FORT COLLINS UTILITIES
CONSTRUCTION WORK ORDER
CATHODIC PROTECTION PROGRAM WESTSIDE
PROJECT
WORK ORDER NO. HYDRO-WCP-51320
CONTRACTOR: Hydro Construction, Inc.
Page 1 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
TABLE OF CONTENTS
AGREEMENT FORMS
00525 Work Order, Notice of Award & Bid Schedule
00530 Work Order Notice to Proceed
00600 Bonds and Certificates
00610 Performance Bond
00615 Payment Bond
00630 Certificate of Insurance
00635 Certificate of Substantial Completion
00640 Certificate of Final Acceptance
00650 Lien Waiver Release (CONTRACTOR)
00651 Lien Waiver Release (SUBCONTRACTOR)
00660 Consent of Surety
00670 Application for Exemption Certificate
00800 Supplementary Conditions
00900 Addenda, Modifications and Payment
00950 Work Order Change Order Form
00960 Application for Payment
ADDITIONAL DOCUMENTS
Attachment A DRAWING INDEX
Page 2 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
SECTION 00500
CONSTRUCTION WORK ORDER AGREEMENT FORMS
00525 Work Order, Notice of Award & Bid Schedule
00530 Work Order Notice to Proceed
Page 3 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
SECTION 00525
WORK ORDER, NOTICE OF AWARD AND BID SCHEDULE
TO: Hydro Construction, Inc.
WORK ORDER NUMBER: Hydro-WCP-51320
PROJECT TITLE: Cathodic Protection Program Westside Project
ORIGINAL BID/RFP NUMBER & NAME: 8286, Construction Contractor for Projects at the
Water and Wastewater Treatment Facilities
MASTER AGREEMENT EFFECTIVE DATE: June 20, 2016
ARCHITECT/ENGINEER: HDR Inc.
OWNER’S REPRESENTATIVE: Sue Paquette
WORK ORDER COMMENCEMENT DATE: May 15, 2020
WORK ORDER COMPLETION DATE: May 31, 2021
MAXIMUM FEE: (time and reimbursable direct costs): $352,024.00
NOTICE OF AWARD DATE: May 13, 2020
OWNER: City of Fort Collins (hereinafter referred to as OWNER)
1. WORK. Pursuant to your MASTER AGREEMENT with OWNER dated June 20, 2016, and
your Work Order Proposal dated May 6, 2020, you have been awarded a Work Order for
Cathodic Protection Program Westside Project
PROJECT DESCRIPTION & SITE LOCATION:
Provide construction services for the cathodic protection program involving the Westside
Transmission water main along Overland Trail including excavation for discontinuity
corrections, design and submittal development for construction of project, installation of
electrical conduit, junction boxes, concrete pads, drill hole for anode placement, rectifier,
and remote monitoring unit for connection to city SCADA. See attached supporting
documentation.
2. CONTRACT PRICE, BONDS AND CERTIFICATES. The price of your Work Order is three
hundred fifty-two thousand twenty-four dollars and zero cents ($352,024.00). Pursuant to
the AGREEMENT and the Work Order Documents, Performance and Payment Bonds and
insurance are required.
3. CONTRACT TIMES. Pursuant to the MASTER AGREEMENT and the Work Order
Documents, the date for Substantial Completion of this Work Order is April 1, 2021, and
after Substantial Completion, the date for Final Completion is May 31, 2021.
4. LIQUIDATED DAMAGES. OWNER and CONTRACTOR recognize that time is of the
essence of this Work Order and that OWNER will suffer financial loss if the Work is not
completed within the times specified in paragraph 3 above, plus any extensions thereof
allowed in accordance with Article 12 of the General Conditions. They also recognize the
delays, expenses and difficulties involved in proving in a legal proceeding the actual loss
Page 4 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
suffered by OWNER if the Work is not completed on time. Accordingly instead of requiring
any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay
(but not as penalty) CONTACTOR shall pay OWNER the amounts set forth hereafter.
1) Substantial Completion: Five hundred dollars ($500.00) for each calendar day
or fraction thereof after April 1, 2021 until the work is Substantially Complete.
2) Final Acceptance: After Substantial Completion, two hundred dollars
($200.00) for each calendar day or fraction thereof after May 31, 2021 until the
Work is ready for Final Payment and Acceptance.
5. EXECUTION. Work Order Documents must be executed in DocuSign within fifteen (15)
calendar days of the date of this Notice of Award. Contractor shall attach Payment and
Performance Bonds and Certificate of Insurance(COI) to the Work Order Documents in
DocuSign. In addition, one original set of executed Bonds and COI shall be provided to the
Buyer.
Failure to comply with these conditions within the time specified will entitle OWNER to
consider your Work Order Proposal abandoned and to annul this Work Order & Notice of
Award.
CONTRACTOR’S NOTICE OF AWARD REPRESENTATION & EXECUTION:
CONTRACTOR agrees to perform the services identified above, in accordance with the terms
and conditions contained herein, the MASTER AGREEMENT, and the NOTICE OF AWARD
between the parties. In the event of a conflict between or ambiguity in the terms of the MASTER
AGREEMENT or specific Work Orders, the MASTER AGREEMENT shall control.
CONTRACTOR: Hydro Construction, Inc.
By: Date:
Name: Title:
Page 5 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Jim Eurich COO
May 20, 2020
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
OWNER’S ACCEPTANCE & EXECUTION:
This Work Order and the attached Contract Documents are hereby accepted and incorporated
herein by this reference.
