Loading...
HomeMy WebLinkAboutCORRESPONDENCE - PURCHASE ORDER - 9200275Work Order Form Official Purchasing Form Last updated 10/2017 WORK ORDER FORM PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND WORK ORDER NUMBER: PROJECT TITLE: ORIGINAL BID/RFP NUMBER & NAME: MASTER AGREEMENT EFFECTIVE DATE (Contract Signed): WORK ORDER COMMENCEMENT DATE: WORK ORDER COMPLETION DATE: MAXIMUM FEE: (time and reimbursable direct costs): PROJECT DESCRIPTION/SCOPE OF SERVICES: Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of ( ) page(s) are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Date: , ACCEPTANCE: Date: , Project Manager REVIEWED: Date: , Buyer or Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) DocuSign Envelope ID: 15555233-CD80-409A-B6B3-0EF2C38C58B1 two Jill Wuertz 1/20/2020 See attached documents. Repair of concrete around Edora Concession Building 4/1/2020 January 20, 2020 2 Edora Concession Concrete Repairs $15,985 November 1, 2019 January 22, 2020 Elliot Dale Small & Miscellaneous Concrete Services Reed W Nelson Fox Construction Systems January 22, 2020 Estimator Fox Construction Systems, LLC P.O BOX 389 WINDSOR, CO 80550 US estimating@fcsnoco.com Estimate ADDRESS Jill Wuertz Edora Park Building & Ball Field Fort Collins Parks ESTIMATE # DATE EXPIRATION DATE 1041 10/11/2019 11/07/2019 P.O. NUMBER SALES REP 1026 Reed Nelson DATE ACTIVITY DESCRIPTION QTY RATE AMOUNT 10/11/2019 DEMOLITION A: Demo existing concrete along building edge, drive lane and existing tall curb, clear grass and gravel . Form & Pour new concrete sidewalk, curb & gutter and drive lane all (6" thick). Include drop down curbs and ADA ramp. 750 10.00 7,500.00 10/11/2019 Structural Fill / Base Course A: Import & Placement of Structural Base Course 750 2.50 1,875.00 10/11/2019 Equipment A: Skid Steer with Breaker 1 980.00 980.00 10/11/2019 TRUCKING A: Haul off & Disposal 1 450.00 450.00 10/11/2019 DEMOLITION B: Sawcut roughly 12" off the fence line from ~5' west of the area inlet to the dugout then north to the grass. Break out and remove concrete highlighted in orange in the attachment. Remove ADA ramp and sunken curb and gutter. Form and Pour new sidewalk and Curb & Gutter, slope sidewalk to integral drain pan shown in the attached drawing. 500 10.00 5,000.00 10/11/2019 Structural Fill / Base Course B: Import & Placement of Structural Base Course 100 2.50 250.00 10/11/2019 Equipment B: Skid Steer with Breaker 1 980.00 980.00 10/11/2019 TRUCKING B: Haul off & Disposal 1 450.00 450.00 10/11/2019 Discount DISCOUNT if options A & B are selected (reduces the trucking, import and equipment cost) 0 -1,500.00 0.00 DocuSign Envelope ID: 15555233-CD80-409A-B6B3-0EF2C38C58B1 NOTES: - See attachment for area map - Areas of work will be taped off with caution tape, expected duration if all options are selected. - Fort Collins Parks to remove and relocate all irrigation heads, and mark new irrigation lines to prevent us from staking them with our form stakes. -Expected Durations -- A: one - two days -- B: one - two day --If all selected: two - three days EXCLUSIONS: - Winter Conditions - Overtime / After Hours Work - Traffic Control - Landscaping of any kind (Unmarked irrigation lines may be hit by form stakes) - Irrigation Work - Caulking - Pumping - Colored Concrete - Truncated domes TOTAL $17,485.00 Accepted By Accepted Date DocuSign Envelope ID: 15555233-CD80-409A-B6B3-0EF2C38C58B1 Remove curb between these points, replace with drop down, driveway curb Remove all concrete, grass, rock in shaded area, adjust, improve & compact subgrade, pour new concrete. Top of slab to meet bottom of split face CMU. Slope away from building ADA ramp Remove existing concrete at shaded location. Adjust grade and replace sidewalk so it slopes into dark red shaded drain pan Remove ADA Ramp, replace curb and gutter to correct the low flow line have drain pan dump into gutter at this location. A B DocuSign Envelope ID: 15555233-CD80-409A-B6B3-0EF2C38C58B1