Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 8844 MISCELLANEOUS CONCRETE (15)2/27/2020 202.01 Sawcut Concrete/Asphalt (0" < 4") Lineal Foot $ 3.50 $ - 202.02 Sawcut Concrete/Asphalt (4" < 6") Lineal Foot $ 3.65 $ - 202.03 Sawcut Concrete/Asphalt (6" < 8") Lineal Foot $ 4.00 $ - 202.04 Sawcut Concrete/Asphalt (8" ≤ 10") Lineal Foot $ 5.75 $ - 202.05 Sawcut - Additional 1" Depth Lineal Foot $ 1.25 $ - 202.06 Remove Concrete Sidewalk Square Foot $ 3.85 $ - 202.07 Remove Concrete Curb & Gutter Lineal Foot $ 6.67 $ - 202.08 Remove Monolithic Curb, Gutter & Sidewalk Square Foot $ 3.95 1982.50 $ 7,830.88 202.09 Remove Concrete Driveway/Apron/Crosspan Square Foot $ 3.85 $ - 202.10 Remove Concrete Pavement - 10" Square Foot $ 4.11 $ - 202.11 Remove Concrete Pavement - Additional 1" Depth Square Foot $ 1.08 $ - 202.12 Remove Asphalt - 6" Square Foot $ 3.08 $ - 202.13 Remove Asphalt - Additional 1" Depth Square Foot $ 1.08 $ - 202.14 Remove Inlet Each $ 539.00 $ - 202.15 Remove and Haul Driveway Fillet Each $ 51.33 $ - 202.16 Remove Flagstone Square Foot $ 3.85 $ - 203.01 Excavation - General Less Than 50 CY Cubic Yard $ 42.00 $ - 203.02 Excavation - General Over 50 CY Cubic Yard $ 32.00 $ - 203.03 Excavation - Walls Only Cubic Yard $ 22.00 $ - 203.04 Excavation - New Inlet Each $ 385.00 $ - 203.05 Borrow - Less than 100 Ton Ton $ 22.00 $ - 203.06 Borrow - Over 100 Ton Ton $ 21.00 $ - 207.01 Imported Topsoil Cubic Yard $ 45.00 $ - 208.01 Stormwater Protection - Rock Filled Wattle Lineal Foot $ 10.27 $ - 208.02 Stormwater Protection - Recycled Rubber Filled Wattle Lineal Foot $ 17.45 $ - 208.03 Stormwater Protection - Straw Bales Each $ 21.00 $ - 208.04 SWMP Maintenance Log - 14 Day Inspection Each $ 97.53 $ - 210.01 Reset Flagstone Square Foot $ 5.13 $ - UNITS TOTAL 2020 Revised Unit Price ADDENDUM 2 BID SCHEDULE 1 - BASE BID (Non-Federal) Item No. Description Unit PROJECT ESTMATE 210.02 Reset Brick Pavers Square Foot $ 8.21 $ - 210.03 Adjust Manhole Each $ 107.80 $ - 210.04 Adjust Valve Box Each $ 107.80 $ - 304.01 Aggregate Base Course/Recycled Concrete Base ≤ 5 Tons Ton $ 41.04 $ - 304.02 Aggregate Base Course/Recycled Concrete Base > 5 Tons Ton $ 40.01 12.00 $ 480.12 304.03 Recycled Asphalt Base Ton $ 26.27 $ - 403.01 Asphalt Surface Preservation Lineal Foot $ 5.13 305.00 $ 1,564.65 403.02 Temporary Asphalt Patching Ton $ 202.10 $ - 601.01 Exposed Sand Finish - Additional Charge Square Foot $ 4.11 $ - 602.01 Reinforcing Steel Pound $ 3.95 $ - 602.02 Reinforcing Steel - Epoxy Coated Pound $ 5.00 $ - 604.01 Install New Area Inlet Each $ 1,413.00 $ - 604.02 Area Inlet – Additional Foot Depth Lineal Foot $ 105.05 $ - 604.03 Reconstruct Area Inlet Deck – Remove & Replace Each $ 814.07 $ - 604.04 Reconstruct Area Inlet Deck - Additional Foot Opening – Remove & Replace Lineal Foot $ 105.02 $ - 604.05 Reconstruct Catch Basin Deck - Remove & Replace Each $ 814.12 $ - 604.06 Reconstruct Catch Basin Deck - Additional Foot Opening – Remove & Replace Lineal Foot $ 105.04 $ - 604.07 