ACCEPTANCE: Date:
Sue Paquette, Civil Engineer III
REVIEWED: Date:
Pat Johnston, Senior Buyer
REQUISITION ENTERED BY: Date:
ACCEPTANCE: Date:
Matt Fater, Director, Civil Engineering
ACCEPTANCE: Date:
Andrew Gingerich, Interim, Deputy Director, Water Engineering & Field Service
ACCEPTANCE: Date:
Theresa Connor, Interim Utilities Executive Director
(if greater than $1,000,000)
ACCEPTANCE: Date:
Gerry Paul, Purchasing Director
(if greater than $60,000)
ACCEPTANCE: Date:
Darin Atteberry, City Manager
(if greater than $1,000,000)
ATTEST: Date:
City Clerk
(if greater than $1,000,000)
Page 6 of 38
Missy Walker
Melissa Walker , Coordinator, Finance
May 15, 2020
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
May 20, 2020
May 20, 2020
May 20, 2020
May 20, 2020
May 20, 2020
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
BID SCHEDULE
Page 7 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
May 6, 2020
Hydro Construction Company, Inc. - Scope of Services.
City Cathodic Program – Westside 60” PCCP Water Line CP Project
Hydro to provide construction and design services for the installation and construction of a
cathodic protection system on the City of Fort Collins Westside 60” PCCP Transmission
water main. These services include (similar to the services they provided for the
installation of the CP system on the Northeast Loop (AB) water line)
• Locating, site investigation, and excavating for discontinuity corrections,
• CP design assistance and feasibility for construction guidance,
• submittal development for construction of project,
• installation of electrical conduit, junction boxes, concrete pads with bollards,
rectifier,
• drill hole for anode placement, and
• electrical installation for remote monitoring unit for connection to city SCADA.
Note: Costs for this scope were developed from the AB water line CP project ICE.
Page 8 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Standard Estimate Report Page 1
Fort Collins West Side CP 5/6/2020
Project name Fort Collins West Side CP
Labor rate table Labor - Bare
Equipment rate table Equipment
Report format Sorted by 'Structure/Prop Item#'
'Detail' summary
Allocate addons
Page 9 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Standard Estimate Report Page 2
Fort Collins West Side CP 5/6/2020
Item Description Takeoff Qty
Labor
Unit Cost Amount
Material
Unit Cost Amount
Subcontract
Amount Name
Equipment
Amount
Other
Amount
Total
Amount
01 Continuity Span Corrections
G General Conditions
14 Project Manager 5.00 wk 799.782 /wk 3,999 - - - 1,734 109 5,842
14 Superintendent 3.00 wk 1,777.293 /wk 5,332 - - - 1,040 87 6,460
18 Telephone Charges 1.00 mo - - - - 291 291
18 Temp Toilet 1.00 mo - - - - 291 291
10 Safety Officer 1.00 ls - - 250 - - 250
12 Fuels 3.00 wk - - - - 3,277 3,277
10 20' Trench Box 1.00 mo - - - - - 1,387 - 1,387
10 Dump Truck 1.00 mo - - - 3,496 - 3,496
G General Conditions 9,331 250 7,658 4,056 21,294
323.00 Labor hours
320.00 Equipment hours
RC1 Mulberry to Eliz 1
10 Pipe Connection 16.00 ch 138.629 /ch 2,218 1.563 /ch 25 - 1,558 - 3,801
10 Trenching 40.00 lf 27.726 /lf 1,109 - - - 90 1,199
10 Trench Fill 2.80 cy 16.00 /cy 45 - - 45
10 Mob Equipment 1.00 ls 500 - 500
4 Wire 180.00 lf 1.25 /lf 225 - 225
4 Test Station 1.00 ea 210.00 /ea 210 - 210
RC1 Mulberry to Eliz 1 3,327 505 500 1,558 90 5,979
48.00 Labor hours
72.00 Equipment hours
RC2 Mulberry to Eliz 2
10 Pipe Connection 16.00 ch 138.629 /ch 2,218 1.563 /ch 25 - 1,558 - 3,801
10 Trenching 40.00 lf 27.726 /lf 1,109 - - - 90 1,199
10 Trench Fill 2.80 cy 19.00 /cy 53 - - 53
10 Mob Equipment 1.00 ls 500 - 500
4 Wire 180.00 lf 1.25 /lf 225 - 225
4 Test Station 1.00 ea 210.00 /ea 210 - 210
RC2 Mulberry to Eliz 2 3,327 513 500 1,558 90 5,988
48.00 Labor hours
72.00 Equipment hours
RC3 Mulberry to Eliz 3
10 Pipe Connection 16.00 ch 138.629 /ch 2,218 1.563 /ch 25 - 1,558 - 3,801
10 Trenching 40.00 lf 3.591 /lf 144 - - - 90 233
10 Trench Fill 2.80 cy 16.00 /cy 45 - - 45
10 Mob Equipment 1.00 ls 500 - 500
4 Wire 180.00 lf 1.25 /lf 225 - 225
4 Test Station 1.00 ea 210.00 /ea 210 - 210
RC3 Mulberry to Eliz 3 2,362 505 500 1,558 90 5,014
34.073 Labor hours
51.109 Equipment hours
01 Continuity Span Corrections 18,347 1,523 1,750 12,331 4,325 38,275
453.073 Labor hours
Standard Estimate Report Page 3
Fort Collins West Side CP 5/6/2020
Item Description Takeoff Qty
Labor
Unit Cost Amount
Material
Unit Cost Amount
Subcontract
Amount Name
Equipment
Amount
Other
Amount
Total
Amount
* unassigned
18 Telephone Charges 1.00 mo - - - - 291 291
10 Safety Officer 1.00 ls - - 250 - - 250
12 Fuels 1.00 wk - - - - 1,092 1,092
10 Jobsite Truck 0.25 mo - - - - - 347 - 347
10 Site Investigation-City 40.00 ch 92.419 /ch 3,697 6.25 /ch 250 - 7,491 874 12,312
10 Site Investigation-CSU 40.00 ch 37.528 /ch 1,501 2.538 /ch 102 - 3,042 355 4,999
* unassigned * 31,449 352 250 13,832 8,772 54,655
162.00 Labor hours
240.00 Equipment hours
02 Design Assist, Site Investigation
