Loading...
HomeMy WebLinkAboutRFP - 9142 POUDRE FIRE AUTHORITY 2019 HAIL DAMAGEFinancial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing REQUEST FOR PROPOSAL 9142 POUDRE FIRE AUTHORITY 2019 HAIL DAMAGE The City of Fort Collins on behalf of the Poudre Fire Authority (PFA) is requesting proposals from qualified Contractors for the repair and replacement of roofs and other building components and systems for multiple PFA facilities throughout the City of Fort Collins. The successful Contractor(s) will be responsible for a “turn key” completed project(s). PFA intends for the work to be complete by the end of the 2020 calendar year. Multiple Contractors may be selected for this project. As part of the City’s commitment to Sustainable Purchasing, proposals should be submitted online through the Rocky Mountain E-Purchasing System (RMEPS) at http://www.bidnetdirect.com/colorado/city-of-fort-collins. Note: please ensure adequate time to submit proposals through RMEPS. Proposals not submitted by the designated Opening Date and Time will not be accepted by the system. Pre-proposal meetings will be held at the following locations and times on Wednesday, June 17, 2020: 1. PFA Station #6 – 2511 Donella Court, Fort Collins at 9 am MST 2. PFA Station #10 – 2067 Vermont Drive, Fort Collins at 10:30 am MST 3. PFA Station #14 – 2019 Westchase Road, Fort Collins at 12:00 pm MST Due to COVID-19 and to ensure compliance with social distancing gathering requirements please RSVP to Jake Rector at jrector@fcgov.com no later than June 15, 2020. Compliance with the face covering ordinance will be required. All questions should be submitted, in writing via email, to [Jake Rector, Senior Buyer] at [jrector@fcgov.com], with a copy to Project Manager, [Jonathan Maxfield at jmaxfield@poudre-fire.org], no later than 5:00 PM MST (our clock) on [June 22, 2020]. Please format your e-mail to include: RFP 9142 Poudre Fire Authority 2019 Hail Damage in the subject line. Questions received after this deadline may not be answered. Responses to all questions submitted before the deadline will be addressed in an addendum and posted on the Rocky Mountain E-Purchasing System webpage. Rocky Mountain E-Purchasing System hosted by Bidnet A copy of the RFP may be obtained at http://www.bidnetdirect.com/colorado/city-of-fort-collins. Prohibition of Unlawful Discrimination: The City of Fort Collins, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The City strictly prohibits unlawful discrimination based on an individual’s gender (regardless of gender identity or gender expression), race, color, religion, creed, national origin, ancestry, age 40 years or older, marital status, disability, sexual orientation, genetic information, or other characteristics protected by law. For the purpose of this policy “sexual orientation” means a person’s actual or perceived orientation toward heterosexuality, homosexuality, and bisexuality. The City also strictly prohibits unlawful harassment in the workplace, including sexual harassment. Further, the City strictly prohibits unlawful retaliation against a person who engages in protected activity. Protected activity includes an employee complaining that he or RFP 9142 Poudre Fire Authority 2019 Hail Damage Page 1 of 17 she has been discriminated against in violation of the above policy or participating in an employment discrimination proceeding. The City requires its vendors to comply with the City’s policy for equal employment opportunity and to prohibit unlawful discrimination, harassment and retaliation. This requirement applies to all third-party vendors and their subcontractors at every tier. Public Viewing Copy: The City is a governmental entity subject to the Colorado Open Records Act, C.R.S. §§ 24-72-200.1 et seq. (“CORA”). Any proposals submitted hereunder are subject to public disclosure by the City pursuant to CORA and City ordinances. Vendors may submit one (1) additional complete proposal clearly marked “FOR PUBLIC VIEWING.” In this version of the proposal, the Vendor may redact text and/or data that it deems confidential or proprietary pursuant to CORA. Such statement does not necessarily exempt such documentation from public disclosure if required by CORA, by order of a court of appropriate jurisdiction, or other applicable law. Generally, under CORA trade secrets, confidential commercial and financial data information is not required to be disclosed by the City. Proposals may not be marked “Confidential” or ‘Proprietary’ in their entirety. All provisions of any contract resulting from this request for proposal will be public information. New Vendors: The City requires new Vendors receiving awards from the City to fill out and submit an IRS form W-9 and to register for Direct Deposit (Electronic) payment. If needed, the W-9 form and the Vendor Direct Deposit Authorization Form can be found on the City’s Purchasing website at www.fcgov.com/purchasing under Vendor Reference Documents. Please do not submit with your proposal. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision-making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited. Collusive or Sham Proposals: Any proposal deemed to be collusive or a sham proposal will be rejected and reported to authorities as such. Your authorized signature of this proposal assures that such proposal is genuine and is not a collusive or sham proposal. The City of Fort Collins reserves the right to reject any and all proposals and to waive any irregularities or informalities. Utilization of Award by Other Agencies: The City of Fort Collins reserves the right to allow other state and local governmental agencies, political subdivisions, and/or school districts to utilize the resulting award under all terms and conditions specified and upon agreement by all parties. Usage by any other entity shall not have a negative impact on the City of Fort Collins in the current term or in any