HomeMy WebLinkAboutRFP - 9135 BUILDING COMMISSIONING SERVICESRFP 9135 Building Commissioning Services Page 1 of 46 REQUEST FOR PROPOSAL 9135 BUILDING COMMISSIONING SERVICES RFP DUE: 3:00 PM MST (our clock), May 13, 2020 The City of Fort Collins is requesting proposals from qualified firms to provide building commissioning services, as requested, on a per project basis. This RFP may be used for federal and non-federal funded projects. Building commissioning services shall be aligned with the City of Fort Collins Design Standards Section 01 91 00-Commissioning. While all qualified firms are encouraged to submit proposals, awarded proposers must be on the approved Commissioning (Cx) and Retro Commissioning (R-Cx) vendor list for Fort Collins Utilities/Platte River Power Authority prior to performing work under this Agreement. Currently approved vendors and instructions for being included on the approved R-Cx and Cx vendor list are found at the following link: https://www.fcgov.com/utilities/business/improve-efficiency/rebates- incentives/integrated-design-assistance/ As part of the City’s commitment to Sustainable Purchasing, proposals should be submitted online through the Rocky Mountain E-Purchasing System (RMEPS) at http://www.bidnetdirect.com/colorado/city-of-fort-collins. Note: please ensure adequate time to submit proposals through RMEPS. Proposals not submitted by the designated Opening Date and Time will not be accepted by the system. A pre-proposal meeting will be held at 2:00 PM MST on April 27, 2020. The pre-proposal meeting will be hosted on-line via Microsoft Teams. Select or copy/paste the below link into your browser for access to the meeting. Please be prepared to announce your name and mute your microphone: https://teams.microsoft.com/l/meetup- join/19%3ameeting_NDU5ODQ1ZDItZDU1MC00MTQ3LTk0NDUtYzI2YWUxM2FmYzY1%40t hread.v2/0?context=%7b%22Tid%22%3a%2247fa2f5f-0d0a-4a68-b431- 6d1a27b66660%22%2c%22Oid%22%3a%224765df56-fd3a-4dc2-a64c- f90540a0aeba%22%7d Alternatively, the pre-proposal meeting can be accessed via phone at the below call-in and conference ID. This option will only allow you to hear the audio presentation. Call-in number: (970) 628-0892 Conference ID: 408 360 285# All questions should be submitted, in writing via email, to Elliot Dale, Senior Buyer at edale@fcgov.com, with a copy to Project Manager, Stu Reeve, Energy Manager, no later than 5:00 PM MST (our clock) on May 1, 2020. Please format your e-mail to include: RFP 9135 Building Commissioning Services in the subject line. Questions received after this deadline may not be answered. Responses to all questions submitted before the deadline will be addressed in an addendum and posted on the Rocky Mountain E-Purchasing System webpage. Rocky Mountain E-Purchasing System hosted by Bidnet A copy of the RFP may be obtained at http://www.bidnetdirect.com/colorado/city-of-fort-collins. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing RFP 9135 Building Commissioning Services Page 2 of 46 Prohibition of Unlawful Discrimination: The City of Fort Collins, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to 2000d- 4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The City strictly prohibits unlawful discrimination based on an individual’s gender (regardless of gender identity or gender expression), race, color, religion, creed, national origin, ancestry, age 40 years or older, marital status, disability, sexual orientation, genetic information, or other characteristics protected by law. For the purpose of this policy “sexual orientation” means a person’s actual or perceived orientation toward heterosexuality, homosexuality, and bisexuality. The City also strictly prohibits unlawful harassment in the workplace, including sexual harassment. Further, the City strictly prohibits unlawful retaliation against a person who engages in protected activity. Protected activity includes an employee complaining that he or she has been discriminated against in violation of the above policy or participating in an employment discrimination proceeding. The City requires its vendors to comply with the City’s policy for equal employment opportunity and to prohibit unlawful discrimination, harassment and retaliation. This requirement applies to all third-party vendors and their subcontractors at every tier. Public Viewing Copy: The City is a governmental entity subject to the Colorado Open Records Act, C.R.S. §§ 24-72-200.1 et seq. (“CORA”). Any proposals submitted hereunder are subject to public disclosure by the City pursuant to CORA and City ordinances. Vendors may submit one (1) additional complete proposal clearly marked “FOR PUBLIC VIEWING.” In this version of the proposal, the Vendor may redact text and/or data that it deems confidential or proprietary pursuant to CORA. Such statement does not necessarily exempt such documentation from public disclosure if required by CORA, by order of a court of appropriate jurisdiction, or other applicable law. Generally, under CORA trade secrets, confidential commercial and financial data information is not required to be disclosed by the City. Proposals may not be marked “Confidential” or ‘Proprietary’ in their entirety. All provisions of any contract resulting from this request for proposal will be public information. New Vendors: The City requires new Vendors receiving awards from the City to fill out and submit an IRS form W-9 and to register for Direct Deposit (Electronic) payment. If needed, the W-9 form and the Vendor Direct Deposit Authorization Form can be found on the City’s Purchasing website at www.fcgov.com/purchasing under Vendor Reference Documents. Please do not submit with your proposal. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision-making authority concerning such sale or any supervisory authority over the services to be rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited. RFP 9135 Building Commissioning Services Page 3 of 46 Collusive or Sham Proposals: Any proposal deemed to be collusive or a sham proposal will be rejected and reported to authorities as such. Your authorized signature of this proposal assures that such proposal is genuine and is not a collusive or sham proposal. The City of Fort Collins reserves the right to reject any and all proposals and to waive any irregularities or informalities. Utilization of Award by Other Agencies: The City of Fort Collins reserves the right to allow other state and local governmental agencies, political subdivisions, and/or school districts to utilize the resulting award under all terms and conditions specified and upon agreement by all parties. Usage by any other entity shall not have a negative impact on the City of Fort Collins in the current term or in any future terms. The selected Vendor shall be expected to sign the City’s standard Agreement prior to commencing Services (see sample attached to this Proposal). Sincerely, Gerry Paul Purchasing Director RFP 9135 Building Commissioning Services Page 4 of 46 REQUEST FOR PROPOSALS 9135 BUILDING COMMISSIONING SERVICES I. BACKGROUND & OBJECTIVE / OVERVIEW A. Objective The City of Fort Collins is requesting proposals from qualified firms to provide building commissioning services, as requested, on a per project basis. This RFP may be used for federal and non-federal funded projects. Building commissioning services shall be aligned with the City of Fort Collins Design Standards Section 01 91 00-Commissioning. While all qualified firms are encouraged to submit proposals, awarded proposers must be on the approved Commissioning (Cx) and Retro Commissioning (R-Cx) vendor list for Fort Collins Utilities/Platte River Power Authority prior to performing work under this Agreement. Currently approved vendors and instructions for being included on the approved R-Cx and Cx vendor list are found at the following link: https://www.fcgov.com/utilities/business/improve-efficiency/rebates- incentives/integrated-design-assistance/ Because this solicitation may be used for federally funded projects, proposals must NOT include pricing. The City will follow Brooks Act procedures and negotiate direct labor and overhead with the most qualified Professional(s). Proposals that include fees will be deemed non-responsive and cannot be considered. No established Disadvantaged Business Enterprise (DBE) goal has been established for this RFP. DBE participation goals may be established for individual Federally funded Work Orders. The Agreement will be effective for a period of one year from the date on the Professional Services Agreement and will be renewable for four (4) additional one-year terms at the option of the City and the Professional. Established rates and fees shall remain the fixed for the first renewal term. B. Background Building commissioning is a comprehensive and systematic process to verify that the systems and building envelope of a new construction project perform as designed to meet the Owner’s requirements. The approach to commissioning is to form a cooperative commissioning team involving the Owner, design team and general contractor and appropriate subcontractors to design and deliver effective, efficient, high performance buildings. Commissioning is a structured process to verify and document that applicable building systems and building envelope meet the design intent and owner’s operational requirements. The Professional is involved in design reviews, construction documents review, design intent and basis of design documentation, and a variety of functional testing tasks and performance verification. A common objective of all these activities is to identify and resolve operational and performance issues at the earliest possible time, because to do so saves time and money. RFP 9135 Building Commissioning Services Page 5 of 46 Design and construction document reviews identify and resolve construction, operation and maintenance issues before they can become physical mechanical problems. Construction observation and pre-functional inspection checklists formalize the start-up process, ensuring that equipment or systems are ready for acceptance testing. Functional performance testing becomes a management tool for the Owner to fully understand the “completion stage” of a facility construction process and associated acceptance and payment procedures. Short-term monitoring and data logging shall ensure that the installed system equipment and building envelope performs optimally, and that the functional performance testing process did not miss identifying operation performance problems. As a formal process, commissioning identifies and resolves operational and performance problems during the design, construction, equipment start-up and acceptance phases of a project. Another benefit of a formal commissioning process is the active participation of the building’s operation and maintenance (O&M) staff in the commissioning process. The O&M staff’s participation in the commissioning activities support their efforts to operate and maintain the commissioned systems at peak performance. COMMISSIONING STATEMENT OF WORK The building commissioning services shall be provided during the design, construction, acceptance and warranty phases of the project as described below. These services shall be undertaken in cooperation coordination with the building Owner, the architectural and engineering design team, the general contractor, the involved subcontractors, various equipment suppliers, and the building operation and maintenance staff. Building systems that may be commissioned include, but are not limited to, all mechanical systems, plumbing systems, HVAC, fans, motors, pumps, electrical systems, lighting, and building envelope. II. SCOPE OF SERVICES A. Scope of Work DESIGN PHASE COMMISSIONING ACTIVITIES The Professional shall consider all aspects of the design from the Owner’s (building operation and maintenance staff) perspective. The Professional, in cooperation with the design team, will undertake the following activities: 1. Develop Owner’s Project Requirements In collaboration with the City of Fort Collins, Architect, and the design team, the Professional will develop the Owner’s Project Requirements (OPR). The purpose of this document is to provide clear and concise documentation of the Owners goals, expectations, and requirements for building systems, and shall be utilized throughout the project as the baseline for comparison of design and performance criteria. The OPR will require an overall review of the City’s Design Standards and alignment specific to each project. 