& GMP Development
31,449 352 250 13,832 8,772 54,655
162.00 Labor hours
240.00 Equipment hours
03 Construction
G General Conditions
16 Bonds 1.00 ls - - - - 7,041 7,041
14 Project Manager 8.00 wk 1,599.564 /wk 12,797 - - - 2,775 175 15,746
14 Superintendent 8.00 wk 1,777.294 /wk 14,218 - - - 2,775 233 17,226
18 Telephone Charges 2.00 mo - - - - 583 583
18 Temp Toilet 2.00 mo - - - - 583 583
10 Safety Officer 1.00 ls 1,919.47 /ls 1,919 - - 250 - - 2,169
12 Fuels 8.00 wk - - - - 8,738 8,738
10 20' Trench Box 2.00 mo - - - - - 2,775 - 2,775
25 Skidsteer Trailer 5053.04 2.00 mo - - - - - 541 - 541
45 Connex Box 5097 2.00 mo - - - - - 3,468 - 3,468
10 Dump Truck 2.00 mo - - - 6,992 - 6,992
G General Conditions 28,934 250 19,325 17,351 65,860
666.00 Labor hours
640.00 Equipment hours
RC013 CSU Location
10 Pipe Connection 8.00 ch 138.629 /ch 1,109 0.00 0 - 333 - 1,442
10 Trenching 300.00 lf 19.013 /lf 5,704 - - - 11,702 672 18,078
10 Trench Fill 80.00 cy 16.00 /cy 1,280 - - 1,280
10 Mob Equipment 1.00 ls 500 - 500
10 Fence Install/Removal 1.00 ls 355.46 /ls 355 139 36 531
10 Cuttings Removal & Disposal 1.00 ls 533.170 /ls 533 1,249 364 2,146
4 Test Station, Wire 1.00 ls 2,200.00 /ls 2,200 - 2,200
10 Seeding 1.00 ls - - 2,500 - - 2,500
10 Bollards 4.00 ea 88.865 /ea 355 250.00 /ea 1,000 - 194 291 1,841
n -sub Sub - Deep Anode Groundbeds 1.00 ls - - - - 85,000 - - 85,000
n -sub Electrical Sub 1.00 ls - - - - 20,000 - - 20,000
n 200 SCADA 1.00 ls 20,000 - - 20,000
RC013 CSU Location 8,057 4,480 128,000 13,616 1,364 155,517
Standard Estimate Report Page 4
Fort Collins West Side CP 5/6/2020
Estimate Totals
Description Amount Totals Hours Rate Cost Basis Cost per Unit Percent of Total
Labor 86,787 1,407.363 hrs 24.65%
Material 6,354 1.81%
Subcontract 130,250 37.00%
Equipment 59,104 1,572.545 hrs 16.79%
Other 31,812 9.04%
314,307 314,307 89.29% 89.29%
Profit & Overhead 37,717 12.000 % T 10.71%
Total 352,024
Page 12 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
2020 2021
May June July August September October November December January February March April May
Project Notice to Proceed
Project Design
Project Construction
Project Substantial Completion
Project Final Acceptance
Schedule for Hydro Westside Cathodic Protection Project and Master Plan Update
Page 13 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
SECTION 00530
WORK ORDER NOTICE TO PROCEED
NOTICE TO PROCEED DATE:
WORK ORDER TITLE: Cathodic Protection Program Westside Project
WORK ORDER NUMBER: Hydro-WCP-51320
TO:
Attn:
This notice is to advise you:
That the Work Order and all amendments and supplements to the Work Order Documents
covering the above described Work have been fully executed by the CONTRACTOR and the
OWNER. That the required CONTRACTOR's Performance and Payment Bonds and insurance
have been received by the OWNER. That the OWNER has approved the said Work Order and
Work Order Documents.
Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and
directed to proceed within ( ) calendar days from receipt of this notice as required
by the Work Order and the AGREEMENT.
The dates for Substantial Completion and Final Acceptance shall be , and ,
respectively.
Dated this _____________ day of ___________, _____.
CITY OF FORT COLLINS (OWNER)
By:
Name, Title
ACKNOWLEDGMENT OF NOTICE
Receipt of the above Work Order Notice to Proceed is hereby acknowledged this Day day of
Month, Year.
(CONTRACTOR)
By: ___________________________________________
Name, Title
Page 14 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
SECTION 00600
BONDS AND CERTIFICATES
00610 Performance Bond
00615 Payment Bond
00630 Certificate of Insurance
00635 Certificate of Substantial Completion
00640 Certificate of Final Acceptance
00650 Lien Waiver Release (CONTRACTOR)
00651 Lien Waiver Release (SUBCONTRACTOR)
00660 Consent of Surety
00670 Application for Exemption Certificate
Page 15 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
SECTION 00610
PERFORMANCE BOND
Bond No __
KNOW ALL MEN BY THESE PRESENTS: that
Hydro Construction, Inc.
77 NW Frontage Road
Fort Collins, CO 80524
(an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and
(Firm)
(Address)
hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300
LaPorte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as
the "OWNER", in the penal sum of three hundred fifty-two thousand twenty-four dollars and zero
cents ($352,024.00) in lawful money of the United States, for the payment of which sum well and
truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these
presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a
certain Master Agreement with the OWNER, dated the 20 day of June, 2006, a copy of which is
hereto attached and made a part hereof, for the performance of The City of Fort Collins Work
Order, titled Cathodic Protection Program Westside Project, Work Order Number WTF- Hydro-
WCP-51320, dated May 13, 2020, a copy of which is hereto attached and made a part hereof.
