Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 8859 GM/GC SERVICES FOR WILLOW STREET IMPROVEMENTSWork Order Form Official Purchasing Form Last updated 10/2017 WORK ORDER FORM PURSUANT TO A MASTER AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND CONNELL RESOURCES, INC WORK ORDER NUMBER: 1-254902204-20 PROJECT TITLE: Willow Street Improvements ORIGINAL BID/RFP NUMBER & NAME: 8859-CMGC for Willow Improvements MASTER AGREEMENT EFFECTIVE DATE: March 15, 2019 WORK ORDER COMMENCEMENT DATE: January 01, 2020 WORK ORDER COMPLETION DATE: March 15, 2020 MAXIMUM FEE: (time and reimbursable direct costs): $50,904.50 PROJECT DESCRIPTION/SCOPE OF SERVICES: Linden Bridge Lighting. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Master Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Master Agreement and this Work Order (including the attached forms) the Master Agreement shall control. The attached forms consisting of ( ) page(s) are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given after all parties have signed this document. SERVICE PROVIDER: Date: Roland Tremble, Project Manager ACCEPTANCE: Date: Nicole Hahn, Project Manager REVIEWED: Date: Elliot Dale, Buyer or Senior Buyer ACCEPTANCE: Date: Gerry Paul, Purchasing Director (if greater than $60,000) DocuSign Envelope ID: 0D55C398-D21C-4D6C-8EC3-753A66706FE9 1/6/2020 1/7/2020 1/6/2020 Cost Detail With Pricing Project Name: Linden Bridge Lighting Customer: City Of Fort Collins - Engineering Job Number: Billing Address: 281 North College Avenue Bid As: Fort Collins, CO 80522 Estimator: Roland Tremble Phone: 970-221-66227 Project Address: Linden Bridge Over The Poudre River, Fort Collins, CO Contact: Nicole Hahn Completion Date: Pay Items Unit Total Description Quantity UM Direct Cost Direct Cost Unit Price Total Price Percent Margin 201-001 - Clear And Grub, Pioneer Access To The River For Man Lift 1.00 LS $3,434.94 $3,434.94 $3,950.19 $3,950.19 13.04% Man Hours: 38.75 MH/LS 38.75 RMV-Clear And Grub 1.00 ACRE $3,434.94 $3,434.94 Man Hours: 38.75 MH/ACRE 38.75 RMV-Removal Haul - Clearing 1.00 LOAD $324.15 $324.15 Man Hours: 2.25 MH/LOAD 2.25 Dump Fee - Clearing- LC Landfill 1.00 LOAD $92.48 $92.48 RMV-Removal Haul (8.00 LOAD/DY, 0.13 DY) 1.00 LOAD $231.67 $231.67 Truck - Tractor W/ Trailer [2] 1.13 HR $69.62 $156.65 DR - Truck Driver [2] 1.13 HR $33.35 $75.03 Clear And Grub 1.00 ACRE $3,110.79 $3,110.79 Man Hours: 36.50 MH/ACRE 36.50 EX-Clear & Grub - Heavy (1.00 ACRE/DY, 1.00 DY) 1.00 ACRE $3,110.79 $3,110.79 Loader CAT 966, 970, 972 9.00 HR $95.25 $857.25 Pickup 9.50 HR $10.00 $95.00 LA - Laborer 9.00 HR $28.22 $253.94 OP - Loader, Large 9.00 HR $40.40 $363.59 Foreman - Grading 9.50 HR $44.50 $422.74 Excavator KOM 200 / 210 / 228 / 308 9.00 HR $83.00 $747.00 OP - Excavator, Small 9.00 HR $41.25 $371.28 212-012 - Landscape Restoration Allowance 1.00 LS $2,500.00 $2,500.00 $2,875.00 $2,875.00 13.04% 613-001 - Electrical Work Total Lump Sum 1.00 LS $32,791.00 $32,791.00 $37,709.65 $37,709.65 13.04% 626-000 - Mobilization / Management / Bond 1.00 LS $5,116.33 $5,116.33 $6,369.66 $6,369.66 13.04% Man Hours: 60.50 MH/LS 60.50 GC-Indirects Local 2.00 WK $2,558.16 $5,116.33 Man Hours: 30.25 MH/WK 60.50 OH-2 Salary Supervision 2.00 WK $1,940.82 $3,881.65 Man Hours: 28.00 MH/WK 56.00 GC-Supervision Site Manager 1.00 WK $2,734.96 $2,734.96 Man Hours: 40.00 MH/WK 40.00 11/27/2019 10:55:10 AM Linden Bridge Lighting 1 DocuSign Envelope ID: 0D55C398-D21C-4D6C-8EC3-753A66706FE9 (Item 626-000 - Mobilization / Management / Bond continued) Unit Total Description Quantity UM Direct Cost Direct Cost Unit Price Total Price Percent Margin GC-Site Manager (1.00 UNIT/DY, 5.00 DY) 5.00 UNIT $546.99 $2,734.96 Pickup 40.00 HR $10.00 $400.00 PM - Site Manager 40.00 HR $58.37 $2,334.96 GC-Supervision Project Manager 2.00 DY $573.34 $1,146.69 Man Hours: 8.00 MH/DY 16.00 GC-Project Manager (1.00 UNIT/DY, 2.00 DY) 2.00 UNIT $573.34 $1,146.69 Pickup 16.00 HR $10.00 $160.00 PM - Project Manager / Estimator 16.00 HR $61.67 $986.69 GC-Roll Off Dumpster 1.00 MO $500.00 $500.00 GC-Mobilization 