Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8106 UTILITY INFRASTRUCTURE CONSTRUCTION SERVICES FOR WATER, WASTEWATER, AND STORMWATER FACILITIES CAPITAL IMPROVEMENTS (2)Change Order Form (for Work Orders) Official Purchasing Form Last updated 10/2017 CHANGE ORDER NO. 2 PROJECT TITLE: Cathodic Protection – AB Water Line Construction CONTRACTOR: Hydro Construction WORK ORDER NUMBER: SCP-HydroCPABConst-041819 PO NUMBER: 9190883 DESCRIPTION: 1. Reason for Change: Cost 2. Description of Change: Hydro has completed the project under budget. Improvements completed included drilling 5 bore holes approximately 350 – 400 feet deep for the placement of a set of anodes (one set = 6 anodes hung in the well column) at each location; installation of 5 rectifiers, installation of SCADA and antenna equipment to transmit information to the WTF to monitor the rectification sites and cathodic protection system; and coordination and connection to electrical power supplies. 3. Change in Work Order Price: $ 97,345.13 4. Completion Date (if changed): NA ORIGINAL WORK ORDER PRICE $ 1,048,253.00 TOTAL APPROVED CHANGE ORDER $ 0.00 TOTAL PENDING CHANGE ORDER $ 97,345.13 TOTAL THIS CHANGE ORDER $ 97,345.13 TOTAL % OF THIS CHANGE ORDER 9% TOTAL C.O.% OF ORIGINAL WORK ORDER 9% ADJUSTED WORK ORDER COST $ 950,907.87 CONTRACTOR: Hydro Construction By: Date: Name: Title: ACCEPTANCE: Date: Sue Paquette, Project Manager REVIEWED: Date: Pat Johnson, Senior Buyer ACCEPTANCE: Date: Matt Fater, Civil Engineering Director DocuSign Envelope ID: 3A7756F7-E1C7-4E1F-8F92-EC180A167221 May 5, 2020 Jim Eurich COO May 5, 2020 May 5, 2020 May 6, 2020 Change Order Form (for Work Orders) Official Purchasing Form Last updated 10/2017 ACCEPTANCE: Date: Andrew Gingerich, Interim Deputy Director, Water Engineering & Field Services ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) DocuSign Envelope ID: 3A7756F7-E1C7-4E1F-8F92-EC180A167221 May 6, 2020 May 8, 2020