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the
undertakings, covenants, terms, conditions and agreements of said Work Order and Master
Agreement during the original term thereof, and any extensions thereof which may be granted by
the OWNER, with or without Notice to the Surety and during the life of the guaranty period, and if
the Principal shall satisfy all claims and demands incurred under such Work Order and Master
Agreement, and shall fully indemnify and save harmless the OWNER from all cost and damages
which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all
outlay and expense which the OWNER may incur in making good any default, then this obligation
shall be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees
that no change, extension of time, alteration or addition to the terms of the Work Order and Master
Agreement or to the Work to be performed thereunder or the Specifications accompanying the
same shall in any way affect its obligation on this bond; and it does hereby waive notice of any
such change, extension of time, alteration or addition to the terms of the Work Order and Master
Agreement or to the Work or to the Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR
shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the
State of Colorado and be acceptable to the OWNER.
Page 16 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which
shall be deemed an original, this _____ day of ___________, _____.
IN PRESENCE OF: Principal
(Title) (Title)
(Corporate Seal)
(Address)
IN PRESENCE OF: Other Partners
_____________________________ By:
_____________________________ By:
IN PRESENCE OF: Surety
_____________________________ By:
_____________________________
(Address)
(Surety Seal)
NOTE: Date of Bond must not be prior to date of Work Order. If CONTRACTOR is
Partnership, all partners should execute Bond.
Page 17 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
SECTION 00615
PAYMENT BOND
Bond No __
KNOW ALL MEN BY THESE PRESENTS: that
Hydro Construction, Inc.
77 NW Frontage Road
Fort Collins, CO 80524
(an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and
(Firm)
(Address)
hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300
LaPorte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as
the "OWNER", in the penal sum of three hundred fifty-two thousand twenty-four dollars and zero
cents ($352,024.00) in lawful money of the United States, for the payment of which sum well and
truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these
presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a
certain Master Agreement with the OWNER, dated the 20 day of June, 2006, a copy of which is
hereto attached and made a part hereof, for the performance of The City of Fort Collins Work
Order, titled Cathodic Protection Program Westside Project, Work Order Number WTF- Hydro-
WCP-51320, dated May 13, 2020, a copy of which is hereto attached and made a part hereof.
NOW, THEREFORE, if the Principal shall make payment to all persons, firms, subcontractors,
and corporations furnishing materials for or performing labor in the prosecution of the Work
provided for in such Work Order and Master Agreement and any authorized extension or
modification thereof, including all amounts due for materials, lubricants, repairs on machinery,
equipment and tools, consumed, rented or used in connection with the construction of such Work,
and all insurance premiums on said Work, and for all labor, performed in such Work whether by
subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and
effect.
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees
that no change, extension of time, alteration or addition to the terms of the Work Order and Master
Agreement or to the Work to be performed thereunder or the Specifications accompanying the
same shall in any way affect its obligation on this bond; and it does hereby waive notice of any
such change, extension of time, alteration or addition to the terms of the Work Order and Master
Agreement or to the Work or to the Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR
shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the
State of Colorado and be acceptable to the OWNER.
Page 18 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which
shall be deemed an original, this _____ day of ___________, _____.
IN PRESENCE OF: Principal
(Title) (Title)
(Corporate Seal)
(Address)
IN PRESENCE OF: Other Partners
_____________________________ By:
_____________________________ By:
IN PRESENCE OF: Surety
_____________________________ By:
_____________________________
(Address)
(Surety Seal)
NOTE: Date of Bond must not be prior to date of Work Order. If CONTRACTOR is
Partnership, all partners should execute Bond.
Page 19 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
SECTION 00630
CERTIFICATE OF INSURANCE
CONTRACTOR shall submit Certificate of Insurance in compliance with the Work Order
Documents.
Page 20 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
SECTION 00635
CERTIFICATE OF SUBSTANTIAL COMPLETION
TO: CITY OF FORT COLLINS (OWNER) PROJECT TITLE: Cathodic Protection
Program Westside Project
DATE OF SUBSTANTIAL COMPLETION: LOCATION: Fort Collins, Colorado
OWNER: City of Fort Collins
PROJECT OR SPECIFIED PART SHALL CONTRACTOR: Hydro Construction, Inc.
INCLUDE:
WORK ORDER DATE: May 13, 2020
The Work performed under this Work Order, pursuant to the Work Order Documents, has been
inspected by authorized representatives of the OWNER, CONTRACTOR, and the ENGINEER
and the project (or specified part of the project, as indicated above) is hereby declared to be
substantially completed on the above date.
A tentative list of items to be completed or corrected is appended hereto. This list may not be
exhaustive, and the failure to include an item on it does not alter the responsibility of the
CONTRACTOR to complete all the Work in accordance with the Work Order Documents.
_____________________________ By: __________________________ ________
PROJECT MANAGER AUTHORIZED REPRESENTATIVE DATE
The CONTRACTOR accepts the above Certificate of Substantial Completion and agrees to
complete and correct the items on the tentative list within the time indicated.
_____________________________ By: __________________________ ________
CONTRACTOR AUTHORIZED REPRESENTATIVE DATE
The OWNER accepts the project or specified area of the project as substantially complete and
will assume full possession of the project or specified area of the project at 12:01 a.m., on
. The responsibility for heat, utilities, security, and insurance
under the Work Order Documents shall be as set forth under "Remarks" below.