future terms. The selected Vendor shall be expected to sign the City’s standard Agreement prior to commencing Services (see sample attached to this Proposal). Sincerely, Gerry Paul Purchasing Director RFP 9142 Poudre Fire Authority 2019 Hail Damage Page 2 of 17 I. BACKGROUND & OBJECTIVE / OVERVIEW A. Objective The City of Fort Collins and Poudre Fire Authority (PFA) are requesting proposals from qualified Contractors for the repair and replacement of roofs and other building components and systems for multiple PFA facilities throughout the City of Fort Collins. The successful Contractor(s) will be responsible for a “turn key” completed project(s). PFA intends for the work to be complete by the end of the 2020 calendar year. Multiple Contractors may be selected for this project. B. Background The overall scope of work described in this RFP is in response to damage to Poudre Fire Authority facilities caused by a Cat-40 hailstorm event that occurred on July 5, 2019. The amount and severity of damage to individual Poudre Fire Authority properties varies widely. The type of repair and replacement and the extent of the work is defined in detail within this RFP. II. SCOPE OF PROPOSAL A. Scope of Work 1. This RFP includes roof repair, replacement and other building repairs and replacement resulting from a Cat-40 hailstorm that occurred in 2019. The properties include: a. PFA Station #6 – 2511 Donella Court, Fort Collins b. PFA Station #10 – 2067 Vermont Drive, Fort Collins c. PFA Station #14 - 2019 Westchase Road, Fort Collins 2. Respondents to this RFP may choose to prepare a proposal for all the facilities noted above or any individual facility or facilities. 3. The awarded Contractor(s) will provide roof system repairs and replacement consistent with best industry practices for any or all of the PFA facilities identified above. The detailed scopes of work are attached as Exhibit A which was prepared by Engle Martin & Associated. Please note, the entire report is attached with the cost estimates redacted. 4. Building code-related upgrades, may not be enumerated in Exhibit A. Responses to the RFP must identify necessary upgrades to meet all applicable building codes. 5. For visible roof surfaces that are being replaced, the Contractor shall endeavor to match existing roof product configurations, details, colors and finishes. Drawings and details of existing buildings within the scope of work can be provided upon request, if available. RFP 9142 Poudre Fire Authority 2019 Hail Damage Page 4 of 17 6. In advance of any work, the Contractor will submit full specifications and manufacturer information for the products and systems proposed for use. The City of Fort Collins and Poudre Fire Authority reserve the right to refuse the use of a particular product, system or manufacturer. 7. The City of Fort Collins and Poudre Fire Authority may choose to retain a Roofing Consultant who may be engaged to fulfill some or all of the services listed below. The Contractor will be expected to cooperate and comply with Roofing Consultants engaged by the City of Fort Collins and Poudre Fire Authority for the benefit of the project. a. Participation in Pre-Bid Walk-Through(s) b. Construction Meetings c. Periodic inspections to ensure conformance with Manufacturer’s recommendations. 8. RFP respondents are to propose a project team (including any subcontractors) that will be performing the work. 9. It is the City’s and PFA’s expectation that the awarded Contractor(s) will work directly with PFA’s designated insurance company for reimbursement of all materials and work performed. Any changes in scope must be approved in writing by PFA’s Project Manager and PFA’s designated insurance before proceeding with any new work or change in project scope. B. Environmental To the best of the City’s and PFA’s knowledge, the areas of work to be performed by the Contractor do not contain Asbestos Containing Materials (RACM) or Lead Based Paint (LBP). However, in the event the award Contractor(s) identify materials suspected to contain RACM, LBP, and/or other hazardous material(s), the Contractor must immediately stop all work and notify the PFA’s Representative. C. Project Controls 1. Contractor to ensure a clean and safe work site at all times. 2. Contractor is obligated to observe applicable OSHA regulations. 3. Contractor is obligated to provide a site-specific, written safety plan and ensure enforcement throughout the life of the project. 4. PFA reserves the right to direct the Contractor to make personnel changes as necessary to ensure the timely, safe and efficient completion of the projects. 5. The Contractor must conform with City of Fort Collins – Building Design and Construction Standards’ unless specifically exempted from compliance by the City’s appointed Project Manager. Manual is available at https://www.fcgov.com/opserv/design-standards.php RFP 9142 Poudre Fire Authority 2019 Hail Damage Page 5 of 17 6. The Contractor must conform with the ‘City of Fort Collins Dust Prevention and Dust Control Manual’. Manual is available at https://www.fcgov.com/airquality/pdf/dust- prevention-and-control-manual.pdf 7. The Contractor must conform with the City of Fort Collins Quality Assurance / Quality Control (QA/QC) Program’. Program information is available at https://www.fcgov.com/opserv/pdf/dsgnstnds/qa-qc-plan.pdf 8. The Contractor is responsible for recording and submitting all applicable information on the ‘City of Fort Collins Waste Management Plan Form’. The Plan form is available at https://www.fcgov.com/recycling/files/construction-waste-management- plan.pdf 9. The City of Fort Collins reserves the right to withhold Final Payment until a completed ‘City of Fort Collins Waste Management Plan Form’ is submitted. 