2. Design review of construction documents a. Design review at 30% design development: The 30% design development review seeks to identify building system and building envelope design issues and potential operation and maintenance issues that RFP 9135 Building Commissioning Services Page 6 of 46 should be addressed during the design development phase of the project. At this phase in the design phase, the building system and building envelope designs are being defined, and many decisions crucial to overall building performance, operations and maintenance are being made. This review is designed to adequately determine whether the targeted building systems and building envelope are likely to meet the design goals. Coordination with the energy modeler is expected by the Professional. Confirmation that design components meet the City of Fort Collins Design Standards are the responsibility of the Professional. b. Design review at 70% construction documents: The 70% construction documents review is undertaken to ensure that each building system and building envelope being commissioned can be commissioned, and that these systems will meet the design goals, the Owner’s needs, operational and maintenance requirements, and various equipment and system controls criteria. Confirmation that design components meet the City of Fort Collins Design Standards are the responsibility of the Professional. c. Design review at 95% construction documents: This review focuses on determining if the construction documents and related contract documents contain sufficient detail and are adequately specified to fully define the operational requirements of the project. The 95% construction document review is undertaken to ensure that the design achieves the major goals relative to functionality, energy performance, maintainability, and indoor environmental quality. Coordination with the energy modeler is expected by the Professional. Confirmation that design components meet the City of Fort Collins Design Standards are the responsibility of the Professional. 3. Develop commissioning specifications In cooperation with the design team, the Professional shall prepare and incorporate commissioning specifications into the construction documents. The commissioning specifications describe the scope and requirements for commissioning, building envelope commissioning, as well as the roles and responsibilities of the general contractor, installing subcontractors, Owner personnel and the Professional. Substantial Completion of the City of Fort Collins requires Professional and Owner approval. 4. Prepare preliminary Commissioning Plan and Schedule The Commissioning Plan describes the implementation of the commissioning process and provides a framework for integration of commissioning activities into the construction and acceptance process. The Commissioning Plan also provides an agenda for organizing and focusing the commissioning scoping meeting. The Commissioning Plan expands to incorporate more information as the design, construction and start-up phases of the facility are completed. The Commissioning Plan will be developed by the Professional and will be updated during the construction and warranty phases. The commissioning schedule will be generated by the Professional and will include all project milestones and commissioning milestones. The schedule will clearly indicate the order of events that are required for proper execution of the commissioning process. Substantial Completion requires Professional and Owner approval. CONSTRUCTION PHASE COMMISSIONING ACTIVITIES RFP 9135 Building Commissioning Services Page 7 of 46 1. Conduct commissioning scoping meeting The scoping meeting brings together all members of the design and construction team that will be involved in the commissioning process. Each building system to be commissioned is addressed, including its intended operation, commissioning requirements, plus completion and start-up schedules. During the scoping meeting, all parties agree on the scope of work, tasks, schedules, deliverables and responsibilities for implementation of the Commissioning Plan. 2. Review submittals Submittals are reviewed prior to construction. The scope includes all submittals related to equipment and systems to be commissioned. The submittals are reviewed for compliance with construction documents and the design goals. Temperature control submittals are carefully reviewed to ensure that all information is provided for a fully functional and efficient system. Confirmation that all submittals meet the City of Fort Collins Design Standards are the responsibility of the Professional. 3. Building automation system interface and approved submittal coordination meeting Coordinate a meeting with the Owner’s representatives, mechanical engineer, building automation system provider, general contractor, and architect regarding specific point to point sequence of operation of designed HVAC equipment operation and any interface to lighting systems, once applicable submittals have been approved. 4. Create pre-functional inspection checklists and functional performance test plans Pre-Functional Inspection Checklists are developed for all major equipment and systems being commissioned (including the building envelope). The checklists capture equipment nameplate and characteristics data and confirm the as-built status of the equipment or system. The checklists include equipment start-up requirements, either from the manufacturer or installing subcontractor. 5. Create functional performance test plans Functional performance plans are written to ensure that all systems are run through the complete sequence of operation. The functional testing plans are reviewed by the design team, Owner and installing subcontractor(s) before they are implemented in the Acceptance Phase. 6. Verify pre-functional inspection checklists The pre-functional inspection checklists, completed by the installing subcontractors, are verified for completeness and accuracy. The verification step is one of several prerequisites to the start of functional performance testing during the acceptance phase. Include the Owner’s representatives in witnessing pre-functional testing with a one-week notice prior to the testing. 7. Conduct construction observation On-site observations are conducted throughout construction progress as necessary to verify compliance with design, standard field practices and manufacturer’s installation and start-up instructions and recommendations, compliance with the design intent and meeting the requirements for efficient operation and maintenance. Testing, adjusting and balancing (TAB) observation will verify TAB methods and procedures on both airside and waterside systems. Commissioning will also include verification of the TAB as a prerequisite to substantial completion. The verification procedure will spot check air and water flow rates at locations selected by the commissioning engineer. Regularly RFP 9135 Building Commissioning Services Page 8 of 46 scheduled meetings are held for site coordination, reporting on construction and commissioning progress and resolution of any identified issues or deficiencies. Construction observation activities will be coordinated with the Owner’s operation and maintenance staff to facilitate their participation in the commissioning process and familiarize them with the building systems that they ultimately will be required to operate and maintain. 8. Witness equipment startup Equipment start-up should always be performed by the manufacturer’s representative, but also requires the attendance of the appropriate mechanical engineer and Professional to verify that proper startup procedure has occurred, and the equipment is operating per the specification requirements. Include the Owner’s representatives in witnessing pre- functional testing with a one-week notice prior to the testing. ACCEPTANCE PHASE COMMISSIONING ACTIVITIES 1. Complete functional performance testing Under the supervision of the Professional’s staff, the installing contractor/subcontractor performs the hardware and/or software manipulations defined in the function performance test plan. The Owner’s operation and maintenance staff should also be present in order to witness and/or assist in system manipulations and observations. The Professional’s staff directs witnesses and records the results of functional performance testing. Testing occurs on all systems being commissioned. 2. Document deficiencies All deficiencies identified during progress site inspections, the function performance test and other verification testing activities are documented and reported to the Owner, the general contractor, and the installing subcontractor. The deficiency report includes all details of the components or systems found to be non-compliant with the parameters of the test plans and contract documents. The report details the adjustments or alterations required for correcting the system operation and identifies the responsible party. 3. Review operation & maintenance manuals and training programs The Operation and Maintenance (O&M) manuals are reviewed for completeness, usefulness, and for adherence to the requirements of the specifications. The General Contractor is responsible for providing training in their specific areas. The Professional will help to organize and facilitate the training schedule with both the Owner’s operation and maintenance staff and the General Contractor. The agenda for staff training programs is reviewed. Materials may be added, or requested from the subcontractors, to stress and enhance the importance of system interactions, troubleshooting and long-term preventative maintenance and operation. Training sessions for commissioned systems will be attended and videotaped by the commissioning engineer, with careful coordination with the Owner’s operation and maintenance staff. 4. Substantial Completion Confirm all commissioning activities are complete and all systems under the commissioning contract are complete per the project design. Include the design team, general contractor, Owner, building automation contractor, HVAC contractor, and electric contractor to confirm Substantial Completion requirements are met. 5. Complete commissioning report and LEED documentation RFP 9135 Building Commissioning Services Page 9 of 46 A final Commissioning Report is compiled which summarizes all of the tasks, findings and documentation of the commissioning process. The report addresses the actual performance of the building systems in reference to the design intent and construction documents. Documentation of Warranty Phase commissioning activities is added to the report after the warranty period is complete. The Commissioning Report includes: a. An evaluation of the operating condition of the systems at the time of functional test completion b. Deficiencies that were discovered and the measures taken to correct them c. Functional test procedures and results d. Reports that document all commissioning field activities as they progressed, and a description and estimated schedule of required deferred testing e. LEED Documentation: Documentation shall certify the LEED section for Building Systems Commissioning f. Re-commissioning management manual as required for LEED credits WARRANTY PHASE COMMISSIONING ACTIVITIES The Warranty Phase activities will be coordinated with the building Owner’s operation and maintenance staff to facilitate their participation in the commissioning process, and to provide a more robust understanding of the operation and performance of the commissioned building systems. 1. Review as-built documentation The as-built documentation is reviewed to verify consistency with field conditions. The as- built documentation includes control schematics and sequences of operation. 2. Complete seasonal testing (Per LEED and Design Standard) Seasonal variation in operations or control strategies may require additional testing during the opposite season to verify performance of the HVAC system and controls. During the warranty period, seasonal testing and other deferred testing is completed as required to fully test all sequences of operation. 3. Complete end-of-warranty review At the end of the warranty period, the Professional will conduct a review of system operation, including interviews with building occupants and the operation and maintenance staff. USGBC – LEED CERTIFICATION Sustainable Design The City of Fort Collins’ goal is that each new construction project will be designed using the U.S. Green Building Council’s (USGBC) LEEDTM Green Building Rating System to achieve at least a “Gold” level certification with the most current and appropriate rating system for the project. The commissioning Professional shall perform all services with the intent of achieving this standard. The City of Fort Collins also recognizes Designed to Earn the ENERGY STAR and ENERGY STAR Certification as a measure of high- performance excellence. RFP 9135 Building Commissioning Services Page 10 of 46 B. Deliverables Design Phase • Owner’s Project Requirements Document (OPR) • 30% Design Development Phase design review • 70% Construction Documents design review • Commissioning specifications • Preliminary Commissioning Plan with schedule • 95% Construction Documents design review Construction Phase • Commissioning kick-off meeting • Commissioning scoping meeting minutes • Submittal Review Reports, as appropriate • Building envelope site visits • Building automation system and approved submittal coordination meeting • Pre-functional checklists for all equipment and systems to be commissioned • Coordination with Owner representatives • Construction Observation Reports • Deficiency Reports Acceptance Phase • Functional Performance Testing Reports • Coordination with Owner representatives • Deficiency Reports • Operation and Maintenance review • Operation and Maintenance training agenda reviews • Preventive maintenance database • Commissioning Report • LEED commissioning certification documents Warranty Phase • As-built Documentation Review Report • Seasonal Testing Reports • Coordination with Owner representatives • End of Warranty period review C. Minimum Qualifications Approved Cx and R-Cx vendor for Fort Collins Utilities/Platte River Power Authority. D. Anticipated Schedule The following represents the City’s target schedule