CITY OF FORT COLLINS ________ By: __________________________ ________
OWNER AUTHORIZED REPRESENTATIVE DATE
REMARKS: _________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
Page 21 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
SECTION 00640
CERTIFICATE OF FINAL ACCEPTANCE
DATE:
TO:
You are hereby notified that on the Day day of Month, Year, the City of Fort Collins, Colorado,
has accepted the Work completed by Hydro Construction, for the City of Fort Collins Work Order,
titled Cathodic Protection Program Westside Project, Work Order Number Hydro-WCP-51320.
Your continuing obligations and guarantees for the Project will be as provided in the Work Order
and Work Order Documents.
Sincerely,
City of Fort Collins
OWNER
By: ___________________________________________
___________________________________________
Name, Title
Page 22 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
SECTION 00650
LIEN WAIVER RELEASE
(CONTRACTOR)
TO: City of Fort Collins, Colorado (OWNER)
FROM: Hydro Construction, Inc. (CONTRACTOR)
WORK ORDER TITLE: Cathodic Protection Program Westside Project
WORK ORDER NUMBER: Hydro-WCP-51320
1. The CONTRACTOR acknowledges having received payment, except retainage from the
OWNER for all work, labor, skill and material furnished, delivered and performed by the
CONTRACTOR for the OWNER or for anyone in the construction, design, improvement,
alteration, addition or repair of the above described project.
2. In consideration of such payment and other good and valuable consideration, the receipt
and adequacy of which are hereby acknowledged, the CONTRACTOR voluntarily waives
all rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims
(40 U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights
which the CONTRACTOR may now or may afterward have, claim or assert for all and any
work, labor, skill or materials furnished, delivered or performed for the construction, design,
improvement, alteration, addition or repair of the above described project, against the
OWNER or its officers, agents, employees or assigns, against any fund of or in the
possession or control of the OWNER, against the project or against all land and the buildings
on and appurtenances to the land improved by the project.
3. The CONTRACTOR affirms that all work, labor and materials, furnished, delivered or
performed to or for the construction, design, improvement, alteration, addition or repair of
the project were furnished, delivered or performed by the CONTRACTOR or its agents,
employees, and servants, or by and through the CONTRACTOR by various Subcontractors
or materialmen or their agents, employees and servants and further affirms the same have
been paid in full and have released in full any and all existing or possible future mechanic's
liens or rights or claims against the project or any funds in the OWNER'S possession or
control concerning the project or against the OWNER or its officers, agents, employees or
assigns arising out of the project.
4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender, if any,
and the Surety on the project against and from any claim hereinafter made by the
CONTRACTOR's Subcontractors, materialmen, employees, servants, agents or assigns
against the project or against the OWNER or its officers, employees, agents or assigns
arising out of the project for all loss, damage and costs, including reasonable attorneys fees,
incurred as a result of such claims.
5. The parties acknowledge that the description of the project set forth above constitutes an
adequate description of the property and improvements to which this Lien Waiver Release
pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and
may be relied upon by the OWNER, the lender, if any, and Surety on any labor and material
bonds for the project.
Page 23 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
Signed this ______ day of __________, ___.
CONTRACTOR: Company Name
By: ___________________________________________
___________________________________________
Name, Title
ATTEST:
_____________________________
Secretary
STATE OF COLORADO )
)ss.
COUNTY OF LARIMER )
Subscribed and sworn to before me this _________ day of __________, _____, by
________________________________________________________________.
Witness my hand and official seal.
My Commission Expires: ___________________________.
_________________________
Notary Public
Page 24 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
SECTION 00650
LIEN WAIVER RELEASE
(SUBCONTRACTOR)
TO: City of Fort Collins, Colorado (OWNER)
FROM: Hydro Construction, Inc. (CONTRACTOR)
WORK ORDER TITLE: Cathodic Protection Program Westside Project
WORK ORDER NUMBER: Hydro-WCP-51320
1. The Subcontractor acknowledges having received payment from the CONTRACTOR for all
work, labor, skill and material furnished, delivered and performed by the Subcontractor for
the CONTRACTOR or for anyone in the construction, design, improvement, alteration,
addition or repair of the above described project.
2. In consideration of such payment and other good and valuable consideration, the receipt
and adequacy of which are hereby acknowledged, the Subcontractor voluntarily waives all
rights, claims and liens, including but not limited to, mechanic's liens, Miller Act claims (40
U.S.C.A. 270 a and b), stop notices, equitable liens and labor and material bond rights which
the Subcontractor may now or may afterward have, claim or assert for all and any work,
labor, skill or materials furnished, delivered or performed for the construction, design,
improvement, alteration, addition or repair of the above described project, against the
CONTRACTOR or its officers, agents, employees or assigns, against the project or against
all land and the buildings on and appurtenances to the land improved by the project.
3. The Subcontractor affirms that all work, labor and materials, furnished, delivered or
performed to or for the construction, design, improvement, alteration, addition or repair of
the project were furnished, delivered or performed by the Subcontractor or its agents,
employees, and servants, or by and through the Subcontractor by various sub-
subcontractors or materialmen or their agents, employees and servants, and further affirms
the same have been paid in full and have released in full any and all existing or possible
future mechanic's liens or rights or claims against the project or against the CONTRACTOR
or its officers, agents, employees or assigns arising out of the project.
4. The Subcontractor agrees to defend and hold harmless the CONTRACTOR, the lender, if
any, and the Surety on the project against and from any claim hereinafter made by the
Subcontractor's sub-subcontractors, materialmen, employees, servants, agents or assigns
against the project or against the CONTRACTOR or OWNER, lender or Surety or their
officers, employees, agents or assigns arising out of the project for all loss, damage and
costs, including reasonable attorneys fees, incurred as a result of such claims.