10. Unless otherwise instructed by PFA’s Project Manager, a Pre-Construction meeting will occur at each project site in which the following topics will be discussed: special facility conditions (if any), hours of operation, access to roofs, security, waste container location and other topics deemed necessary to the scope of work. 11. Special working conditions and restrictions may apply to some buildings within the scope of work. PFA reserves the right to orchestrate work in cooperation with the Contractor to minimize impact to normal PFA operations. 12. PFA or its representative will perform QA/QC inspections. 13. Communication Protocol: Contractors will comply with the communication protocol as established in a Pre-Construction Meeting. 14. Project Permits: Contractors shall obtain any required construction inspection cards prior to beginning any work and shall post in an obvious and convenient location at the project site. It is the responsibility of the Contractor to schedule all required inspections. Contractors are responsible to obtain necessary signatures on the permit cards from the inspectors, including sign off. Upon completion of inspections, Contractors are required to turn in all inspection cards (fully signed) to PFA’s Project Manager. Final payment will be withheld until all inspection cards have been signed and turned into PFA’s Project Manager. Any approved change order that significantly revises the scope of work will be available for review by PFA’s Project Manager. Contractor shall correct deficiencies and call for inspection. If a conflict is found within the contract documents and/or requirements, Contractor shall generate project correspondence to aid the team in resolving a failed inspection. 15. Building Restricted Access Requirements: Contractors shall not begin any project without first reviewing project site access and limitations with PFA’s Project Manager. Coordination is required of all labor force and subcontractors to determine work hours within the facility to avoid disruption of services, events and RFP 9142 Poudre Fire Authority 2019 Hail Damage Page 6 of 17 operations. Contractors are to be informed of the facility restrictions such as noise, dust and access prior to beginning work. 16. Keys: Keys for Contractor access, if required, will be coordinated through PFA’s Project Manager. Contractors must provide at least 72-hour notice of need for keys. The Contractor is responsible for coordinating access to the work for subcontractors. All keys must be returned prior to authorization of final payment. Contractors must sign/check-in daily at the facility office prior to starting any work. 17. Contact List: Contractors shall provide a 24-hour emergency contact list to PFA’s Project Manager electronically. 18. Staging & Parking: Staging, parking and traffic control is to be coordinated by PFA’s Project Manager. Contractor shall park all vehicles in designated areas outlined by PFA’s Project Manager, with attention to preclude interference with PFA’s operations, activities, including snow removal. 19. Deliveries: All deliveries, including subcontractors’ and materials deliveries, shall be coordinated by the Contractor. In no case, will PFA’s Project Manager and/or personnel receive or coordinate deliveries. 20. Dumpsters: Contractors are responsible for disposal of all refuse from the project. In no case, will the Contractor be authorized to deposit construction debris or discarded materials of any kind in a PFA dumpster. 21. Cleanup: Contractors will provide daily cleanup at the project location. Contractor will provide necessary protection within the building against dust and dirt. Contractor shall provide necessary protection within the project site against damage to finished work, tools and materials. 22. Contractor will take necessary measures to ensure that no odors or fumes associated with the work will enter any buildings. Means and methods for achieving this protection will vary by building and will be subject to review by PFA’s Project Manager. 23. Non-Smoking: Smoking is prohibited on all PFA and City properties. 24. Schedule: Contractors shall provide a schedule of work for distribution, prior to construction start. The schedule shall be kept up-to-date by the Contractor and provided to PFA’s Project Manager. 25. Meetings: The Contractor will record all minute from meetings and be responsible for distribution to the team. Separate meetings shall be held prior to beginning work for any major re-roofing or any work that involves critical sequencing or major coordination. 26. Document Conflicts: If code, specification, unforeseen conditions and/or drawing conflicts are found, they shall be documented and forwarded to PFA’s Project Manager for review and resolution prior to the initiation of work. RFP 9142 Poudre Fire Authority 2019 Hail Damage Page 7 of 17 27. Work Changes: Under no circumstances will the Contractor begin any changes in the work without PFA’s Project Manager written consent. PFA’s Project Manager is the only person authorized to make changes (cost or no cost) on the project. 28. Closeout: Contractors are to review closeout requirements, expectations and schedule as well as Warranty Procedures. a. Instructions, manuals, guides, charts, training, etc. b. All punch list items are completed or scheduled for corrections and/or deficiencies. c. Contractors returns keys. d. Record drawings (as-builts) including Contractors redlines completed. All approved changes, RFI’s, ASI’s, COB’s are to be included within the record set. e. Guarantee/Warranty requirements are met. Schedule an eleven (11) month walk through with PFA’s Project Manager. f. Roof warranties, reports, records, files and other documents related to construction are in order and turned over to owner. g. Removal of all Contractor’s temporary work, dumpster, cleanup and debris removal completed. h. Post contract maintenance conditions are understood and arranged. D. Detailed Scope of Work See attached Exhibit A prepared by Engle Martin & Associated. E. Project Schedule The City of