Install New Curb Inlet – 4’ Opening Each $ 2,074.67 $ - 604.08 Curb Inlet – Additional Foot Depth Lineal Foot $ 105.04 $ - 604.09 Reconstruct Curb Inlet Deck – Remove and Replace Each $ 814.07 $ - 604.10 Reconstruct Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot $ 105.04 $ - 604.11 Install New Type R Inlet - 5' Opening Each $ 3,571.17 $ - 604.12 Type R Inlet – Additional Foot Depth Lineal Foot $ 105.05 $ - 604.13 Reconstruct Type R Inlet Deck – Remove and Replace Each $ 1,313.08 $ - 604.14 Reconstruct Type R Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot $ 131.31 $ - 604.15 Install New Modified Type 13 Curb Inlet (includes new Frame, Grate & Adjustable Curb Bonnet) Each $ 2,366.00 $ - 604.16 Modified Type 13 Curb Inlet – Additional Foot Depth Lineal Foot $ 105.05 $ - 604.17 Reconstruct Modified Type 13 Curb Inlet Deck – Remove & Replace Each $ 814.07 $ - 604.18 Reconstruct Modified Type 13 Curb Inlet Deck – Additional Foot Opening – Remove and Replace Lineal Foot $ 105.05 $ - 604.19 Modified Type 13 Curb Inlet – Materials only - (Frame, Grate, & adjustable bonnet (East Jordan Iron Works 7030 or Equivalent Material) Each $ 840.33 $ - 604.20 Concrete Sidewalk Culvert – 4’ opening Each $ 1,017.50 $ - 604.21 Metal Sidewalk Culvert - 2' Opening, Remove & Replace Each $ 815.67 $ - 604.22 Metal Sidewalk Culvert - 2' Opening, Materials Only Each $ 1,632.33 $ - 604.23 Additional Square Foot 5/8" Plate Square Foot $ 158.10 $ - 608.01 Driveover Curb, Gutter & 6" Sidewalk Lineal Foot $ 44.07 305.00 $ 13,441.35 608.02 Driveover Curb and Gutter - No Sidewalk Lineal Foot $ 26.12 $ - 608.03 Vertical Curb, Gutter and 6" Sidewalk Lineal Foot $ 44.07 $ - 608.04 Vertical Curb and Gutter - No Sidewalk Lineal Foot $ 27.11 $ - 608.05 Out Fall Curb & Gutter Lineal Foot $ 26.02 $ - 608.06 Hollywood Curb, Gutter and 6" Sidewalk Lineal Foot $ 39.66 $ - 608.07 Hollywood Curb and Gutter - No Sidewalk Lineal Foot $ 22.01 $ - 608.08 Highback Curb and Gutter - No Sidewalk Lineal Foot $ 38.89 $ - 608.09 Barrier Curb - 6" x 18" Lineal Foot $ 25.92 $ - 608.10 Barrier Curb - Key Way Style Lineal Foot $ - $ - 608.11 Barrier Curb - Epoxy Lineal Foot $ - $ - 608.12 Mountable Curb - 12" x 18" Lineal Foot $ 25.92 $ - 608.13 Mountable Curb - Keyway Style Lineal Foot $ - $ - 608.14 Mountable Curb – Epoxy Lineal Foot $ - $ - 608.15 Pedestrian Access Ramp Square Foot $ 8.62 $ - 608.16 Pedestrian Access Ramp, Highback Curb Square Foot $ 8.88 $ - 608.17 Truncated Dome Panel Square Foot $ 43.09 $ - 608.18 Apron - 8" Square Foot $ 8.91 $ - 608.19 Crosspan - 8" Square Foot $ 8.89 $ - 608.20 Valley Pan - 6" Square Foot $ 7.79 $ - 608.21 Flatwork - 4" Square Foot $ 5.06 $ - 608.22 Flatwork - 6" Square Foot $ 6.11 $ - 608.23 Replace Flatwork - 1" Additional Depth Square Foot $ 1.14 $ - 608.24 Concrete Pavement 8" (Joints Sealed) Square Foot $ 9.04 $ - 608.25 Alley Approach - 8" Square Foot $ 8.89 $ - 608.26 Enhanced Crosswalk - 10" Tile Red Square Foot $ 14.11 $ - 608.27 Enhanced Crosswalk - 10" San Diego Buff