5. The parties acknowledge that the description of the project set forth above constitutes an
adequate description of the property and improvements to which this Lien Waiver Release
pertains. It is further acknowledged that this Lien Waiver Release is for the benefit of and
may be relied upon by the CONTRACTOR, OWNER, the lender, if any, and Surety on any
labor and material bonds for the project.
Page 25 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
Signed this ______ day of _________, ___.
SUBCONTRACTOR:
By: ___________________________________________
___________________________________________
Name, Title
ATTEST:
_____________________________
Secretary
STATE OF COLORADO )
)ss.
COUNTY OF LARIMER )
Subscribed and sworn to before me this _________ day of __________, _____, by
__________________________________________________________________.
Witness my hand and official seal.
My Commission Expires: ___________________________.
__________________________________
Notary Public
Page 26 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
SECTION 00660
CONSENT OF SURETY
TO: City of Fort Collins, Colorado (hereinafter referred to as the "OWNER")
CONTRACTOR: Hydro Construction, Inc.
TITLE: Cathodic Protection Program Westside Project
WORK ORDER NUMBER: Hydro-WCP-51320
WORK ORDER DATE: May 13, 2020
In accordance with the provisions of the Work Order and Master Agreement between the OWNER
and the CONTRACTOR as indicated above, for the Work Order titled Cathodic Protection
Program Westside Project on bond of
, (Surety) _______________________________________ hereby approves of the Final
Payment to the CONTRACTOR, and agrees that Final Payment to the CONTRACTOR shall not
relieve the Surety Company of any of its obligations to the OWNER, as set forth in the said Surety
Company's Bond.
IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this _________ day of
_________ _, _____.
____________________________________________
(Surety Company)
By: ________________________________________
(Name) Attorney-in-Fact
ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-Fact.
Page 27 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
Page 28 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
Page 29 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
SECTION 00800
SUPPLEMENTARY CONDITIONS
These Supplementary Conditions amend or supplement the General Conditions of the
Construction Contract (EJCDC General Conditions 1910-8, 1990 edition, with City of Fort Collins
Modifications, Rev. 9/94) and other provisions of the Work Order Documents as indicated below.
SC-1 DEFINITIONS
SC-1.38. Add the following language to the conclusion of paragraph 1.38 of the General
Conditions:
1.38. Substantial Completion. .... Substantial Completion is further defined as that
degree of completion of the operating facilities or systems of the Project defined in the
Work Order sufficient to provide the OWNER the full time, uninterrupted, continuous,
beneficial operation of the modifications, and all inspections required have been
completed and identified conditions corrected.
SC-1.43.A. Add the following new paragraph immediately after paragraph 1.43 of the General
Conditions:
1.43.A. Work Order--A written document executed by OWNER and
CONTRACTOR that provides for the construction of the Work, or a portion of the Work
pursuant to the Master Agreement and all as required by the Work Order Documents,
and that becomes a Work Order Document when executed.
SC-2 PRELIMINARY MATTERS
SC-2.8. Delete paragraph 2.8 of the General Conditions entirely and replace it with the
following paragraph:
2.8. Preconstruction Conference. Within ten days after the Work Order
Times for a Work Order start to run, but before any Work at the site is started, a
conference attended by CONTRACTOR, ENGINEER and others as appropriate will
be held to establish a working relationship among the parties as to the Work and to
discuss the schedules referred to in paragraph 2.6, procedures for handling Shop
Drawings and other submittals, processing Applications for Payment, and maintaining
required records.
SC-2.10. Add the following new paragraph immediately after paragraph 2.9 of the General
Conditions:
2.10. Work Order Required for All Work. References to the Master Agreement in
this Article 2 and in the General and Supplementary Conditions and Work Order
Documents notwithstanding, no Work shall be initiated or performed until
CONTRACTOR has received a signed and executed Work Order, and the Notice to
Proceed, from OWNER; and no provision of this Article 2 or of the General and
Supplementary Conditions and Work Order Documents shall permit or require any
action of CONTRACTOR in the absence of a signed and executed Work Order. All
provisions of this Article 2 and of the General and Supplementary Conditions and Work
Page 30 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
Order Documents referencing the Master Agreement or other parts of the Work Order
Documents, or permitting or requiring any action of CONTRACTOR, shall be read as
referencing and, as appropriate, requiring a signed and executed Work Order.
SC-4 AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS;
REFERENCE POINTS
SC-4.2.1.2. Add the following new paragraph immediately following paragraph 4.2.1.2 of the
General Conditions:
4.2.1.2.1. No drawing of physical conditions in or relating to existing surface or
subsurface structures (except Underground Facilities referred to in paragraph 4.3)
which are at or contiguous to the site have been utilized by the Engineer in preparation
of the Work Order Documents, except the following:
None
SC-5 BONDS AND INSURANCE
SC-5.4.7. Include the following parties or entities as additional insureds, as provided in
paragraph 5.4.7 of the General Conditions:
5.4.7.1. City of Fort Collins, Colorado, PO Box 580, Fort Collins, CO 80522.
5.4.7.2. None
SC-5.4.8.1. Add the following new paragraph immediately following paragraph 5.4.8 of the
General Conditions:
5.4.8.1. Limits of Liability. The limits of liability for the insurance required by the
paragraph numbers of the General Conditions listed below are as follows:
For Paragraphs 5.02.A.1 and 5.02.A.2: Coverage A - Statutory Limits; Coverage B -
$100,000 / $100,000 / $500,000.
For Paragraphs 5.02.A.3 and 5.02.A.5: The Commercial General Liability policy will
have limits of $1,000,000 combined single limits (CSL). This policy will include
coverage for Explosion, Collapse, and Underground coverage unless waived by the
Owner.
For Paragraph 5.02.A.6: The Comprehensive Automobile Liability Insurance policy
will have limits of $1,000,000 combined single limits (CSL).
