Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8827 CONSULTING ENGINEERING SERVICES WATER TREATMENT FACILITY DESIGN AND CONSTRUCTION FOR CAPITAL IMPROVEMENTS (4)Utilities Work Order Form Official Purchasing Form Last updated 10/2017 WORK ORDER PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND HDR ENGINEERING, INC. WORK ORDER NUMBER: HDR AWIA WO 2 PROJECT TITLE: AWIA Risk and Resiliency Assessment ORIGINAL BID/RFP NUMBER & NAME: 8827, Consulting Engineering Services for Water Treatment Facility Design & Construction Services MASTER AGREEMENT EFFECTIVE DATE: February 20, 2019 ARCHITECT/ENGINEER: HDR Engineering, Inc OWNER’S REPRESENTATIVE: Mark Kempton, Director of Plant Operations WORK ORDER COMMENCEMENT DATE: March 2, 2020 WORK ORDER COMPLETION DATE: June 1, 2020 MAXIMUM FEE: (time and reimbursable direct costs): $32,900 PROJECT DESCRIPTION/SCOPE OF SERVICES: Engineering consultant work to ensure the City’s compliance with the America’s Water Infrastructure Act (AWIA) Risk and Resiliency Assessment. Work includes project management, the development of an addendum to the Water Treatment Facility’s existing Vulnerability Assessment (VA) and an AWWA Cybersecurity Assessment. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of (4) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: HDR Engineering, Inc. By: Date: Name: Title: DocuSign Envelope ID: F1239FE1-FBCF-4B1B-A791-13633015E0D2 R. Bradley Martin 3/24/2020 Senior Vice President Utilities Work Order Form Official Purchasing Form Last updated 10/2017 OWNER’S ACCEPTANCE & EXECUTION: This Work Order and the attached Contract Documents are hereby accepted and incorporated herein by this reference. ACCEPTANCE: Date: Mark Kempton, Project Manager REVIEWED: Date: Marisa Donegon, Buyer II APPROVED AS TO FORM: Date: Name,City Attorney's Title (if greater than $1,000,000) ACCEPTANCE: Date: Carol Webb, Deputy Director Water Resources & Treatment ACCEPTANCE: Date: Kevin Gertig, Utilities Executive Director (if greater than $1,000,000) ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) ACCEPTANCE: Date: Darin Atteberry, City Manager (if greater than $1,000,000) ATTEST: Date: City Clerk (if greater than $1,000,000) DocuSign Envelope ID: F1239FE1-FBCF-4B1B-A791-13633015E0D2 3/23/2020 3/23/2020 3/25/2020 Utilities Work Order Form Official Purchasing Form Last updated 10/2017 ATTACHMENT A WORK ORDER SCOPE OF SERVICES DocuSign Envelope ID: F1239FE1-FBCF-4B1B-A791-13633015E0D2 Scope of Work Date: Wednesday, February 26, 2020 Project: America’s Water Infrastructure Act (AWIA) Risk and Resiliency Assessment To: Mark Kempton, PE From: Jamie Eichenberger, PE Project Background America’s Water Infrastructure Act of 2018 requires that all community water systems serving populations greater than 3,300 persons shall assess the risks to, and resilience of, its system (referred to hereinafter as the Risk and Resilience Assessment or “RRA”). The RRA includes the following elements:  Risk to the system from malevolent acts and natural hazards,  Resilience of the infrastructure, including SCADA/cyber resilience  The monitoring practices of the system  The financial infrastructure of the system  The use, storage, or handling of various chemicals by the system  The operation and maintenance of the system The detailed RRA culminates with an implementation plan for capital and operational needs for risk and resilience management of the system. The assessment is to be finalized and then certified to the Administrator of the Environmental Protection Agency (EPA) by March 31, 2020, in the case of systems serving a population of more than 100,000. The RRA must be reviewed at least every five years to determine if the assessment shall be revised. Upon review, the water system shall recertify the original assessment or certify a revision to the assessment. Within six months of completion of the RRA, America’s Water Infrastructure Act of 2018 also requires a letter of certification to EPA that the Emergency Response Plan (ERP) for a utility is updated, and at least every 5 years thereafter. For the Water Utility, ERP certification is required by September 30, 2020. The ERP must contain the following elements:  Strategies and resources to improve the resilience of the system, including the physical security and cybersecurity of the system,  Plans and procedures that can be implemented, and identification of equipment that can be utilized, in the event of a malevolent act or natural hazard that threatens the ability of the community water system to deliver safe