 $0 $0 $250 • Transmit ACAD and Revit Files $0 $0 $0 $0 1 $120 $0 $0 $0 $0 $0 $0 $120 • Utility Coordination $0 $0 $0 $0 $0 $0 1 $140 $0 1 $140 $0 $0 $280 • Coordinate Preliminary City Landscape Plans $0 $0 $0 $0 $0 2 $220 $0 $0 $0 $0 $0 $220 • Prepare DD Grading and Drainage Plans (See Civil) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 • Prepare and Submit DD Review Package $0 1 $140 $0 $0 2 $240 1 $110 1 $140 2 $220 1 $140 2 $160 2 $380 $1,530 • Revise DD Review Package 1 2 $240 $0 $0 $0 $0 $0 $0 $240 • Prepare Preliminary Plan Package 2 $240 $0 $0 $0 $0 $0 $0 $240 • Submit Preliminary Plan Package $0 1 $140 1 $140 $0 1 $120 $0 $0 $0 $0 $0 $0 $400 • Estimate of Construction Cost 2 $380 1 $140 1 $140 1 $120 $0 1 $110 $0 1 $110 $0 1 $80 1 $190 $1,270 SUBTOTALS 3 $570 8 $980 1 $140 0 $0 13 $1,560 5 $550 5 $700 8 $880 9 $1,260 14 $1,120 8 $1,520 $10,550 PHASE II SUBTOTAL $10,550 CIVIL SITE ENGINEERING (SEE NE BREAKDOWN) $7,512 IRRIGATION DESIGN (OLSSON) $2,130 PHASE II TOTAL $20,192 PHASE III - CONSTRUCTION DOCUMENTS Work Session 3 (Meeting) 1 $190 1 $140 $0 $0 1 $120 $0 $0 $0 $0 $0 1 $190 $640 Work Session 4 (Meeting) 1 $190 1 $140 $0 $0 $0 $0 1 $140 $0 1 $140 $0 $0 $610 • Prepare Preliminary CD Documents 1 $190 1 $140 $0 $0 2 $240 $0 1 $140 2 $220 1 $140 8 $640 2 $380 $2,090 • Utility Coordination $0 1 $140 $0 $0 $0 $0 1 $140 $0 1 $140 $0 $0 $420 • Incorporate Final Landscape Plans $0 $0 $0 $0 $0 1 $110 $0 $0 $0 $0 $0 $110 • Prepare Final Grading and Drainage Plans (See Civil) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 • Prepare and Submit CD Review Package $0 1 $140 $0 $0 2 $240 $0 1 $140 2 $220 1 $140 6 $480 2 $380 $1,740 • Revise CD Review Package $0 1 $140 $0 $0 1 $120 $0 $0 1 $110 $0 1 $80 $0 $450 • Estimate of Construction Cost 2 $380 1 $140 $0 $0 2 $240 $0 1 $140 $0 1 $140 $0 1 $190 $1,230 SUBTOTALS 2 $950 5 $980 0 $0 0 $0 5 $960 1 $110 4 $700 5 $550 4 $700 15 $1,200 4 $1,140 $7,290 PHASE III SUBTOTAL $7,290 CIVIL SITE ENGINEERING (SEE NE BREAKDOWN) $6,392 Structural Engineer TOTAL COSTS Dave Niemann $190/HR Design Architect Matt Glawatz $145/HR LEED Coordinator Andrea Anderson $145/HR Project Architect Kate Penning $115/HR Mech Engineer Brenton Boyer $150/HR Landscape Architect Sean Ray $110/HR Mech Designer Christian Denton $110/HR Elec Engineer Dan Wroblewski $150/HR Elec Designer Tanner Creviston $80/HR DESCRIPTION OF SERVICES $210/HR Principal Philip Walter Project Manager Casey Roberts $145/HR BUCKING HORSE PARK DocuSign Envelope ID: 