for the RFP. The City reserves the right to amend the target schedule at any time. • RFP issuance: April 21, 2020 RFP 9135 Building Commissioning Services Page 11 of 46 • Pre-Proposal Meeting: 2:00 PM MST on April 27, 2020 • Question deadline: 5:00 PM MST on May 1, 2020 • Proposal due date: 3:00 MST (our clock) on May 13, 2020 • Interviews (tentative): Week of May 25, 2020 • Award of Contract (tentative): Week of May 25, 2020 E. Interviews In addition to submitting a written proposal, the top-rated Vendors may be interviewed by the RFP assessment team and asked to participate in an oral presentation to provide an overview of the company, approach to the project and to address questions. The evaluation criteria for the oral interviews will be the same as the criteria for the written evaluations and is included in Section IV. Because of recent events involving COVID-19, the City may use non-traditional methods for the optional interview phase of the assessment process. The City will receive and score written proposals. However, instead of traditional in-person interviews for the optional interview session, the City may opt to use alternate methods including, but not limited to remote interviews through a platform such as Microsoft Teams or Zoom. F. Travel & Expenses Vendors are to provide a list of fees for reimbursable expenses. Reasonable expenses will be reimbursable per the current rates found at www.gsa.gov. G. Subcontractors Vendors will be responsible for identifying any subcontractors in their proposal. Please note that the City will contract solely with the awarded Vendor; therefore subcontractors will be the responsibility of the Vendor. H. Laws and Regulations The Vendor agrees to comply fully with all applicable local, State of Colorado and Federal laws and regulations and municipal ordinances. I. Work Orders The awarded Vendor(s) will be expected to sign the City’s standard Work Order type Professional Services Agreement, a sample of which is attached as Section VI for reference purposes. In the event that the City has agreements with multiple Vendors, the City may request proposals from all awarded Vendors for individual work assignments. The City reserves the right to enter into a Work Order with the Vendor of their choice at their sole option. Individual work assignments will be requested and agreed to utilizing the City’s standard Work Order (included in the agreement). Each Work Order form must include a start and completion date, total cost and a general summary of work. Subsequent supporting documentation pages may include a project schedule, deliverables, hours, cost detail supporting total cost, and personnel details. Fees outlined in the work order will conform with those submitted in the RFP response and subsequently included in the contract. RFP 9135 Building Commissioning Services Page 12 of 46 No work order over $5,000 will be considered valid until signed, at a minimum, by the Vendor, project manager and Purchasing Department representative. Depending on the cost and nature of the work, additional signature authorization may be required. Any changes to the dates, cost or scope of any Work Order must be agreed upon in writing utilizing the City’s Change Order (included in the agreement) and will not be considered valid until signed, at a minimum, by the Vendor, project manager and Purchasing Department representative. J. Invoicing and Payment Invoices should be emailed monthly to invoices@fcgov.com and the Project Manager. The cost of the work completed shall be paid to the Vendor each month following the submittal of a correct invoice by the Vendor indicating the project name, Purchase Order number, task description, hours worked, personnel/work type category, hourly rate for each employee/work type category, date of the work performed specific to the task, percentage of that work that has been completed by task, 3rd party supporting documentation with the same detail and a brief progress report. Payments will be made using the prices listed on the agreed-to Price Schedule. In the event a service is requested which is not listed on the Price Schedule, the Vendor and the City will negotiate an appropriate unit price for the service prior to Consultant initiating such work. The City pays invoices on Net 30 terms. RFP 9135 Building Commissioning Services Page 13 of 46 III. PROPOSAL SUBMITTAL Please limit the total length of your proposal to a maximum of twenty (20) double sided or forty (4) single sided 8 ½ x 11” pages (excluding cover pages, table of contents, dividers and Vendor Statement form – Section V). Font shall be a minimum of 10 Arial and margins are limited to no less than .5” for sides and top/bottom. Extended page sizes, such as 11” x 17”, count as a single page. Please, no embedded documents. Proposals that do not conform to these requirements may be rejected The responses shall be considered technical offers of what Vendors propose to provide and shall be incorporated in the contract award as deemed appropriate by the City. A proposal that does not include all the information required may be deemed non-responsive and subject to rejection. The City of Fort Collins shall not reimburse any firm for costs incurred in the preparation and presentation of their proposal. A. Cover Letter / Executive Summary The Executive Summary should highlight the content of the proposal and features of the program offered, including a general description of the program and any unique aspects or benefits provided by your firm. Indicate your availability to participate in the interviews/demonstrations on the proposed dates as stated in the Schedule section. B. Vendor Information 1. Describe your firm’s business and background 2. Number of years in the business 3. Details about ownership 4. An overview of services offered and experience providing commissioning services described in the RFP 5. Size of the firm 6. Location(s) of offices. If multiple, please identify which will be the primary for our account. 7. Primary contact information for the company including contact name(s) and title(s), mailing address(s), phone number(s), and email address(s). Complete Section V, Vendor Statement. C. Scope of Proposal 1. Provide a detailed narrative of the proposed services. The narrative should include any options that may be beneficial for the City to consider. 2. Describe how the project would be managed and who would have primary responsibility for its timely and professional completion. 3. Describe the methods and timeline of communication your firm will use with the City’s Project Manager and other parties. 4. Include a description of the software and other analysis tools to be used. 5. Identify what portion of work, if any, may be subcontracted. D. Firm Capability RFP 9135 Building Commissioning Services Page 14 of 46 1. Provide an Organization Chart/Proposed Project Team: An organization chart containing the names of all key personnel and sub consultants with titles and their specific task assignment for this project. Include a notation for the ones who are DBE certified. 2. State your firm’s commitment to, and experience with, integrated, high-performance buildings and sustainable design. List six (6) projects completed within the past five years and the scope of your commissioning services that have involved the staff proposed to work under this project. 3. Describe your firm’s experience with the US Green Building Council’s LEED™ Green Building Rating System and the ENERGY STAR Certification and Rating System. 4. Provide references from three or more organizations or municipalities, which have used your firm for “similar services” within the past five years. Submit the following information relative to each reference listed: a. Name and address of referenced user or client. b. Name, title, email address and telephone number of contact person for referenced user or client. c. A description of services provided for the referenced user or client. d. Dates/time frame in which services were provided for the referenced user or client. The Professional authorizes City to verify any and all information contained in the Professional’s submittal from references contained herein, and hereby releases all those concerned providing information as a reference from any liability in connection with any information they give. 5. The City of Fort Collins operates Johnson Controls Metasys (BAS) and Distech building automation systems. Describe your firm’s experience with these specific operating systems. E. Assigned Personnel 1. List of Project Personnel: This list should include the identification of the contact person with primary responsibility for this Agreement, the personnel proposed for this Agreement, and any supervisory personnel, including partners and/or sub consultants, and their individual areas of responsibility. 2. Provide a resume for each key professional and technical staff assigned to the project, including partners and/or sub consultants. Please limit resumes to one page. 3. Describe any unique capabilities/experience your key staff will bring to the commissioning effort. F. Availability 1. Describe the availability of project personnel to participate in this project in the context of your other commitments. 2. Are other qualified personnel available to assist in meeting the project schedule if required? G. Sustainability/TBL Methodology RFP 9135 Building Commissioning Services Page 15 of 46 In concise terms (no more than two pages), please describe how your organization strives to be sustainable. Address how your firm incorporates Triple Bottom Line (TBL) into the workplace. See Section IV: Review and Assessment for additional information. Please highlight areas of opportunity in the project where sustainability could be applied and/or improved. H. Certification Regarding Lobbying Vendor shall review, sign and submit with their proposal the Certification Regarding Lobbying found in Section VI. I. Additional Information Provide any information that distinguishes Vendor from its competition and any additional information applicable to this RFP that might be valuable in assessing Vendor’s proposal. Explain any concerns Vendor may have in maintaining objectivity in recommending the best solution. All potential conflicts of interest must be disclosed. Exceptions to the Scope of Services and City Agreement (a sample of which is attached in Section VII) shall be documented. RFP 9135 Building Commissioning Services Page 16 of 46 IV. REVIEW AND ASSESSMENT CRITERIA A. Proposal and Interview Criteria Professional firms will be evaluated on the following criteria. These criteria will be the basis for review and assessment of the written proposals and optional interview session. At the discretion of the City, interviews of the top-rated Vendors may be conducted. Final score may include evaluation of elements from the written proposal and interview. The rating scale shall be from 1 to 5, with 1 being a poor rating, 3 being an average rating, and 5 being an outstanding rating. WEIGHTING FACTOR QUALIFICATION STANDARD 3.0 Scope of Proposal Does the proposal address all elements of the RFP? Does the proposal show an understanding of the project objectives, methodology to be used and results/outcomes required by the project? Are there any exceptions to the specifications, Scope of Work, or agreement? 2.0 Assigned Personnel Do the persons who will be working on the project have the necessary skills and qualifications? Are sufficient people of the requisite skills and qualifications assigned to the project? 1.0 Availability Can the work be completed in the necessary time? Can the target start and completion dates be met? Are other qualified personnel available to assist in meeting the project schedule if required? Is the project team available to attend meetings as required by the Scope of Work? 3.0 Firm Capability Does the firm have the resources, financial strength, capacity and support capabilities required to successfully complete the project on-time and in- budget? Has the firm successfully completed previous projects of this type and scope? Is the firm capable of meeting DBE participation by being a DBE firm or partnering with a DBE-certified sub-consultant? 