drinking water,  Actions, procedures, and equipment which can obviate or significantly lessen the impact of a malevolent act or natural hazard on the public health and the safety and supply of DocuSign Envelope ID: F1239FE1-FBCF-4B1B-A791-13633015E0D2 drinking water provided to communities and individuals, including the development of alternative source water options, relocation of water intakes, and construction of flood protection barriers; and  Strategies that can be used to aid in the detection of malevolent acts or natural hazards that threaten the security or resilience of the system. This scope of services includes the following tasks identified during the first phase of this project:  Develop an addendum document to provide missing sections identified in the Gap Memo to update the existing (2017 CH2M-Jacobs) Vulnerability Assessment (VA) to comply with AWIA requirements.  Conduct cybersecurity assessment using the AWWA Cybersecurity Tool. Task 100 – Project Management and Meetings Task 100.1 Project Management, Accounting and Quality Control  Initiate project accounting, budget, and resource management tools.  Prepare monthly invoices and progress reports.  Perform QA/QC reviews of reports and supporting documents.  Perform project closeout. Task 100.2 Project Coordination  Prepare and maintain Decision/Action Item Log. KEY ASSUMPTIONS:  2-month project schedule DELIVERABLES:  Monthly invoices and progress reports Task 200 – Develop Addendum to Existing Vulnerability Assessment (VA) Interviews will be conducted with City staff to fill in missing information needed to complete the Risk and Resiliency Assessment (RRA) update. An addendum to the existing VA will be prepared that adds missing sections and speaks to AWIA compliance. The addendum memo will rename the document and provide compliance background. The memo will include information on automated systems, source water protection, financial data backup/infrastructure for continuity, and operation and maintenance. The memo will also summarize the AWWA Cyber Security Tool results from Task 300. KEY ASSUMPTIONS:  All existing documents will be provided by the City in editable electronic files which can be utilized for the analysis.  All deliverables are electronic. DocuSign Envelope ID: F1239FE1-FBCF-4B1B-A791-13633015E0D2 DELIVERABLES:  Addendum to VA Task 300 – AWWA Cybersecurity Assessment The City will be provided with 22 cybersecurity questions to be answered and provided back to HDR and Launch! Consulting, who will enter these results into the AWWA Cybersecurity Assessment Tool. A meeting over the phone with the City’s IT lead and SCADA lead will be completed to discuss further questions for cyber security improvements. The results of the tool will be provided to the City electronically and will be summarized in a section of the addendum to the VA. KEY ASSUMPTIONS:  City will answer questions and be available for phone meetings as required DELIVERABLES:  Results of AWWA Cybersecurity Assessment Tool DocuSign Envelope ID: F1239FE1-FBCF-4B1B-A791-13633015E0D2 Utilities Work Order Form Official Purchasing Form Last updated 10/2017 ATTACHMENT B WORK ORDER COST DETAIL DocuSign Envelope ID: F1239FE1-FBCF-4B1B-A791-13633015E0D2 WORK BREAKDOWN STRUCTURE Subconsultants Launch! Consulting TOTAL FEE Fee Estimate for: AWIA Phase I - Data Collection Date: 2/26/2020 Firm Name: HDR Engineering, Inc. Mark Beebe QA/QC Jamie Eichenberger Project Manager Tiffany Schick Senior Accountant Total Labor (Hours) Total Labor ($) Total Expenses ($) HDR Total Fee (Labor & Expenses) Hourly Rate $240.00 $230.00 $105.00 Task 100 - Project Management 4 8 2 14 $3,010.00 $250.00 $3,260.00 $0.00 $3,260.00 100.1 Project Management, Accounting and Quality Control Project Initiation and Closeout 2 2 $460.00 $460.00 $460.00 Project Invoicing 2 2 4 $670.00 $670.00 $670.00 QA/QC 4 4 $960.00 $960.00 $960.00 100.2 Project Coordination 4 4 $920.00 $250.00 $1,170.00 $1,170.00 Task 200 - Develop Addendum to VA 0 4 0 4 $920.00 $250.00 $1,170.00 $16,000.00 $17,170.00 200.1 - Develop Addendum to VA 4 4 $920.00 $250.00 $1,170.00 $16,000.00 $17,170.00 Task 300 - AWWA Cybersecurity Assessment 0 4 0 4 $920.00 $250.00 $1,170.00 $10,000.00 $11,170.00 300.1 - AWWA Cybersecurity Assessment 4 4 $920.00 $250.00 $1,170.00 $10,000.00 $11,170.00 TOTAL HOURS 4 16 2 22 TOTAL LABOR $960.00 $3,680.00 $210.00 $4,850.00 $750.00 $5,600.00 $26,000.00 $31,600.00 MARK-UP ON SUB-CONSULTANTS $1,300.00 $1,300.00 TOTAL FEE (ROUNDED) $32,900.00 DocuSign Envelope ID: F1239FE1-FBCF-4B1B-A791-13633015E0D2