Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8286 CONSTRUCTION CONTRACTOR FOR PROJECTS AT THE WATER & WASTEWATER TREATMENT FACILITIES (25)Contract Change Order 00950-1 CHANGE ORDER NO. 1 PROJECT TITLE: WTF Replacement Project – Presedimentation Basin Phase I - Repairs CONTRACTOR: Hydro Construction WORK ORDER NUMBER: PARENT: 5026311000 PO NUMBER: PO9164809 (BU 5026310055) DESCRIPTION: 1. Reason for change: Cost – project closeout. 2. Description of Change: Hydro has completed the project under budget. Repairs to the Presedimentation Basin included concrete and joints in south and southeast basin walls, exterior concrete and install waterstops in joints. 3. Change in Contract Cost: $45,872.32 4. Change in Contract Time: NA __________________________________________________________________________________ ORIGINAL WORK ORDER PRICE $ 138,511.00 TOTAL APPROVED CHANGE ORDERS $00.00 TOTAL PENDING CHANGE ORDERS $45,872.32 TOTAL THIS CHANGE ORDER $45,872.32 TOTAL % OF THIS CHANGE ORDER 33% TOTAL C.O.% OF ORIGINAL WORK ORDER 33% ADJUSTED WORK ORDER COST $ 92,638.68 CONTRACTOR By: _______________________________________________ DATE: _____________________ Name: ____________________________________________ TITLE: _____________________ ACCEPTANCE: DATE: Mark Kempton, Director of Plant Operations REVIEWED: DATE: Pat Johnson, Senior Buyer ACCEPTANCE: DATE: Matt Fater, Civil Engineering Director ACCEPTANCE: DATE: Carol Webb, Deputy Director, WRTO ACCEPTANCE: DATE: Gerry Paul, Purchasing Director (if over $60,000) DocuSign Envelope ID: BFC0D2DF-E24A-4582-8631-B5920615B6AB 5/20/2020 Jim Eurich COO 5/21/2020 5/21/2020 5/21/2020 5/21/2020