1.0 Sustainability/TBL Methodology Does the firm demonstrate a commitment to Sustainability and incorporate Triple Bottom Line methodology in both their Scope of Work for the project, and their day-to-day business operating processes and procedures? Definitions Sustainable Purchasing is a process for selecting products or services that have a lesser or reduced negative effect on human health and the environment when compared with RFP 9135 Building Commissioning Services Page 17 of 46 competing products or services that serve the same purpose. This process is also known as “Environmentally Preferable Purchasing” (EPP), or “Green Purchasing”. The Triple Bottom Line (TBL) is an accounting framework that incorporates three dimensions of performance: economic, or financial; environmental, and social. The generally accepted definition for TBL is that it “captures the essence of sustainability by measuring the impact of an organization’s activities on the world…including both its profitability and shareholders values and its social, human, and environmental capital.” B. Reference Evaluation Criteria Prior to award, the Project Manager will check references using the following criteria. Negative responses from references may impact the award determination. CRITERIA STANDARD QUESTIONS Overall Performance Would you hire this Vendor again? Did they show the skills required by this project? Timetable Was the original Scope of Work completed within the specified time? Were interim deadlines met in a timely manner? Completeness Was the Vendor responsive to client needs; did the Vendor anticipate problems? Were problems solved quickly and effectively? Budget Was the original Scope of Work completed within the project budget? Job Knowledge If a study, did it meet the Scope of Work? If Vendor administered a construction contract, was the project functional upon completion and did it operate properly? Were problems corrected quickly and effectively? RFP 9135 Building Commissioning Services Page 18 of 46 V. VENDOR STATEMENT Vendor hereby acknowledges receipt of the City of Fort Collins Request for Proposal and acknowledges that it has read and agrees to be fully bound by all of the terms, conditions and other provisions set forth in the RFP. Additionally, Vendor hereby makes the following representations to City: a. All of the statements and representations made in this proposal are true to the best of the Vendor’s knowledge and belief. b. Vendor commits that it is able to meet the terms provided in this proposal. c. This proposal is a firm and binding offer, for a period of 90 days from the date hereof. d. Vendor further agrees that the method of award is acceptable. e. Vendor has signed and included in their proposal the Certificate Regarding Lobbying (Section VI). f. Vendor also agrees to complete the proposed Agreement with the City of Fort Collins within 30 days of notice of award. If contract is not completed and signed within 30 days, City reserves the right to cancel and award to the next highest rated firm. g. Vendor acknowledge receipt of addenda. Legal Firm Name: Physical Address: Remit to Address: Phone: Name of Authorized Agent of Firm: Signature of Authorized Agent: Primary Contact for Project: Title: Email Address: Phone: Cell Phone: NOTE: VENDOR STATEMENT IS TO BE SIGNED & RETURNED WITH YOUR PROPOSAL. Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 19 of 46 VI. CERTIFICATION REGARDING LOBBYING Certification for Contracts, Grants, Loans, and Cooperative Agreements The undersigned [Contractor] certifies, to the best of his or her knowledge and belief, that: (1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. (2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for making lobbying contacts to an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form--LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions [as amended by "Government wide Guidance for New Restrictions on Lobbying," 61 Fed. Reg. 1413 (1/19/96). Note: Language in paragraph (2) herein has been modified in accordance with Section 10 of the Lobbying Disclosure Act of 1995 (P.L. 104-65, to be codified at 2 U.S.C. 1601, et seq.)] (3) The undersigned shall require that the language of this certification be included in the award documents for all subawards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31, U.S.C. § 1352 (as amended by the Lobbying Disclosure Act of 1995). Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. [Note: Pursuant to 31 U.S.C. § 1352(c)(1)-(2)(A), any person who makes a prohibited expenditure or fails to file or amend a required certification or disclosure form shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such expenditure or failure.] The Contractor, ________________ ___, certifies or affirms the truthfulness and accuracy of each statement of its certification and disclosure, if any. In addition, the Contractor understands and agrees that the provisions of 31 U.S.C. A 3801, et seq., apply to this certification and disclosure, if any. __________________________ Signature of Contractor's Authorized Official __________________________ Name and Title of Contractor's Authorized Official ___________________________ Date Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 20 of 46 VII. SAMPLE AGREEMENT (FOR REFERENCE ONLY – DO NOT SIGN ) PROFESSIONAL SERVICES AGREEMENT WORK ORDER TYPE THIS AGREEMENT made and entered into the day and year set forth below by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and , hereinafter referred to as the "Professional". WITNESSETH: In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows: 1. Scope of Services. The Professional agrees to provide services in accordance with any project Work Orders for , issued by the City. A blank sample of a work order is attached hereto as Exhibit A, consisting of ( ) page(s) and is incorporated herein by this reference. A general scope of services is attached hereto as Exhibit C, consisting of ( ) page(s) and is incorporated herein by this reference. The City reserves the right to independently bid any project rather than issuing a Work Order to the Professional for the same pursuant to this Agreement. Irrespective of references in Exhibit A to certain named third parties, the Professional shall be solely responsible for performance of all duties hereunder. The term “Work” as used in this Agreement shall include the services and deliverables contained in Exhibit A and any Work Orders issued by the City. The City may, at any time during the term of a particular Work Order and without invalidating such Work Order, make changes to the scope of the particular services. Such changes shall be agreed upon in writing by the parties by Change Order, a sample of which is attached hereto as Exhibit B, consisting of one (1) page and incorporated herein by this reference. 2. The Work Schedule. The services to be performed pursuant to this Agreement shall be performed in accordance with the Work Schedule stated on each Work Order. 3. Time of Commencement and Completion of Services. The services to be performed pursuant to this Agreement shall be initiated as specified on each Work Order. Time is of the essence. Any extensions of any time limit must be agreed upon in writing by the parties hereto. 4. Contract Period. This Agreement shall commence , 20 , and shall continue in full force and effect until , 20 , unless sooner terminated as herein provided. In addition, at the option of the City, the Agreement may be extended for additional one year periods not to exceed four (4) additional one year periods. Renewals and pricing changes shall be negotiated by and agreed to by both parties. Written notice of renewal shall be provided to the Professional and mailed no later than thirty (30) days prior to contract end. Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 21 of 46 5. Early Termination by City/Notice. Notwithstanding the time periods contained herein, the City may terminate this Agreement at any time without cause by providing written notice of termination to the Professional. Such notice shall be delivered at least fifteen (15) days prior to the termination date contained in said notice unless otherwise agreed in writing by the parties. All notices provided under this agreement shall be effective when mailed, postage prepaid and sent to the following address: Professional: City: Copy to: Attn: City of Fort Collins Attn: PO Box 580 Fort Collins, CO 80522 City of Fort Collins Attn: Purchasing Dept. PO Box 580 Fort Collins, CO 80522 In the event of any such early termination by the City, the Professional shall be paid for services rendered prior to the date of termination subject only to the satisfactory performance of the Professional's obligations under this Agreement. Such payment shall be the Professional's sole right and remedy for such termination. 6. Design, Project Insurance and Insurance Responsibility. The Professional shall be responsible for the professional quality, technical accuracy, timely completion and the coordination of all services rendered by the Professional, including but not limited to designs, plans, reports, specifications, and drawings and shall, without additional compensation, promptly remedy and correct any errors, omissions, or other deficiencies. The Professional shall indemnify, save and hold harmless the City its officers and employees, in accordance with Colorado law, from all damages whatsoever claimed by third parties against the City and for the City's costs and reasonable attorney’s fees arising directly or indirectly out of the Professional's negligent performance of any of the services furnished under this Agreement. The Professional shall maintain insurance in accordance with Exhibit E, consisting of one (1) page, attached hereto and incorporated herein. 7. Compensation. In consideration of services to be performed pursuant to this Agreement, the City agrees to pay the Professional on a time and reimbursable direct cost basis designated in Exhibit D, consisting of ( ) page(s), attached hereto and incorporated herein by this reference. At the election of the City, each Work Order may contain a maximum fee, which shall be negotiated by the parties hereto for each such Work Order. Monthly partial payments based upon the Professional's billings and itemized statements are permissible. The amounts of all such partial payments shall be based upon the Professional's City-verified progress in completing the services to be performed pursuant to the Work Order and upon approval of the Professional's direct reimbursable expenses. Final payment shall be made following acceptance of the Work by the City. Upon final payment, all designs, plans, reports, specifications, drawings, and other services rendered by the Professional shall become the sole property of the City. 8. License. Upon execution of this Agreement, the Professional grants to the City an irrevocable license to use any and all sketches, drawings, specifications, designs, blueprints, data files, calculations, studies, analysis, renderings, models and other Work Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 22 of 46 Order deliverables (the “Instruments of Service”), in any form whatsoever and in any medium expressed, for purposes of constructing, using, maintaining, altering and adding to the project, provided that the City substantially performs its obligations under the Agreement. The license granted hereunder permits the City and third parties reasonably authorized by the City to reproduce applicable portions of the Instruments of Service for use in performing services or construction for the project. In addition, the license granted hereunder shall permit the City and third parties reasonably authorized by the City to reproduce and utilize the Instruments of Service for similar projects, provided however, in such event the Professional shall not be held responsible for the design to the extent the City deviates from the Instruments of Service. This license shall survive termination of the Agreement by default or otherwise. 9. City Representative. The City will designate, prior to commencement of the Work, its project representative who shall make, within the scope of his or her authority, all necessary and proper decisions with reference to the project. All requests for contract interpretations, change orders, and other clarification or instruction shall be directed to the City Representative. 10. Project Drawings. Upon request and before final payment, the Professional shall provide the City with reproducible drawings of the project containing accurate information on the project as constructed. Drawings shall be of archival quality, prepared on stable mylar base material using a non-fading process to provide for long storage and high quality reproduction. "CD" disc of the as-built drawings shall also be submitted to the owner in and AutoCAD version no older than the established City standard. The Professional acknowledges the City is a governmental entity subject to the Colorado Open Records Act, C.R.S. §§ 24-72-200.1, et seq. (the “CORA”), and documents in the City’s possession may be considered public records subject to disclosure under the CORA. 11. Monthly Report. Commencing thirty (30) days after Notice to Proceed is given on any Work Order and every thirty days thereafter, the Professional is required to provide the City Representative with a written report of the status of the Work with respect to the Work Order, Work Schedule and other material information. Failure to provide any required monthly report may, at the option of the City, suspend the processing of any partial payment request. 12. Independent Contractor. The services to be performed by the Professional are those of an independent contractor and not of an employee of the City of Fort Collins. The City shall not be responsible for withholding any portion of the Professional's compensation hereunder for the payment of FICA, Workers' Compensation, other taxes or benefits or for any other purpose. 