For Paragraph 5.02.B.3: This policy will include completed operations coverage /
product liability coverage with limits of $1,000,000 combined single limits (CSL). This
policy shall also include an Umbrella Excess Liability as follows: General liability and
automobile liability insurance in an amount not less than $1,000,000 per occurrence
in excess of the above stated primary limits.
Page 31 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
SC-6 CONTRACTOR’S RESPONSIBILITIES
SC-6.14.3. Add the following new paragraph immediately after paragraph 6.14.2 of the
General Conditions:
6.14.3. The following Laws or Regulations are included in the Work Order
Documents as mandated by statute or for the convenience of the CONTRACTOR.
Other Laws and Regulations apply which are not included herein, and are within the
CONTRACTOR's duty and responsibility for compliance thereto:
6.14.3.1. Notice to owners of Underground Facilities is required prior to excavations in
the vicinity of such facilities.
6.14.3.2. Unless otherwise decided by reason of the amount of the Work Order Price
involved, or other good reason, before or at the time that the contract is awarded to a
corporation outside the State of Colorado, such corporation must carry out the proper
procedure to become authorized to do business in the State of Colorado, designate a
place of business therein, and appoint an agent for service of process.
Such corporation must furnish the OWNER with a certificate from the Secretary of
State of Colorado has been issued by its office and there shall also be procured from
the Colorado Secretary of State or certified copy of the designated of place of business
and appointment of agent for service of process, or a letter from the Colorado
Secretary of State that such designation of place of business and agent for service of
process have been made.
6.14.3.3. The CONTRACTOR must conform to the rules and regulations of the
Industrial Commission of Colorado. Particular reference is made to rules and
regulations governing excavation Work adopted by the Industrial Commission of
Colorado.
SC-11 CHANGE OF CONTRACT PRICE
SC-11.6.2.7. Add the following new paragraph to paragraph 11.6.2 of the General Conditions:
11.6.2.7. Cost of the Work. Allowances for profit, overhead and mark-up prescribed
by the Master Agreement shall be used in lieu of any CONTRACTOR'S fee, overhead,
profit or mark-up allowances as prescribed in paragraphs 11.6.2.1, 11.6.2.2, and
11.6.2.3.
SC-12 CHANGE OF CONTRACT TIMES
SC-12.3. Add the following language to the end of paragraph 12.3 of the General Conditions:
12.3. .... Lost days due to abnormal weather conditions will be allocated as
required.
SC-14 PAYMENTS TO CONTRACTOR AND COMPLETION
SC-14.1. Add the following language to the end of paragraph 14.1 of the General Conditions:
Page 32 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
14.1. Schedule of Values. .... Progress payments on the fixed fee shall be in
proportion to the cumulative actual Cost of the Work as a percentage of the Allowable
Cost of the Work. An amount not to exceed fifteen (15%) percent of the fixed fee shall
be advanced to the Contractor for mobilization in the first progress payment.
Page 33 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
SECTION 00900
ADDENDA, MODIFICATIONS AND PAYMENT
00950 Change Order
00960 Application for Payment
Page 34 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
SECTION 00950
CHANGE ORDER NO.
PROJECT TITLE: Cathodic Protection Program Westside Project
CONTRACTOR: Hydro Construction, Inc.
WORK ORDER NUMBER: Hydro-WCP-51320
PO NUMBER:
DESCRIPTION:
1. Reason for Change: Why is the change required?
2. Description of Change: Provide description of the changes to the Work
3. Change in Work Order Price:
4. Change in Work Order Time:
ORIGINAL WORK ORDER PRICE $ .00
TOTAL APPROVED CHANGE ORDER .00
TOTAL PENDING CHANGE ORDER .00
TOTAL THIS CHANGE ORDER .00
TOTAL % OF THIS CHANGE ORDER %
TOTAL C.O.% OF ORIGINAL WORK ORDER %
ADJUSTED WORK ORDER COST $ .00
CONTRACTOR: Hydro Construction, Inc.
By: Date:
Name: Title:
ACCEPTED: Date:
City PM Name, Title
REVIEWED: Date:
Name, Buyer or Senior Buyer
ACCEPTED: Date:
Name, Title
ACCEPTED: Date:
Gerry Paul, Purchasing Director
(if greater than $60,000)
Page 35 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
SECTION 00960
APPLICATION FOR PAYMENT
PROJECT Page 1 of 1
OWNER:
ENGINEERS:
ADDRESS:
NUMBER DATE AMOUNT
$ -
$ -
$ -
NUMBER DATE AMOUNT FUND OBJECT
Amount Due this Pay Application (before retainage):
$ -
$ -
0.00%
Payment of the above Amount Due This Application has been reviewed by the OWNER'S Project Manager
BY: DATE: DATE:
NAME & TITLE:
BY: DATE:
NAME & TITLE: Official Purchasing Form
Last updated 10/2017
Net Change by Change Order:
Change order %:
Original Contract Amount
Net Change by Change Order
Revised Current Contract Amount
Total Work Completed to Date:
Total Stored to Date:
CHANGE ORDERS PAY APPLICATION
Application is made for Payment as shown below in connection with the Contract.
The present status of the account for this Contract is as follows:
CONTRACTOR:
$ -
$ -
RETAINAGE
$ -NumbersCharge
$ -
$ -
Less Previous Payments:
Total Completed and Stored Materials to Date:
Less Retainage
$ -
$ -
$ -
AMOUNT DUE THIS APPLICATION: $ -
The above Amount Due this Application is requested by the CONTRACTOR's Project Manager.
BY:
PO NUMBER
ADDRESS: ADDRESS:
APPLICATION NUMBER
APPLICATION DATE
PERIOD BEGINNING
PERIOD ENDING
PROJECT NUMBER
Retainage to Date:
NAME & TITLE:
Total (after retainage):
Payment of the above Amount Due This Application is approved by the OWNER.