Fort Collins and Poudre Fire Authority intend for the work to be completed by the end of the 2020 calendar year. The awarded Contractor(s) will be required to collaborate with PFA’s Project Manager to develop a mutually acceptable project schedule. F. Anticipated Schedule The following represents the City of Fort Collins and Poudre Fire Authority’s target schedule for the RFP. The City reserves the right to amend the target schedule at any time. • RFP issuance: June 8, 2020 • Pre-Proposal Meeting: [9 AM] MST on [June 17, 2020] • Question deadline: 5:00 PM MST on [June 22, 2020] • Proposal due date: 3:00 PM MST (our clock) on [July 3, 2020] • Interviews (tentative): Week of July 13, 2020 • Award of Contract (tentative): July 17, 2020 • Completion of project: December 31,2020 RFP 9142 Poudre Fire Authority 2019 Hail Damage Page 8 of 17 G. Interviews In addition to submitting a written proposal, the top-rated Vendors may be interviewed by the RFP assessment team and asked to participate in an oral presentation to provide an overview of the company, approach to the project and to address questions. The evaluation criteria for the oral interviews will be the same as the criteria for the written evaluations and is included in Section IV. H. Subcontractors Vendors will be responsible for identifying any subcontractors in their proposal. Please note that the City will contract solely with the awarded Vendor; therefore subcontractors will be the responsibility of the Vendor. I. Proposal Format Please limit the total length of your proposal to a maximum of ten (10) double sided or twenty (20) single sided 8 ½ x 11” pages (excluding cover pages, table of contents, dividers, Vendor Statement form, and Exhibit A. Font shall be a minimum of 10 Arial and margins are limited to no less than .5” for sides and top/bottom. Extended page sizes, such as 11” x 17”, count as a single page. Please, no embedded documents. Proposals that do not conform to these requirements may be rejected. J. Fees, Licenses, Permits The successful Vendor shall be responsible for obtaining any necessary licenses, fees or permits without additional expense to the City. All equipment shall be properly licensed and insured, carry the appropriate permits and be placarded as required by law. K. Laws and Regulations The Vendor agrees to comply fully with all applicable local, State of Colorado and Federal laws and regulations, municipal ordinances, and building codes. L. Agreement The awarded Contractor(s) will be expected to sign the City’s standard Services Agreement, a sample of which is attached as Section VI for reference purposes. In the event that the City has agreements with multiple Contractors for the Work, the City reserves the right to choose which Vendor to contact regarding the project. M. Invoicing and Payment It is the City’s and PFA’s expectation that the awarded Contractor(s) will work directly with PFA’s designated insurance company for all work performed. Any changes in scope must be approved in writing by PFA’s Project Manager and PFA’s designated insurance before proceeding with any new work or change in project scope. III. PROPOSAL SUBMITTAL For this section, Vendors are required to provide detailed written responses to the following items in the order outlined below. The responses shall be considered technical offers of what Vendors propose to provide and shall be incorporated in the contract award as deemed appropriate by the City. A proposal that does not include all the information required may be deemed non-responsive and subject to rejection. RFP 9142 Poudre Fire Authority 2019 Hail Damage Page 9 of 17 Responses must include all the items in the order listed below. It is suggested that the Vendors include each of the City’s questions with their response immediately following the question. The City of Fort Collins shall not reimburse any firm for costs incurred in the preparation and presentation of their proposal. A. Cover Letter / Executive Summary The Executive Summary should highlight the content of the proposal and features of the program offered, including a general description of the program and any unique aspects or benefits provided by your firm. Indicate your availability to participate in the interviews/demonstrations on the proposed dates as stated in the Schedule section. B. Vendor Information 1. Describe the Vendor’s business and background 2. Number of years in the business 3. Details about ownership 4. An overview of services offered and qualifications 5. Size of the firm 6. Location(s) of offices. If multiple, please identify which will be the primary for our account. 7. Primary contact information for the company including contact name(s) and title(s), mailing address(s), phone number(s), and email address(s). Complete Section V, Vendor Statement. C. Scope of Proposal 1. Provide a detailed narrative of the services proposed if awarded the contract per the scope above. The narrative should include any options that may be beneficial for the City to consider. 2. Describe how the project would be managed and who would have primary responsibility for its timely and professional completion. Include a description regarding how the analysis will be performed for the various identified areas identified, the methods and assumptions used, and the limitations of the analysis. 3. Describe the methods and timeline of communication your firm will use with the City’s Project Manager and other parties. 4. Identify what portion of work, if any, may be subcontracted. D. Firm Capability Provide relevant information regarding previous experience related to this or similar Projects, to include the following: 1. Provide an Organization Chart/Proposed Project Team: An organization chart containing the names of all key personnel and subcontractor(s) (if applicable) with titles and their specific task assignment for this Agreement shall be provided in this section. RFP 9142 Poudre Fire Authority 2019 Hail Damage Page 10 of 17 2. A list of qualifications for your firm and qualifications and experience of the specific staff members proposed to perform the services described above. 