13. Subcontractors. The Professional may not subcontract any of the Work set forth in the Exhibit A, Statement of Work without the prior written consent of the city, which shall not be unreasonably withheld. If any of the Work is subcontracted hereunder (with the consent of the City), then the following provisions shall apply: (a) the subcontractor must be a reputable, qualified firm with an established record of successful performance in its respective trade Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 23 of 46 performing identical or substantially similar work, (b) the subcontractor will be required to comply with all applicable terms of this Agreement, (c) the subcontract will not create any contractual relationship between any such subcontractor and the City, nor will it obligate the City to pay or see to the payment of any subcontractor, and (d) the Work of the subcontractor will be subject to inspection by the City to the same extent as the Work of the Professional. The Professional shall require all subcontractors performing Work hereunder to maintain insurance coverage naming the City as an additional insured under this Agreement of the type and with the limits specified within Exhibit E, consisting of one (1) page attached hereto and incorporated herein by this reference. The Professional shall maintain a copy of each subcontract’s certificate evidencing the required insurance. Upon request, the Professional shall promptly provide the City with a copy of such certificate(s). 14. Personal Services. It is understood that the City enters into this Agreement based on the special abilities of the Professional and that this Agreement shall be considered as an agreement for personal services. Accordingly, the Professional shall neither assign any responsibilities nor delegate any duties arising under this Agreement without the prior written consent of the City. 15. Acceptance Not Waiver. The City's approval of drawings, designs, plans, specifications, reports, and incidental work or materials furnished hereunder shall not in any way relieve the Professional of responsibility for the quality or technical accuracy of the Work. The City's approval or acceptance of, or payment for, any of the services shall not be construed to operate as a waiver of any rights or benefits provided to the City under this Agreement. 16. Default. Each and every term and condition hereof shall be deemed to be a material element of this Agreement. In the event either party should fail or refuse to perform according to the terms of this Agreement, such party may be declared in default. 17. Remedies. In the event a party has been declared in default, such defaulting party shall be allowed a period of ten (10) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to (a) terminate the Agreement and seek damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail himself of any other remedy at law or equity. If the non-defaulting party commences legal or equitable actions against the defaulting party, the defaulting party shall be liable to the non-defaulting party for the non-defaulting party's reasonable attorney fees and costs incurred because of the default. 18. Binding Effect. This writing, together with the exhibits hereto, constitutes the entire Agreement between the parties and shall be binding upon said parties, their officers, employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. 19. Law/Severability. The laws of the State of Colorado shall govern the construction, interpretation, execution and enforcement of this Agreement. In the event any provision of Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 24 of 46 this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such holding shall not invalidate or render unenforceable any other provision of this Agreement. 20. Prohibition Against Employing Illegal Aliens. Pursuant to Section 8-17.5-101, C.R.S., et. seq., the Professional represents and agrees that: a. As of the date of this Agreement: 1. The Professional does not knowingly employ or contract with an illegal alien who will perform work under this Agreement; and 2. The Professional will participate in either the e-Verify program created in Public Law 208, 104th Congress, as amended, and expanded in Public Law 156, 108th Congress, as amended, administered by the United States Department of Homeland Security (the “e-Verify Program”) or the Department Program (the “Department Program”), an employment verification program established pursuant to Section 8- 17.5-102(5)(c) C.R.S. in order to confirm the employment eligibility of all newly hired employees to perform work under this Agreement. b. The Professional shall not knowingly employ or contract with an illegal alien to perform work under this Agreement or knowingly enter into a contract with a subcontractor that knowingly employs or contracts with an illegal alien to perform work under this Agreement. c. The Professional is prohibited from using the e-Verify Program or Department Program procedures to undertake pre-employment screening of job applicants while this Agreement is being performed. d. If the Professional obtains actual knowledge that a subcontractor performing work under this Agreement knowingly employs or contracts with an illegal alien, the Professional shall: 1. Notify such subcontractor and the City within three days that the Professional has actual knowledge that the subcontractor is employing or contracting with an illegal alien; and 2. Terminate the subcontract with the subcontractor if within three days of receiving the notice required pursuant to this section the subcontractor does not cease employing or contracting with the illegal alien; except that the Professional shall not terminate the contract with the subcontractor if during such three days the subcontractor provides information to establish that the subcontractor has not knowingly employed or contracted with an illegal alien. e. The Professional shall comply with any reasonable request by the Colorado Department of Labor and Employment (the “Department”) made in the course of an investigation that the Department undertakes or is undertaking pursuant to the authority established in Subsection 8-17.5-102 (5), C.R.S. Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 25 of 46 f. If the Professional violates any provision of this Agreement pertaining to the duties imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If this Agreement is so terminated, the Professional shall be liable for actual and consequential damages to the City arising out of the Professional’s violation of Subsection 8-17.5-102, C.R.S. g. The City will notify the Office of the Secretary of State if Professional violates this provision of this Agreement and the City terminates the Agreement for such breach. 21. Special Provisions. Special provisions or conditions relating to the services to be performed pursuant to this Agreement are set forth in Exhibit F - Confidentiality, consisting of one (1) page, attached hereto and incorporated herein by this referenced and Exhibit G - Federal Transit Administration Federally Required and Other Model Contract Clauses, consisting of eleven (11) pages, attached hereto and incorporated herein by this reference. Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 26 of 46 THE CITY OF FORT COLLINS, COLORADO By: Gerry Paul Purchasing Director DATE: ATTEST: APPROVED AS TO FORM: PROFESSIONAL'S NAME By: Printed: Title: CORPORATE PRESIDENT OR VICE PRESIDENT Date: Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 27 of 46 EXHIBIT A WORK ORDER FORM PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND PROFESSIONAL'S NAME WORK ORDER NUMBER: PROJECT TITLE: ORIGINAL BID/RFP NUMBER & NAME: MASTER AGREEMENT EFFECTIVE DATE: Original Contract Date WORK ORDER COMMENCEMENT DATE: WORK ORDER COMPLETION DATE: MAXIMUM FEE: (time and reimbursable direct costs): PROJECT DESCRIPTION/SCOPE OF SERVICES: Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of ( ) page(s) are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. PROFESSIONAL: Date: Name, Title ACCEPTANCE: Date: Name, Project Manager REVIEWED: Date: Name, Buyer or Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 28 of 46 EXHIBIT B CHANGE ORDER NO. PROJECT TITLE: PROFESSIONAL: Company Name WORK ORDER NUMBER: PO NUMBER: DESCRIPTION: 1. Reason for Change: Why is the change required? 2. Description of Change: Provide details of the changes to the Work 3. Change in Work Order Price: 4. Change in Work Order Time: ORIGINAL WORK ORDER PRICE $ .00 TOTAL APPROVED CHANGE ORDER .00 TOTAL PENDING CHANGE ORDER .00 TOTAL THIS CHANGE ORDER .00 TOTAL % OF THIS CHANGE ORDER % TOTAL C.O.% OF ORIGINAL WORK ORDER % ADJUSTED WORK ORDER COST $ .00 PROFESSIONAL: Date: Name, Title ACCEPTANCE: Date: Name, Project Manager REVIEWED: Date: Name, Buyer or Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 29 of 46 EXHIBIT C GENERAL SCOPE OF SERVICES Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 30 of 46 EXHIBIT D (BID SCHEDULE/COMPENSATION) Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 31 of 46 EXHIBIT E INSURANCE REQUIREMENTS 1. The Professional will provide, from insurance companies acceptable to the City, the insurance coverage designated hereinafter and pay all costs. Before commencing Work under this bid, the Professional shall furnish the City with certificates of insurance showing the type, amount, class of operations covered, effective dates and date of expiration of policies, and containing substantially the following statement: “The insurance evidenced by this Certificate will not reduce coverage or limits and will not be cancelled, except after thirty (30) days written notice has been received by the City of Fort Collins.” In case of the breach of any provision of the Insurance Requirements, the City, at its option, may take out and maintain, at the expense of the Professional, such insurance as the City may deem proper and may deduct the cost of such insurance from any monies which may be due or become due the Professional under this Agreement. The City, its officers, agents and employees shall be named as additional insureds on the Professional 's general liability and automobile liability insurance policies for any claims arising out of Work performed under this Agreement. 2. Insurance coverages shall be as follows: A. Workers' Compensation & Employer's Liability. The Professional shall maintain during the life of this Agreement for all of the Professional's employees engaged in Work performed under this Agreement: 1. Workers' Compensation insurance with statutory limits as required by Colorado law. 2. Employer's Liability insurance with limits of $100,000 per accident, $500,000 disease aggregate, and $100,000 disease each employee. B. Commercial General & Vehicle Liability. The Professional shall maintain during the life of this Agreement such commercial general liability and automobile liability insurance as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of Work under this Agreement. Coverage for property damage shall be on a "broad form" basis. The amount of insurance for each coverage, Commercial General and Vehicle, shall not be less than $1,000,000 combined single limits for bodily injury and property damage. In the event any Work is performed by a subcontractor, the Professional shall be responsible for any liability directly or indirectly arising out of the Work performed under this Agreement by a subcontractor, which liability is not covered by the subcontractor's insurance. C. Errors & Omissions. The Professional shall maintain errors and omissions insurance in the amount of $1,000,000. Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 32 of 46 EXHIBIT F CONFIDENTIALITY IN CONNECTION WITH SERVICES provided to the City of Fort Collins (the “City”) pursuant to this Agreement (the “Agreement”), the Professional hereby acknowledges that it has been informed that the City has established policies and procedures with regard to the handling of confidential information and other sensitive materials. In consideration of access to certain information, data and material (hereinafter individually and collectively, regardless of nature, referred to as “information”) that are the property of and/or relate to the City or its employees, customers or suppliers, which access is related to the performance of services that the Professional has agreed to perform, the Professional hereby acknowledges and agrees as follows: That information that has or will come into its possession or knowledge in connection with the performance of services for the City may be confidential and/or proprietary. The Professional agrees to treat as confidential (a) all information that is owned by the City, or that relates to the business of the City, or that is used by the City in carrying on business, and (b) all information that is proprietary to a third party (including but not limited to customers and suppliers of the City). The Professional shall not disclose any such information to any person not having a legitimate need-to-know for purposes authorized by the City. Further, the Professional shall not use such information to obtain any economic or other benefit for itself, or any third party, except as specifically authorized by the City. The foregoing to the contrary notwithstanding, the Professional understands that it shall have no obligation under this Agreement with respect to information and material that (a) becomes generally known to the public by publication or some means other than a breach of duty of this Agreement, or (b) is required by law, regulation or court order to be disclosed, provided that the request for such disclosure is proper and the disclosure does not exceed that which is required. In the event of any disclosure under (b) above, the Professional shall furnish a copy of this Agreement to anyone to whom it is required to make such disclosure and shall promptly advise the City in writing of each such disclosure. In the event that the Professional ceases to perform services for the City, or the City so requests for any reason, the Professional shall promptly return to the City any and all information described hereinabove, including all copies, notes and/or summaries (handwritten or mechanically produced) thereof, in its possession or control or as to which it otherwise has access. The Professional understands and agrees that the City’s remedies at law for a breach of the Professional’s obligations under this Confidentiality Agreement may be inadequate and that the City shall, in the event of any such breach, be entitled to seek equitable relief (including without limitation preliminary and permanent injunctive relief and specific performance) in addition to all other remedies provided hereunder or available at law. Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 33 of 46 EXHIBIT G FEDERAL TRANSIT ADMINISTRATION FEDERALLY REQUIRED AND OTHER MODEL CONTRACT CLAUSES TABLE OF CONTENTS 1. NO GOVERNMENT OBLIGATION TO THIRD PARTIES ......................................................................... 34 2. PROGRAM FRAUD AND FALSE OR FRAUDULENT STATEMENTS AND RELATED ACTS ....................... 34 3. ACCESS TO RECORDS AND REPORTS ................................................................................................. 34 4. FEDERAL CHANGES ............................................................................................................................ 36 5. CIVIL RIGHTS REQUIREMENTS ........................................................................................................... 36 6. INCORPORATION OF FEDERAL TRANSIT ADMINISTRATION (FTA) TERMS ........................................ 37 7. ENERGY CONSERVATION REQUIREMENTS ........................................................................................ 37 8. TERMINATION ................................................................................................................................... 38 9. GOVERNMENT-WIDE DEBARMENT AND SUSPENSION (NONPROCUREMENT) ................................ 39 10. BREACHES AND DISPUTE RESOLUTION ............................................................................................. 39 11. LOBBYING .......................................................................................................................................... 40 12. CLEAN AIR .......................................................................................................................................... 42 13. CLEAN WATER REQUIREMENTS ........................................................................................................ 42 14. PATENT AND RIGHTS IN DATA .......................................................................................................... 42 15. DISADVANTAGED BUSINESS ENTERPRISE (DBE) ............................................................................... 45 16. ADA ACCESS....................................................................................................................................... 45 17. CITY OF FORT COLLINS BID PROTEST PROCEDURES .......................................................................... 46 Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 34 of 46 1. NO GOVERNMENT OBLIGATION TO THIRD PARTIES No Obligation by the Federal Government. 1. The Purchaser and Contractor acknowledge and agree that, notwithstanding any concurrence by the Federal Government in or approval of the solicitation or award of the underlying contract, absent the express written consent by the Federal Government, the Federal Government is not a party to this contract and shall not be subject to any obligations or liabilities to the Purchaser, Contractor, or any other party (whether or not a party to that contract) pertaining to any matter resulting from the underlying contract. 2. PROGRAM FRAUD AND FALSE OR FRAUDULENT STATEMENTS AND RELATED ACTS (31 U.S.C. 3801 et seq. 49 CFR Part 31 18 U.S.C. 1001 49 U.S.C. 5307) Program Fraud and False or Fraudulent Statements or Related Acts. 1. The Contractor acknowledges that the provisions of the Program Fraud Civil Remedies Act of 1986, as amended, 31 U.S.C. § 3801 et seq. and U.S. DOT regulations, "Program Fraud Civil Remedies," 49 C.F.R. Part 31, apply to its actions pertaining to this Project. Upon execution of the underlying contract, the Contractor certifies or affirms the truthfulness and accuracy of any statement it has made, it makes, it may make, or causes to be made, pertaining to the underlying contract or the FTA assisted project for which this contract work is being performed. In addition to other penalties that may be applicable, the Contractor further acknowledges that if it makes, or causes to be made, a false, fictitious, or fraudulent claim, statement, submission, or certification, the Federal Government reserves the right to impose the penalties of the Program Fraud Civil Remedies Act of 1986 on the Contractor to the extent the Federal Government deems appropriate. 2. The Contractor also acknowledges that if it makes, or causes to be made, a false, fictitious, or fraudulent claim, statement, submission, or certification to the Federal Government under a contract connected with a project that is financed in whole or in part with Federal assistance originally awarded by FTA under the authority of 49 U.S.C. § 5307, the Government reserves the right to impose the penalties of 18 U.S.C. § 1001 and 49 U.S.C. § 5307(n)(1) on the Contractor, to the extent the Federal Government deems appropriate. 3. The Contractor agrees to include the above two clauses in each subcontract financed in whole or in part with Federal assistance provided by FTA. It is further agreed that the clauses shall not be modified, except to identify the subcontractor who will be subject to the provisions. 3. ACCESS TO RECORDS AND REPORTS (49 U.S.C. 5325, 18 CFR 18.36 (i), 49 CFR 633.17) Access to Records - The following access to records requirements apply to this Contract: Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 35 of 46 1. Where the Purchaser is not a State but a local government and is the FTA Recipient or a subgrantee of the FTA Recipient in accordance with 49 C.F.R. 18.36(i), the Contractor agrees to provide the Purchaser, the FTA Administrator, the Comptroller General of the United States or any of their authorized representatives access to any books, documents, papers and records of the Contractor which are directly pertinent to this contract for the purposes of making audits, examinations, excerpts and transcriptions. Contractor also agrees, pursuant to 49 C.F.R. 633.17 to provide the FTA Administrator or his authorized representatives including any PMO Contractor access to Contractor's records and construction sites pertaining to a major capital project, defined at 49 U.S.C. 5302(a)1, which is receiving federal financial assistance through the programs described at 49 U.S.C. 5307, 5309 or 5311. 2. Where the Purchaser is a State and is the FTA Recipient or a subgrantee of the FTA Recipient in accordance with 49 C.F.R. 633.17, Contractor agrees to provide the Purchaser, the FTA Administrator or his authorized representatives, including any PMO Contractor, access to the Contractor's records and construction sites pertaining to a major capital project, defined at 49 U.S.C. 5302(a)1, which is receiving federal financial assistance through the programs described at 49 U.S.C. 5307, 5309 or 5311. By definition, a major capital project excludes contracts of less than the simplified acquisition threshold currently set at $100,000. 3. Where the Purchaser enters into a negotiated contract for other than a small purchase or under the simplified acquisition threshold and is an institution of higher education, a hospital or other non-profit organization and is the FTA Recipient or a subgrantee of the FTA Recipient in accordance with 49 C.F.R. 19.48, Contractor agrees to provide the Purchaser, FTA Administrator, the Comptroller General of the United States or any of their duly authorized representatives with access to any books, documents, papers and record of the Contractor which are directly pertinent to this contract for the purposes of making audits, examinations, excerpts and transcriptions. 4. Where any Purchaser which is the FTA Recipient or a subgrantee of the FTA Recipient in accordance with 49 U.S.C. 5325(a) enters into a contract for a capital project or improvement (defined at 49 U.S.C. 5302(a)1) through other than competitive bidding, the Contractor shall make available records related to the contract to the Purchaser, the Secretary of Transportation and the Comptroller General or any authorized officer or employee of any of them for the purposes of conducting an audit and inspection. 5. The Contractor agrees to permit any of the foregoing parties to reproduce by any means whatsoever or to copy excerpts and transcriptions as reasonably needed. 6. The Contractor agrees to maintain all books, records, accounts and reports required under this contract for a period of not less than three years after the date of termination or expiration of this contract, except in the event of litigation or settlement of claims arising from the performance of this contract, in which case Contractor agrees to maintain same until the Purchaser, the FTA Administrator, the Comptroller General, or any of their duly authorized representatives, have disposed of all such litigation, appeals, claims or exceptions related thereto. Reference 49 CFR 18.39(i)(11). 7. FTA does not require the inclusion of these requirements in subcontracts. Requirements for Access to Records and Reports by Types of Contract Contract Characteristics Operational Service Contract Turnkey Construction Architectural Engineering Acquisition of Rolling Stock Professional Services Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 36 of 46 I State Grantees a. Contracts below SAT ($100,000) None Those imposed on state pass thru to Contractor None None None None b. Contracts above $100,000/Capital Projects None unless1 non-competitive award Yes, if non- competitive award or if funded thru2 5307/5309/5311 None unless non-competitive award None unless non-competitive award None unless non-competitive award II Non State Grantees a. Contracts below SAT ($100,000) Yes 3 Those imposed on state pass thru to Contractor Yes Yes Yes Yes b. Contracts above $100,000/Capital Projects Yes 3 Yes Yes Yes Yes Sources of Authority: 1 49 USC 5325 (a) 2 49 CFR 633.17 3 18 CFR 18.36 (i) 4. FEDERAL CHANGES (49 CFR Part 18) Federal Changes - Contractor shall at all times comply with all applicable FTA regulations, policies, procedures and directives, including without limitation those listed directly or by reference in the Master Agreement between Purchaser and FTA, as they may be amended or promulgated from time to time during the term of this contract. Contractor's failure to so comply shall constitute a material breach of this contract. 5. CIVIL RIGHTS REQUIREMENTS (29 U.S.C. § 623, 42 U.S.C. § 2000 42 U.S.C. § 6102, 42 U.S.C. § 12112 42 U.S.C. § 12132, 49 U.S.C. § 5332 29 CFR Part 1630, 41 CFR Parts 60 et seq.) Civil Rights - The following requirements apply to the underlying contract: 1. Nondiscrimination - In accordance with Title VI of the Civil Rights Act, as amended, 42 U.S.C. § 2000d, section 303 of the Age Discrimination Act of 1975, as amended, 42 U.S.C. § 6102, section 202 of the Americans with Disabilities Act of 1990, 42 U.S.C. § 12132, and Federal transit law at 49 U.S.C. § 5332, the Contractor agrees that it will not Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 37 of 46 "Office of Federal Contract Compliance Programs, Equal Employment Opportunity, Department of Labor," 41 C.F.R. Parts 60 et seq., (which implement Executive Order No. 11246, "Equal Employment Opportunity," as amended by Executive Order No. 11375, "Amending Executive Order 11246 Relating to Equal Employment Opportunity," 42 U.S.C. § 2000e note), and with any applicable Federal statutes, executive orders, regulations, and Federal policies that may in the future affect construction activities undertaken in the course of the Project. The Contractor agrees to take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, color, creed, national origin, sex, or age. Such action shall include, but not be limited to, the following: employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. In addition, the Contractor agrees to comply with any implementing requirements FTA may issue. b) Age - In accordance with section 4 of the Age Discrimination in Employment Act of 1967, as amended, 29 U.S.C. § § 623 and Federal transit law at 49 U.S.C. § 5332, the Contractor agrees to refrain from discrimination against present and prospective employees for reason of age. In addition, the Contractor agrees to comply with any implementing requirements FTA may issue. c) Disabilities - In accordance with section 102 of the Americans with Disabilities Act, as amended, 42 U.S.C. § 12112, the Contractor agrees that it will comply with the requirements of U.S. Equal Employment Opportunity Commission, "Regulations to Implement the Equal Employment Provisions of the Americans with Disabilities Act," 29 C.F.R. Part 1630, pertaining to employment of persons with disabilities. In addition, the Contractor agrees to comply with any implementing requirements FTA may issue. 3. The Contractor also agrees to include these requirements in each subcontract financed in whole or in part with Federal assistance provided by FTA, modified only if necessary to identify the affected parties. 