Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8475 CIVIL ENGINEERING PROFESSIONAL ON-CALL (32)Official Purchasing Form Last updated 10/2017 Work Order Form WORK ORDER FORM PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND INTERWEST CONSULTING GROUP WORK ORDER NUMBER: PROJECT TITLE: Power Trail Surveying - FIR ORIGINAL BID/RFP NUMBER & NAME: RFP 8475: Civil Engineering Professional On Call MASTER AGREEMENT EFFECTIVE DATE: June 1, 2017 WORK ORDER COMMENCEMENT DATE: 3-10-2020 WORK ORDER COMPLETION DATE: 3-10-2021 MAXIMUM FEE: (time and reimbursable direct costs): $19,000 PROJECT DESCRIPTION/SCOPE OF SERVICES: See Attached Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of two (2) page are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Date: 3-10-20 Michael Oberlander, Sr. PM ACCEPTANCE: Date: Date: ACCEPTANCE: Date: ACCEPTANCE: DocuSign Envelope ID: AED64486-E816-4E4F-AF85-AF9A69A02653 Caleb Feaver 3/10/2020 400901770-INTERWEST-20-01 Civil Engineer I Dan Woodward Engineering - Capital Projects 3/10/2020 3/12/2020 Sr. Buyer Elliot Dale March 10, 2020 Mr. Caleb Feaver City of Fort Collins - Engineering Power Trail Surveying - FIR Project Description and Scope of Services Dear Caleb, Description The City has used King Surveyors for the survey efforts at the Power Trail and future Harmony Grade Separate Crossing. The project is moving into the CDOT FIR level of plans and additional topographic survey, as well as miscellaneous additional survey will be required. King Surveyors and Interwest will provide the following tasks with this work order: 1. King will add the areas shown in red (below) to the existing survey and surface files. Utility locates will be provided by Primo for this area. Fee $5,000 DocuSign Envelope ID: AED64486-E816-4E4F-AF85-AF9A69A02653 2. The allowance below is reserved if traffic control is needed for the surveying in Harmony Road. Fee $3,500 3. Interwest will update the base files previously provided to OTAK (Interwest layer convention). Fee $2,500 4. The allowance below is for any additional survey that is determined to be needed for the completion of the FIR portion of the project. This may include staking out existing easements and rights of way; staking and grading improvements for field meetings, etc. Fee $8,000 Total project fee is estimated to be $19,000. Assumptions: 1. CDOT Right Of Way Plans and Legal Descriptions will be prepared with a separate agreement. Please call me at 970-460-8471 if you have any questions or need any additional information. Thanks, Michael Oberlander, PE DocuSign Envelope ID: AED64486-E816-4E4F-AF85-AF9A69A02653