3. Provide a minimum of three similar projects with public agencies in the last 5 years that have involved the staff proposed to work on this project. Include the owner’s name, title of project, beginning price, ending price, contact name, email and phone number, subcontractor(s) on the team and a brief description of the work and any change orders. 4. Provide examples of at least two projects where you’ve worked with your subcontractor(s) if applicable. List the subcontractor(s) for this Agreement, their area(s) of expertise, and include all other applicable information herein requested for each subcontractor. Identify what portion of work, if any, may be subcontracted. E. Assigned Personnel 1. List of Project Personnel: This list should include the identification of the contact person with primary responsibility for this Agreement, the personnel proposed for this Agreement, and any supervisory personnel, including partners and/or subcontractors and their individual areas of responsibility. 2. A resume for each professional and technical person assigned to the Agreement, including partners and/or subcontractors, shall be submitted. . Please limit resumes to one page. 3. Some functions of this project may require the use of subcontractors. If you intend to utilize subcontractors you must list each and provide resumes for their key personnel. 4. Describe the availability of project personnel to participate in this project in the context of the contractor firm’s other commitments. F. Availability 1. Can the work be completed in the necessary timeframe? 2. Are other qualified personnel available to assist in meeting the project schedule if required? 3. Is the project team available to attend meetings as required by the Scope of Work? 4. Provide an outline of the schedule for completing tasks. RFP 9142 Poudre Fire Authority 2019 Hail Damage Page 11 of 17 5. Describe the methods and timeline of communication your firm will use with the City’s Project Manager and other parties. G. Sustainability/TBL Methodology In concise terms (no more than two pages), please describe how your organization strives to be sustainable. Address how your firm incorporates Triple Bottom Line (TBL) into the workplace. See Section IV: Review and Assessment for additional information. If possible, please highlight areas of opportunity in the project where sustainability could be applied and/or improved. H. Cost Submittal In your response to this proposal, please provide the following: 1. Cost by Task: Provide the cost of each task identified in Exhibit A. Provide a total not to exceed figure for the Scope of Proposal. Price all additional services/deliverables separately. . I. Additional Information Provide any information that distinguishes Vendor from its competition and any additional information applicable to this RFP that might be valuable in assessing Vendor’s proposal. Explain any concerns Vendor may have in maintaining objectivity in recommending the best solution. All potential conflicts of interest must be disclosed. Exceptions to the Scope of Services and City Agreement (a sample of which is attached in Section VI) shall be documented. IV. REVIEW AND ASSESSMENT CRITERIA A. Proposal and Interview Criteria Vendors will be evaluated on the following criteria. These criteria will be the basis for review and assessment of the written proposals and optional interview session. At the discretion of the City, interviews of the top-rated Vendors may be conducted. The rating scale shall be from 1 to 5, with 1 being a poor rating, 3 being an average rating, and 5 being an outstanding rating. WEIGHTING FACTOR QUALIFICATION STANDARD 2.0 Scope of Proposal Does the proposal address all elements of the RFP? Does the proposal show an understanding of the project objectives, methodology to be used and results/outcomes required by the project? Are there any RFP 9142 Poudre Fire Authority 2019 Hail Damage Page 12 of 17 exceptions to the specifications, Scope of Work, or agreement? 2.0 Firm Capability Does the firm have the resources, financial strength, capacity and support capabilities required to successfully complete the project on- time and in-budget? Has the firm successfully completed previous projects of this type and scope? 2.0 Assigned Personnel Do the persons who will be working on the project have the necessary skills and qualifications? Are sufficient people of the requisite skills and qualifications assigned to the project? 1.0 Availability Can the work be completed in the necessary time? Can the target start and completion dates be met? Are other qualified personnel available to assist in meeting the project schedule if required? Is the project team available to attend meetings as required by the Scope of Work? 1.0 Sustainability/TBL Methodology Does the firm demonstrate a commitment to Sustainability and incorporate Triple Bottom Line methodology in both their Scope of Work for the project, and their day-to-day business operating processes and procedures? 