1356DEF1-A55E-44F2-B42D-6857C9BDD488 • Utility Coordination 1 $210 1 $145 $0 $0 2 $230 $0 1 $150 $0 1 $150 $0 $0 $885 • Incorporate Preliminary City Landscape Plans $0 $0 $0 $0 $0 2 $220 $0 $0 $0 $0 $0 $220 • Prepare Conceptual Grading and Drainage Plans (See Civil) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 • Prepare and Submit Conceptual Design Package 1 $210 4 $580 2 $290 $0 8 $920 $0 2 $300 4 $440 1 $150 2 $160 2 $380 $3,430 • Revise Conceptual Design Package $0 $0 $0 $0 2 $230 $0 $0 $0 $0 $0 $0 $230 • Estimate of Construction Cost 1 $210 1 $145 $0 $0 $0 $0 1 $150 1 $110 1 $150 1 $80 1 $190 $1,035 $0 $0 SUBTOTALS 17 $3,570 22 $3,190 14 $2,030 4 $580 34 $3,910 2 $220 12 $1,800 17 $1,870 10 $1,500 16 $1,280 8 $1,520 $21,470 PHASE I SUBTOTAL $21,470 CIVIL SITE ENGINEERING (SEE NE BREAKDOWN) $5,182 IRRIGATION DESIGN (OLSSON) $250 PHASE I TOTAL $26,902 PHASE II - DESIGN DEVELOPMENT Work Session 2 (Meeting) 2 $380 2 $280 $0 2 $240 $0 $0 1 $140 $0 1 $140 $0 $0 $1,180 Preliminary Plan Review (Meeting(s)) 2 $420 2 $290 $0 $0 2 $230 $0 1 $150 $0 1 $150 $0 $0 $1,240 IDAP DD Review (Meeting) 4 $760 4 $560 $0 4 $480 $0 $0 2 $280 $0 2 $280 $0 $0 $2,360 • Prepare DD Preliminary Documents 4 $760 4 $560 1 $140 2 $240 14 $1,680 $0 8 $1,120 10 $1,100 6 $840 12 $960 6 $1,140 $8,540 • Review Code Requirements and TIS 1 $190 1 $140 1 $140 2 $240 4 $480 $0 $0 $0 $0 $0 $0 $1,190 • Review Parking $0 1 $140 $0 $0 4 $480 2 $220 $0 $0 $0 $0 $0 $840 • Virtual Tour Production $0 0 $0 0 $0 $0 8 $960 $0 $0 $0 $0 $0 $0 $960 • Transmit ACAD and Revit Files $0 $0 $0 $0 1 $120 $0 $0 $0 $0 $0 $0 $120 • Utility Coordination 1 $190 2 $280 1 $140 $0 4 $480 $0 $0 $0 $0 $0 $0 $1,090 • Coordinate Preliminary City Landscape Plans $0 $0 $0 $0 $0 2 $220 $0 $0 $0 $0 $0 $220 • Prepare DD Grading and Drainage Plans (See Civil) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 • Prepare and Submit DD Review Package 1 $190 1 $140 $0 $0 10 $1,200 1 $110 8 $1,120 10 $1,100 10 $1,400 16 $1,280 12 $2,280 $8,820 • Revise DD Review Package 1 $190 1 $140 $0 $0 2 $240 $0 $0 $0 $0 $0 $0 $570 • Prepare Preliminary Plan Package $0 $0 $0 $0 4 $480 $0 $0 $0 $0 $0 $0 $480 • Submit Preliminary Plan Package 1 $190 1 $140 1 $140 1 $120 2 $240 1 $110 $0 1 $110 $0 1 $80 $0 $1,130 • Estimate of Construction Cost 2 $380 1 $140 $0 1 $120 1 $120 2 $220 1 $140 $0 1 $140 $0 1 $190 $1,450 SUBTOTALS 17 $3,270 19 $2,670 4 $560 11 $1,320 56 $6,590 6 $660 20 $2,810 21 $2,310 20 $2,810 29 $2,320 18 $3,420 $30,190 PHASE II SUBTOTAL $30,190 CIVIL