2.00 LOAD $267.34 $534.68 Man Hours: 2.25 MH/LOAD 4.50 GC-Mobilization (4.00 LOAD/DY, 0.50 DY) 2.00 LOAD $267.34 $534.68 Truck - Low Boy Transport 4.50 HR $80.20 $360.90 DR - Lowboy 4.50 HR $38.62 $173.78 GC-Temp Utility-Sanitary Facility 1.00 MO $200.00 $200.00 Temp Sanitary Facility 1.00 MO $200.00 $200.00 11/27/2019 10:55:10 AM Linden Bridge Lighting 2 DocuSign Envelope ID: 0D55C398-D21C-4D6C-8EC3-753A66706FE9 Direct Cost Totals Indirect Cost Totals Amount Equipment Rented: Direct Cost Percent of Equipment Owned: Materials Owned: Materials Purchased: Labor: Subcontracted: Trucking Owned: Trucking Hired: Miscellaneous: Plug: Direct Cost: Labor: Equipment Owned: Equipment Rented: Materials Owned: Materials Purchased: Subcontracted: Trucking Owned: Trucking Hired: Miscellaneous: Plug: Amount Indirect Cost Percent of Indirect Cost: $4,982.00 $2,776.80 $0.00 $0.00 $32,791.00 $0.00 $0.00 $792.48 $2,500.00 $0.00 $43,842.27 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 11.36% 0.00% 0.00% 74.79% 0.00% 0.00% 1.81% 5.70% 6.33% 0.00% Page 1 LINDEN STREET BRIDGE LIGHTING Electrical Proposal Office: 720.494.8944 Fax: 720.494.9008 8312 Raspberry Way, Suite A Frederick, CO November 21, 2019 Project: Linden Street Bridge Underdeck Lighting – Ft Collins, Colorado Permit Drawings Listed below is our scope of work and pricing for the project listed above. Our proposal is based upon our interpretation of the drawings dated 9.18.19 by Clanton Lighting Design, and the 2017 National Electrical Code. This information is proprietary and confidential and may not be disclosed to others without prior written consent. INCLUSIONS: I. Service Equipment and Feeders: a) Provide and install 100a meter pedestal per City specs. b) Provide and install feed to meter pedestal from box located at top of bridge. c) Provide grounding and bonding per NEC. II. Site Lighting: a) Provide and install Luminaire ARV17 fixtures on underdeck bridging per drawings. b) Install photocell at meter pedestal to control lighting. c) Provide (3) additional trips to adjust output per spec requirements after installation (up to 1 year). III. Site Power: a) Provide service receptacle at meter pedestal per 2/LE04. IV. Inclusions: a) All wiring in to be in PVC and GRC conduit. b) Hand excavation along bridge to meter pedestal. c) Daily Clean up with trash disposed in container by others. d) Lift/aerial equipment for installation over river. EXCLUSIONS: Bret’s Electric specifically excludes the following items from our proposed scope of work: I. Formed concrete or asphalt construction, repair or disposal (including pole bases, equipment/generator pads, demolition, etc.). II. Asphalt/Concrete coring, cutting, pours and placement. III. Landscape and irrigation repairs (if necessary). IV. We are basing our pricing on a standard 40-hour work week. V. Unforeseen conditions, underground obstructions, engineering omissions and owner changes. VI. Commodity material price escalations. With the ever changing increases in copper pricing we cannot, nor will our suppliers, hold their pricing for more than one week at a time. We hereby propose to furnish labor and materials, complete in accordance with the above scope and clarifications for the sum of: BASE BID: $32,791 If you have any questions regarding our proposal please call me at 720-494-8944 or email justin@bretselectric.com. Any feedback you can provide will be greatly appreciated. Thank you! Sincerely, Justin Martin / Bret’s Electric DocuSign Envelope ID: 0D55C398-D21C-4D6C-8EC3-753A66706FE9 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Man-hours: 99.25 Man-hours: 0.00 Bid Price $50,904.50 $2,213.24 Pay Item Summary Amount Total Bond: Total Indirect Cost: Total Overhead: Total Profit: Total Direct Cost: Total Bid Price: $43,842.27 $0.00 $422.51 $4,426.48 Total DC Adds/Cuts: $0.00 86.13% 0.00% 0.00% 0.83% 8.70% 4.35% Total Overall Cost: $44,264.78 Total Margin: $6,639.72 86.96% 13.04% Percent of Total Man-hours: 99.25 11/27/2019 10:55:10 AM Linden Bridge Lighting 3 DocuSign Envelope ID: 0D55C398-D21C-4D6C-8EC3-753A66706FE9