2.0 Cost & Work Hours Does the proposal included detailed cost break- down for each cost element as applicable and are the line-item costs competitive? Do the proposed cost and work hours compare favorably with the Project Manager's estimate? Are the work hours presented reasonable for the effort required by each project task or phase? Definitions Sustainable Purchasing is a process for selecting products or services that have a lesser or reduced negative effect on human health and the environment when compared with competing products or services that serve the same purpose. This process is also known as “Environmentally Preferable Purchasing” (EPP), or “Green Purchasing”. The Triple Bottom Line (TBL) is an accounting framework that incorporates three dimensions of performance: economic, or financial; environmental, and social. The generally accepted definition for TBL is that it “captures the essence of sustainability by measuring the impact of an organization’s activities on the world…including both its profitability and shareholders values and its social, human, and environmental capital.” B. Reference Evaluation Criteria Prior to award, the Project Manager will check references using the following criteria. Negative responses from references may impact the award determination. RFP 9142 Poudre Fire Authority 2019 Hail Damage Page 13 of 17 CRITERIA STANDARD QUESTIONS Overall Performance Would you hire this Vendor again? Did they show the skills required by this project? Timetable Was the original Scope of Work completed within the specified time? Were interim deadlines met in a timely manner? Completeness Was the Vendor responsive to client needs; did the Vendor anticipate problems? Were problems solved quickly and effectively? Budget Was the original Scope of Work completed within the project budget? Job Knowledge If a study, did it meet the Scope of Work? If Vendor administered a construction contract, was the project functional upon completion and did it operate properly? Were problems corrected quickly and effectively? RFP 9142 Poudre Fire Authority 2019 Hail Damage Page 14 of 17 V. VENDOR STATEMENT Vendor hereby acknowledges receipt of the City of Fort Collins Request for Proposal and acknowledges that it has read and agrees to be fully bound by all of the terms, conditions and other provisions set forth in the RFP. Additionally, Vendor hereby makes the following representations to City: a. All of the statements and representations made in this proposal are true to the best of the Vendor’s knowledge and belief. b. Vendor commits that it is able to meet the terms provided in this proposal. c. This proposal is a firm and binding offer, for a period of 90 days from the date hereof. d. Vendor further agrees that the method of award is acceptable. e. Vendor also agrees to complete the proposed Agreement with the City of Fort Collins within 30 days of notice of award. If contract is not completed and signed within 30 days, City reserves the right to cancel and award to the next highest rated firm. f. Vendor acknowledge receipt of addenda. Legal Firm Name: Physical Address: Remit to Address: Phone: Name of Authorized Agent of Firm: Signature of Authorized Agent: Primary Contact for Project: Title: Email Address: Phone: Cell Phone: NOTE: VENDOR STATEMENT IS TO BE SIGNED & RETURNED WITH YOUR PROPOSAL. RFP 9142 Poudre Fire Authority 2019 Hail Damage Page 15 of 17 VI. SAMPLE AGREEMENT (FOR REFERENCE ONLY – DO NOT SIGN ) RFP 9142 Poudre Fire Authority 2019 Hail Damage Page 16 of 17 Exhibit A PFA Building No. 6 2511 Donella Court Exterior DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV 1. Comb and straighten a/c condenser fins - with trip charge 1.00 EA 2. Comb and straighten a/c condenser fins - w/out trip charge 1.00 EA Downspout 3. R&R Downspout - box - aluminum - 6" 30.00 LF 4. Mask and prep for paint - tape only (per LF) 60.00 LF 5. Prime & paint downspout 30.00 LF Totals: Totals: Back DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV Downspout 6. R&R Downspout - box - aluminum - 6" 20.00 LF 7. Mask and prep for paint - tape only (per LF) 40.00 LF 8. Prime & paint downspout 20.00 LF Totals: Totals: Right DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV 9. Misc. Equipment - Commercial - Labor Minimum 2.00 EA Sign repairs CONTINUED - Front DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV Arch 10. Clean trim - wood 11. Mask and prep for paint - tape only (per LF) 12. Sand wood - exterior 13. Paint door or window opening - Large - 2 (pe coats r side) 92.00 LF 184.00 LF 92.00 SF 2.00 EA Two ladders with jacks and plank (per day) Window Wraps 2.00 DA 14. 15. R&R Wrap wood window frame & trim with aluminum sheet 16. Mask and prep for paint - tape only (per LF) 17. Paint door or window opening - 2 coats (per side) Downspout 3.00 EA 110.40 LF 3.00 EA 18. R&R Downspout - box - aluminum - 6" 19. Mask and prep for paint - tape only (per LF) 20. Prime & paint downspout Garage Doors 56.00 LF 112.00 LF 56.00 LF 21. Clean overhead door & hardware - Large 22. Mask and prep for paint - paper and tape (per LF) 23. Mask the surface area per square foot - plastic and tape - 4 mil 24. Prime & paint metal siding - overhead doors 5.00 EA 200.00 LF 70.00 SF 910.00 SF Totals: Totals: Front DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV Window Wraps 25. R&R Wrap wood window frame & trim with aluminum sheet 11.00 EA 26. Mask and prep for paint - tape only (per LF) 404.80 LF 27. Paint door or window opening - 2 coats (per side) 11.00 EA Downspout 28. R&R Downspout - box - aluminum - 6" 24.00 LF 29. Mask and prep for paint - tape only (per LF) 30. Prime & paint downspout 48.00 LF 24.00 LF DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV Totals: 0.00 Totals: Left 0.00 Left Dormer Siding Formula Elevation 12' x 0" x 6' 36.00 SF Walls 36.00 SF Long Wall 16.97 LF Ceil. Perimeter 12.00 LF Floor Perimeter 36.00 SF Short Wall DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV 31. Clean siding - wood 36.00 SF 32. Mask and prep for paint - paper and tape (per LF) 24.00 LF 33. Sand wood - exterior 36.00 SF 34. Seal & paint wood siding 36.00 SF 35. Two ladders with jacks and plank (per day) 2.00 DA Totals: Totals: Left Dormer Siding Shed 135.69 Surface Area 48.11 Total Perimeter Length 1.36 Number of Squares 9.04 Total Ridge Length 7' 6" 7' 6" 6' 6' DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV 36. Tear off, haul and dispose of comp. shingles - Laminated 1.36 SQ 37. Roofing felt - 30 lb. 1.36 SQ 12' 9' CONTINUED - Shed DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV 38. Remove Additional charge for