SITE ENGINEERING (SEE NE BREAKDOWN) $11,326 IRRIGATION DESIGN (OLSSON) $435 PHASE II TOTAL $41,951 Alternate - Deduct Virtual Tour $ (960.00) PHASE II TOTAL W/ALTERNATE DEDUCTS $40,991 PHASE III - CONSTRUCTION DOCUMENTS Work Session 3 (Meeting) 2 $380 2 $280 2 $280 $0 2 $240 $0 $0 $0 $0 $0 $0 $1,180 Work Session 4 (Meeting) 2 $380 2 $280 $0 2 $240 $0 $0 2 $280 $0 2 $280 $0 $0 $1,460 IDAP CD Review (Meeting) 4 $760 4 $560 $0 4 $480 $0 $0 2 $280 $0 2 $280 $0 $0 $2,360 • Prepare Preliminary CD Documents 2 $380 4 $560 $0 2 $240 18 $2,160 $0 6 $840 18 $1,980 6 $840 20 $1,600 20 $3,800 $12,400 • Utility Coordination 1 $190 1 $140 $0 $0 2 $240 $0 1 $140 $0 1 $140 $0 $0 $850 • Incororate Final Landscape Plans $0 $0 $0 $0 2 $240 2 $220 $0 $0 $0 $0 $0 $460 • Prepare Final Grading and Drainage Plans $0 $0 $0 $0 2 $240 $0 $0 $0 $0 $0 $0 $240 • Prepare and Submit CD Review Package 2 $380 6 $840 2 $280 8 $960 2 $240 $0 8 $1,120 16 $1,760 8 $1,120 12 $960 6 $1,140 $8,800 • Revise CD Review Package 1 $190 4 $560 1 $140 2 $240 1 $120 $0 1 $140 2 $220 1 $140 2 $160 1 $190 $2,100 • Estimate of Construction Cost 2 $380 5 $700 2 $280 3 $360 2 $240 $0 2 $280 3 $330 2 $280 3 $240 1 $190 $3,280 EAST PARK DISTRICT MAINTENANCE FACILITY Principal Philip Walter $110/HR $150/HR $110/HR $190/HR DESCRIPTION OF SERVICES $210/HR $145/HR $145/HR $145/HR $115/HR $150/HR $80/HR Project Manager Casey Roberts Design Architect Matt Glawatz LEED Coordinator Andrea Anderson Project Architect Kate Penning TOTAL COSTS Structural Engineer Dave Niemann Landscape Architect Sean Ray Mech Engineer Brenton Boyer Mech Designer Christian Denton Elec Engineer Dan Wroblewski Elec Designer Tanner Creviston DocuSign Envelope ID: 1356DEF1-A55E-44F2-B42D-6857C9BDD488 Philip Walter $110/HR $150/HR $110/HR $190/HR DESCRIPTION OF SERVICES $210/HR $145/HR $145/HR $145/HR $115/HR $150/HR $80/HR Project Manager Casey Roberts Design Architect Matt Glawatz LEED Coordinator Andrea Anderson Project Architect Kate Penning TOTAL COSTS Structural Engineer Dave Niemann Landscape Architect Sean Ray Mech Engineer Brenton Boyer Mech Designer Christian Denton Elec Engineer Dan Wroblewski Elec Designer Tanner Creviston COST AND WORK HOURS 37 H. COST AND WORK HOURS HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL HRS SUBTOTAL PHASE I - CONCEPTUAL & SCHEMATIC DESIGN Project Kickoff (Meeting) 2 $420 2 $290 2 $290 $0 2 $230 $0 $0 $0 $0 $0 $0 $1,230 Work Session 1 (Meeting) 2 $420 2 $290 2 $290 $0 2 $230 $0 1 $150 $0 1 $150 $0 $0 $1,530 IDAP Design