6. INCORPORATION OF FEDERAL TRANSIT ADMINISTRATION (FTA) TERMS (FTA Circular 4220.1E) Incorporation of Federal Transit Administration (FTA) Terms - The preceding provisions include, in part, certain Standard Terms and Conditions required by DOT, whether or not expressly set forth in the preceding contract provisions. All contractual provisions required by DOT, as set forth in FTA Circular 4220.1E, are hereby incorporated by reference. Anything to the contrary herein notwithstanding, all FTA mandated terms shall be deemed to control in the event of a conflict with other provisions contained in this Agreement. The Contractor shall not perform any act, fail to perform any act, or refuse to comply with any (name of grantee) requests which would cause (name of grantee) to be in violation of the FTA terms and conditions. 7. ENERGY CONSERVATION REQUIREMENTS Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 38 of 46 (42 U.S.C. 6321 et seq. 49 CFR Part 18) Energy Conservation - The contractor agrees to comply with mandatory standards and policies relating to energy efficiency which are contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation Act. 8. TERMINATION (49 U.S.C. Part 18 FTA Circular 4220.1E) a. Termination for Convenience (General Provision) The (Recipient) may terminate this contract, in whole or in part, at any time by written notice to the Contractor when it is in the Government's best interest. The Contractor shall be paid its costs, including contract close-out costs, and profit on work performed up to the time of termination. The Contractor shall promptly submit its termination claim to (Recipient) to be paid the Contractor. If the Contractor has any property in its possession belonging to the (Recipient), the Contractor will account for the same, and dispose of it in the manner the (Recipient) directs. b. Termination for Default [Breach or Cause] (General Provision) If the Contractor does not deliver supplies in accordance with the contract delivery schedule, or, if the contract is for services, the Contractor fails to perform in the manner called for in the contract, or if the Contractor fails to comply with any other provisions of the contract, the (Recipient) may terminate this contract for default. Termination shall be effected by serving a notice of termination on the contractor setting forth the manner in which the Contractor is in default. The contractor will only be paid the contract price for supplies delivered and accepted, or services performed in accordance with the manner of performance set forth in the contract. If it is later determined by the (Recipient) that the Contractor had an excusable reason for not performing, such as a strike, fire, or flood, events which are not the fault of or are beyond the control of the Contractor, the (Recipient), after setting up a new delivery of performance schedule, may allow the Contractor to continue work, or treat the termination as a termination for convenience. c. Opportunity to Cure (General Provision) The (Recipient) in its sole discretion may, in the case of a termination for breach or default, allow the Contractor [an appropriately short period of time] in which to cure the defect. In such case, the notice of termination will state the time period in which cure is permitted and other appropriate conditions If Contractor fails to remedy to (Recipient)'s satisfaction the breach or default of any of the terms, covenants, or conditions of this Contract within [ten (10) days] after receipt by Contractor of written notice from (Recipient) setting forth the nature of said breach or default, (Recipient) shall have the right to terminate the Contract without any further obligation to Contractor. Any such termination for default shall not in any way operate to preclude (Recipient) from also pursuing all available remedies against Contractor and its sureties for said breach or default. d. Waiver of Remedies for any Breach In the event that (Recipient) elects to waive its remedies for any breach by Contractor of any covenant, term or condition of this Contract, such waiver by (Recipient) shall not limit (Recipient)'s remedies for any succeeding breach of that or of any other term, covenant, or condition of this Contract. Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 39 of 46 i. Termination for Convenience or Default (Architect and Engineering) The (Recipient) may terminate this contract in whole or in part, for the Recipient's convenience or because of the failure of the Contractor to fulfill the contract obligations. The (Recipient) shall terminate by delivering to the Contractor a Notice of Termination specifying the nature, extent, and effective date of the termination. Upon receipt of the notice, the Contractor shall (1) immediately discontinue all services affected (unless the notice directs otherwise), and (2) deliver to the Contracting Officer all data, drawings, specifications, reports, estimates, summaries, and other information and materials accumulated in performing this contract, whether completed or in process. If the termination is for the convenience of the Recipient, the Contracting Officer shall make an equitable adjustment in the contract price but shall allow no anticipated profit on unperformed services. If the termination is for failure of the Contractor to fulfill the contract obligations, the Recipient may complete the work by contact or otherwise and the Contractor shall be liable for any additional cost incurred by the Recipient. If, after termination for failure to fulfill contract obligations, it is determined that the Contractor was not in default, the rights and obligations of the parties shall be the same as if the termination had been issued for the convenience of the Recipient. 9. GOVERNMENT-WIDE DEBARMENT AND SUSPENSION (NONPROCUREMENT) Suspension and Debarment This contract is a covered transaction for purposes of 49 CFR Part 29. As such, the contractor is required to verify that none of the contractor, its principals, as defined at 49 CFR 29.995, or affiliates, as defined at 49 CFR 29.905, are excluded or disqualified as defined at 49 CFR 29.940 and 29.945. The contractor is required to comply with 49 CFR 29, Subpart C and must include the requirement to comply with 49 CFR 29, Subpart C in any lower tier covered transaction it enters into. By signing and submitting its bid or proposal, the bidder or proposer certifies as follows: The certification in this clause is a material representation of fact relied upon by the City of Fort Collins. If it is later determined that the bidder or proposer knowingly rendered an erroneous certification, in addition to remedies available to the City of Fort Collins, the Federal Government may pursue available remedies, including but not limited to suspension and/or debarment. The bidder or proposer agrees to comply with the requirements of 49 CFR 29, Subpart C while this offer is valid and throughout the period of any contract that may arise from this offer. The bidder or proposer further agrees to include a provision requiring such compliance in its lower tier covered transactions. 10. BREACHES AND DISPUTE RESOLUTION (49 CFR Part 18FTA Circular 4220.1E) Disputes - Disputes arising in the performance of this Contract which are not resolved by agreement of the parties shall be decided in writing by the authorized representative of (Recipient)'s [title of employee]. This decision shall be final and conclusive unless within Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 40 of 46 [ten (10)] days from the date of receipt of its copy, the Contractor mails or otherwise furnishes a written appeal to the [title of employee]. In connection with any such appeal, the Contractor shall be afforded an opportunity to be heard and to offer evidence in support of its position. The decision of the [title of employee] shall be binding upon the Contractor and the Contractor shall abide be the decision. Performance During Dispute - Unless otherwise directed by (Recipient), Contractor shall continue performance under this Contract while matters in dispute are being resolved. Claims for Damages - Should either party to the Contract suffer injury or damage to person or property because of any act or omission of the party or of any of his employees, agents or others for whose acts he is legally liable, a claim for damages therefor shall be made in writing to such other party within a reasonable time after the first observance of such injury of damage. Remedies - Unless this contract provides otherwise, all claims, counterclaims, disputes and other matters in question between the (Recipient) and the Contractor arising out of or relating to this agreement or its breach will be decided by arbitration if the parties mutually agree, or in a court of competent jurisdiction within the State in which the (Recipient) is located. Rights and Remedies - The duties and obligations imposed by the Contract Documents and the rights and remedies available thereunder shall be in addition to and not a limitation of any duties, obligations, rights and remedies otherwise imposed or available by law. No action or failure to act by the (Recipient), (Architect) or Contractor shall constitute a waiver of any right or duty afforded any of them under the Contract, nor shall any such action or failure to act constitute an approval of or acquiescence in any breach thereunder, except as may be specifically agreed in writing. 11. LOBBYING (31 U.S.C. 1352 49 CFR Part 19 49 CFR Part 20) Clause and specific language therein are mandated by 49 CFR Part 19, Appendix A. Modifications have been made to the Clause pursuant to Section 10 of the Lobbying Disclosure Act of 1995, P.L. 104-65 [to be codified at 2 U.S.C. § 1601, et seq.] - Lobbying Certification and Disclosure of Lobbying Activities for third party contractors are mandated by 31 U.S.C. 1352(b)(5), as amended by Section 10 of the Lobbying Disclosure Act of 1995, and DOT implementing regulation, "New Restrictions on Lobbying," at 49 CFR § 20.110(d) - Language in Lobbying Certification is mandated by 49 CFR Part 19, Appendix A, Section 7, which provides that contractors file the certification required by 49 CFR Part 20, Appendix A. Modifications have been made to the Lobbying Certification pursuant to Section 10 of the Lobbying Disclosure Act of 1995. - Use of "Disclosure of Lobbying Activities," Standard Form-LLL set forth in Appendix B of 49 CFR Part 20, as amended by "Government wide Guidance For New Restrictions on Lobbying," 61 Fed. Reg. 1413 (1/19/96) is mandated by 49 CFR Part 20, Appendix A. Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 41 of 46 Byrd Anti-Lobbying Amendment, 31 U.S.C. 1352, as amended by the Lobbying Disclosure Act of 1995, P.L. 104-65 [to be codified at 2 U.S.C. § 1601, et seq.] - Contractors who apply or bid for an award of $100,000 or more shall file the certification required by 49 CFR part 20, "New Restrictions on Lobbying." Each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant or any other award covered by 31 U.S.C. 1352. Each tier shall also disclose the name of any registrant under the Lobbying Disclosure Act of 1995 who has made lobbying contacts on its behalf with non- Federal funds with respect to that Federal contract, grant or award covered by 31 U.S.C. 1352. Such disclosures are forwarded from tier to tier up to the recipient. APPENDIX A, 49 CFR PART 20--CERTIFICATION REGARDING LOBBYING Certification for Contracts, Grants, Loans, and Cooperative Agreements (To be submitted with each bid or offer exceeding $100,000) The undersigned [Contractor] certifies, to the best of his or her knowledge and belief, that: (1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. (2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for making lobbying contacts to an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form--LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions [as amended by "Government wide Guidance for New Restrictions on Lobbying," 61 Fed. Reg. 1413 (1/19/96). Note: Language in paragraph (2) herein has been modified in accordance with Section 10 of the Lobbying Disclosure Act of 1995 (P.L. 104-65, to be codified at 2 U.S.C. 1601, et seq.)] (3) The undersigned shall require that the language of this certification be included in the award documents for all subawards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31, U.S.C. § 1352 (as amended by the Lobbying Disclosure Act of 1995). Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. [Note: Pursuant to 31 U.S.C. § 1352(c)(1)-(2)(A), any person who makes a prohibited expenditure or fails to file or amend a required certification or disclosure form shall be subject Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 42 of 46 to a civil penalty of not less than $10,000 and not more than $100,000 for each such expenditure or failure.] The Contractor, ________________ ___, certifies or affirms the truthfulness and accuracy of each statement of its certification and disclosure, if any. In addition, the Contractor understands and agrees that the provisions of 31 U.S.C. A 3801, et seq., apply to this certification and disclosure, if any. __________________________ Signature of Contractor's Authorized Official __________________________ Name and Title of Contractor's Authorized Official ___________________________ Date 12. CLEAN AIR (42 U.S.C. 7401 et seq, 40 CFR 15.61, 49 CFR Part 18) Clean Air - (1) The Contractor agrees to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act, as amended, 42 U.S.C. §§ 7401 et seq. The Contractor agrees to report each violation to the Purchaser and understands and agrees that the Purchaser will, in turn, report each violation as required to assure notification to FTA and the appropriate EPA Regional Office. (2) The Contractor also agrees to include these requirements in each subcontract exceeding $100,000 financed in whole or in part with Federal assistance provided by FTA. 13. CLEAN WATER REQUIREMENTS (33 U.S.C. 1251) Clean Water - (1) The Contractor agrees to comply with all applicable standards, orders or regulations issued pursuant to the Federal Water Pollution Control Act, as amended, 33 U.S.C. 1251 et seq. The Contractor agrees to report each violation to the Purchaser and understands and agrees that the Purchaser will, in turn, report each violation as required to assure notification to FTA and the appropriate EPA Regional Office. (2) The Contractor also agrees to include these requirements in each subcontract exceeding $100,000 financed in whole or in part with Federal assistance provided by FTA. 14. PATENT AND RIGHTS IN DATA (37 CFR Part 401, 49 CFR Parts 18 and 19) CONTRACTS INVOLVING EXPERIMENTAL, DEVELOPMENTAL, OR RESEARCH WORK. A. Rights in Data - These following requirements apply to each contract involving experimental, developmental or research work: (1) The term "subject data" used in this clause means recorded information, whether or not copyrighted, that is delivered or specified to be delivered under the contract. The term includes graphic or pictorial delineation in media such as drawings or photographs; text in specifications or related performance or design-type Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 43 of 46 documents; machine forms such as punched cards, magnetic tape, or computer memory printouts; and information retained in computer memory. Examples include, but are not limited to: computer software, engineering drawings and associated lists, specifications, standards, process sheets, manuals, technical reports, catalog item identifications, and related information. The term "subject data" does not include financial reports, cost analyses, and similar information incidental to contract administration. (2) The following restrictions apply to all subject data first produced in the performance of the contract to which this Attachment has been added: (a) Except for its own internal use, the Purchaser or Contractor may not publish or reproduce subject data in whole or in part, or in any manner or form, nor may the Purchaser or Contractor authorize others to do so, without the written consent of the Federal Government, until such time as the Federal Government may have either released or approved the release of such data to the public; this restriction on publication, however, does not apply to any contract with an academic institution. (b) In accordance with 49 C.F.R. § 18.34 and 49 C.F.R. § 19.36, the Federal Government reserves a royalty-free, non-exclusive and irrevocable license to reproduce, publish, or otherwise use, and to authorize others to use, for "Federal Government purposes," any subject data or copyright described in subsections (2)(b)1 and (2)(b)2 of this clause below. As used in the previous sentence, "for Federal Government purposes," means use only for the direct purposes of the Federal Government. Without the copyright owner's consent, the Federal Government may not extend its Federal license to any other party. 1. Any subject data developed under that contract, whether or not a copyright has been obtained; and 2. Any rights of copyright purchased by the Purchaser or Contractor using Federal assistance in whole or in part provided by FTA. (c) When FTA awards Federal assistance for experimental, developmental, or research work, it is FTA's general intention to increase transportation knowledge available to the public, rather than to restrict the benefits resulting from the work to participants in that work. Therefore, unless FTA determines otherwise, the Purchaser and the Contractor performing experimental, developmental, or research work required by the underlying contract to which this Attachment is added agrees to permit FTA to make available to the public, either FTA's license in the copyright to any subject data developed in the course of that contract, or a copy of the subject data first produced under the contract for which a copyright has not been obtained. If the experimental, developmental, or research work, which is the subject of the underlying contract, is not completed for any reason whatsoever, all data developed under that contract shall become subject data as defined in subsection (a) of this clause and shall be delivered as the Federal Government may direct. This subsection (c) , however, does not apply to adaptations of automatic data processing equipment or programs for the Purchaser or Contractor's use whose costs are financed in whole or in part with Federal assistance provided by FTA for transportation capital projects. (d) Unless prohibited by state law, upon request by the Federal Government, the Purchaser and the Contractor agree to indemnify, save, and hold harmless the Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 44 of 46 Federal Government, its officers, agents, and employees acting within the scope of their official duties against any liability, including costs and expenses, resulting from any willful or intentional violation by the Purchaser or Contractor of proprietary rights, copyrights, or right of privacy, arising out of the publication, translation, reproduction, delivery, use, or disposition of any data furnished under that contract. Neither the Purchaser nor the Contractor shall be required to indemnify the Federal Government for any such liability arising out of the wrongful act of any employee, official, or agents of the Federal Government. (e) Nothing contained in this clause on rights in data shall imply a license to the Federal Government under any patent or be construed as affecting the scope of any license or other right otherwise granted to the Federal Government under any patent. (f) Data developed by the Purchaser or Contractor and financed entirely without using Federal assistance provided by the Federal Government that has been incorporated into work required by the underlying contract to which this Attachment has been added is exempt from the requirements of subsections (b), (c), and (d) of this clause, provided that the Purchaser or Contractor identifies that data in writing at the time of delivery of the contract work. (g) Unless FTA determines otherwise, the Contractor agrees to include these requirements in each subcontract for experimental, developmental, or research work financed in whole or in part with Federal assistance provided by FTA. (3) Unless the Federal Government later makes a contrary determination in writing, irrespective of the Contractor's status (i.e., a large business, small business, state government or state instrumentality, local government, nonprofit organization, institution of higher education, individual, etc.), the Purchaser and the Contractor agree to take the necessary actions to provide, through FTA, those rights in that invention due the Federal Government as described in U.S. Department of Commerce regulations, "Rights to Inventions Made by Nonprofit Organizations and Small Business Firms Under Government Grants, Contracts and Cooperative Agreements," 37 C.F.R. Part 401. (4) The Contractor also agrees to include these requirements in each subcontract for experimental, developmental, or research work financed in whole or in part with Federal assistance provided by FTA. B. Patent Rights - The following requirements apply to each contract involving experimental, developmental, or research work: (1) General - If any invention, improvement, or discovery is conceived or first actually reduced to practice in the course of or under the contract to which this Attachment has been added, and that invention, improvement, or discovery is patentable under the laws of the United States of America or any foreign country, the Purchaser and Contractor agree to take actions necessary to provide immediate notice and a detailed report to the party at a higher tier until FTA is ultimately notified. (2) Unless the Federal Government later makes a contrary determination in writing, irrespective of the Contractor's status (a large business, small business, state government or state instrumentality, local government, nonprofit organization, institution of higher education, individual), the Purchaser and the Contractor agree to take the necessary actions to provide, through FTA, those rights in that invention Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 45 of 46 due the Federal Government as described in U.S. Department of Commerce regulations, "Rights to Inventions Made by Nonprofit Organizations and Small Business Firms Under Government Grants, Contracts and Cooperative Agreements," 37 C.F.R. Part 401. (3) The Contractor also agrees to include the requirements of this clause in each subcontract for experimental, developmental, or research work financed in whole or in part with Federal assistance provided by FTA. 15. DISADVANTAGED BUSINESS ENTERPRISE (DBE) (49 CFR Part 26) of DBE subcontracting participation when specific contract goals have been established. Disadvantaged Business Enterprises a. This contract is subject to the requirements of Title 49, Code of Federal Regulations, Part 26, Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs. The national goal for participation of Disadvantaged Business Enterprises (DBE) is 10%. The agency’s overall goal for DBE participation is 2%. A contract goal has not been established for this procurement. b. The contractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of this DOT-assisted contract. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the City of Fort Collins deems appropriate. Each subcontract the contractor signs with a subcontractor must include the assurance in this paragraph (see 49 CFR 26.13(b)). c. The successful bidder/offeror will be required to report its DBE participation obtained through race-neutral means throughout the period of performance. d. The contractor is required to pay its subcontractors performing work related to this contract for satisfactory performance of that work no later than 30 days after the contractor’s receipt of payment for that work from the City of Fort Collins. In addition, the contractor may not hold retainage from its subcontractors and is required to return any retainage payments to those subcontractors within 30 days after the subcontractor's work related to this contract is satisfactorily completed. e. The contractor must promptly notify the City of Fort Collins whenever a DBE subcontractor performing work related to this contract is terminated or fails to complete its work, and must make good faith efforts to engage another DBE subcontractor to perform at least the same amount of work. The contractor may not terminate any DBE subcontractor and perform that work through its own forces or those of an affiliate without prior written consent of the City of Fort Collins. 16. ADA ACCESS Accessibility. Facilities to be used in public transportation service must comply with 42 U.S.C. Sections 12101 et seq. and DOT regulations, “Transportation Services for Individuals with Disabilities (ADA),” 49 CFR Part 37; and Joint ATBCB/DOT regulations, “Americans with Disabilities (ADA) Accessibility Specifications for Transportation Vehicles,” 36 CFR Part 1192 and 49 CFR Part 38. Notably, DOT incorporated by Official Purchasing Document Last updated 10/2017 RFP 9135 Building Commissioning Services Page 46 of 46 reference the ATBCB’s “Americans with Disabilities Act Accessibility Guidelines” (ADAAG), revised July 2004, which include accessibility guidelines for buildings and facilities, and are incorporated into Appendix A to 49 CFR Part 37. DOT also added specific provisions to Appendix A modifying the ADAAG, with the result that buildings and facilities must comply with both the ADAAG and amendments thereto in Appendix A to 49 CFR Part 37. 17. CITY OF FORT COLLINS BID PROTEST PROCEDURES The City of Fort Collins has a protest procedure, covering any phase of solicitation or award, including but not limited to specification or award. The protest procedures are available from the Purchasing Department, City of Fort Collins, 215 N. Mason, Street, 2nd Floor, P. O. Box 580, Fort Collins, CO. 80522. You may also request a copy of the procedures by emailing: Purchasing@fcgov.com or calling 970-221-6775. discriminate against any employee or applicant for employment because of race, color, creed, national origin, sex, age, or disability. In addition, the Contractor agrees to comply with applicable Federal implementing regulations and other implementing requirements FTA may issue. 2. Equal Employment Opportunity - The following equal employment opportunity requirements apply to the underlying contract: a) Race, Color, Creed, National Origin, Sex - In accordance with Title VII of the Civil Rights Act, as amended, 42 U.S.C. § 2000e, and Federal transit laws at 49 U.S.C. § 5332, the Contractor agrees to comply with all applicable equal employment opportunity requirements of U.S. Department of Labor (U.S. DOL) regulations,