steep roof - 7/12 to 9/12 slope 1.36 SQ 39. Additional charge for steep roof - 7/12 to 9/12 slope 1.50 SQ 40. Laminated - comp. shingle rfg. - w/out felt 1.50 SQ Cap Flashing 41. R&R Cap flashing - steel - large 30.03 LF 42. Mask and prep for paint - paper and tape (per LF) 60.07 LF 43. Prime & paint metal siding - large cap trim 30.03 SF Totals: Totals: Shed Building Roof 14315.29 Surface Area 690.17 Total Perimeter Length 13.11 Total Hip Length 143.15 Number of Squares 294.31 Total Ridge Length DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV 44. Telehandler/forklift and operator 16.00 HR 45. Tear off, haul and dispose of comp. shingles - Laminated 131.70 SQ 46. Roofing felt - 30 lb. 151.50 SQ 47. Laminated - comp. shingle rfg. - w/out felt 151.50 SQ 48. R&R Continuous ridge vent - shingle-over style 294.31 LF 49. Additional charge for high roof (2 stories or greater) 91.87 SQ 50. Additional charge for high roof (2 stories or greater) 105.75 SQ 51. Remove Additional charge for steep roof - 7/12 to 9/12 slope 131.70 SQ 52. Additional charge for steep roof - 7/12 to 9/12 slope 151.50 SQ 53. Remove Modified bitumen roof 11.46 SQ 54. Modified bitumen roof 12.60 SQ 55. Step flashing 48.74 LF 138 '' 55 "" 6' 9" 7' 7" 74' 4" 74' 4" 40' 3" 15' 2" 32' 7" 22' 1" 26' 102"6' 10" 21' 6"21' 6" CONTINUED - Building Roof DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV 56. R&R Valley metal 273.42 LF 57. R&R Counterflashing - Apron flashing 26.91 LF 58. R&R Flashing - pipe jack 4.00 EA 59. R&R Furnace vent - rain cap and storm collar, 6" 3.00 EA 60. R&R Furnace vent - rain cap and storm collar, 5" 10.00 EA 61. R&R Furnace vent - rain cap and storm collar, 8" 2.00 EA 62. R&R Gravity roof ventilator - 18" 2.00 EA 63. Antenna - Detach & reset 2.00 EA 64. Electrical - Labor Minimum 2.00 EA Calibrate antenna 65. Prime & paint roof vent 21.00 EA Cap Flashing 66. R&R Cap flashing - steel - large 331.99 LF 67. Mask and prep for paint - paper and tape (per LF) 663.98 LF 68. Prime & paint metal siding - large cap trim 331.99 SF Skylight 69. R&R Siding - aluminum (.024 thickness) 72.00 SF 70. Window Installer - per hour labor to install covers per 9/12 slope 3.00 HR Gutters 71. R&R Gutter - box - aluminum - 6" 358.18 LF 72. Mask and prep for paint - paper and tape (per LF) 358.18 LF 73. Prime & paint gutter 358.18 LF Totals: Totals: Building Roof Area Total: Totals: Exterior Debris Removal DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV 74. Dumpster load - Approx. 30 yards, 5-7 tons of debris 1.00 EA Totals: Totals: Debris Removal Area Total: 0.00 94,480.00 (21,356.56) 73,123.44 Totals: Building No. 6 0.00 94,480.00 21,356.56 73,123.44 Area Total: 0.00 94,480.00 (21,356.56) 73,123.44 Line Item Totals: 0.00 94,480.00 21,356.56 73,123.44 Grand Total Areas: 36.00 SF Walls 0.00 SF Ceiling 36.00 SF Walls and Ceiling 0.00 SF Floor 0.00 SY Flooring 12.00 LF Floor Perimeter 36.00 SF Long Wall 36.00 SF Short Wall 16.97 LF Ceil. Perimeter 0.00 Floor Area 0.00 Total Area 0.00 Interior Wall Area 0.00 Exterior Wall Area 0.00 Exterior Perimeter of Walls 14,450.98 Surface Area 144.51 Number of Squares 738.28 Total Perimeter Length 303.34 Total Ridge Length 13.11 Total Hip Length 35' 20' 1" 16' 1" 15' 5" 50' 3" 34' 9" 43' 1" 2' 9" F23(A) 2' 9" F28(A) Roof7 (1) 64' 6" Roof6 (4) F20(B) Roof4 (2) F29(B) Roof5 (3) F19(A) Roof10 (5) F24(B) F32 F27(B) Roof8 (6) Building Roof F26(A) F30(A) F21 F22(B) F31(B) 21' 9" 21' 9" 17' 5" 17' 5" Exterior 12' 7' 6" 7' 6" 6' 6' 21' 10" 21' 10" 17' 6" 17' 6" 30' 11" 31' 11" 24' 9" 25' 6" 81' 11" 8' 5" 13' 5" 8' 5" 6' 9" 6' 9" 7' 7" 74' 4" 9' 74' 4" 40' 3" 17' 10" 15' 2" 4' 8" 32' 7" 22' 1" 8' 5" 6' 9" 13' 5" 26' 10" 21' 6" 26' 10" 62' 10" 21' 6" 42' 11" Building No. 10 PFA Building No. 10 2067 Vermont Drive DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV 1. Final cleaning - construction - Commercial 2478.15 SF Totals: Total: Building No. 10 Exterior DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV 2. R&R Downspout - aluminum - 6" 63.00 LF Totals: Totals: Back DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV 3. R&R Downspout - aluminum - 6" 84.00 LF 4. Comb and straighten a/c condenser fins - with trip charge 1.00 EA 5. Comb and straighten a/c condenser fins - w/out trip charge 2.00 EA Totals: Totals: Left DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV 6. R&R Downspout - aluminum - 6" 36.00 LF 7. R&R Downspout - aluminum - up to 5" 15.00 LF Totals: Totals: Front DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV 8. R&R Downspout - aluminum - 6" 39.00 LF Totals: Totals: Right CONTINUED - Front Roof 8579.76 Surface Area 619.54 Total Perimeter Length 304.50 Total Hip Length 85.80 Number of Squares 65.20 Total Ridge Length DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV 9. Tear off, haul and dispose of comp. shingles - Laminated 85.80 SQ 10. Roofing felt - 30 lb. 85.80 SQ 11. Laminated - comp. shingle rfg. - w/out felt 99.00 SQ 12. R&R Ridge cap - composition shingles 369.70 LF 13. Additional charge for high roof (2 stories or greater) 37.59 SQ 14. greater) 43.25 SQ 15. R&R Drip edge 619.54 LF 12' 10" 50' 6" 8' 7" 45' 4" 65' 3" 8' 2" CONTINUED - Roof DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV 16. Step flashing 73.08 LF 17. R&R Valley metal 103.08 LF 18. R&R Chimney flashing - average (32" x 36") 1.00 EA 19. R&R Counterflashing - Apron flashing 102.15 LF 20. R&R Flashing - pipe jack 9.00 EA 21. R&R Furnace vent - rain cap and storm collar, 6" 5.00 EA 22. R&R Furnace vent - rain cap and storm collar, 5" 1.00 EA 23. R&R Furnace vent - rain cap and storm collar, 6" - Accounts for 12" 2.00 EA 24. Antenna - Detach & reset 1.00 EA 25. Electrical - Labor Minimum 1.00 EA Calibrate antenna 26. Prime & paint roof vent 20.00 EA Gutters 27. R&R Gutter - aluminum - up to 5" 523.26 LF Chimney 28. R&R Flue cap 2.00 EA 29. R&R Fireplace - chimney chase cover - sheet metal 1.00 EA 30. Prime & paint metal siding - Chase Cover 25.00 SF 31. Clean stucco 110.00 SF 32. Mask and prep for paint - plastic, paper, tape (per LF) 20.00 LF 33. Stucco or Exterior Plaster - Labor Minimum 1.00 EA 34. Seal & paint stucco 121.00 SF Totals: Totals: Roof Area Total: Totals: Exterior Gutter Debris DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV 35. Dumpster load - Approx. 