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
Unit Price Total Quanitity Total Quantity Total Quantity Total
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
$ -
$ -
$ -
$ -
$ -
0.00%
$ - $ - $ - $ - $ - 0.00%
Official Purchasing Form
Last Updated 10/2017
Total to Date Less Retention
Change Orders to Date (see attached)
$ -
$ -
CONTRACT SUMMARY
Total Due
Adjusted Contract Amount
$ -
Total Change Order Work to Date (see attached)
Value of Work in Place
Percent Complete Including Stored Materials
Less Retention @ 10% up to 50% complete, 5% beyond 50% of Adjusted Contract
Crosscheck
Total Completed to Date
Total Materials Remaining @ Site
$ -
$ -
$ -
Original Contract Amount
Less Previous Billings $ -
$ -
$ -
$ -
Utilities Work Order – Construction Form Official Purchasing Form
Last updated 10/2017
ATTACHMENT A
DRAWING INDEX
WORK ORDER # Hydro-WCP-51320
WORK ORDER TITLE Cathodic Protection Program Westside Project
BY: Hydro Construction
Sheet Title Drawing Revision Date
The design services are a part of this work order.
Page 38 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
05/18/2020
Flood and Peterson
PO Box 578
Greeley CO 80632
Dana Stewart, CIC, CISR
(970) 266-7149 (970) 506-6845
DStewart@floodpeterson.com
Hydro Construction Company Inc.
77 NW Frontage Road
Fort Collins CO 80524
Phoenix Insurance Company 25623
Charter Oak Fire Insurance Company 25615
Travelers Property Casualty Company of America 25674
Pinnacol Assurance 41190
GL/AU/WC/XS x4/21
A Y DT-CO-8G990899-PHX-20 04/01/2020 04/01/2021
1,000,000
300,000
10,000
1,000,000
2,000,000
2,000,000
B Y 810-9L108491-20-26-G 04/01/2020 04/01/2021
1,000,000
C
10,000
Y CUP-2J40080A-20-26 04/01/2020 04/01/2021
10,000,000
10,000,000
D Y 2091550 04/01/2020 04/01/2021
1,000,000
1,000,000
1,000,000
Project #: Hydro-WCP-51320
Cathodic Protection Program Westside Project. 8286 Construction Contractor for Projects at the Water and Wastewater Treatment Facilities
City of Fort Collins is included as Additional Insured as required by written contract but only as respects to liability arising out of work performed by the
named insured. Waiver of subrogation applies.
City of Fort Collins
700 Wood Street
Fort Collins CO 80521
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
INSURER(S) AFFORDING COVERAGE
INSURER F :
INSURER E :
INSURER D :
INSURER C :
INSURER B :
INSURER A :
NAIC #
NAME:
CONTACT
(A/C, No):
FAX
E-MAIL
ADDRESS:
PRODUCER
(A/C, No, Ext):
PHONE
INSURED
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR
WVD
ADDL
INSD
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
$
$
$
PROPERTY DAMAGE $
BODILY INJURY (Per accident)
BODILY INJURY (Per person)
COMBINED SINGLE LIMIT
AUTOS ONLY
AUTOS ONLY AUTOS
NON-OWNED
OWNED SCHEDULED
ANY AUTO
AUTOMOBILE LIABILITY
Y / N
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under
ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT
ER
OTH-
STATUTE
PER
(MM/DD/YYYY) LIMITS
POLICY EXP
(MM/DD/YYYY)
POLICY EFF
LTR TYPE OF INSURANCE POLICY NUMBER
INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
EXCESS LIAB
UMBRELLA LIAB EACH OCCURRENCE $
AGGREGATE $
$
OCCUR
CLAIMS-MADE
DED RETENTION $
PRODUCTS - COMP/OP AGG $
GENERAL AGGREGATE $
PERSONAL & ADV INJURY $
MED EXP (Any one person) $
EACH OCCURRENCE $
DAMAGE TO RENTED
PREMISES (Ea occurrence) $
COMMERCIAL GENERAL LIABILITY
CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:
POLICY
PRO-
JECT LOC
CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
CANCELLATION
AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.
CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED
AUTOS ONLY
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
$ -
$ -
Combined
Total Completed to Date
Total Contract Amount
Total This Period
Previous Billings
Balance Remaining
Percent Complete
PAY REQUEST
Item # Description Quantity Cost
Remaining
Percent
UOMComplete
Contract Summary This Period Previous Total to Date
Period Ending:
Page 37 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
The undersigned CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection with the WORK have been satisfied as required in paragraph 14.3 of the General Conditions
of the Contract.
CERTIFICATION
BU
SCOPE OF WORK CHANGE ORDERS
RECONCILIATION CHANGE ORDERS
INVOICE NUMBER
Total Change Order Work to Date:
$ -
$ -
Retainage Previous:
Change in Retainage:
Page 36 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
126.29 Labor hours
177.436 Equipment hours
03 Construction 36,991 4,480 128,250 32,941 18,715 221,378
792.29 Labor hours
817.436 Equipment hours
Page 11 of 38
DocuSign Envelope ID: 9902ECDB-A8FC-4C3C-BB1A-B59187048300
515.109 Equipment hours
02 Design Assist, Site Investigation & GMP Development
* unassigned
14 Project Manager 92.00 hrs 115.524 /hrs 10,628 - - - 1,021 2,010 13,659
14 Project Engineer 126.00 hrs 79.978 /hrs 10,077 - - - 1,398 2,752 14,228
14 Superintendent 48.00 hrs 115.524 /hrs 5,545 - - - 533 1,398 7,476