Charette (Meeting) 4 $840 4 $580 4 $580 4 $580 0 $0 $0 2 $300 $0 2 $300 $0 $0 $3,180 Conceptual Plan Review (Meeting) 2 $420 2 $290 2 $290 $0 0 $0 $0 1 $150 $0 1 $150 $0 $0 $1,300 • Analyze and Update Prototypes 1 $210 1 $145 $0 $0 4 $460 $0 $0 $0 $0 $0 $0 $815 • Present Schematic Building Alternatives 1 $210 1 $145 $0 $0 2 $230 $0 $0 $0 $0 $0 $0 $585 • Prepare Conceptual Building Plans 1 $210 1 $145 2 $290 $0 4 $460 $0 2 $300 6 $660 1 $150 6 $480 2 $380 $3,075 • Perform Building Assessment 1 $210 1 $145 $0 $0 4 $460 $0 2 $300 6 $660 2 $300 6 $480 2 $380 $2,935 • Review ADA Code Requirements $0 1 $145 $0 $0 2 $230 $0 $0 $0 $0 $0 $0 $375 • Review Parking and Traffic Impact $0 1 $145 $0 $0 1 $115 $0 $0 $0 $0 $0 $0 $260 • Transmit ACAD and Revit Files $0 $0 $0 $0 1 $115 $0 $0 $0 $0 1 $80 1 $190 $385 • Utility Coordination 1 $210 1 $145 $0 $0 2 $230 $0 1 $150 $0 1 $150 $0 $0 $885 • Incorporate Preliminary City Landscape Plans $0 $0 $0 $0 $0 2 $220 $0 $0 $0 $0 $0 $220 • Prepare Conceptual Grading and Drainage Plans (See Civil) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 • Prepare and Submit Conceptual Design Package 1 $210 4 $580 2 $290 $0 8 $920 $0 2 $300 4 $440 1 $150 2 $160 2 $380 $3,430 • Revise Conceptual Design Package $0 $0 $0 $0 2 $230 $0 $0 $0 $0 $0 $0 $230 • Estimate of Construction Cost 1 $210 1 $145 $0 $0 $0 $0 1 $150 1 $110 1 $150 1 $80 1 $190 $1,035 $0 $0 SUBTOTALS 17 $3,570 22 $3,190 14 $2,030 4 $580 34 $3,910 2 $220 12 $1,800 17 $1,870 10 $1,500 16 $1,280 8 $1,520 $21,470 PHASE I SUBTOTAL $21,470 CIVIL SITE ENGINEERING (SEE NE BREAKDOWN) $5,182 IRRIGATION DESIGN (OLSSON) $250 PHASE I TOTAL $26,902 PHASE II - DESIGN DEVELOPMENT Work Session 2 (Meeting) 2 $380 2 $280 $0 2 $240 $0 $0 1 $140 $0 1 $140 $0 $0 $1,180 Preliminary Plan Review (Meeting(s)) 2 $420 2 $290 $0 $0 2 $230 $0 1 $150 $0 1 $150 $0 $0 $1,240 IDAP DD Review (Meeting) 4 $760 4 $560 $0 4 $480 $0 $0 2 $280 $0 2 $280 $0 $0 $2,360 • Prepare DD Preliminary Documents 4 $760 4 $560 1 $140 2 $240 14 $1,680 $0 8 $1,120 10 $1,100 6 $840 12 $960 6 $1,140 $8,540 • Review Code Requirements and TIS 1 $190 1 $140 1 $140 2 $240 4 $480 $0 $0 $0 $0 $0 $0 $1,190 • Review Parking $0 1 $140 $0 $0 4 $480 2 $220 $0 $0 $0 $0 $0 $840 • Virtual Tour Production $0 0 $0 0 $0 $0 8 $960 $0 $0 $0 $0 $0 $0 $960 • Transmit ACAD and Revit Files $0 $0 $0 $0 1 $120 $0 $0 $0 $0 $0 $0 $120 • Utility Coordination 1 $190 2 $280 1 $140 $0 4 $480 $0 $0 $0 $0 $0 $0 $1,090 • Coordinate Preliminary City Landscape Plans $0 $0 $0 $0 $0 2 $220 $0 $0 $0 $0 $0 $220 • Prepare DD Grading and Drainage Plans (See Civil) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 • Prepare and Submit DD Review Package 1 $190 1 $140 $0 $0 10 $1,200 1 $110 8 $1,120 10 $1,100 10 $1,400 16 $1,280 12 $2,280 $8,820 • Revise DD Review Package 1 $190 1 $140 $0 $0 2 $240 $0 $0 $0 $0 $0 $0 $570 • Prepare Preliminary Plan Package $0 $0 $0 $0 4 $480 $0 $0 $0 $0 $0 $0 $480 • Submit Preliminary Plan Package 1 $190 1 $140 1 $140 1 $120 2 $240 1 $110 $0 1 $110 $0 1 $80 $0 $1,130 • Estimate of Construction Cost 2 $380 1 $140 $0 1 $120 1 $120 2 $220 1 $140 $0 1 $140 $0 1 $190 $1,450 SUBTOTALS 17 $3,270 19 $2,670 4 $560 11 $1,320 56 $6,590 6 $660 20 $2,810 21 $2,310 20 $2,810 29 $2,320 18 $3,420 $30,190 PHASE II SUBTOTAL $30,190 CIVIL SITE ENGINEERING (SEE NE BREAKDOWN) $11,326 IRRIGATION DESIGN (OLSSON) $435 PHASE II TOTAL $41,951 Alternate - Deduct Virtual Tour $ (960.00) PHASE II TOTAL W/ALTERNATE DEDUCTS $40,991 PHASE III - CONSTRUCTION DOCUMENTS Work Session 3 (Meeting) 2 $380 2 $280 2 $280 $0 2 $240 $0 $0 $0 $0 $0 $0 $1,180 Work Session 4 (Meeting) 2 $380 2 $280 $0 2 $240 $0 $0 2 $280 $0 2 $280 $0 $0 $1,460 IDAP CD Review (Meeting) 4 $760 4 $560 $0 4 $480 $0 $0 2 $280 $0 2 $280 $0 $0 $2,360 • Prepare Preliminary CD Documents 2 $380 4 $560 $0 2 $240 18 $2,160 $0 6 $840 18 $1,980 6 $840 20 $1,600 20 $3,800 $12,400 • Utility Coordination 1 $190 1 $140 $0 $0 2 $240 $0 1 $140 $0 1 $140 $0 $0 $850 • Incororate Final Landscape Plans $0 $0 $0 $0 2 $240 2 $220 $0 $0 $0 $0 $0 $460 • Prepare Final Grading and Drainage Plans $0 $0 $0 $0 2 $240 $0 $0 $0 $0 $0 $0 $240 • Prepare and Submit CD Review Package 2 $380 6 $840 2 $280 8 $960 2 $240 $0 8 $1,120 16 $1,760 8 $1,120 12 $960 6 $1,140 $8,800 • Revise CD Review Package 1 $190 4 $560 1 $140 2 $240 1 $120 $0 1 $140 2 $220 1 $140 2 $160 1 $190 $2,100 • Estimate of Construction Cost 2 $380 5 $700 2 $280 3 $360 2 $240 $0 2 $280 3 $330 2 $280 3 $240 1 $190 $3,280 EAST PARK DISTRICT MAINTENANCE FACILITY Principal Philip Walter $110/HR $150/HR $110/HR $190/HR DESCRIPTION OF SERVICES $210/HR $145/HR $145/HR $145/HR $115/HR $150/HR $80/HR Project Manager Casey Roberts Design Architect Matt Glawatz LEED Coordinator Andrea Anderson Project Architect Kate Penning TOTAL COSTS Structural Engineer Dave Niemann Landscape Architect Sean Ray Mech Engineer Brenton Boyer Mech Designer Christian Denton Elec Engineer Dan Wroblewski Elec Designer Tanner Creviston DocuSign Envelope ID: 1356DEF1-A55E-44F2-B42D-6857C9BDD488