Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9200591Utilities Work Order Form Official Purchasing Form Last updated 10/2017 WORK ORDER PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND SAGE TELECOMMUNICATIONS CORP. OF COLORADO, LLC WORK ORDER NUMBER: USage - B&S SW Channel 022020 PROJECT TITLE: UBrewer & Sitka Drainage Channel ORIGINAL BID/RFP NUMBER & NAME: U8820, Directional Boring & Trenching On- Call MASTER AGREEMENT EFFECTIVE DATE: U03/11/2019 ARCHITECT/ENGINEER: UNA OWNER’S REPRESENTATIVE: USandra Bratlie WORK ORDER COMMENCEMENT DATE: UFebruary 26, 2020 WORK ORDER COMPLETION DATE: UMarch 13, 2020 MAXIMUM FEE: (time and reimbursable direct costs): U$7,156.00 PROJECT DESCRIPTION/SCOPE OF SERVICES: UThis work order is for 23 potholes in Conifer St and adjacent easement in support of the Brewer & Sitka drainage channel improvements design. The contractor will coordinate traffic control and obtain necessary permits to complete the work. The work is scheduled to be completed in the next two weeks (by Mar 13th) dependent on weather and traffic plan restrictions. See the attached supporting documentation. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of 1 (UoneU) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Sage Telecommunications Corp. of Colorado, LLC By: Date: Name: Title: Page 1 of 5 DocuSign Envelope ID: 72EB0E41-C3DE-4F00-85B1-FA85379F9EB3 Project Manager March 2, 2020 Domingo Torres Utilities Work Order Form Official Purchasing Form Last updated 10/2017 OWNER’S ACCEPTANCE & EXECUTION: This Work Order and the attached Contract Documents are hereby accepted and incorporated herein by this reference. ACCEPTANCE: Date: Sandra Bratlie, Civil Engineer III REVIEWED: Date: Pat Johnson, Senior Buyer REQUISITION ENTERED: Date: ACCEPTANCE: Date: Andrew Gingerich, Director, Water Field Operations ACCEPTANCE: Date: Theresa Connor, Deputy Director, Water Engineering & Field Services ACCEPTANCE: Date: Kevin Gertig, Utilities Executive Director (if greater than $1,000,000) ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) ACCEPTANCE: Date: Darin Atteberry, City Manager (if greater than $1,000,000) ATTEST: Date: City Clerk (if greater than $1,000,000) Page 2 of 5 DocuSign Envelope ID: 72EB0E41-C3DE-4F00-85B1-FA85379F9EB3 2/28/20 Coordinator, Finance Melissa Walker March 1, 2020 March 1, 2020 March 9, 2020 March 10, 2020 Utilities Work Order Form Official Purchasing Form Last updated 10/2017 ATTACHMENT A WORK ORDER COST & SCOPE DETAIL Page 3 of 5 DocuSign Envelope ID: 72EB0E41-C3DE-4F00-85B1-FA85379F9EB3 NTI NUMBER: DATE SENT: 2/25/2020 COMPANY: City of Ft.Collins Water Department COMPANY: SAGE TELECOMMUNICATIONS CORP. OF COLORADO,LLC ADDRESS: 700 Wood Street ADDRESS: 6700 Race Street Fort Collins,Co 80522 Denver,Co 80229 PHONE: 970-221-6700 PHONE: (303) 227-0986 FAX 970-221-6619 FAX: (303) 227-0991 CONTACT: DOMINGO TORRES, (970) 566-1257 DOMINGO.TORRES@SAGECOM.NET CONTR. ID: JOB LOCATION CONTACT PO NUMBER Brewer St & Sitka Dr Doug Groves FC.202 QTY DESCRIPTION TOTAL 15 Potholes (Soft) FC.19 Ea. $115.00 $ 1,725.00 8 Potholes (Hard) FC.18 Ea. $257.00 $ 2,056.00 4 Traffic Control 23.B Day $768.75 $ 3,075.00 1 Permits 23.B Ea $300.00 $ 300.00 TOTAL $ 7,156.00 APPROVED BY DATE (303) 227-0986 PHONE (303 227-0991 FAX Estimate Estimate SERVICES FOR SERVICES FROM UNIT COST SAGE TELECOMMUNICATIONS CORP. OF COLORADO, LLC Denver, Co 80229 6700 Race Street Page 4 of 5 DocuSign Envelope ID: 72EB0E41-C3DE-4F00-85B1-FA85379F9EB3 Utilities Work Order Form Official Purchasing Form Last updated 10/2017 ATTACHMENT B CERTIFICATE OF INSURANCE CONTRACTOR shall submit Certificate of Insurance in compliance with the Contract Documents. Page 5 of 5 DocuSign Envelope ID: 72EB0E41-C3DE-4F00-85B1-FA85379F9EB3