12 yards, 1-3 tons of debris 1.00 EA CONTINUED - Gutter Debris DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV Totals: Gutter Debris Area Total: Totals: Building No. 10 Area Total: Line Item Totals: Grand Total Areas: 0.00 SF Walls 0.00 SF Ceiling 0.00 SF Walls and Ceiling 0.00 SF Floor 0.00 SY Flooring 0.00 LF Floor Perimeter 0.00 SF Long Wall 0.00 SF Short Wall 0.00 LF Ceil. Perimeter 0.00 Floor Area 0.00 Total Area 0.00 Interior Wall Area 0.00 Exterior Wall Area 0.00 Exterior Perimeter of Walls 8,579.76 Surface Area 85.80 Number of Squares 619.54 Total Perimeter Length 65.20 Total Ridge Length 304.50 Total Hip Length Exterior 28' 11" 56' 2" 28' 11" 28' 1" 28' 1" 36' 11" 36' 8" 35' 5" 35' 2" Exterior Roof8 (1) Roof6 (6) Roof7 (3) Roof Roof5 (5) Roof2 (2) Roof3 (4) 118' 10" 13' 4" 12' 10" 50' 6" 8' 7" 9' 2" 15' 5" 14' 9" 1' 6" 65' 3" 45' 4" 8' 2" 8' 2" 7' 11" 7' 11" 15' 10" PFA Building No. 14 2109 Westchase Road Exterior DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV 1. Tear off, haul and dispose of comp. shingles - Laminated 91.62 SQ 2. Additional charge for high roof (2 stories or greater) 37.63 SQ 3. R&R Drip edge 672.38 LF 4. Roofing felt - 30 lb. 105.37 SQ 5. R&R Flashing, 14" wide 104.74 LF 6. Laminated - comp. shingle rfg. - w/out felt 105.50 SQ 7. Additional charge for high roof (2 stories or greater) 43.50 SQ 8. Ridge cap - High profile - composition shingles 397.82 LF 9. R&R Gutter - aluminum - up to 5" 537.22 LF 10. Step flashing 73.08 LF 11. R&R Chimney flashing - average (32" x 36") 1.00 EA 12. R&R Counterflashing - Apron flashing 106.45 LF 13. R&R Flashing - pipe jack 8.00 EA 14. R&R Furnace vent - rain cap and storm collar, 6" 5.00 EA 15. R&R Furnace vent - rain cap and storm collar, 5" 4.00 EA 16. R&R Furnace vent - rain cap and storm collar, 6" - Accounts for 12" 2.00 EA 17. R&R Roof vent - turtle type - Metal 2.00 EA 18. Antenna - Detach & reset 1.00 EA 19. Electrical - Labor Minimum 1.00 EA Calibrate antenna 20. Prime & paint roof vent 21.00 EA Chimney 21. R&R Flue cap 1.00 EA 22. R&R Fireplace - chimney chase cover - sheet metal 1.00 EA 23. R&R Siding - aluminum (.024 thickness) 120.00 SF Metal Trim Right Elevation 24. Clean trim 95.00 LF 25. Mask the surface area per square foot - plastic and tape - 4 mil 256.00 SF 26. Sand metal trim - exterior 95.00 SF 27. Seal ceiling joist trim system 104.50 SF 28. Painter - per hour for metal trim 2.00 HR Totals: Totals: Roof DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV 29. R&R Fascia - metal - 6" 20.00 LF Totals: Totals: Right Front Elevation Formula Elevation 60' x 14' x 0" 504.00 SF Walls 840.00 SF Long Wall 36.00 LF Ceil. Perimeter 36.00 LF Floor Perimeter 840.00 SF Short Wall Missing Wall - Goes to Floor/Ceiling (2) 12' X 14' Opens into Exterior Subroom 1: Offset Formula Elevation 7' x 12' x 0" 84.00 SF Walls 84.00 SF Long Wall 7.00 LF Ceil. Perimeter 7.00 LF Floor Perimeter 84.00 SF Short Wall Subroom 2: Offset Formula Elevation 60' x 5' x 0" 300.00 SF Walls 300.00 SF Long Wall 60.00 LF Ceil. Perimeter 60.00 LF Floor Perimeter 300.00 SF Short Wall Subroom 3: Offset Formula Elevation 10' x 5' x 0" 50.00 SF Walls 50.00 SF Long Wall 10.00 LF Ceil. Perimeter 10.00 LF Floor Perimeter 50.00 SF Short Wall Subroom 4: Offset Formula Elevation 12' x 5' x 0" 60.00 SF Walls 60.00 SF Long Wall 12.00 LF Ceil. Perimeter 12.00 LF Floor Perimeter 60.00 SF Short Wall DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV 30. R&R Siding - aluminum (.024 thickness) 998.00 SF 31. R&R Overhead door panel - up to 12' - High grade 14.00 EA 32. Overhead door bottom panel weather seal w/track 24.00 LF 33. R&R Exterior light fixture - High grade 1.00 EA 34. R&R Downspout - box - aluminum - 6" 24.00 LF Totals: Totals: Front Elevation Left Elevation Formula Elevation 56' x 5' x 0" 280.00 SF Walls 280.00 SF Long Wall 56.00 LF Ceil. Perimeter 56.00 LF Floor Perimeter 280.00 SF Short Wall Subroom 1: Offset Formula Elevation 47' x 5' x 0" 235.00 SF Walls 235.00 SF Long Wall 47.00 LF Ceil. Perimeter 47.00 LF Floor Perimeter 235.00 SF Short Wall Subroom 2: Offset Formula Elevation 10' x 5' x 0" 50.00 SF Walls 50.00 SF Long Wall 10.00 LF Ceil. Perimeter 10.00 LF Floor Perimeter 50.00 SF Short Wall DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV 35. R&R Siding - aluminum (.024 thickness) 565.00 SF 36. R&R Downspout - box - aluminum - 6" 72.00 LF Totals: Totals: Left Elevation Area Total: Totals: Exterior Debris Removal DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV 37. Dumpster load - Approx. 20 yards, 4 tons of debris 1.00 EA Totals: Totals: Debris Removal Area Total: Totals: Building No. 14 DESCRIPTION QTY UNIT PRICE TAX RCV DEPREC. ACV 38. Cleaning labor minimum 1.00 EA Totals: Totals: Labor Minimums Applied Area Total: Line Item Totals: Grand Total Areas: 1,563.00 SF Walls 0.00 SF Ceiling 1,563.00 SF Walls and Ceiling 0.00 SF Floor 0.00 SY Flooring 238.00 LF Floor Perimeter 1,899.00 SF Long Wall 1,899.00 SF Short Wall 238.00 LF Ceil. Perimeter 0.00 Floor Area 0.00 Total Area 0.00 Interior Wall Area 6,930.53 Exterior Wall Area 644.60 Exterior Perimeter of Walls 0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length 0.00 Total Ridge Length 0.00 Total Hip Length CHIMNEY1 (B1) Exterior 22' 7" 33' 7" 19' 7" 30' 7" 1' 6" 14' 3" 17' 3" 12' 4" 24' 8" 13' 11" 12' 4" 8' 6" 8' 6" 15' 10" 13' 6" 15' 3' 6" 4' 2" 11' 11" 9' 5" 9' 10" 4' 6" 4' 3" 11' 10" 12' 5" 14' 3" 21' 9" 20' 2" 21' 7" 13' 4" 2' 6" 12' 9" 11' 3" 25' 8" 13' 11" 13' 11" 14' 5" 31' 2" 1' 1" 51' 3" 56' 3" 55' 9" 58' 9" Exterior