Square Foot $ 13.60 $ - 608.28 Enhanced Crosswalk - 10" Brick Red, Stamped Square Foot $ 14.11 $ - 608.29 Colored Trail with Fibermesh - 5" Yosemite Brown Square 608.33 Median Cover - 4" San Diego Buff Square Foot $ 8.17 $ - 608.34 Fibermesh - Added to Any Item - Additional Charge Pounds / Cubic Yard $ 11.34 $ - 608.35 24 Hour High Early Concrete - Added to Any Item - Additional Charge Cubic Yard $ 66.99 $ - 608.36 Stamp Pattern - Added to Any Item, Additional Charge Square Foot $ 3.08 $ - 608.37 6" Concrete Bollard Each $ 486.50 $ - 608.38 8" Concrete Bollard Each $ 574.00 $ - 608.39 Flowable Fill Cubic Yard $ 149.44 $ - 608.40 Non-reinforced Concrete Wall - 8" Square Face Foot $ 18.59 $ - 608.41 Non-reinforced Concrete Footer - 8" Square Foot $ 18.59 $ - 608.42 Concrete Staining/Sealing Square Foot $ 4.72 $ - 608.43 Expansion Material Lineal Foot $ 4.21 $ - 608.44 Joint Sealant (Pavement) Lineal Foot $ 5.29 $ - 608.45 Irrigation Sleeve Lineal Foot $ 5.00 $ - 608.46 Dump Fee Ton $ 59.55 $ - 608.47 6" Concrete Median Barrier Curb, Placed (Detail FC703-Section B) (8" Bar paid under 608.48) Lineal Foot $ 21.68 $ - 608.48 6" Concrete Median Barrier Curb, Drilled (Detail FC703-Section C) Each $ 8.93 $ - 608.49 Add Domes to Existing Ramp - Remove and Replace Square Foot $ 38.99 608.5 Add Domes to Existing Ramp - Dryset Placement Square Foot $ 30.80 630.01 "NO PARKING" Sign With Stand Per Each Per Day $ 2.00 $ - 630.02 Vertical Panel Without Light Per Each Per Day $ 1.25 $ - 630.03 Channelizing Barrels Per Each Per Day $ 1.50 $ - 630.04 Type I/II Barricade Without Light Per Each Per Day $ 1.00 $ - 630.05 Type III Barricade Without Light Per Each Per Day $ 5.00 $ - 630.06 Size A Sign With Stand Per Each Per Day $ 2.00 $ - 630.07 Size B Sign With Stand Per Each Per Day $ 2.00 $ - 630.08 Size A Specialty Sign - Cost of Manufacturing Each $ 95.00 $ - 630.09 Size B Specialty Sign - Cost of Manufacturing Each $ 100.00 $ - 630.10 Cone With Reflective Strip Per Each 630.16 Traffic Control Supervisor Hour $ 46.20 $ - 630.17 Flagging Hour $ 26.69 $ - $ - $ - FA1 Laborer Hour $ 33.88 $ - FA2 Foreman Hour $ 51.33 $ - FA3 Finisher Hour $ 46.20 $ - FA4 Form Setter Hour $ 46.20 $ - FA5 Skid Steer and Operator Hour $ 87.27 $ - FA6 Mini Trackhoe and Operator Hour $ 97.53 $ - FA7 Dump Truck and Operator Hour $ 77.00 $ - FA8 Backhoe and Operator Hour $ 97.53 $ - TOTAL COST $ - $ 23,317.00 Base Material, Backfill, Top Soil. Actual costs will be invoiced at contractual unit prices. 29,146.24 ADDITIONAL SERVICES Per Day $ 0.85 $ - 630.11 Safety Fence Per Roll Per Day $ 5.00 $ - 630.12 Light Per Each Per Day $ 1.00 $ - 630.13 Advance Warning Flashing or Sequencing Arrow Panel Per Each Per Day $ 45.00 $ - 630.14 Variable Message Board Per Each Per Day $ 90.00 $ - 630.15 Traffic Control Supervisor Per Day $ 436.33 $ - Foot $ 8.39 $ - 608.30 Mow Strip - 4" x 12" Lineal Foot $ 9.75 $ - 608.31 Splashblock - 4" Exposed Aggregate Square Foot $ 7.75 $ - 608.32 Splashblock - 4" San Diego Buff Square Foot $ 8.17 $ -